ML11293A206: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 14: Line 14:
| page count = 91
| page count = 91
}}
}}
=Text=
{{#Wiki_filter:523 1                                United States of America 2                            Nuclear Regulatory Commission 3                                      + + + + +
4                        ATOMIC SAFETY AND LICENSING BOARD PANEL 5                                      HEARING 6
7 8 IN THE MATTER OF                                DOCKET NO: 50-275-LR and 9 PACIFIC GAS & ELECTRIC COMPANY                  50-323-LR 10 (Diablo Canyon Nuclear Power Plant,              ASLBP No. 10-890-01-LR-BD01 11 Units 1 and 2) 12 13 14 15                                      Thursday, 16                                  October 13, 2011 17                                      + + + + +
18                                Rockville, Maryland 19                  The trial commenced in Room T-3B45 of Two White Flint 20            North, Rockville Pike, Rockville, Maryland, at 10:00 a.m.
21 22            BEFORE:
23                  Alex S. Karlin, Chairman 24                  Nicholas G. Trikouros 25                  Dr. Paul B. Abramson 26
524 1 Diablo Canyon Power Plant -- Docket Nos. 50-275-LR and 50-323-LR 2 ORDER (Scheduling Oral Argument) 3 4                  Counsel for Pacific Gas and Electric Company 5                  Winston & Strawn, LLP 6                  101 California Street 7                  San Francisco, CC 94111-5802 8                  David, E. Repka, Esq.
9 10                  Winston & Strawn, LLP 11                  1700 K Street, NW 12                  Washington, DC 20006 13                  Rachel Miras-Wison, Esq.
14 15                  San Luis Obispo Mothers for Peace 16                  1123 Flora Road 17                  Arroyo Grande, CA 93420 18                  Jill ZamEk, Esq.
19 20                  Counsel for San Luis Obispo Mothers for Peace 21                  Harmon, Curran, Spielberg, and Eisenberg 22                  MORGAN, LEWIS & BOCKIUS LLP 23                  1726 M Street, N.W., Suite 600 24                  Washington, DC 20036 25                  Diane Curran, Esq.
525 1                              P-R-O-C-E-E-D-I-N-G-S 2                                                                    1:30 p.m.
3                        CHAIRMAN KARLIN:  Good afternoon. My name is Alex 4 Karlin. We are going on the record, court reporter. This an oral argument in 5 the matter of Pacific Gas & Electric Company application for a renewal of its 6 license for the San Luis Obispo Diablo Canyon nuclear power plants two nuclear 7 reactors. For the record, the docket number of this matter is 50-275-LR and 8 50-323-LR. And the ASLBP number is 10-890-01-LR-BD01. This oral argument is 9 being held pursuant to an order that this court issued on September 30th of this 10 year. Todays date is October 13th. This proceeding is hopefully being 11 webcast.
12            Normally, we try to hold as many of our proceedings in the vicinity 13 of the proposed -- or the existing power plant as possible. Because of the 14 relatively short notice for this particular argument, we decided to hold it 15 here in Washington in our Rockville hearing room. And thus, we have been able 16 to webcast this, hopefully, to the people out West who might be interested in 17 this matter.
18            At this point Id like to introduce -- call for introductions, 19 first of the board. To begin, Im Alex Karlin. Im one of the legal members 20 of judges, and to my right is Dr. Paul Abramson, and to my left is Nick 21 Trikouros. These are other judges. We also have Jonathan Ezer, who is the 22 lawyer and law clerk who is assisting us and other people in the room, 23 including Karen Valloch as an administrative assistant who is helping.
24            The petitioners, San Luis Obispo Mothers for Peace, Ms. Curran, 25 youre sitting there alone, but do you care to introduce your team or yourself.
526 1            DIANE CURRAN:  Good afternoon. Im Diane Curran with the law firm 2 of Harmon, Curran, Spielberg and Eisenberg. And Im her representing the San 3 Luis Obispo Mothers for Peace.
4            CHAIRMAN KARLIN:  Thank you. Now, the applicant is Pacific Gas &
5 Electric. Mr. Repka, would you like to introduce your team?
6            DAVID REPKA:  Yes. My name is David Repka, and Im counsel for 7 Pacific Gas & Electric Company, and with me today is my associate at the law 8 firm of Winston & Strawn. Rachel Miras-Wilson.
9            CHAIRMAN KARLIN:  Okay, thank you. Welcome. And the staff, Ms.
10 Utall?
11            SUSAN UTALL:  Good afternoon. My name is Susan Utall. I am with 12 the Office of General Counsel at the Nuclear Regulatory Commission. I 13 represent the Nuclear Regulatory Commission staff. With me is Richard Harper, 14 also of the Office of General Counsel. Mr. Harper will be presenting the 15 staffs position today.
16            CHAIRMAN KARLIN:  All right, thank you. Before we begin, I think 17 its worth reviewing a little bit of the background of this case. This is a 18 license renewal proceeding, as I mentioned. And the applicant, Pacific Gas &
19 Electric, submitted its application to renew its license in 2009. In January 20 of 2010, the NRC staff issued a notice in the Federal Register informing the 21 public that anyone who had any issues with regard to this proposed license 22 renewal should speak now or forever hold your peace, raise your concerns and 23 request a hearing. And indeed, the San Luis Obispo Mothers for Peace did file 24 a petition for a hearing and five proposed contentions in, I guess it was March 25 2010.
527 1              Pursuant to that request, the parties briefed the contention 2 admissibility and standing issues, and we had an oral argument in San Luis 3 Obispo on this matter in May of 2010, and then in August, issued a decision 4 admitting four of the proposed contentions and finding that one of the -- the 5 fifth contention was not admissible and did not meet the admissibility 6 criteria. Im not going to go into the details of that decision. But it does 7 turn out that the staff and the applicant appealed all or parts of that 8 decision quite promptly in September of 2010. And yesterday, the Commission, 9 14 months later, issued its ruling on the appeals of the admission of those 10 contentions. Essentially the Commission threw out all of the contentions 11 except for one. And so there is still one contention in the proceeding.
12              But thats not why were here today. Today were looking at a new 13 contention that the Mothers for Peace -- and Im going to refer to them as 14 Mothers for Peace, if thats okay. Its a little shorter than San Luis Obispo 15 Mothers for Peace. They recently filed a new contention in August -- August 16 11th of 2011, and its related to the tragic events that occurred in Japan, 17 associated with the Fukushima Daiichi Nuclear Power Plants and the earthquake 18 and the tsunami and then the nuclear power plant problems that occurred out 19 there. And so, thats how we come here today.
20              Now, a little bit of review on that. The Fukushima Daiichi 21 accident and the earthquake and the tsunami occurred on March 11th of 2011. On 22 April 14th of 2011, the Mothers for Peace and others filed a petition with the 23 Commission to suspend all the licensing proceedings in light of the Fukushima 24 Daiichi situation. The Commission did not act upon that for several months.
25 And so, in the meantime, on August 11th, the Mothers for Peace filed this
528 1 contention in this proceeding. And its the similar contention was filed in 2 many other adjudicatory proceedings by boards of reactor cases.
3            But meanwhile, on September 9th, the Commission did rule on the 4 earlier petition to suspend all the proceedings in a decision that were going 5 to call -- or Im going to refer to as COI 11-5. Thats the Commissions 6 decision. And they, among other things, the Commission denied the petition to 7 suspend all the adjudications. And so we are continuing obviously with this 8 adjudication. And thats what were here to do today, is proceed with this 9 adjudication and this contention, this -- what Im sometimes refer to as the 10 Fukushima contention.
11            The purpose of this oral argument is to hear from the lawyers 12 regarding the admissibility of the Fukushima contention. Weve read their 13 briefs. Weve studied the issues. And I think we understand much of what 14 theyve covered, but we have some questions that would help us in trying to 15 decide the admissibility of this contention. And thats important for everyone 16 to know. This proceeding is only dealing with the admissibility of the 17 contention, whether its timely, whether its admissible under the criteria of 18 the NRC regs, 10CFR 2.309 is the particular reg. And it lays out criteria such 19 as the contention must be within the scope of the licensing renewal proceeding.
20 And it must be supported by alleged facts or expert opinion. And there are 21 other relatively technical criteria that a contention must meet in order to be 22 deemed admissible. The point is we are not here to decide the merits of the 23 contention, whether its meritorious, whether it is, in fact -- should be 24 ultimately supported, but only whether its admissible and timely.
25            And we are not here to discuss something else, the decision that
529 1 the Commission issued yesterday regarding the four contentions and the appeal 2 of the four contentions. So I dont see us really confronting or addressing 3 that at all. We have not asked the parties to address that, and I dont think 4 were fully prepared to do that either.
5            So if we find this contention, this Fukushima contention admissible 6 and timely, we would admit it and hold an evidentiary hearing later. This is 7 just the oral argument. So, how are we going to proceed at the moment is that 8 we would ask for the parties to deliver opening statements of not greater than 9 five minutes. Please come to the podium when you do that. Well start with 10 the petitioners, the Mothers for Peace, and then the applicant, Pacific Gas &
11 Electric, and then the staff. After that, we will commence with questions 12 essentially in the same order as the intervener, the applicant and the staff.
13 And we may then ask some rebuttal questions as well.
14            Do either of my colleagues have any additional remarks or -- that 15 they would like to make?
16            NICHOLAS TRIKOUROS:  I dont.
17            DR. PAUL ABRAMSON:  I do.
18            CHAIRMAN KARLIN:  Okay, great.
19            DR. PAUL ABRAMSON:  For the record, Judge Abramson. Let me just 20 ask the lawyers who are here who are going to comment in their pleadings to 21 confine their statements to descriptions of whats in the pleading. Its 22 important because this is oral argument on whats in the pleading. Its not an 23 opportunity to make a new case.
24            CHAIRMAN KARLIN:  Very good. Ms. Curran, please take the podium 25 and --
530 1            DIANE CURRAN:  Thank you. Im very grateful that youve allowed us 2 to make an opening statement because I believe there are many members of the 3 Mothers for Peace in California and other neighbors of the Diablo Canyon plant 4 that are very interested in the outcome of this proceeding, how the contention 5 is handled, whether were going to be able to litigate Fukushima-related issues 6 with respect to this coastal nuclear plant. And so thank you very much.
7            As the world knows, seven months ago, a serious radiological 8 accident began at the Fukushima Daiichi Nuclear Power Plant complex in Japan.
9 The accident itself involved a serious earthquake and a tsunami. The response 10 to the accident revealed a pronounced inability of safety systems to prevent or 11 to stop the release of significant quantities of radioactive materials to the 12 environment. The NRC Commissioners recognized immediately that the Fukushima 13 accident could have significant implications for the safety of U.S. reactors.
14 Therefore, it assembled a high-level task force, composed of its most talented 15 and experienced regulators and asked them to provide a systematic and 16 methodical review of NRC processes and regulations in order to determine 17 whether the agency should make additional improvements to its regulatory 18 system.
19            In July of this year, the task force came back to the NRC 20 Commissioners with a report that included a very significant conclusion, that 21 the NRCs safety approach -- that was in quotes, safety approach -- is 22 incomplete without a strong program for dealing with the unexpected, including 23 severe accidents. And as we know, the NRCs safety program currently has very 24 little in the way of mandatory programs to address severe accidents, and thus 25 the task force was commenting that more is needed.
531 1            The report also found -- made findings on a number of significant 2 issues that are extremely important for Diablo Canyon. One is that there may 3 be significant differences between plants and the way they protect against 4 earthquakes and against floods and the adequacy of the safety margin involved.
5 The task force also found that measures for mitigating station blackout events 6 needed to be improved, and therefore the task force recommended the NRC address 7 the concerns raised in the report by adopting a series of new regulatory 8 measures.
9            While the Commission is studying these recommendations, to a large 10 extent, they have not yet been adopted. It appears that rulemakings to adopt 11 these recommendations under the NRCs Atomic Energy Act safety program may take 12 years. In the meantime, the license renewal proceeding for Diablo Canyon 13 proceeds.
14            We are here to seek enforcement of the National Environmental 15 Policy Act, which requires that environmental issues that pertain to major 16 federal decisions with significant potential impacts on the environment --
17 those environmental issues have to be addressed before the licensing decision 18 is made. Its not okay under the National Environmental Policy Act to postpone 19 consideration of these issues until after licensing. Were not here to argue 20 about what the Atomic Energy Act requires, but its very clear the NRC has a 21 non-discretionary duty to consider the environmental impacts of this licensing 22 actions before making the decision, the purpose, of course, being to prevent 23 harmful decisions from being made and then rationalized in hindsight without 24 really dealing with the environmental risks.
25            The Mothers for Peace believe that the Task Force Report has
532 1 enormous implications with respect to the adequacy of the environmental 2 analysis for the Diablo Canyon Nuclear Plant. What do I got?  One minute?
3            CHAIRMAN KARLIN:  Yeah, one minute.
4            DIANE CURRAN:  Okay. And really, theres a number of 5 recommendation that the task force makes, but there is an overarching 6 recommendation that has huge significance which is that the current safety 7 systems, the current regulatory system under the Atomic Energy Act is not broad 8 enough to embrace all of the types of accidents that need to be addressed in a 9 safety regulatory scheme. If this issue -- if this issue is not addressed 10 under the Atomic Energy Act, then NEPA requires that it must be addressed under 11 -- in the environmental analysis for this plant. And therefore, we urge the 12 licensing board to admit our contention. Thank you.
13            CHAIRMAN KARLIN:  Thank you. Mr. Repka?
14            DAVID REPKA:  Thank you and good afternoon. And Ill try to be 15 brief and stick to some -- what I think are the key points that are in our 16 written filings. First, I want to say that the issue before us is not whether 17 the tragic events in Japan at Fukushima need to be addressed by the NRC or by 18 the nuclear industry in the United States. The issue before us is whether or 19 not they need to be addressed under NEPA in this license renewal site-specific 20 case and in the -- the answer to that question is no, they do not. Certainly 21 the issues at Fukushima will be addressed by the industry and by PG&E and the 22 NRC, but this license renewal proceeding is not the appropriate forum.
23            The contention before us from the Mothers for Peace is based 24 entirely on the NRCs own task force, the Near-Term Task Force Report. And that 25 particular report does not say anything about seismic hazards at Diablo Canyon.
533 1 It doesnt address anything about equipment at the Diablo Canyon. It doesnt 2 address anything about particular severe accident mitigation alternatives at 3 Diablo Canyon, nor does it address even environmental impacts of the accident 4 in Japan.
5            The issue of severe accidents, which must be addressed under the 6 National Environmental Policy Act, is addressed in the generic environmental 7 impact statement for license renewal, the so-called GEIS. There is a 8 substantial analysis of severe accident impacts, including severe accident 9 mitigation alternatives. The Task Force Report does not address that in any 10 way and does not portend to be an environmental analysis. Severe accident 11 mitigation alternatives are addressed in the site-specific Diablo Canyon 12 environmental report to support license renewal. That analysis includes 13 measures related to seismic risks. It includes measures related to off-site 14 power. And the Task Force Report doesnt in any way address those issues.
15            So the issue is, for us, does further analysis need to be conducted 16 in this context related to environmental impacts of license renewal?  And the 17 answer is no. Those issues have been addressed. And the sole basis for the 18 contention, the Task Force Report, provides no new information on those points.
19 As we talked about in our pleadings, and I wont belabor this, the NRC has a 20 very -- a carefully crafted regulatory structure related to license renewal, 21 including generic evaluations of environmental impacts of severe accidents, 22 including severe accidents related to spent fuel pools. And those issues have 23 been addressed. And certainly to the extent that as evaluations of the 24 Fukushima accident go forward, if new and significant environmental information 25 were to arise from those ongoing studies, that would be evaluated, and
534 1 supplements would be considered if necessary. But as the Commission recognized 2 in TLI 11-05, the Commissions ruling on the petitions for suspension of all 3 proceedings, the Task Force Report has revealed -- provided no information on 4 environmental impacts at this point and any obligation with respect to -- or 5 any assertion that theres an obligation to address new and significant 6 information is simply premature. And on that basis, there can be no contention 7 of omission in this case at this time, and the contention should not be 8 admitted.
9            CHAIRMAN KARLIN:  Thank you, Mr. Repka. Yes, staff?  Its Mr.
10 Harper, right?  Okay, thank you.
11            RICHARD HARPER:  Good afternoon. Thank you for this opportunity to 12 come in and rehash a few of the points in our pleading. Specifically, your 13 honors, the NRC staff opposes the admission of this contention, primarily on 14 the basis that it does not meet the requirements under 10CFR 2.3091.
15            Specifically, the contention attempts to introduce issues that are 16 outside the scope of license renewal. It states that the license renewal 17 application must deal with the recommendations in the Task Force Reports when 18 those recommendations are planned to be dealt with generically by the 19 Commission and implemented on all the plants regardless of licensing status.
20 Additionally, it challenges regulations in generic determinations as a whole.
21 It attempts to raise emergency planning issues, which are clearly outside the 22 scope of license renewal. And it constitutes -- as a whole, it generalizes 23 attack on the NRC safety regulations. Additionally, the contention does not 24 present a material issue with the license renewal application. The Task Force 25 Report makes safety recommendations that dont relate directly to the
535 1 contention, potentially based primarily on environmental considerations under 2 NEPA. The contention also does not identify specific portions of the 3 applications which are flawed or which require correction. The contention 4 additionally challenges issues that are dealt with generically in the GEIS as 5 well as in 10 CFR Part 51, Subpart A, Appendix B. And its -- the SAMA 6 challenges within the contention are not material because NEPA does not require 7 implementation of any mitigation measures. And the contention does not 8 identify any faults with any specific SAMA. Additionally the contention relies 9 on insufficial [spelled phonetically] factual basis. The contention deals 10 directly with SAMAs. The SAMAs are not dealt with or referenced in the Task 11 Force Report. Additionally, the Mahajani declaration whereupon the contention 12 relies does not provide adequate support for the contention. Additionally, the 13 contention misrepresents the Task Force Report by claiming it questions whether 14 the NRC, under the current regulatory structure and team, can continue on with 15 licensing activities. Finally, the contention for reliance on the MARSH 16 standard for the examination of new and significant information is misplaced.
17 Also, the staff challenges the admissibility of the contention under the timing 18 requirements for new contentions of 10CFR 23092, and those requirements for 19 non-timely filings in 10CFR 2.3092. In light of the recent Commission 20 decisions, the staff wishes to reemphasize that the Task Force Report presents 21 no new and significant information which triggers the nuclear review under 22 these circumstances. And additionally, that the Commission plans 23 [unintelligible] and will address and implement the recommendations in the Task 24 Force Report generically and generally to all plants regardless of license and 25 status. For these reasons, the staff opposes admission of the contention.
536 1 Thank you.
2            CHAIRMAN KARLIN:  Thank you, Mr. Harper. Okay, Ms. Curran, we have 3 a few questions for you. If you would please go to the podium.
4            DIANE CURRAN:  Oh, sure.
5            CHAIRMAN KARLIN:  I have a question to start with, and I think I 6 would refer you to the Commissions decision denying your petition to suspend 7 the adjudicatory proceedings, CLI-11-5. Mr. Repka alluded to this in his 8 opening statement. And I think it is something that is -- something Id like 9 to ask a question about. On Page 30, it seems to me, of that decision is some 10 of the key language. And Im going to read that, and Im going to ask you to 11 help us understand how this contention can survive after the Commission makes 12 this ruling. And I quote, on Page 30 of the CLI-11-5, the Commission was asked 13 to deal with -- Im not quoting at this point -- whether or not you asking the 14 Commission to update its generic environmental impact statement to take into 15 account Fukushima-related events. And the Commission said, quote, Petitioners 16 request that the NRC conduct a separate generic NEPA analysis regarding whether 17 the Fukushima events constitute, quote, new and significant information, 18 close quote, under NEPA that must be analyzed as a part of the environmental 19 review for new reactor and license renewal decisions, close quote. And it 20 jumps down to later on that same page, quote, This request is premature.
21 Although the task force completed its review and provided its recommendations 22 to us, the agency continues to evaluate the accident and its implications for 23 U.S. facilities. And the full picture of what happened at Fukushima is still 24 far from clear. In short, we do not know today the full implications of the 25 Japan events for U.S. facilities. Therefore, any generic NEPA duty, if one
537 1 were appropriate at all, does not accrue now, period, close quote. How does -
2 - how do you confront that?  Youre now asking us to deal with an individual 3 environmental impact statement or ER and have that be updated, and you claim 4 that there is new and significant information requiring that it be updated.
5 Could you please help with that?
6            DIANE CURRAN:  Well, I think the key is that the word generic is 7 used uniformly to modify what the Commission isnt prepared to do. The 8 Commission does not want to do a generic -- you know, it describes what the 9 request is for a generic analysis and says we are not prepared to do a generic 10 analysis. That is something thats completely in the discretion of the 11 Commission, whether to do a site-specific analysis or a generic analysis. The 12 courts have been very clear that no one really has anything to say about that.
13 Thats the Commissions call. So theyve made their call. And then, you know, 14 with respect to, okay, what about this particular case, if you turn to Page 35, 15 then theres language there saying we think that if individual parties want to 16 raise issues in individual licensing cases, the hearing process is sufficient 17 to deal with those concerned. So if the decision is consistent with what we 18 did.
19            Another thing is that one would expect where there has been -- if 20 the Commission was going to make a determination that theres no new and 21 significant information, period, there would be some technical discussion. And 22 it isnt there on Pages 30 and 31. And it seems to be more linked with two 23 issues. One is were not prepared to do anything generic. And then the second 24 issue is many of these license renewal decisions wont be made very 25 immediately, so we have time.
538 1            CHAIRMAN KARLIN:  So are you suggesting that if the Commission 2 wanted to rule that none of the individual contentions could be admitted then 3 because theres no new and significant information, they could have done so, 4 but rather than doing that, they said on Page 35 to go ahead with the 5 individual adjudications.
6            DIANE CURRAN:  Right. And, you know, you have to remember, too, 7 that this contention wasnt before them when they made that decision. The 8 timings been a little odd, right, because we filed the emergency petition in 9 April, and then after months passed in which the Commission made no decision --
10 you know, a number of groups got together and said lets ask the Commission for 11 guidance here, because its not really clear. Nothings been said about NEPA.
12 How are we supposed to raise NEPA issues?  Because we all know NEPA applies 13 before licensing decisions are made. And the Commission didnt rule. So after 14 the Task Force Report came out and had some very significant conclusions in it, 15 the same groups submitted contentions raising the issue. Then, some months 16 later -- that was in August. Then the next month, September, the Commission 17 issued a decision on the April petition, basically saying, yeah, you were right 18 to go ahead with these individual cases. Thats how it should be determined.
19            CHAIRMAN KARLIN:  Well, let me ask -- you say, well, that was a 20 generic determination. And on Page 15 of your motion, your contention, Im 21 going to ask, is there something site-specific about this contention for Diablo 22 Canyon?  Here you say, quote, Yet the task force found that significant 23 differences may exist between plants and the way they protect against design 24 basis natural phenomenon, including seismic and flooding hazards and the safety 25 margin provided. Ill delete the sites. For instance, while tsunami hazards
539 1 have been considered in the design basis for operating plants sited on the 2 Pacific Ocean, the same cannot be said for those on the Atlantic Coast.
3 Accordingly, the task force recommended that licensees reevaluate the seismic 4 and flooding hazards at their sites. Now, are you -- is there something site-5 specific about this contention for this proceeding?
6            DIANE CURRAN:  It is site-specific in the sense that always under 7 NEPA the decision is site-specific. There is no generic NEPA decisions to 8 relicense our reactors. There is one decision to relicense Diablo Canyon, and 9 what our contention is saying with great specificity is in this decision for 10 Diablo Canyon, there is no reference to a major report that has significant 11 implications with respect to this licensing decision, and certainly the report 12 was written in generic terms. Mr. Repka said, the report doesnt talk about 13 Diablo Canyon. But the report talks about issues that are applicable to Diablo 14 Canyon, and therefore its site-specific.
15            NICHOLAS TRIKOUROS:  Well, Id like to explore that a little more.
16 You use terminology -- you say that an analysis of the environmental 17 implications of the Task Force Report should be performed. Now were talking 18 site-specific -- plant-specific here. What analysis are you referring to?  Are 19 you referring to -- if I looked at the Mahajani declaration and I look at your 20 motion, I could see two things. I could see an alternatives analysis and a 21 SAMA analysis. Are those the two -- is that the analysis that youre referring 22 to?  Are there others that I didnt mention?
23            DIANE CURRAN:  Well, there is -- its an implicit statement in the 24 Task Force Report. The task force does not explicitly state we consider the 25 current regulatory regime to be inadequate, but its a necessary inference of
540 1 what theyre saying. When they say we think that what now constitutes a scope 2 of safety regulations to protect against design basis accidents needs to be 3 extended, the flip side -- the necessary conclusion is we think theres a 4 problem here. This is not, you know, the safety regulations are what is 5 considered necessary by the NRC. The task force basically said, hey, 30 years 6 ago after Three Mile Island, you were told, NRC commissioners, you really need 7 to strengthen you regulatory program. It does not encompass enough of a 8 spectrum of accidents. And now, theyre saying it again. This second accident 9 has confirmed that.
10            NICHOLAS TRIKOUROS:  Im going to interrupt you because I know 11 where youre going with this. I understand that. I think everybody 12 understands that there are significant issues. Theyre being dealt with in 13 other forums. Im more interested in this question specifically how one would 14 fit the Task Force Report recommendations to the Diablo Canyon license renewal.
15 Thats our job now.
16            DIANE CURRAN:  Okay. I mean, heres another example. The ones 17 that you gave, those are --
18            PAUL B. ABRAMSON:  Ms. Curran, as you address these questions, 19 would you try to point us to where in your pleadings these things are answered?
20 We are not permitted to take new information. So show us where in your 21 pleadings this sort of stuff is addressed.
22            DIANE CURRAN:  Sure. I just have to find my contention. Im 23 sorry. Oh, here it is. Okay, first example is on Page 12 of the contention, 24 where we discuss the fact that in the generic EIS for license renewal, most of 25 the accidents that are considered are design-basis accidents. And they are
541 1 considered to be adequately dealt with by compliance with NRC safety 2 regulations. So theres a conclusion there that the environmental impacts of 3 accidents, design-basis accidents are small. Well, what if the design basis is 4 too small?  What if the -- if you think of the Atomic Energy Act regulations 5 and NEPA as circles, okay, and the Atomic Energy Act is the inner circle --
6            DR. PAUL ABRAMSON:  Show us in the pleadings, please.
7            CHAIRMAN KARLIN:  I think thats permissible for her to argue.
8            DIANE CURRAN:  I mean, Im trying to -- its in the pleading, and 9 Im just trying to give you an illustration of how this works in my mind. The 10 Atomic Energy Act safety regulations are a smaller circle inside a bigger 11 circle that includes -- that NEPAs bigger because NEPA covers not just design-12 basis accidents, but severe accidents. So theyre all included inside NEPA, 13 but the Atomic Energy Act design basis is within NEPA. So in that margin 14 around the Atomic Energy Act safety program, you have severe accidents. The 15 way severe accidents are handled is that mitigation measures are considered to 16 be optional in the sense that if theyre too expensive, they dont have to be 17 carried out. So they might not happen because theyre too expensive. And what 18 the task force is saying is the circles too small for the Atomic Energy Act 19 safety regulations. They need more, more accidents covered by mandatory 20 regulations. Thats huge. That is enormously significant from both the Atomic 21 Energy Act standpoint and NEPA. Theyre very -- theyre overlapping statutes.
22            NICHOLAS TRIKOUROS:  But, again, let me rephrase my question in 23 this way. If we were to ask the applicant to modify their license renewal 24 application to accommodate the Task Force Report recommendations, what would 25 you think that they would provide us?
542 1            DR. PAUL ABRAMSON:  Sorry, before we go there, can you point us to 2 legal authority where the applicant is required to do that, to modify its ER?
3 Isnt NEPA a duty of the agency, not of the applicant?
4            DIANE CURRAN:  Well, Judge Abramson, youre raising a good 5 question. You know, the -- its kind of like the rough draft of the EIS thats 6 prepared by the applicant. And that becomes the basis for the environmental 7 impact statement. Now, Im not quite sure exactly how this would work. I 8 think there is a requirement in -- its in 51.53, yes, that environmental 9 reports must consider new and significant information. As a practical matter, 10 it might be that the staff ended up doing it. I dont know how it will work 11 out as a practical matter. Thats more kind of inside the agency. How does 12 the agency want to do this?  Our concern is that it needs to be considered.
13            And Id also like just to start by saying, Judge Trikouros, I can 14 suggest some ideas of how this would happen. One of our main points here is it 15 is not the publics job to do this analysis for the NRC. Its what the -- what 16 the interested members of the public are doing here is putting the issue of 17 NEPA compliance before the agency and saying, You need to do this. You need 18 to show us that you are addressing this. You need to say something about this 19 that we could respond to. We are not the experts but we do know the law.
20            NICHOLAS TRIKOUROS:  Well, the -- again, the agency has a 21 responsibility with respect to the current licensing basis of Diablo Canyon.
22 And you know this argument well, that they are doing that, they will do that, 23 but again, Im looking at the license renewal issue because we are narrowly 24 focused in that area here. And they could modify the current licensing basis 25 of this plant significantly, but none of that has an impact on this proceeding.
543 1            So I just dont want to mix the apples and the oranges here. I 2 understand there are big issues, significant changes are likely coming, all of 3 that. But were dealing with a contention on license renewal, and Im trying 4 to understand how it fits.
5            DIANE CURRAN:  I need -- Id like to ask you a question. Are you -
6 - in your question, I hear you suggesting that maybe the scope of this 7 proceeding is limited to safety issues related to aging and degradation and not 8 the current licensing basis. Because I wasnt -- I mean, to me, whatever it is 9 in the current licensing basis is maybe relevant here, but the central question 10 is the environmental analysis.
11            NICHOLAS TRIKOUROS:  Right. The -- in the environmental analysis, 12 I identified what I saw as two potential areas, alternatives and SAMA. A party 13 might even argue that alternatives is not an appropriate analysis area for this 14 application. Do you agree with that, that it would be limited to SAMA and 15 alternatives?
16            DIANE CURRAN:  No, I think it would include SAMA and alternatives, 17 but also would include a discussion of how the task forces evaluation of the 18 Fukushima accident should affect the discussion of environmental impact.
19 Because if the scope of design-basis accidents is really too small, then the 20 findings in the generic EIS of that -- if a licensee complies with safety 21 requirements, it has adequately protected against accidents is now subject to 22 question and needs to be addressed. And Im not saying what the outcome of 23 that analysis should be. But we are saying it needs to be addressed.
24            DR. PAUL ABRAMSON:  So, am I correct in reading into what youre 25 saying?  And maybe you can point to me how you get this out of your pleading,
544 1 that the contention asks this board to consider, as a preliminary matter, 2 whether the scope of the design-basis accidents, currently considered, is 3 inadequate and therefore needs to be expanded?
4            DIANE CURRAN:  What were asking the board to do is to consider 5 whether we have raised a genuine and material dispute about that, such that the 6 question should be admitted whether the implications of the accident and the 7 Task Force Report rise to the level of something that needs to be addressed.
8            DR. PAUL ABRAMSON:  So youre saying that because the Task Force 9 Report makes a statement to the effect that theyre concerned about the scope 10 of design-basis accidents, that that is a foundation for admission of a 11 contention that challenges it?  Is that right?  And that that is -- thats the 12 linkage between the Task Force Report and this license renewal?
13            DIANE CURRAN:  Yes, that our contention is based on two technical 14 documents -- the Task Force Report and its conclusions and Dr. Mahajanis 15 declaration, which essentially affirms his belief that this report raises 16 significant environmental issues. And he explains how he thinks some of the 17 environmental analyses for any nuclear plant would change if the task force 18 recommendations were taken into account. But again, I dont think it is our 19 burden here to show how it would change. What we need to show is that it could 20 change, that theres a significant potential that it could change because the 21 basic assumptions, the inputs to the environmental analysis are changing.
22            DR. PAUL ABRAMSON:  Let me, if I may focus us back on -- your 23 motion to file the new contention or the contention itself is described as a 24 NEPA contention. And thats what it is, right?  Its not a safety contention, 25 correct?
545 1            DIANE CURRAN:  Right.
2            DR. PAUL ABRAMSON:  Its a NEPA contention. And the contention is 3 stated at Page 4, and Im going to read it because I have some questions about 4 that. On Page 4 of your motion, it is, quote, Statement of contention. The 5 ER for Diablo Canyon license renewal fails to satisfy the requirements of NEPA 6 because it does not address the new and significant environmental implications 7 of the findings and recommendations raised by the NRCs Fukushima Task Force 8 Report, period. As required by NEPA and the NRC regulations, these 9 implications must be addressed in the ER, close quote, and thats the end of 10 your statement of the contention. As I -- let me just ask this. What, when 11 you talk about the findings and recommendations raised by the Task Force 12 Report, are they -- is that the new and significant information, the findings 13 and recommendations?  Or is it the Fukushima event itself?
14            DIANE CURRAN:  Well, its a combination because the task force was 15 -- they were assigned to evaluate --
16            DR. PAUL ABRAMSON:  Yeah, but be careful there -- be careful there 17 because CLI-11-5, the Commission just said -- and at that point, the Commission 18 was just dealing with the Fukushima events as I understand it, and the quote is 19 from CLI-11-5, Page 30, Petitioners request that the NRC conduct a separate 20 generic analysis regarding whether the Fukushima events constitute new and 21 significant information. So there you were saying the Fukushima events 22 constitute new and significant information. Here you have -- the contention 23 says the findings and recommendations are the new and significant information.
24 I think that works. But is that what youre saying?  I mean, thats what 25 youve been saying in your pleading?
546 1            DIANE CURRAN:  Yes. We based the contention on the conclusion of 2 the NRCs own experts about the significance of the Fukushima accident. So the 3 contention is based on those conclusions.
4            DR. PAUL ABRAMSON:  Right, right. So if I understand the logic of 5 this contention, it is sort of as follows. First, the task force recommends 6 what you describe as a complete overhaul of the safety regulations. Second, 7 that the complete over -- and this is found at motion Page 13 and thereabouts, 8 14 -- first, that the task force has recommendations, two -- second, that the 9 recommendations are going to be costly, three, that the cost-benefit analysis 10 of NEPA and the alternatives analysis of NEPA and the SAMA analysis of NEPA 11 needs to be updated to reflect those additional costs. And therefore, this is 12 new and significant information, and the ER, the EIS needs to incorporate that.
13 Is that -- thats how I understand your logic. Is that right basically?
14            DIANE CURRAN:  Yes, Im not sure it completely covers everything in 15 the contention because we would like to see a discretion of how the conclusions 16 of the task force affects the conclusions about the significance of 17 environmental impacts. And I think the issue of cost is -- I think that it 18 would be handled in several potentially different ways. The concepts raised by 19 the task force are all about safety and safety requirements. And the task 20 force distinguishes between mandatory safety requirements and discretionary 21 requirements, things like SAMAs that are subject to cost-benefit analysis.
22 Well, NEPA is all about cost-benefit analysis. Theres no requirements under 23 NEPA.
24            So then the question is how do you do a NEPA analysis when you just 25 -- and apply it to a question -- or a conclusion like youve got from the task
547 1 force?  Well, one way you might do it is you weight the benefit side of the 2 SAMA so much that its going to come out to be almost inevitable that its 3 cost-effective. I dont know how it would be done, but it would involve that 4 sort of reasoning.
5            NICHOLAS TRIKOUROS:  When I read the task force recommendations, I 6 dont see them the way that you describe in your pleading. The -- if a severe 7 accident is moved into the design basis space, its no longer a SAMA issue 8 because theres no cost-benefit anymore. You have to do it. Its -- at least 9 right now, its deterministic and not even risk-informed to any large extent, 10 so you have to do it. If all severe accidents were moved into design basis 11 space as you, you know, seem to be implying is the recommendation, then there 12 would be no need for a SAMA.
13            DIANE CURRAN:  Thats right. And then we would have no contention.
14            DR. PAUL ABRAMSON:  Do you see -- do you see --
15            NICHOLAS TRIKOUROS:  This is circular reasoning.
16            DR. PAUL ABRAMSON:  Do you see any conflict between your position 17 that the task force is saying the regulatory scheme needs to be completely 18 overhauled and we need to -- this is your interpretation, I think -- that we 19 need to bring severe accidents into design basis-basis space?  Do you see any 20 conflict between that and the quite plain statement that the task force made 21 that theres no problem with existing plants?
22            DIANE CURRAN:  No, I dont because the task force was talking in 23 terms of imminent risk. And that is a term of art that is used in enforcement 24 cases to decide whether immediate shutdown is warranted. And I think what they 25 were saying there was, We dont see any reason to shut down any of these
548 1 plants, but thats really different from the question of, over time, is our 2 regulatory scheme good enough to protect against nuclear power plant accidents, 3 and I think they were saying no, its not.
4            And if I could go back to what Judge Trikouros was talking about, 5 the problem, the reason that were here under NEPA is because we dont have 6 confidence that all these recommendations that the task force has proposed are 7 going to be incorporated or adopted before Diablo Canyon is relicensed and also 8 because were obligated to raise our concerns as quickly as they come up. And 9 so, if, as we believe, NEPA requires that environmental issues have to be dealt 10 with at the time of licensing, we want to be sure that we get before you our 11 claim that these issues have to be dealt with before Diablo Canyon is 12 relicensed. If the NRC wants to take these severe accidents and make them 13 design-basis accidents, well, then do it before Diablo Canyon is licensed. Or 14 if theyre not ready to do that yet, then do an environmental analysis that 15 shows this has been taken into consideration.
16            NICHOLAS TRIKOUROS:  Which gets us back to my initial questions --
17 youre talking about redoing the SAMA analysis with some additional assumptions 18 or with a new set of assumptions. Thats where you --
19            DIANE CURRAN:  Thats one thing, yes.
20            CHAIRMAN KARLIN:  But arent you saying that if the recommendations 21 of the task force are implemented, then the costs of meeting the minimal design 22 basis requirements will increase substantially?  You say that. And that 23 increased cost needs to be factored into the NEPA analysis of whether nuclear 24 power is better or worse than some other alternative and whether any particular 25 severe accident mitigation alternative is worth it or not.
549 1            DIANE CURRAN:  Thats true, yes.
2            CHAIRMAN KARLIN:  So the NEPA contention, its not a safety 3 contention.
4            DIANE CURRAN:  Its not a safety contention.
5            NICHOLAS TRIKOUROS:  Well, as a break, Ill ask another slightly 6 varied question here. In your pleading -- in your motion, again, I think its 7 Page 5, 6, you make this argument about the task force finding no imminent risk 8 was posed. You also indicate that they found that operation is not inimical to 9 the common defense and security but that they failed to indicate that the 10 operation of the plants would not be inimical to public health and safety.
11 Could you help me to understand the implications of that that youre trying to 12 make in your pleading?
13            DIANE CURRAN:  I think that the task force avoided saying that the 14 current regulations are adequate to protect public health and safety in 15 licensing decisions. They couched their language in enforcement terms.
16 Theres no imminent risk that would cause us to recommend a shutdown of these 17 plants. But underlying this report, there is a very strong inference that 18 this task force does not believe that the current body of regulations, safety 19 regulations, is adequate. And this is borne out for them by the Three Mile 20 Island accident and the Fukushima accident. I think that is a fair reading of 21 the Task Force Report.
22            NICHOLAS TRIKOUROS:  All right, but how does that relate to 23 contention admissibility here?
24            DIANE CURRAN:  Because what this contention is discussing is the 25 entire scope of accidents that are covered by NEPA. That includes severe
550 1 accidents and it includes design-basis accidents. It includes the process for 2 considering SAMAs and it includes the process for determining that plants are 3 safe, because NEPAs all about public health, the human environment. So NEPA 4 covers the question of whether or not nuclear plant licensing poses undue risk.
5 So its -- if they had said, well, we think that a nuclear plant today could be 6 relicensed or licensed and that the regulations are perfectly adequate to 7 support that finding, we might be in a different place. But they didnt say 8 that.
9            NICHOLAS TRIKOUROS:  And so, if -- go ahead.
10            DR. PAUL ABRAMSON:  Ms. Curran, is there not a carve-out from NEPA 11 for remote and speculative events, that theres not required to consider under 12 NEPA the environmental impacts of remote and speculative events?
13            DIANE CURRAN:  Yes, thats right.
14            DR. PAUL ABRAMSON:  And is it not possible that many -- some severe 15 accidents are so unlikely as to be remote and speculative?  In other words, not 16 every severe accident would avoid the exclusion.
17            DIANE CURRAN:  Thats always been true. But I think that what 18 weve seen at the NRC over the years since the severe accident report was 19 prepared in Reg 1150, since the Three Mile Island accident, since Chernobyl, is 20 this increasing acknowledgement that what was initially -- initially no severe 21 accidents were considered credible. They were considered impossible. And then 22 that -- the understanding of whats possible keeps growing and growing, and the 23 understanding of whats likely is changing too. And I think thats the sea 24 change that we see in the Task Force Report. Thats why its so significant.
25 Now, the Commission -- the Commission may end up saying the task force, We
551 1 totally disagree with the task force. We think this is really wrong. But 2 under NEPA, the NRC cant ignore what the conclusions of their hand-picked 3 technical experts that theyve got a problem.
4            CHAIRMAN KARLIN:  As I see it in the Task Force Report 5 recommendation number one, the central thrust of that is to say that we need --
6 that they recommend that the agency redraw the line of what they denominate as 7 adequate protection and that many things that are now not comprehended within 8 the design basis, which is required without regard to probability -- its just 9 deterministically required that you must meet the design basis -- the task 10 force recommendation number one talks about defense-in-depth, mentions the word 11 dozens of time and says essentially we should move the adequate protection 12 standards further over and capture more things, and they call that, quote, 13 extended design basis, that basically what youre doing is capturing severe 14 accidents, which were formally severe accidents, and now calling them design 15 basis, right?
16            DIANE CURRAN:  I think thats correct, yes.
17            CHAIRMAN KARLIN:  And so youre thrust is that when you do that, 18 when you push the, quote, adequate protection standard further down the line 19 and include more severe accident events, deterministically, no probabilistic 20 about it, just include it, thats going to increase costs. And increased costs 21 is going to change SAMAs, its going to change alternatives.
22            DIANE CURRAN:  Yes.
23            CHAIRMAN KARLIN:  Thats what you say in -- and that is indeed what 24 you say at Page 13 to 14 of your motion. And I think I understand that.
25            DIANE CURRAN:  And it might also change discretion of the
552 1 environmental impacts as well.
2            CHAIRMAN KARLIN:  Let me ask this, if I may. As I truly see it, 3 your contention says that the findings and recommendations of the task force 4 are the new and significant information. You repeat that many times. You said 5 that in your reply. How can recommendations be, quote, new and significant 6 information?  Arent they just words piece -- you know, ideas?  They may never 7 come to pass.
8            DIANE CURRAN:  Well, we rely on the conclusions of the task force, 9 which are interpretations of --
10            CHAIRMAN KARLIN:  All right. Where are the conclusions?  I mean, I 11 can read in the Task Force Report, theres a section, Recommendations, 1 12 through 12 and I can read -- I dont know what section is the conclusions or 13 the findings. You used both of those words, and Im not sure -- I didnt find 14 a conclusions or findings section.
15            DIANE CURRAN:  Well, theyre in each -- in relation to each 16 recommendation, theres a discussion. And the task force explains how it 17 arrived at the recommendation. And we rely on both. I mean, the 18 recommendations got to come from somewhere.
19            CHAIRMAN KARLIN:  Okay, but these are recommendations -- they are 20 conclusions, theyre findings, theyre recommendations, theyre words.
21            DIANE CURRAN:  Theyre interpretations --
22            CHAIRMAN KARLIN:  How does that constitute new and significant 23 information, environmental information that needs to be -- requires the 24 supplementation of an ER or EIS?
25            DIANE CURRAN:  Well, I dont think you can divorce the
553 1 recommendations from the actual occurrence of the accident. This is -- when we 2 -- just to give you a little background, right after the accident, of course, 3 members of the public were very concerned, wanted to raise their concerns 4 before the NRC, get these addressed. And the answer was, well, this accident 5 is progressing. We just dont know whats happening. We havent analyzed it 6 yet. Well, then somebody analyzed it, and that was the task force. And not 7 only did they analyze it, but they were the best people the NRC had. They 8 analyzed it, and they came up with some pretty earth-shattering conclusions and 9 recommendations.
10            CHAIRMAN KARLIN:  But Im not sure whether you can have it both 11 ways. The Commission ruled on September 9th that the events at Fukushima are so 12 evolving and unclear that revising the generic EISs would be inappropriate at 13 this time because its premature. We dont know enough about -- the 14 information is not clear. So if its the events of Fukushima, then its 15 premature. If its the recommendations of the task force, then at least thats 16 something that happened on July 12th and its in black and white, and we know 17 what those recommendations are. So its not premature, but the question is, is 18 a recommendation new and significant information if its just a recommendation?
19            DIANE CURRAN:  Well, I think a couple things. First of all, 20 getting back to what we were talking about before, that conclusion in CLI-11-05 21 is that it is not appropriate to do a generic analysis at this point. And the 22 Commission does talk about the Task Force Report, but in point of fact, the 23 Task Force Report was not presented to the Commission in April because it 24 didnt -- it hadnt been written yet. So the Commission has made a decision 25 about whether to proceed generically or not, and its made a characterization
554 1 of the Task Force Report for generic purposes. I dont see anywhere in the --
2 in CLI-11-05 where the Commission says we have made a determination that in no 3 case does the Task Force Report present new and significant information. And 4 as a matter of fact, the Commission says we know that there has been 5 contentions filed in individual cases, and were asking the licensing board to 6 go ahead with their regular processes.
7            CHAIRMAN KARLIN:  Maam, I grant you that on Page 35, they direct 8 us to -- all the adjudicatory -- all the boards to continue with their 9 adjudications. So, if the Commission wanted to tell us that it was premature, 10 they had a great opportunity to, and they didnt. So, they told us to go 11 ahead. But I mean, this is another issue -- recommendations. Im still 12 focusing on whether words on a piece of paper can constitute new and 13 significant information requiring a NEPA supplement or update, and theres lots 14 of recommendations that fly around. On July 12th, the task force issued its 15 report and its recommendations. You know, then the Commission had a meeting 16 and directed the staff to prioritize those recommendations. And what was it?
17 The ACRS met, and they studied the recommendations and they discussed it and 18 said some things. And on October 3rd of 2011, a few days ago, the staff issued 19 a memo prioritizing the task forces recommendations on making some of its own 20 recommendations.
21            Now, is there every time the staff or anybody makes some 22 recommendations, does that automatically trigger the requirement to do -- that 23 its new and significant information that triggers a need to supplement the EIS 24 every time?  Certainly, you cant say that. How do we draw a line between 25 recommendations that trigger -- that constitute new and significant
555 1 information, triggering the duty to supplement and some second lieutenant in 2 the bowels of NRC making some, you know, stray recommendation, and does that 3 trigger the duty to supplement?
4            DIANE CURRAN:  Well, I think its possible that it does. I guess 5 it would depend on -- for instance, with the SECY paper that the staff issued 6 on October 3rd, Im not sure that does because its really --
7            CHAIRMAN KARLIN:  That does what?
8            DIANE CURRAN:  Would trigger a new obligation because it really is 9 just kind of developing a further analysis and a plan, a plan for how the 10 staff, under a safety regime, is going to address the recommendations.
11            But it seems to me that all -- that there is kind of a point of 12 departure for us anyway, that the first opportunity where we had a high-level 13 body in the Commission sanctioned by the NRC Commissioners evaluating the 14 significance of the Fukushima accident. We are obligated, theres no question 15 of our obligation to put that before you and to ask you to admit a contention.
16 Now, if, you know, if you want to tell us we think its premature, we would 17 appreciate knowing when its right because were not getting any guidance from 18 anybody. And its got to be right sometime before this license renewal 19 decision is made.
20            CHAIRMAN KARLIN:  We will address that here before the end of the 21 day.
22            DR. PAUL ABRAMSON:  Didnt the Commission in either CLI-11-5 or 11-23 11 say something to the effect that theyre confident that the plants can keep 24 operating as they are and that if were going to make changes, well do it with 25 our regs and our normal course just like we did with DMI [spelled phonetically]
556 1 and we will -- and theres nothing that will -- in fact, theres nothing to 2 prohibit us and we expect to make changes in regulation for plants whether 3 theyre relicensed or not?  Isnt that essentially is what they said?
4            DIANE CURRAN:  Judge Abramson, I think I remember language like 5 that in the discussion of the safety regulations and how the safety regime 6 works, the NRCs process for regulating plants under the Atomic Energy Act. If 7 you notice -- and thats CLI-11-05. Most of that decision is devoted to safety 8 issues. Theres two pages for NEPA, and so, you know, thats -- we are not --
9 another time maybe well make an argument about the Atomic Energy Act. Thats 10 not what were bringing to you. Were asking you to enforce NEPA here.
11            CHAIRMAN KARLIN:  On the safety issue, both the applicant and the 12 staff make a point that -- well, the Task Force Report upon which you rely 13 deals with safety issues. That doesnt say anything they say about 14 environmental or environmental issues. So, ipso facto, in NEPA -- you cant 15 base a NEPA contention on recommendations that only deal with safety. How do 16 you respond to that?
17            DIANE CURRAN:  Well, as we were discussing before, NEPA embraces 18 safety issues. If safety issues arent addressed in the context of the safety 19 regulatory scheme, then they have to be addressed under NEPA. And this 20 contention is really directed towards circumstances where the agency doesnt --
21 does not address the issues in a timely way under the Atomic Energy Act. For 22 instance, if the NRC were to just say today, Were adopting all of the task 23 force recommendations under our safety programs, I dont think wed have a 24 contention. Our contention raises the concern that the NRCs -- the NRC has no 25 timetable for addressing these safety issues, but NEPA does have a timetable,
557 1 and that is it has to be done before the license renewal decision.
2            CHAIRMAN KARLIN:  Well, isnt the simpler answer something to the 3 effect that, well, if the NRC, for safety reasons, said that the Diablo Canyon 4 Nuclear Power Plant needed to be moved 500 feet up the bluff, and if some 5 endangered snail guarder [spelled phonetically] lived 500 feet up the bluff, 6 then there might be some environmental implications associated with that even 7 though the direction was safety-related, it never mentioned the endangered 8 snail guarder.
9            DIANE CURRAN:  Well, thats true.
10            CHAIRMAN KARLIN:  So a report need not necessarily mention 11 environmental to have environmental to have environmental implications.
12            DIANE CURRAN:  Thats true.
13            CHAIRMAN KARLIN:  Okay.
14            NICHOLAS TRIKOUROS:  Im going to take you back to Page 14 again.
15 It seems to be a favorite area that -- of your motion --
16            MALE SPEAKER:  -- of what?
17            NICHOLAS TRIKOUROS:  Page 14 of your motion.
18            MALE SPEAKER:  Okay.
19            NICHOLAS TRIKOUROS:  You say where SAMA is imposed as mandatory 20 measures, the outcome of the ER and subsequently the EIS for Diablo Canyon 21 could be affected significantly and then you go on to describe having to make 22 modifications and the cost implications of that, et cetera. Those words --
23 first of all, was this then sort of a thinking out loud stream of consciousness 24 writing or was there something associated with this contention that I need --
25 Id like to understand about this, because when you say where SAMA has imposed
558 1 these mandatory measures, I assume youre saying that if the SAMA is found to 2 be cost beneficial, it would be required to be implemented in some reasonable 3 timeframe. Is that what youre saying there?
4            DIANE CURRAN:  Well, if -- this is going to the question under the 5 case law and the regulation that new information doesnt have to be considered 6 unless its significant, in other words unless it could affect the outcome of 7 the environmental analysis or the -- it could affect the licensing decision.
8 So, Im sorry if it was hard to understand, but what we were trying to get at 9 was that if SAMAs were imposed as mandatory measures, it could make the plant 10 safer, which would be a good outcome. It would change the licensing division.
11            NICHOLAS TRIKOUROS:  Are you talking about all SAMAs or cost 12 beneficial SAMAs?
13            DIANE CURRAN:  Well, we were saying if -- supposing they were 14 effectively made mandatory. In other words, you did a cost benefit analysis 15 and you waived the benefits by so much that it ended up being mandatory, 16 because thats kind of the implication of the task force report.
17            NICHOLAS TRIKOUROS:  But, this has really no direct implication to 18 the --
19            DIANE CURRAN:  Well, what were trying to say is that it would make 20 a big difference in the outcome of the environmental analysis for Diablo Canyon 21 if these issues were taken into account --
22            NICHOLAS TRIKOUROS:  Okay, but --
23            DIANE CURRAN:  -- it could.
24            NICHOLAS TRIKOUROS:  Thats not the situation, so its just sort of 25 wishful thinking?
559 1            CHAIRMAN KARLIN:  Well, may I?  On Page 19 of your motion you make 2 a statement that we referenced and that the applicant and staff references 3 that, quote, "Of course the Commission could moot the contention by adopting 4 all of the task forces recommendations," close quote. Now, I just dont 5 understand that comment at all and let me explain why. It seems to me that the 6 contention is that the recommendations, task force made recommendations, if 7 those recommendations are implemented, costs will increase and therefore the ER 8 and the EIS cost benefit analysis need to reflect that. So, it seems like the 9 contention assumes that the recommendations will be, or hopes that the 10 recommendations will be implemented and in implementing them, the cost goes up 11 and the environmental impact statement needs to be revised. So, rather than 12 mooting the contention, the NEPA contention, the -- if the Commission adopted 13 all of the recommendations, it would support the contention and say, Wow, 14 Voila! Yes, the costs have increased and therefore the alternatives need to be 15 reanalyzed.
16            DIANE CURRAN:  I see now that I think youre right.
17            CHAIRMAN KARLIN:  I dont know -- yeah. I just dont understand 18 it, the mooting. I think you may -- what you probably meant is if the 19 Commission adopted all the recommendations, youd be very happy --
20            DIANE CURRAN:  Yeah, but --
21            CHAIRMAN KARLIN:  -- but not necessarily --
22            DIANE CURRAN:  No, no, the Mothers for Peace, their main concern is 23 safety and protecting the environment. Theyre not here to have an academic 24 debate. They want to make Diablo Canyon safer and so that was what -- that 25 argument was driving that was if the Commission adopted all those task force
560 1 recommendations, then I agree with you, Judge Karlin. You pointed out 2 something I didnt see. Yes, it would change the ultimate cost benefit 3 analysis, but it would remove the issue of SAMAs. Thats what it would do, 4 because theyd be required --
5            CHAIRMAN KARLIN:  Well, it wouldnt remove the issue of SAMAs.
6 They would still be -- it move the issue of SAMAs down further along the pike, 7 because once they drew the line, there would still be severe accidents out 8 there and there would still need to be a SAMA analysis as to whether any 9 particular mitigation measure was worth it or not.
10            DIANE CURRAN:  That true, yeah.
11            NICHOLAS TRIKOUROS:  On Page 15 of your motion, you say the NRC 12 cannot meet the fundamental purposes of NEPA if it does not include all of the 13 costs associated with required mitigative measures. You say there can be no 14 hard look at the cost and benefits unless costs are disclosed.
15            DIANE CURRAN:  Im sorry, what page are you on?
16            NICHOLAS TRIKOUROS:  Page 15 of your motion and the question I have 17 for you regarding that was that lets assume its correct, we agree, et cetera, 18 Im not saying it, but assuming we did, then are we at the point where we can 19 say that we know what all the costs are going to be?
20            DIANE CURRAN:  Well, probably, no. We dont know at this point, 21 because the analysis hasnt been done.
22            NICHOLAS TRIKOUROS:  Right, so what you are saying thats required 23 to do the hard look wont be known for some period of time into the future?
24            DIANE CURRAN:  Well, okay theres -- I was answering a question as 25 to whether we know right now in the context of all the analysis hasnt been
561 1 done, so we dont know and I think what you might have been asking was because 2 we dont know everything about the accident, Fukushima accident, that we wont, 3 or we dont -- Im not sure.
4            NICHOLAS TRIKOUROS:  It goes to the issue of ripeness. This --
5 there will come a time when all of this information is known, but now is not 6 that time.
7            DIANE CURRAN:  Well, NEPA does require that an agency use the best 8 information thats available to it at the time. So, I dont think that it's 9 allowed under NEPA to say we are not going to talk about the Fukushima accident 10 at all because we still dont know everything about it. I think under NEPA 11 its clear, the case law is clear that the agency should use the best 12 information available to it and inform its decision as well as possible, using 13 what it knows.
14            DR. PAUL ABRAMSON:  And what new information about environmental 15 impacts of the accidents at Fukushima is revealed by a report, not the 16 recommendations, by the report, what new information is revealed and what 17 information is revealed therein about the environmental impacts one might 18 expect at Diablo Canyon?
19            DIANE CURRAN:  Well --
20            DR. PAUL ABRAMSON:  And where did you mention it in your pleadings?
21            DIANE CURRAN:  Id like to point you to paragraph seven of Dr.
22 Mahajanis declaration, where --
23            DR. PAUL ABRAMSON:  I read Dr. Mahajanis --
24            DIANE CURRAN:  Because that -- at the end of that paragraph, he 25 said, Adequate protection of the public is incompatible with the NRCs
562 1 continued reliance on voluntary evaluation of severe external and internal 2 events, voluntary adoption of the indicated measures or the use of cost benefit 3 analysis to evaluate their desirability. What I think the Fukushima task 4 force observed was that the system --
5            DR. PAUL ABRAMSON:  Thats not my question --
6            DIANE CURRAN:  All right.
7            DR. PAUL ABRAMSON:  -- and I understand what Dr. Mahajanis 8 speculates, but what Im asking you is where in your pleadings do you talk 9 about new information about environmental impacts, actual new information on 10 environmental impacts from the Fukushima Daiichi accidents and how, if you 11 didnt mention it, where do you discuss its relevance and the projected 12 environmental impacts for Diablo Canyon; and if the answer is we didn't, thats 13 okay. I just want to know where you did, if you did.
14            MALE SPEAKER:  [inaudible] but we will in a minute.
15            DR. PAUL ABRAMSON:  Counselor, my colleague advises that we are 16 going to take a break in some short period of time and when we do, perhaps it 17 might be appropriate for you during the break, to plow through your pleadings 18 and answer that question later.
19            CHAIRMAN KARLIN:  Okay, great. Yeah, I think we were gone a little 20 while, but lets go until 3:00, an hour and a half. Youve been in the hot 21 seat for a while, Ms. Curran. You might share the wealth with others in a 22 moment or two, but right now I have a question for you. PG&E in its answer on 23 Page 11 raises something that I think is quite important and its a question of 24 whether or not you have an impermissible challenge to the regulations, whether 25 this contention represents an impermissible challenge to the regulation, and
563 1 Im going to set aside the argument of impermissible challenge of the safety 2 regulations because I dont really see that at the moment, but I do see a 3 problem with regard to the environmental regulations, Part 51 and they point 4 out in Page 11 of the PG&E answer, quote, "Absent action by the Commission, 5 Category 1 environmental issues, including the environmental impacts of design 6 basis accidents, severe accidents, and onsite storage of spent fuel do not need 7 to be addressed in a site specific environmental review and cannot be 8 adjudicated in a plant specific license renewal proceeding, even if based on 9 allegedly new and significant information," and a quote, a case I am familiar 10 with, which is Vermont Yankee and the Commissions decision in COI 07-3. So, 11 isnt it true that --
12            MALE SPEAKER:  [inaudible]
13            CHAIRMAN KARLIN:  -- Yes, isnt it true that that entire -- you 14 cant challenge anything thats a Category 1 issue and under Part 1, and once 15 you ask for a waiver and you havent done that here.
16            DIANE CURRAN:  We absolutely did ask for a waiver.
17            CHAIRMAN KARLIN:  Asked for a waiver and the prior one --
18            DIANE CURRAN:  No.
19            CHAIRMAN KARLIN:  -- wheres the waiver here?
20            DIANE CURRAN:  Its attached to the contention.
21            CHAIRMAN KARLIN:  You had a -- I didnt see anything that looked 22 like a waiver.
23            DIANE CURRAN:  Oh, Im sorry, Im sorry --
24            [talking simultaneously]
25            CHAIRMAN KARLIN:  It was a rulemaking --
564 1            DIANE CURRAN:  It was a rulemaking --
2            [talking simultaneously]
3            CHAIRMAN KARLIN:  Yeah, yeah, yeah.
4            DIANE CURRAN:  -- issue that was attached to this contention. We 5 just couldnt see how it was --
6            CHAIRMAN KARLIN:  You couldnt come up with something site specific 7 or unique to this site?
8            [talking simultaneously]
9            DIANE CURRAN:  Not site specific about the task force --
10            CHAIRMAN KARLIN:  Right.
11            DIANE CURRAN:  -- overall recommendation, until we did a rulemaking 12 petition and that is now before the staff.
13            CHAIRMAN KARLIN:  Right, so, but my question therefore, still 14 remains. Absent -- this does appear to me to be at least with regard to 15 Category 1 issues for license renewal, a challenge to the regulations Part 1, 16 you know regulations and therefore would have to be stripped entirely from this 17 contention, if it survives at all.
18            DIANE CURRAN:  Wed ask you to make a ruling that except for the 19 Category 1 issue, that you otherwise would find the issue admissible, and await 20 the --
21            CHAIRMAN KARLIN:  It would be with regard to Category 2 issues?
22            DIANE CURRAN:  Yeah --
23            CHAIRMAN KARLIN:  I dont know.
24            DIANE CURRAN:  -- but I agree with you that you couldnt consider 25 the issue.
565 1            CHAIRMAN KARLIN:  Well, let me ask this, is an alternative -- NEPA 2 requires -- our regs require, and you talk about the need to revise the 3 alternatives analysis, whether nuclear is cost effective after you add all 4 these additional supposed costs that are going to be imposed. Is the 5 alternatives analysis a Category 1 or a Category 2 issue?  Im going to ask Mr.
6 Repka and others, I dont know where -- it doesnt look like its either one, 7 but I dont know.
8            DIANE CURRAN:  Honestly, Im not sure.
9            CHAIRMAN KARLIN:  Okay, well that may be something that you can put 10 in -- and if you can find anything on that, great, after the break.
11            DIANE CURRAN:  Judge Karlin, I just wanted to add that we consider 12 ourselves obligated to raise our concerns when they arise and that you know, 13 this is part and parcel of our contention, and so we know we were -- we 14 explained how the -- even if in making an analysis of whether it matters to the 15 environmental impact statement, thats part of what you have to evaluate in 16 admitting -- deciding whether to admit this contention. It seems to me that it 17 is appropriate to consider whether it could change some part of the analysis 18 that is maybe subject to Category 1 because you know, Category 1 is -- it isnt 19 set in stone. It can be changed and NEPA requires that Category 1, it cant 20 hold if there is new and significant information that disturbs it. Thats --
21 it cant be used as a block to that --
22            CHAIRMAN KARLIN:  Well --
23            DIANE CURRAN:  -- and perhaps you dont have the authority to 24 change it, but I dont think that this precludes you from considering how that 25 analysis might change.
566 1            CHAIRMAN KARLIN:  Okay, well I think the law is pretty clear and 2 the Commission has spoken emphatically several times on the category one issue 3 in Vermont, Yankee, and elsewhere, but one further question that I have before 4 we take a break and its something that was alluded to earlier. In your reply, 5 at Page 9, and I -- when I say reply, Im generally going to be referring to 6 your reply memorandum. You have two documents you filed at that moment. You 7 filed a reply and then you filed an attached reply memorandum, which is 8 something I think that was filed in many of the cases, right?
9            DIANE CURRAN:  Yes.
10            CHAIRMAN KARLIN:  So, Im referring to the reply memorandum, I 11 guess, and in that section, you attack as it were the applicants and you say, 12 quote, "Applicants erroneously conflate interveners responsibility under NEPA 13 with those of the agency," close quote. And there youre arguing that you 14 shouldnt have the burden of doing the EIS and you dont have to prove that 15 this juncture you know, that its going to make a necessarily big difference if 16 the agency thats responsible -- and you quote on Page 10, the case law, quote, 17 "As courts have made abundantly clear," quote, "it is the agency not an 18 environmental plaintiff that has the continuing duty to gather and evaluate new 19 information relevant to the environmental impacts of its actions," close quote.
20 And then you go on to say quote, "Compliance with NEPA is a primary duty of 21 every federal agency," close quote. Okay, if thats true, I have a problem 22 with your contention, which says the applicant has to update the ER in order to 23 reflect the new and significant information. Now, I can composited that the 24 NRC may have to update or include in its EIS -- because thats what NEPA 25 imposes the duties on the agency in Marsh versus Oregon, it imposes the duty on
567 1 the agency, but where is there any duty on the applicant to update its ER?
2            DIANE CURRAN:  I believe it is in 51.53 and I think its cited in 3 the contention. Ill find that for you.
4            CHAIRMAN KARLIN:  Yes, it is cited in the contention and its -- I 5 will read it here if I can find it and I think its not as helpful as it might 6 be. I will note that 10 CFR 51.72 A deals with the supplement to the draft 7 EIS, and I will quote it to say that the staff will prepare a supplement if 8 quote "there are significant new circumstances or information relevant to the 9 environmental concerns and varying on the proposed action or its impacts,"
10 close quote. Staff will update the EIS. We turn to the closest analog in the 11 ER context. It is 10 CFR 51.53 C 3 iv, or little four, quote.  "The 12 environmental report must contain any new and significant information regarding 13 these environmental impacts of license renewal of which the applicant is 14 aware."  So, it doesnt really say you have to supplement the ER. It just says 15 the ER should contain that from the get go it seems. Is that the section 16 youre relying on?
17            DIANE CURRAN:  Yes, and we are confined to Section 10 CFR 2.309 to 18 facing environmental contentions on the environmental document thats available 19 to us and there are only two right now that I did, one is the environmental 20 report and one is the License Renew GI Act.
21            CHAIRMAN KARLIN:  But, does that -- think about it this way, the 22 applicant has done an ER, you  -- let us posit subsequent to that ER, new and 23 significant information has arisen; let's posit that. The staff will be 24 issuing a draft environmental impact statement some day, a draft supplemental 25 environmental impact statement, I guess. Isnt your juncture for filing this
568 1 contention when the staff issues its draft environmental impact statement?
2            DIANE CURRAN:  The way that members of the public interpret 10 CFR 3 2.309 is that youd better file an contingent --
4            CHAIRMAN KARLIN:  Right.
5            DIANE CURRAN:  As soon as you have the information --
6            [talking simultaneously]
7            CHAIRMAN KARLIN:  Youre dealing with --
8            [talking simultaneously]
9            DIANE CURRAN:  If you [inaudible] it is at your peril.
10            CHAIRMAN KARLIN:  So, youre dealing with the Mike Farrar [spelled 11 phonetically] Machs [spelled phonetically] Case catch 22. Youre concerned 12 about the catch 22, so you filed now?
13            DIANE CURRAN:  It is not a good bargain to guess about those things 14 that are --
15            [talking simultaneously]
16            CHAIRMAN KARLIN:  Understood.
17            DIANE CURRAN:  -- filed early and have the board say, Youre too 18 early, come back, and all were asking is if youre going to tell us that, 19 give us some guidance on when to come back.
20            DR. PAUL ABRAMSON:  If the applicant were to take the position that 21 the ER is prepared, does consider all of the significant information of which 22 it is aware, is that the end of it, because its the applicant who has to 23 decide of which it is aware, significant information of which it is aware. So, 24 it can say we -- it seems to me and thats what I want to ask, is that 25 something that from your perspective, if the applicant says, Weve looked at
569 1 whats available from Fukushima. Weve considered everything thats available 2 to us about Fukushima. Weve looked at the task force report. Weve 3 considered what we think is relevant from that and our ER encompasses that, is 4 that the end of the applicants obligation under that -- under the clause we 5 were reading before?
6            DIANE CURRAN:  Well, then the question is how do you interpret of 7 which the applicant is aware, the information about the task force report is 8 publically available. You can presume the applicants aware of it. I think --
9            DR. PAUL ABRAMSON:  But, the question is what does it do to its ER, 10 and thats why I was asking you earlier can you show me what environmental 11 impacts information you have from either the task force report -- from the task 12 force report and where you have referred to it in your pleadings, because that 13 to me is crucial to this.
14            DIANE CURRAN:  [affirmative].
15            CHAIRMAN KARLIN:  At this juncture itd probably be a good idea to 16 take a break. Its 3:05 or so, 3:03. Why dont we take a 10 minute break and 17 its going to be relatively Chris [phonetic], so well be back in 10 minutes.
18 Im not sure, Ill consult with my fellow board members, but we may at that 19 point, although we may not be finished entirely with you, Ms. Curran, we may --
20 you are going to be coming up for rebuttal, so we may ask Mr. Repka at that 21 point to start, but Ill have to consult with them first. So, everybody stand 22 by and well adjourn for 10 minutes. Thank you.
23            (Whereupon, a short recess was taken) 24            CHAIRMAN KARLIN:  Okay, please be seated. Thank you. Were 25 [unintelligible] licensing board in the Pacific Gas and Electric case is now
570 1 reconvening and well go back on the record. Ive consulted with my colleagues 2 and though we still may have a couple of questions for Ms. Curran, were going 3 to turn to Mr. Repka and ask him to take the podium and maybe we can ask some 4 questions of you, sir.
5            Id like to start with the same question I think we started with 6 Ms. Curran, was just to focus on the meaning of CLI 11-5, Page 30 and where the 7 Commission talks about prematurity I guess, and Im not going to re-quote it, 8 but I do want to refer to your sur-reply. We ask you, each party, to address 9 the meaning of CLI 11-5. You all submitted a sur-reply and on Page 2, you talk 10 about this Page 30, and you say, the contention is premature, quote, "The 11 Commission specifically held however, that requests for a NEPA supplement based 12 on the Fukushima event are premature. The conclusion applies equally to the 13 current proposed contention, close quote, and so this is part of -- my 14 question is you say the Commission ruled that requests for a NEPA supplement 15 based on the Fukushima event are premature. The contention, as I read it, says 16 that the -- is based upon the recommendations of the task force report. Do you 17 see that difference?  Is it about a difference that makes any difference?
18            DAVID REPKA:  Its a difference that makes no difference. The 19 Commissions statement in CLI 1105 was made in September. The Commission says 20 in full, The request is premature, although the task force completed its 21 review and provided its recommendations to us. So, they had the task force 22 report in hand and they concluded that they had, they, the Commission, the NRC, 23 had no new and significant environmental information based on either the 24 Fukushima accident itself or the task force report and recommendations, and 25 that makes sense, because the obligation to complete a supplement to the
571 1 generic environmental impact statement is one that belongs to the Commission.
2 The request that was being addressed in CLI 1105 was one about setting off to 3 do exactly that, updating the generic environmental impact statement to address 4 Fukushima, and so the Commission had to address that based on everything it 5 knew as of September of whatever the date of CLI 1105 is, and they did that, 6 and they specifically referenced the fact that they had the recommendations in 7 hand.
8            CHAIRMAN KARLIN:  Yes, you are correct that they referenced the 9 fact that theres a task force and that it issued a report, but in context it 10 says further on there, In short, we do not know today the full implications of 11 the Japan events for U.S. facilities. So, theyre really talking about, in 12 the petition to suspend was based upon the events at Fukushima. Do you pause 13 at that?  I mean the task force report didnt even exist at the time --
14            [talking simultaneously]
15            DAVID REPKA:  When the petition was filed, thats correct.
16            CHAIRMAN KARLIN:  -- and then subsequently the task force report 17 came out, but the petitioners there were not relying upon the task force 18 report. They were relying upon the events of Fukushima and it is those events 19 which it seems the Commission is saying, well, its premature. A picture of 20 what happened at Fukushima is far from clear, but the picture of what the task 21 force recommended is absolutely clear, isnt it?
22            DAVID REPKA:  And based on that, the Commission said, today, 23 September 20th, or whatever the date was, they said, "Today, the full 24 implications are not clear. They didnt have enough information as of that 25 point, based on both the event and the task force report, and recommendations
572 1 if there was any significant, new environmental impact information, and to step 2 back for a minute and look at what we in fact have in front of us, based upon 3 the event and the task force report. We have nothing in the event itself 4 thats any -- the event itself stands for the fact that there was a severe 5 accident, a beyond design basis accident in Japan. Thats precisely the issue 6 thats addressed in the generic environmental impact statement, among other 7 things, and Ms. Curran gave some misleading information about the fact that the 8 analysis was done was about design basis accident thats simply not true. Its 9 a very comprehensive evaluation beyond design basis events. So, based on the 10 event, was there anything there to say that theres something new that hasnt 11 been addressed?  No. Based upon the task force report coming out and the 12 recommendations, which the Commission had in front of them, they said, no, we 13 still have no new environmental information bearing on the project and its 14 environmental impact. Yes, theres recommendation related to our regulatory 15 structure, but nothing there specific to the environmental impacts of --
16            CHAIRMAN KARLIN:  I understand there is recommendations to deal 17 with safety issues versus environmental issues, and thats another issue we may 18 get into, but okay, COI 11-5, on Page 30 says this is all premature. On Page 19 35, and Ms. Curran has pointed this too, the Commission says, reactor 20 adjudication to go forward related to Fukushima. Quote, "Reactor adjudication 21 should go forward, including those that may involve proposed contentions based 22 on the issues implicated at the Fukushima events," close quote. If -- that 23 doesnt make any sense, if the Commission just said Fukushima contentions are 24 all premature.
25            DAVID REPKA:  No, the Commission didn't say Fukushima contentions
573 1 are all premature, and what it said was that the adjudications could go 2 forward. There could be many different types of issues arising out of the 3 Fukushima event and they said, Go forward, consider those various issues.
4            CHAIRMAN KARLIN:  Why didnt they just say thats all premature, I 5 mean they could have put us all out of our misery basically, by saying this 6 whole entire thing is premature and none of these -- because they knew when 7 they issued this decision that in 21 different adjudicatory proceedings or 8 boards had a Fukushima contention and all they had to do was say, Its all 9 premature, and they didnt do that.
10            DAVID REPKA:  I think what they did was they said, with respect to 11 the NEPA claim, that theres new and significant information, they did put you 12 out of your misery. They did tell you, you dont have to deal with that. Its 13 premature.
14            CHAIRMAN KARLIN:  Why did they tell us to go --
15            DAVID REPKA:  We have a petition thats affecting countless dockets 16 with --
17            CHAIRMAN KARLIN:  Right.
18            DAVID REPKA:  -- with all manner of different regulatory approvals 19 involved, and so the Commission wasnt trying to address every single issue 20 that could be raised and every single regulatory content. It simply said, 21 boards go do that, but certainly take into account what weve just said here 22 today in COI 1105, and one of the things they specifically addressed was the 23 environmental new information issue.
24            CHAIRMAN KARLIN:  Let me ask you another potential difference with 25 regard to this case and COI 11-5, okay.
574 1            DR. PAUL ABRAMSON:  Judge Karlin, before you go to that, can I just 2 follow up for a second on --
3            CHAIRMAN KARLIN:  Oh, sure, sure.
4            DR. PAUL ABRAMSON:  -- on the underlying questions. Mr. Repka, I 5 think Judge Karlins been talking at length about the distinction between a 6 challenged based on Fukushima and a challenge based on the task force report, 7 and you said theres -- its a distinction without any meaning. What would be 8 required in -- of the task force report?  Whats missing from the task force 9 report that would make such a distinction meaningful?  In other words, what 10 would the task force report have to have had in it for there to be a foundation 11 for a NEPA contention?
12            DAVID REPKA:  Okay, broadly speaking, it would have to address the 13 environmental impacts of a project, so thats the parameters. Now, what would 14 specifically get to that?  One thing that would address that is if the task 15 force report was analyzed and the consequences of the Fukushima accident, which 16 is something I dont think that anybody has a clear handle on yet, today, and I 17 think the Commission acknowledges that. So, if a report were to come out and 18 say the consequences of this accident were this, that, and the other thing in 19 terms of land contamination goes to the public, whatever it might be, the 20 source term material released, then that would have to be compared against what 21 was already analyzed in the generic environmental impact statement for severe 22 accidents, and so then there might be new information.
23            DR. PAUL ABRAMSON:  So, there would need to be the technical 24 information, either leading to or providing an environmental impact, the basics 25 of an environmental impact from that event, right?
575 1            DAVID REPKA:  Correct.
2            DR. PAUL ABRAMSON:  Would you also need to know the sequence in the 3 events that led to that, so that you could factor into some sort of severe 4 accident analysis or could you start simply from the environmental impacts?  In 5 other words, they got radiation measurements; weve seen it in a number of 6 petitions. Could those -- could, would that enable an environmental impact 7 number from which one could somehow back out some NEPA claim?
8            DAVID REPKA:  Perhaps, its very difficult to speculate in a 9 vacuum, but you have a severe accident model thats used by the NRC in a 10 generic environmental impact statement based on standard codes, based on 11 certain assumptions, and so you would need to know enough about the accident 12 and perhaps its sequence of events and source term -- and again, make a 13 comparison, some amount of technical information to say does that challenge the 14 model, did that challenge the analysis that was conducted for a severe 15 accident.
16            DR. PAUL ABRAMSON:  And was there anything in the task force report 17 that addressed any of that?
18            DAVID REPKA:  No, nothing at all.
19            CHAIRMAN KARLIN:  Now, today were here as I think I said in the 20 intro, to deal with the issue of contention, admissibility, and timeliness, 21 right?  Were not here to address the merits of the contention, just whether it 22 meets 2.309 F1 and F2, and C, and whatever other provisions that apply to 23 contention admissibility. So, Id like you to think about the focus on Page 30 24 of CLI 11-5. Wasnt that a ruling on the merits?  The Commission was asked to 25 undertake a new generic environmental impact statement immediately and the
576 1 Commission on the merits, said it, wasnt going to do that. So, the question 2 whether or not something is new and significant information is a merits 3 determination, isnt it?
4            DAVID REPKA:  It could be, but it could also be a basis for a 5 contention argument. It could -- because of the contention admissibility 6 requirements require a genuine dispute on a material issue. So, the issue 7 raised in the petition is one that we -- theres new and significant 8 information that triggers the NEPA obligation. The Commission says there 9 isnt. It is a factual statement that goes to the adequacy, not only of the 10 basis for the petition, but goes to the same -- the adequacy of the basis for 11 the present contention, and so the board is allowed to look behind the 12 contention to determine whether or not that basis is real. The Commission has 13 given an indication and it relies on the task force report, and the Fukushima 14 event, the Commission has already looked at the documents relied upon and said 15 that this doesnt say anything about that and made the conclusion that the 16 contention is premature. So, they have made that finding and I think the 17 licensing board is certainly allowed to credit that finding, and should credit 18 that finding.
19            Secondarily, even if the Commission had not said that in CLI 1105 20 the licensing board in making an admissibility determination is always free to 21 look at the documents that are being offered as the basis for the contention 22 and determine whether there really is a basis there for the contention, and I 23 think this is exactly the point that the task force report doesnt provide a 24 basis on environmental impact. Its simply not an environmental --
25            CHAIRMAN KARLIN:  Okay, well I asked this of Ms. Curran, which is
577 1 the fact that the task force report focuses on safety doesnt mean, or does it 2 mean, that it necessarily cannot have environmental implications?
3            DAVID REPKA:  An event may have environmental implications, but we 4 dont know what those are, based upon that report and that report doesnt 5 advance the ball or provide any evidence on that.
6            CHAIRMAN KARLIN:  Well, thats why I was talking and asking Ms.
7 Curran, I mean Ive read the contention and it doesnt say the Fukushima 8 events, it says, the task force recommendations and findings," and as I 9 understand the logic that they articulate, she articulates in that motion, the 10 recommendations, if implemented, will be very costly. Those costs will drive 11 up the cost of the reactor and our continuing to operate the facility, which 12 will then affect the SAMA analysis and the alternatives analysis, and that is 13 something that must be done in the NEPA space. So, the fact that the 14 recommendations are safety related does not in itself mean that it doesnt have 15 environmental implications. Talk me through your response to that. It seems 16 to be your logic and Id like to understand how you would respond.
17            DAVID REPKA:  Well, lets review the bidding and start at the 18 beginning: severe accidents is a Category 1 issue. Its addressed in the TEIS.
19            CHAIRMAN KARLIN:  But I thought it was a Category 2 on the part 20 Table B1, severe accident is a Category 2 issue.
21            DAVID REPKA:  Only to the extent that it relates to active 22 mitigation alternatives.
23            CHAIRMAN KARLIN:  Wasnt that what their contentions about?
24            DAVID REPKA:  Their contention is about new and significant 25 information related to environmental consequences and it does raise among many,
578 1 many other things, it does raise alternative issues, but --
2            CHAIRMAN KARLIN:  Yeah, I mean part Table B1 says, severe 3 accidents, category two, the probability of weighted consequences of the 4 atmospheric release," et cetera, "however alternatives to mitigate severe 5 accidents must be considered for all plants that have not considered such 6 alternatives, and thats whats happening here. Is it not?  I mean there was 7 a SAMA analysis in the ER --
8            DAVID REPKA:  Right.
9            CHAIRMAN KARLIN:  -- but the -- so thats a Category 2 issue.
10            DAVID REPKA:  The SAMA issue is severe accident mitigation 11 alternatives issue, not the consequence issues because the consequence issues 12 is addressed in dozens of pages in the GIS.
13            Now, with respect to alternatives, theres two things here that are 14 being muddled together. One is the projects alternatives and the overall cost 15 benefit of the project, and this is an issue I think the staff addressed very 16 well in their response. NRC regulations on license renewal dont require an 17 environmental report or an environmental analysis to address the overall cost 18 and benefits of the project, and thats 5145 C and 5153 C in 10 CRF. So, that 19 issue of the idea that -- and this is certainly in the Mark Ajani Affidavit --
20 that the task force is going to require all these things that are going to 21 drive up the cost of the project and somehow thats going to change the overall 22 cost benefit. Thats simply not a license renewal issue.
23            So, the second alternative issue is the SAMA issue of lets accept 24 that there are severe accidents. What can we do to address beyond design basis 25 events and what might be cost effective, and you know, certainly the task force
579 1 report says nothing about that. The environmental report for Diablo Canyon 2 says a lot about that and the contention says nothing about that, and doesnt 3 suggest anything thats wrong with that evaluation. So --
4            CHAIRMAN KARLIN:  But doesnt the -- let me ask this if I may.
5 Doesnt the task force report say that there needs to be this new category of 6 extended design basis?  The design basis is not sufficient at this point and 7 they recommend that some things that are now beyond design basis, i.e. severe 8 accidents be moved into the mandatory, Defense-in-Depth, deterministic, must be 9 done regardless of probability or not, so many things like the task force 10 report recommendations were implemented, things that are now considered severe 11 accidents and only need to be dealt with if theyre cost effective mitigation 12 measures. Now would be mandatory and have to be imposed. So, it moves a 13 number of things which were severe accidents into the design basis mandatory 14 category.
15            DAVID REPKA:  Yes, I see that, but that doesnt --
16            [talking simultaneously]
17            CHAIRMAN KARLIN:  So, it increases the cost.
18            [talking simultaneously]
19            DAVID REPKA:  It would raise the cost of -- there would be a cost 20 associated with implementing those measures and number one, those measures that 21 would be a current operating regulatory issue. It would be a challenge; it 22 would relate to the existing regulations and therefore is outside the scope of 23 license renewal. To the extent its related to the overall cost of the 24 project, its not even linked to license renewal. So, to say that thats a 25 cost of license renewal is inaccurate. That would be a cost of a project.
580 1 That would be a cost of ongoing compliance with the project and the regulations 2 on license renewal, the ones I just cited in Part 51 dont require that overall 3 cost related --
4            CHAIRMAN KARLIN:  Let me point you to another reg that concerns me 5 and help me with this, 5153 do you have it in front of you?  Do you have the 6 regs?  5153 C, thats the Operating License Renewal Stage Environmental Report, 7 5153 C 2 and about half way through it, its a long provision and this is what 8 the staff I believe refers to in its brief. Quote, "The report is not --" this 9 is talking about the environmental report right?  Quote, "The report is not 10 required to include discussion of the need for power or the economic costs and 11 economic benefits of the proposed action or of alternatives to the proposed 12 action, except in so far as such cost and benefits are either essential for 13 determination regarding the inclusion of an alternative in the range of 14 alternatives considered or relevant to mitigation."  So, doesnt that exception 15 undermine what you just said?  Its like well, okay its relevant to 16 alternatives --
17            [talking simultaneously]
18            DAVID REPKA:  Not at all.
19            CHAIRMAN KARLIN:  -- and its relevant to mitigation.
20            DAVID REPKA:  Not at all. That section is a referral to the 21 consideration of alternatives in the SAMA context, not overall project costs.
22 So, not lets look at SAMAs, because thats the second part of this piece that 23 --
24            [talking simultaneously]
25            CHAIRMAN KARLIN:  Does it say that?
581 1            DAVID REPKA:  Well, it references or its relevant to including an 2 alternative in the range of alternatives considered. Thats for SAMA or 3 relevant to mitigation. Thats itself, you have to decide what alternatives 4 are going to be potentially relevant and will be considered in your SAMA 5 evaluation, and then you address those, the benefits and costs of those, 6 because their beyond design basis. So, I believe thats what thats a 7 reference to. In the SAMA evaluation process, if the recommendation of the 8 task force were adopted and more events are considered design basis and plant 9 [inaudible] are required to bring those within the design basis, again thats a 10 current operating issue, not linked in any way to license renewal, but for 11 environmental purposes or safety purposes, but that would have the effect of 12 taking them -- and I think Judge Trikouros alluded to this earlier, they would 13 no longer be SAMA. They would be things that would be part of the design basis 14 and they would be excluded from the SAMA pool. So, we would continue to still 15 look at things that go beyond that new design basis for cost design basis prime 16 [spelled phonetically] and do the same SAMA evaluation on whatevers left 17 there, but --
18            CHAIRMAN KARLIN:  But it would increase the total cost of the 19 facility of operating it --
20            [talking simultaneously]
21            DAVID REPKA:  But that's not a relevant number.
22            CHAIRMAN KARLIN:  Well, it is relevant to alternatives analysis.
23            DAVID REPKA:  No, its not.
24            CHAIRMAN KARLIN:  Why not?
25            DAVID REPKA:  Its relevant to a projects alternative --
582 1            CHAIRMAN KARLIN:  Yes.
2            DAVID REPKA:  -- perhaps, but thats not a license renewal relevant 3 issue.
4            CHAIRMAN KARLIN:  Well, but its -- the license renewal as I 5 understand that Turkey Point and others have taught us that you know, when you 6 get into license renewal space safety issues exclude current licensing basis 7 issues --
8            DAVID REPKA:  Right.
9            CHAIRMAN KARLIN:  -- NEPA does not so circumscribe any additional 10 costs or you know, can be you know or environmental impacts can be covered 11 within the NEPA analysis for a license renewal, right?
12            DAVID REPKA:  Im sorry, I [inaudible] --
13            [talking simultaneously]
14            CHAIRMAN KARLIN:  Turkey Point the Commission taught that there is 15 a distinction in license renewal. Safety issues are limited to aging 16 management issues and they are not to include current licensing basis issues.
17 NEPA issues in license renewal are not so constrained and can cover any 18 environmental impact that might be associated in some way with the license 19 renewal, whether its aging management related or not.
20            DAVID REPKA:  Thats correct. It relates to the impact of 21 continued operations, not necessarily the impact of plant retrofits that are 22 being made or being considered under the current operating [inaudible] of the 23 plant.
24            [talking simultaneously]
25            DR. PAUL ABRAMSON:  Help me, Mr. Repka, with this one. What were
583 1 talking about it sounds to me is expanding the events that fall into design 2 basis by adding in some severe accidents of probabilities -- probably higher 3 probabilities than one in a million per year.
4            DAVID REPKA:  Thats correct, or you need --
5            DR. PAUL ABRAMSON:  -- so they claim 6            [talking simultaneously]
7            DAVID REPKA:  -- and that are currently dealt with as a you know, 8 that may be for some plants not dealt with --
9            DR. PAUL ABRAMSON:  Right.
10            DAVID REPKA:  -- like design basis and station blackout.
11            [talking simultaneously]
12            DR. PAUL ABRAMSON:  So we would expand those in the design basis by 13 having the design deal with those by putting the plant mods in place or 14 retrofits in place to deal with those, would the effect not be to reduce the 15 environmental impact, because of whats left out there for SAMA is a smaller 16 set?
17            DAVID REPKA:  Thats correct, for sure. That would have that 18 affect of reducing certainly the likelihood and consequences of an offsite --
19 of a severe, beyond design basis accident. That is accurate, but I think that 20 going to Judge Karlins point again that the concept of the project 21 alternatives and what could be done to improve the project or instead of the --
22 what other things could be done other than license renewal and relative cost 23 and benefits of those, that's just something thats not considered here in this 24 context under the regulations and --
25            DR. PAUL ABRAMSON:  So, your view is that that regulation takes
584 1 such events, such considerations off the table for license renewal, whether or 2 not theres safety, takes them off the table for NEPA also?
3            DAVID REPKA:  And thats correct, because again, its -- theres a 4 linkage here between those are issues that are really being dealt with in the 5 regulatory process as current operating issues.
6            NICHOLAS TRIKOUROS:  Can I?  This new and significant information 7 under NEPA, your pleading, your sur-reply I believe indicates that Mothers for 8 Peace would have an opportunity to challenge the lack or quality of a NEPA 9 supplement if new and significant information, environmental information 10 applicable to Diablo Canyon is ever identified and its pretty clear that both 11 the staff and PG&E feel that the task force recommendations do not introduce 12 any new and significant environmental information, and really never will. I 13 mean --
14            [talking simultaneously]
15            DAVID REPKA:  Well, the recommendations in and of themselves dont 16 do that and never will, but certainly the analysis of the event if it goes 17 forward if it -- as I talked about in responding to Judge Abramsom, if there 18 was some new consequence data that came out of ongoing studies where there was 19 new seismic information out of Japan that said that you know, thats relevant 20 to Diablo Canyon or new tsunami data that says a 46 foot tsunami was going to -
21 -
22            NICHOLAS TRIKOUROS:  Well, let me address that specifically then 23 with respect to the recommendations that we have now from the task force. In 24 all of the meetings that are taking place discussing these recommendations and 25 prioritizing them, its becoming very clear that the 50.50 4(hh) equipment
585 1 requirements, the station blackout efforts that are now proceeding, that would 2 -- that might have say diesel fuel requirements for portable pumps, that -- all 3 of that is indicating that if we're a multi-unit site, which is one of the task 4 force recommendations, I think its in four somewhere, that the consequences to 5 be considered would be for multi-unit sites would be higher than for single 6 unit sites. So, for example at Diablo Canyon all of the SAMA analysis that are 7 done in the environmental report deal with one core-melt all of the costs 8 associated with the cost benefit analysis is one core-melt, but the 9 recommendations are clearly indicating that consideration should be given to, 10 in the case of Diablo Canyon, two core-melts. So, do you consider that a -- do 11 you not see that as new and significant information with respect to this 12 situation?
13            DAVID REPKA:  Not at the present time and certainly dont see it as 14 an issue that was raised in either of the contention or the Mark Ajani 15 declaration and I think that was the point that we -- why we included some 16 excerpts from the SAMA evaluation, showing the range of some of the 17 alternatives that were considered because they go to, you know albeit with a 18 one core-melt event, but go to some of those precise issues, like offsite power 19 station blackout, hydrogen control, and so those are things that are 20 specifically considered in  the SAMA evaluation already, and you know nothing 21 in the declaration at all or the contention engages that and says you know, 22 this is whats wrong. This is what needs to be considered in addition.
23            CHAIRMAN KARLIN:  Somewhat -- well, this may be a slightly 24 different area, but as I understand it, your position as stated in the sur-25 reply is that along with CLI 11-5, you agree with the Commission that Fukushima
586 1 related contentions are premature at this point.
2            DAVID REPKA:  Fukushima related contentions that assert theres a 3 need for a supplemented environmental impact statement based on new and 4 significant information are premature at this point.
5            CHAIRMAN KARLIN:  Okay, okay. Fair clarification, I appreciate 6 that, and Ms. Curran sites to the Machs case about the catch 22 problem, which 7 is -- commonly we see interveners trying to grapple with timeliness in terms of 8 filing their contentions, new contentions and they are faced with double whammy 9 of the -- well, its late and its premature, and so we grapple with -- we all 10 try to deal with when -- what is the moment in time when its right or 11 appropriate?
12            Now, the Commission in CLI 11-5, on Page 33 states, and theyre 13 dealing with this issue about whether or not -- when the contention should be 14 filed, and at that point to the interveners, Im sorry, the petitioners had 15 asked the Commission to set up, as I understand it, issue some schedule or 16 guidance as to when it would be mature, when Fukushima related contentions 17 ought to be filed. And Id like your help here, because the Commission 18 declines to do that and says, Respondents disagree, arguing, quote 19 "Respondents disagree, arguing that," quote "NRC regulations and case law 20 already provide clear and uniform standards to determine the timeliness of 21 motions to add new contentions or to reopen the record, and this situation 22 should not be treated differently. As a general matter we agree with the 23 respondents assessment."  Being a respondent, can you help us understand what 24 these clear and uniform standards are as to when these Fukushima contentions 25 ought to be filed?
587 1            DAVID REPKA:  Well, I think its referenced at 2.309 and the 2 requirements in the -- for new or amended contentions and it talked about 3 basically timely relative to when new information is available and without 4 reading those requirements, I believe thats what its a reference to. I think 5 that it has to be read in concert, too, though with the requirements for 6 updating -- the staffs update and when an update to the environmental impact 7 statement or draft environmental impact statement would be required and the 8 Commission sites those regulations 51 71 2A, which talks about their 9 substantial changes in the proposed action that are relevant to environmental 10 concerns. Well, thats not happening here and --
11            CHAIRMAN KARLIN:  Well, that wouldnt apply here yet, although I 12 value that comment, because they havent even done their EIS or draft EIS, yet.
13            DAVID REPKA:  Or there are significant new circumstances or 14 information relevant to environmental concerns, and bearing on the proposed 15 action are impacts. So, I think if you look at -- that would be the basis for 16 a contention if there needs to be an update, assuming there hasnt been an 17 update, and --
18            CHAIRMAN KARLIN:  Let me stop you there. I mean so youre -- the 19 clear and uniform standards are 2.309 F2.
20            DAVID REPKA:  Right.
21            CHAIRMAN KARLIN:  Well, I know that only came into effect in 2004, 22 but there must be literally hundreds of cases where the boards grappled with 23 applying that regulation and its predecessors, and theyre all over the boards 24 in terms of whether theres something's timely or not, and in fact the parties, 25 the applicant and the staff, commonly, almost uniformly argue that its not
588 1 timely and or its premature, the catch 22 Judge Ferrara was referring to. So, 2 youre suggesting that that standard is clear and what is the word clear in 3 uniform standards?  Have we achieved clarity and uniformity with the hundreds 4 of LBPs that have been issued on that reg.?
5            DAVID REPKA:  I wont get between the licensing board and the 6 Commission on that one. I think the Commission views it as clear and uniform, 7 but I understand the licensing board views may differ, but I think those are 8 the requirements and I think it certainly accepted that if some new report were 9 to come out with environmental impact information, that was germane to a plant 10 in the United States based on Fukushima, you know certainly the standard, 11 acceptable standard is if you file within 30 days of a new report, it will be 12 considered timely and thats what happened here, and Ill just point out the 13 PG&E did not object on the basis of timeliness.
14            CHAIRMAN KARLIN:  Right. You ultimately -- well, let me just 15 continue that then. The staff has an answer, page -- staff answer at Page 33 16 and 34, the staff sites to the Commission decision in Oyster Creek, quote, "Our 17 contention admissibility and timeliness rules require a high degree of 18 discipline and preparation by petitioners who must examine the public available 19 material and set forth their claims at the outset. Now, on Page 34 they refer 20 to this old canard that the interveners have a quote, "Iron clad obligation to 21 examine the publicly available documentary material."  Given that the -- are 22 the interviews supposed to be omniscient or something?  The Commission itself 23 doesnt even know whats happening at Fukushima or what happened and they are 24 saying its premature. How in the world can an impecunious intervener have an 25 iron clad obligation to know everything that happened at Fukushima?
589 1            DAVID REPKA:  Well, certainly the citation to the case and the 2 obligation is an accurate one. Its an argument Im not making and PG&E is not 3 making, so Im not going to defend it.
4            CHAIRMAN KARLIN:  Well, perhaps you could help us then. What --
5 lets say we wanted to issue -- back up for a second. There are many regs that 6 deal with safety issues and though they aren't black and white, CFR Part 50, 7 Part 52, Part 54, and the Commission issues many, many guidance documents, 8 NUREGS and other guidance documents as to how to apply and comply with those 9 regs. Now, here we have 10 CFR, Part 2.309F2 and the Commission doesnt want 10 to issue any guidance document, but if we were to issue some scheduling order 11 trying to lay out some objectively determinable events by which we could assess 12 the timeliness of any Fukushima related contentions. What -- help us -- what 13 do you think we should come up with for objectively determinable events rather 14 than some subjective fight about it?  Is there anything you can help us with?
15            DAVID REPKA:  I cant anticipate what all the new -- what form the 16 new information might take and Id rather not, but certainly an example would 17 be some specific report that a petitioner or an intervener is going to rely 18 upon as a basis for a contention. I think that creates the obligation to then 19 timely file and thats routinely interpreted as 30 days, but I think that 20 ultimately it has to be filed within 30 days of the information being available 21 and thats the regulatory standard and I really dont see the difficulty in 22 that being the standard.
23            CHAIRMAN KARLIN:  Well, in Fukushima perhaps the information is 24 coming out over time and its clarity is getting better perhaps, and then our 25 knowledge or the information is becoming better, but isnt it kind of a very
590 1 slippery slope as to what the moment in time is when the contention should be 2 filed?
3            DAVID REPKA:  And perhaps thats because its a very much a fact-4 based determination and then and thats why the regulations read the way they 5 are and Im, I dont know --
6            CHAIRMAN KARLIN:  Would this be --
7            DAVID REPKA:  -- how we could be otherwise.
8            CHAIRMAN KARLIN:  Would this be a situation where even if it might 9 arguably not be timely there might be good cause for not filing it precisely 10 when somebody thought they should of if you know it was coming out through the 11 smoke and the haze gradually?
12            DAVID REPKA:  Thats always part of the showing and so thats 13 certainly they exist.
14            CHAIRMAN KARLIN:  Okay. Yeah, go ahead.
15            NICHOLAS TRIKOUROS:  Lets see, in your -- Mr. Repka, your answer, 16 Pages 13, 14, its -- you were talking about having considered in the SAMA 17 analysis for Diablo Canyon station blackout and seismic related SAMAs you, in 18 fact, included an attachment to your pleading that identified all of those 19 SAMAs that were specifically related to station blackout and seismic, but all 20 of those were rejected as being not required or not cost beneficial.
21            DAVID REPKA:  Thats correct.
22            NICHOLAS TRIKOUROS:  And would that -- is that still true today in 23 light of the task force recommendations that were dealing with here?
24            DAVID REPKA:  I dont know how the task force recommendations would 25 change that particular calculus. You know, the SAMA evaluation is done based
591 1 upon the models as they exist, based upon the PRA and the offsite consequences, 2 and the recommendations go to whether or not additional design-basis measures 3 should be required. But putting that aside, if youre looking at it still on a 4 purely cost-benefit, beyond-design basis, you know everything that goes in that 5 calculation would be the same today as it was you know a year ago.
6            You know, again, based on what we know today. If there were 7 something that changed the seismic hazard or changed the, changed the, you 8 know, something that would lead to a conclusion that at Diablo Canyon there was 9 a greater than assumed potential for core melt, containment failure, offsite 10 consequences, those would be the things that would change the SAMA results and 11 we just dont have anything that says that that would be true.
12            CHAIRMAN KARLIN:  One or two more questions perhaps. The 13 interveners assert that the environmental report needs to be supplemented or 14 updated in light of this new and significant information. Im not sure I see 15 where -- I understand that NEPA requires EISs to be supplemented and updated if 16 new and significant information arises. Let us posit for a moment that there 17 is new and significant information. Did you argue in any of your answers that, 18 well it doesnt apply to the ER anyway because were not subject to any of 19 those requirements?
20            DAVID REPKA:  I dont believe we made that argument.
21            CHAIRMAN KARLIN:  So are we disallowed from rejecting the 22 contention on that basis, because you didnt make the argument according to 23 Judge Abramson?
24            DAVID REPKA:  Im --
25            [laughter]
592 1            DR. PAUL ABRAMSON:  According to -- according to the footnote 133 2 in CLI-11-11 you are.
3            DAVID REPKA:  Right and thats a different -- I mean thats the 4 point the Commission is making if there is no new and significant information.
5 You know if there were new, then again --
6            CHAIRMAN KARLIN:  [inaudible]
7            DAVID REPKA:  -- as to what would happen if there was something 8 else that happened next week or next month or next year that said there is new 9 or significant information. It -- thats again that contention could be filed 10 at that time. Number two is, is there an obligation that runs the PG&E 11 independent of the NRC staff to say something at that time?  I actually think, 12 and I couldnt find this over the break, but I believe that we are subject to 13 an annual update of the license renewal application environmental report at 14 least until the draft environmental impact statement comes out. I couldnt 15 find the citation for that. So if at some point PG&E thought there was new and 16 significant information, you know we would put that in such an update, and even 17 if there were not such an update requirement if we found -- made that 18 determination having a complete and accurate application in all material 19 respects may lead us to make that kind of notification to the NRC. So I think 20 there are obligations on PG&Es part, its just we havent -- there -- that 21 doesnt exist right now.
22            DR. PAUL ABRAMSON:  Counselor, just one point of clarification if I 23 may. Lets suppose that Diablo Canyon -- that no new and significant 24 information on environmental impacts arises before the license is actually 25 renewed, and there are some plants as you know that are in the queue that are
593 1 going to be done soon. Yours is some years away perhaps. What would then be 2 the recourse?  This proceeding would be closed because the license renewal 3 would be issued. So at that point contention admissibility they dont file a 4 contention because a proceedings done. What would happen at that point?  What 5 would be the remedy available to the interveners if they thought there was new 6 information at that point?
7            DAVID REPKA:  I guess there would -- and its a question I have not 8 thought a lot about.
9            DR. PAUL ABRAMSON:  But it seems to me thats part of whats 10 concerning.
11            DAVID REPKA:  That is -- there would be no licensing action, no 12 major federal action before the NRC that would trigger an environmental impact 13 statement or environmental assessment obligation, but I dont think that 14 theres anything that would prevent a petitioner from filing a petition for 15 rulemaking to update the generic environmental impact statement or to ask the 16 Commission to conduct a generic environmental impact statement related to 17 continued operations you know [inaudible].
18            DR. PAUL ABRAMSON:  How about for Diablo Canyon per se?  Could they 19 -- would they -- could they would the process be for them to petition the 20 Commission for a back fit or for some modification to the license to, to adapt 21 to deal with new and significant information?  How would that work?
22            DAVID REPKA:  I do not believe there would be a NEPA obligation 23 that would exist at that point, but could there be some petition some, some 24 request that would trigger some Commission obligation to look at that?  Its 25 possible, I just dont know what that would be.
594 1            DR. PAUL ABRAMSON:  Thanks.
2            CHAIRMAN KARLIN:  Any more questions for Mr. Repka?  Okay, thank 3 you Mr. Repka. I think were done with you. [laughter]  Mr. Harper?
4            Mr. Repka -- Im sorry, Mr. Harper. Weve talked about whether 5 its premature and whether its timely and weve gotten through that a little 6 bit. Im going to skip past some of that discussion. In the staff -- but in 7 the staffs SER reply on Page 4 you say based on CLI-11-5 that the contention 8 is premature. Meanwhile, on Page 35 of your answer, I think Ive got this cite 9 right, you say that its not timely. The issues presented here in the 10 proffered contention were readily available and discussed by the interveners 11 expert more than four months ago. At that time the intervener chose to forgo 12 filing the contentions. As such the late filed contention is not timely and 13 should be denied. So which is it?  Isnt this exactly the catch 22?  Its not 14 timely, its late and oh, by the way, its premature. Youve said both, which 15 one is it?
16            RICHARD HARPER:  Yes, I think it would cover both, your honor. Let 17 me explain how that would be. The argument on timeliness that it is not a 18 timely submission based on the opinions of the underlying presumption in the 19 task force. As the, Dr. Mahajanis declaration states the task force supports 20 his opinions that were submitted four -- or four months ago at that time, so in 21 April, and our argument is based there on that if those opinions were available 22 and were expressed at that time, and the report is basically a confirmation of 23 those opinions and, therefore, it is not timely.
24            CHAIRMAN KARLIN:  Well lets go back to the contention. The 25 contention is that not based on the task force report. The contention is based
595 1 upon new and significant environmental implications of the findings and 2 recommendations of the Task Force Report. So the contention is not based on 3 Fukushima, its based on the time -- findings and recommendations of task force 4 report.
5            RICHARD HARPER:  Correct, your honor, and as I believe in the 6 petitioners reply they clarify that and state that the contention is based on 7 the conclusions and recommendations within the task force [inaudible].
8            CHAIRMAN KARLIN:  Same thing arent they?
9            RICHARD HARPER:  Thats more of ancillary point. Kind of going 10 towards that what Im, what were arguing at the staff is that the underlying 11 opinions for those conclusions and for the recommendation are similar if not, 12 you know, are similar in essence to those opinions that were expressed four 13 months earlier. Id like to also add at this time that even if the board were 14 to decide that the contention is timely it does not defeat all of our other 15 arguments that the contention is inadmissible.
16            CHAIRMAN KARLIN:  I understand, I understand its a different 17 issue. Okay, lets ask the question I think we need to ask of everyone, which 18 is -- and I want to refer to your answer at Page 33 and 34 again. And here you 19 say theres an ironclad obligation on the part of the intervener and its a 20 high standard of discipline they must undertake. In this context, in the 21 situation where the Fukushima events are coming out and the information is 22 coming out, what objectively determinable events could we use in the scheduling 23 order to specify when, if ever, these kinds of contentions become mature or 24 ripe?
25            RICHARD HARPER:  I think it would be difficult to compile a
596 1 conclusive list but I think, you know, based on Mr. Repkas comments I think 2 thats a good starting point. Some type of official report that outlines the 3 findings. You know, as the Commission said findings as they are right now, the 4 picture is not clear which implies that you know that the clarification process 5 is ongoing, and there will be certain steps along the way where information 6 will be released. At that time, I would say would be an appropriate time for 7 the clock to start ticking if you will.
8            CHAIRMAN KARLIN:  Well heres, I think you make this argument in 9 your pleadings which is well, this report is just a compilation of information 10 that was previously available. So the issuance of the report is meaningless.
11 The information was already floating around out there and so the contention 12 shouldve been filed earlier. Is that what youre arguing with regard to the 13 Task Force Report?
14            RICHARD HARPER:  I would go back to my earlier comment that the 15 recommendations in the underlying opinions of the task force, yes, I would say 16 that was the case is that those were available, the information -- the task 17 force report is a compilation of the information and opinions, recommendations 18 based on that information. As far as the contention is based on that then I 19 would say yes.
20            CHAIRMAN KARLIN:  And so that the issuance of reports does not 21 necessarily provide us a crisp, objectionably determinable event from which 22 contentions could be filed?
23            RICHARD HARPER:  I think its, its difficult to wrap this all up 24 in a nice package. I think it depends on the situation. Here we have, you 25 know -- the Fukushima disaster was very well chronicled and the information the
597 1 NRC gained at the time as it was presented was made public. The Task Force 2 Report made its recommendations based on that public information. It compiled 3 that information and expressed opinions that according to Dr. Mahajani coincide 4 with what you -- he established four months earlier.
5            CHAIRMAN KARLIN:  Let me ask this. I believe you do make the 6 argument that under the regs there is no duty imposed upon the applicant to 7 update its environmental report, even if there is new and significant 8 information, right?
9            RICHARD HARPER:  I believe thats correct.
10            CHAIRMAN KARLIN:  And so the applicant has no duty to update its 11 environmental report even if there is new and significant information. So --
12            DR. PAUL ABRAMSON:  No, its a question up to the applicant to 13 decide whether its new and significant. Isnt that what the reg says?
14            CHAIRMAN KARLIN:  No, not necessarily. Im just trying -- the reg 15 does not say that it says the environmental report must include new and 16 significant information. It does not say that the environmental report 17 thereafter must be supplemented or updated. So weve got an environmental 18 report, lets posit that it doesnt have to be updated because Part 51 doesnt 19 require that and NEPA doesnt apply to applicants anyway. So the environmental 20 report doesnt need to be updated, but the draft EIS is coming out someday, 21 right?
22            RICHARD HARPER:  That, that is correct, your honor.
23            CHAIRMAN KARLIN:  And when that report comes out if Ms. Curran and 24 her client are unhappy with the contents of that draft environmental report, 25 i.e. it doesnt discuss the recommendations of the task force or whatever else,
598 1 presumably they can challenge it at that point. Right?
2            RICHARD HARPER:  They can challenge the findings in the 3 supplemental environmental impact statement.
4            CHAIRMAN KARLIN:  Right, and would that be timely then?
5            RICHARD HARPER:  It certainly depends on the information and the 6 challenges they are bringing up. I am hesitant to say absolutely yes.
7            DR. PAUL ABRAMSON:  Thats fine. Mr. Harper, can I just pick this 8 up for a second?  I cant help clarifying this question. If the EIS, or 9 whatever it is, supplement draft, whatever form it comes out, only uses 10 information that was used in preparation of the ER and does not use -- and 11 theres no new say specific technical report that comes out between then and --
12 between today and the issuance of this staff document that regards the 13 consequences or the environmental impacts of Fukushima vis--vis Diablo Canyon.
14 If -- would it be timely for the filing of a contention claiming that the EIS, 15 this staff document, does not consider the recommendations of the Task Force 16 Report since it has already filed that contention now and were looking at 17 that?  In other words theres nothing new other than a claim that they didnt -
18 - that now the ER needs to include it and it doesnt and that sometime in the 19 future when the staff document comes out can they make the same claim?  They 20 raised it timely in accordance with the regs now. If we reject it now would it 21 be timely in the future?
22            RICHARD HARPER:  Just, just to make sure I understand your 23 question. I apologize.
24            DR. PAUL ABRAMSON:  Same, same challenge. Its just the only new -
25 -
599 1            RICHARD HARPER:  Yeah, same challenge only I [inaudible] --
2            DR. PAUL ABRAMSON:  Not yet, no new, nothing new under the sun 3 between then and the time they raise the challenge to the staff EIS or DEIS or 4 supplement. If all that theyre -- if they want to challenge just the 5 exclusion of consideration or failure to consider this task force report and 6 its already been dealt with by us and they challenged it now is that timely to 7 raise then?
8            RICHARD HARPER:  I would say yes, simply because the draft 9 supplemental environmental, impact statement would be the document that starts 10 the clock, that allows for the time to proceed from then. So the appropriate 11 time to challenge the NRCs failure to include or lack of inclusion of that --
12 those -- that information would be at that time.
13            DR. PAUL ABRAMSON:  Even though theyve challenged it now, which 14 seems to be the ER. Theyve made the same challenge to the ER. Todays 15 challenge is the ER doesnt consider the recommendations of the Task Force 16 Report. We for some reason -- if we find its premature for whatever reason 17 then youre saying its okay to raise the challenge later when the -- when the 18 ER -- when the staffs document comes out.
19            RICHARD HARPER:  Well clearly it would have to be a different 20 challenge. The challenge currently is the challenge that the environmental 21 report is not including consideration. At that time the challenge would need 22 to be structured that the staff has not included consideration of those 23 elements within the environmental impact statement.
24            CHAIRMAN KARLIN:  Yeah, all right, and I think in addition setting 25 aside whether its premature, I mean its to dispense with that entirely if we
600 1 rule there is no duty to up -- as we see it in Part 51, to up -- to supplement 2 the ER. It was filed. It was what it was. Theres no duty to supplement it.
3 No contention could be raised about supplementing the ER, but when the draft 4 EIS comes out if that doesnt have the right stuff in it then thats the time 5 for this contention to be filed or some -- any contention to be filed about 6 that.
7            Now, when is the draft supplemental environmental impact statement 8 going -- I know you all get to file this monthly report and its very helpful, 9 but I think you kind of finessed that one. You talk about the final being, 10 what is it February to May of 2014?  [laughter]
11            RICHARD HARPER:  Your honor, Ill admit I was not -- I did not 12 [inaudible].
13            CHAIRMAN KARLIN:  [inaudible] Okay. All right, well it will be 14 whatever it is but --
15            RICHARD HARPER:  It will be released, that is simply the 16 information [inaudible].
17            CHAIRMAN KARLIN:  You will have to issue a draft supplemental 18 environmental impact statement first and therell be a final. Okay. Im not 19 sure I have any more questions.
20            NICHOLAS TRIKOUROS:  With respect to this question of the duty of 21 the applicant, with respect to the environmental report. So if theres a 22 significant issue, a significant environmental piece of information, they have 23 no obligation to incorporate that into their environmental report as a 24 supplement. The DEIS comes out and doesnt include it because frankly the 25 staff had -- didnt know about it. Does that make sense?  It doesnt to me.
601 1            RICHARD HARPER:  Based on the conversation and discussion weve 2 just had, your honor, and the regulations that outline the applicants 3 responsibilities whether or not they should update or theyre required to 4 update the environmental report, the logical next step is -- for contention to 5 be raised would be at the issuance of the draft supplemental environmental 6 statement. It doesnt mean that that time necessarily that --
7            CHAIRMAN KARLIN:  The part, the ER is a creature of Part 51 and 8 only of Part 51, not of NEPA, and unless theres a duty in Part 51 to 9 supplement I am concerned whether there is any duty to supplement the ER, and 10 we have to study 51.53.C34 and see if that covers it.
11            DR. PAUL ABRAMSON:  Would the staffs RAI process -- say the staff 12 thought there was new and significant information for the ER, for the 13 environmental side. Would the staff -- is it the staffs practice to ask the 14 applicant to advise them how that would impact the ER through an RAI or some 15 other method?
16            RICHARD HARPER:  Your honor, I dont know that off the top of my 17 head. If I may consult with my lead counsel?
18            DR. PAUL ABRAMSON:  Please.
19            CHAIRMAN KARLIN:  Can we proceed, Mr. Harper?  Ill ask the 20 reporter to read back the question. No, no thats [inaudible]. What was the 21 question?
22            RICHARD HARPER:  That may be helpful. First as a point of 23 clarification based on the last question, the applicant has a yearly 24 responsibility to update their application which includes update of the 25 environmental [inaudible].
602 1            CHAIRMAN KARLIN:  Where is that in the regs?
2            RICHARD HARPER:  Part 54. I apologize, I dont --
3            DR. PAUL ABRAMSON:  Let them find it for us as we move along. Go 4 ahead with your next point, Mr. Harper.
5            RICHARD HARPER:  Along with that that would include any type of new 6 and significant information. With response to the question on whether an RAIs 7 -- our responses to RAIs and perhaps -- perhaps if you could ask your question 8 again, your honor. I apologize.
9            DR. PAUL ABRAMSON:  My question is if the staff becomes aware of 10 some information it feels is new and significant vis--vis its EIS, would the 11 staff customarily ask the applicant -- provide the applicant with a request 12 for, with a request for additional information which is what RAI is, and let 13 the applicant deal with that or is it the sort of thing the staff would just 14 deal with on its own in the EIS?
15            RICHARD HARPER:  Yes, well the staff would definitely consult with 16 the applicant and request further information clarifying information from that.
17            DR. PAUL ABRAMSON:  Okay, so that if it comes up and the reason it 18 what, it -- for example, if some report that comes out from some experts who 19 looked at all the data coming out of Fukushima and said heres the 20 environmental impact from Fukushima and heres how we think it will impact U.S.
21 plants. That sounds like new and significant information to me. Is that the 22 sort of thing that then the staff would ask the applicant address it in its ER 23 one way or another, right?  Thank you.
24            RICHARD HARPER:  [inaudible]
25            CHAIRMAN KARLIN:  Yeah, there are regs I found that the staff can
603 1 ask the applicant to update its ER. Thats a may, not a shall, and so I think 2 its the contention hinges upon a shall and so at least thats one way to read 3 it. Is there a reg in 10 CFR Part 54 or 51 that you can cite as to that says 4 the applicant must annually update its ER?
5            DR. PAUL ABRAMSON:  Theyre looking for it.
6            RICHARD HARPER:  Can we get back to your [inaudible].
7            CHAIRMAN KARLIN:  Okay. Okay. Id be very much interested in 8 finding that out because that could make a difference. I think were going to 9 go back. Were probably done with you, Mr. Harper. We have some other 10 questions that wed have some fun with but were not going to ask them so --
11            RICHARD HARPER:  I appreciate that.
12            CHAIRMAN KARLIN:  You can sit down.
13            RICHARD HARPER:  Thank you.
14            CHAIRMAN KARLIN:  When Ms. Curran comes back [inaudible]. Oh, 15 yeah, well. Ms. Curran could you come back to the podium?  We have a couple of 16 further questions for you. One of them was my -- one of my earlier questions, 17 one of my first questions and Im not sure I got an answer. I dont know that 18 I did. Which is, the Commission dealt with the generic EIS in the context of 19 CLI-11-5 and said no were not going to update, -- were not going to initiate 20 a revised generic EIS, its premature. You filed this contention -- we filed 21 it before that decision came down saying, well this environmental impact 22 statement or ER at this site and needs to be implemented -- updated because 23 theres new and significant information. Now my question at that point was on 24 Page 15 of your motion and also at Page 17 you talk about -- you refer to some 25 things that are sort of site specific. Let me see if I can pull that up.
604 1 Sorry, its going to take me a moment.
2            DR. PAUL ABRAMSON:  While youre looking for that, Judge Karlin, 3 Ms. Curran did you have any answers for my earlier questions that we deferred?
4            DIANE CURRAN:  I did.
5            DR. PAUL ABRAMSON:  Okay, lets address this.
6            CHAIRMAN KARLIN:  Yeah, go ahead. Im sorry.
7            DR. PAUL ABRAMSON:  While were waiting.
8            CHAIRMAN KARLIN:  Good idea.
9            DIANE CURRAN:  I hope this is responsive to your question, Judge 10 Abramson. On Page 12 to 13, we talk about the NRCs determination that the 11 environmental impacts of both design-basis accidents and severe accidents are 12 small. And so the Task Force Report provides new and significant information 13 suggesting that the environmental impacts of severe accidents are not 14 necessarily small because there, because the task force suggests that they 15 should be included within the realm of accidents for which mitigation is 16 required. In other words, it --.
17            DR. PAUL ABRAMSON:  Okay, I understand that.
18            DIANE CURRAN:  [inaudible] is considered to have small impacts 19 because theyre very unlikely to happen. Thats the general idea and what the 20 implication of the task force report is --
21            DR. PAUL ABRAMSON:  Implication.
22            DIANE CURRAN:  -- more likely --
23            DR. PAUL ABRAMSON:  Implication.
24            DIANE CURRAN:  -- than that.
25            DR. PAUL ABRAMSON:  Implication.
605 1            DIANE CURRAN:  The implication. Its a strong implication.
2            DR. PAUL ABRAMSON:  I understand that, and thats what you have?
3            DIANE CURRAN:  Yes.
4            DR. PAUL ABRAMSON:  Thank you.
5            CHAIRMAN KARLIN:  Okay, my -- Im referring to Page 15 of your 6 motion and 17 also, but the question is, is this contention based upon any kind 7 of sort of site-specific environmental impacts or issues?  Because the problem 8 is the Commission has dealt with the generic issue and said no, thats 9 premature. So how can you -- is the survival of this contention founded upon 10 it being site-specific to Diablo Canyon in some way?
11            DIANE CURRAN:  Well, as I think I said previously, its not 12 necessary for the task force conclusions to be site specific for those 13 conclusions to have site-specific ramification and that is what is discussed in 14 the contention at Pages 15 and 16. In other words, the Task Force Report 15 expressed concern about seismic risk, about risk of flooding. Well we have 16 here a nuclear plant -- Im as close to California in an earthquake zone. So 17 we made a connection between that general concern of the task force and the 18 specific circumstances of the Diablo Canyon plant, and then another example is 19 station blackout. Well thats generally expressed concerned in the task force 20 report but it is -- it has a site specific application to Diablo Canyon.
21            CHAIRMAN KARLIN:  Oh, okay. So youre saying you dont have any --
22 that the task force report findings and recommendations, although generic, have 23 site specific effects or implications or potentially and thats how youre 24 approaching this?
25            DIANE CURRAN:  Right.
606 1            CHAIRMAN KARLIN:  Okay. I think thats [inaudible]
2            DIANE CURRAN:  This task force report has environmental 3 implications, major environmental implications. The Commission has a choice.
4 It could deal with them generically. It could deal with them on a case-by-case 5 basis in pending license renewal cases. In CLI-11-05 the Commission decided 6 not to deal with those generically, and we would submit to you then that leaves 7 only one choice, which is deal with them on a case-by-case basis. But the NRC 8 must deal with them somehow.
9            CHAIRMAN KARLIN:  Okay, I understand that. I want to ask the 10 question that weve asked the others and, you know, what objectively 11 determinable events can we, could we craft, would you suggest that we put into 12 -- if we were going to do a case management order, a scheduling order -- here 13 is the win, the Fukushima contention should, would be timely, or here are the 14 criteria that would be used in determining whether theyre timely. You dont 15 want to be in the catch 22. Youve said that. I understand that. I mean, is 16 there anything you would suggest?
17            DIANE CURRAN:  Well I guess in the course of the answering that Id 18 like to address two predicates.
19            CHAIRMAN KARLIN:  All right but. Go ahead.
20            DIANE CURRAN:  Issue one is, if the Board ends up ruling that 21 theres no obligation, no legal obligation to supplement an environmental 22 report then it seems to me that the logical conclusion is that the next 23 juncture at which it would be appropriate to submit a contention is when the 24 supplemental EIS comes out. Then and at that point we would submit the task 25 force report and anything else that had happened in the meantime that we
607 1 thought was relevant. That one seems clear to me. The issue of whether or not 2 this is just premature because not enough was known about the Fukushima 3 accident or because theres something in CLI-11-05 that suggests that -- first 4 of all I dont think CLI-11-05 says that and second, I think its really basic 5 to this case, to NEPA, to this contention that a group of experts within the 6 NRC has issued an expert opinion about the implications of the task --
7 Fukushima accident. About you know what, what does it mean for U.S. reactors?
8 Even if the Commission somewhere say between now and the issuance of the draft 9 EIS, the Commission says we reviewed the Task Force Report.
10            We think theyre full of beans and were not regarding this unless 11 they make a real technical determination of that and say we hereby determine 12 this is not new, this is not significant. They cant just wish it away. Its 13 been said by credible experts within the agency so it must be dealt with on a 14 NEPA.
15            CHAIRMAN KARLIN:  Okay, any other questions?
16            DR. PAUL ABRAMSON:  No.
17            CHAIRMAN KARLIN:  Questions?  Thank you, Ms. Curran.
18            DIANE CURRAN:  Oh, I have one more thing, Judge Karlin.
19            CHAIRMAN KARLIN:  What?
20            DIANE CURRAN:  And thats just, just to comment on what you, you 21 had said wouldnt you do an EIS anyway supposing the Commission adopted all 22 these recommendations?  And I just happened to notice while I was sitting there 23 a footnote in PG&Es response on Page 14 that -- I havent read these cases, 24 but it seems to give the answer that if the supplement to an EIS would make the 25 environment better then it doesnt need to be supplemented. I think thats
608 1 where our -- anyway I hate give that away but I think thats, you know.
2            DR. PAUL ABRAMSON:  Thats, thats, thats kind of where I was 3 going earlier, right?  You put more in the design basis, the environmental 4 impact gets less.
5            DIANE CURRAN:  Yeah.
6            CHAIRMAN KARLIN:  Okay, thank you Ms. Curran.
7            DIANE CURRAN:  Thank you.
8            CHAIRMAN KARLIN:  Mr. Harper, do you have that cite for us?
9            RICHARD HARPER:  Your honor, in 54.13(b) it says each applicant 10 shall notify the Commission of [inaudible].
11            CHAIRMAN KARLIN:  I see it, let me get it, 54.13?
12            RICHARD HARPER:  (b).
13            CHAIRMAN KARLIN:  (b), yes. Each applicant shall notify --
14            RICHARD HARPER:  The Commission of information identified by the 15 applicant as having for the regulated activity a significant implication for 16 public health and safety or common defense and security.
17            DR. PAUL ABRAMSON:  Identified by the applicant.
18            RICHARD HARPER:  Identified by the applicant.
19            DR. PAUL ABRAMSON:  So if they dont think it does, they dont 20 notify you. Right?
21            CHAIRMAN KARLIN:  Well, okay, but that -- there could be question 22 whether thats a subjective standard or an objective standard, you know. But, 23 but the point lets -- is that what youre relying on for the annual updates?
24            SUSAN UTALL:  No, I couldnt find [inaudible].
25            CHAIRMAN KARLIN:  [laughter] Yeah because, yeah okay, because.
609 1            SUSAN UTALL:  Have to send it on.
2            CHAIRMAN KARLIN:  Each applicant shall notify the Commission of 3 information identified there as having for the regulated activity significant 4 implication of or common defense and security. Thats the completeness and 5 accurate -- so thats your basic completeness and accuracy provision that comes 6 in every Part 30, Part 40, Part 50, Part 70.
7            SUSAN UTALL:  Its the same as 50.9.
8            CHAIRMAN KARLIN:  Yeah, yeah.
9            DAVID REPKA:  Judge Karlin, thats part of what I alluded to.
10            CHAIRMAN KARLIN:  Yeah.
11            DAVID REPKA:  [inaudible] material information but I did allude to 12 my recollection of an annual update. I havent been able to find that citation 13 either and I can certainly -- Im willing to take that as homework to see if I 14 can find more [inaudible].
15            DR. PAUL ABRAMSON:  Let them both e-mail it.
16            CHAIRMAN KARLIN:  Well lets see here. Let me just try -- let me 17 look at one thing here. [inaudible]
18            [laughter]
19            Well there is 54.21(b), which talks about CLB changes during the 20 NRC review of the application. Each year following the submittal of the 21 license renewal application, blah, blah, blah, the application -- amendment to 22 the renewal application must be submitted that identifies any changes to the 23 CLB the. Is that what were talking about?  There is an annual update relating 24 to CLB, not environmental. Maybe that --
25            DAVID REPKA:  That may be what I was recollecting.
610 1            CHAIRMAN KARLIN:  Yeah. I mean it could be in guidance, which 2 isnt going to cut it really in terms of a mandatory Part 51, but Okay. Well 3 why dont -- I dont -- I hate to end this and say, okay, submit this, you 4 know, post-hearing briefs on anything. This is not to be long, this is a one 5 page or less and -- and that you can submit lets say in five days, would you 6 please, and all three of you may submit that. Is there and the only question 7 is, is there a reg?  What reg, if any, requires the environmental report to be 8 supplemented or updated annually or whatever other time?
9            SUSAN UTALL:  Can I add --
10            DR. PAUL ABRAMSON:  Can I make that more specific?  Provide the --
11 identify any regulation which requires.
12            CHAIRMAN KARLIN:  Yeah, okay, here lets --
13            DR. PAUL ABRAMSON:  And you dont need a page, either there is or 14 there isnt.
15            CHAIRMAN KARLIN:  And Ms. Curran will be incentivized to find that 16 reg as well, so all three of you would be, you know, submit what there is on 17 that. Ms. Utall, yes?
18            SUSAN UTALL:  Yeah, Id like to make one point regarding what is 19 done in practice because the licensees [inaudible].
20            CHAIRMAN KARLIN:  Practice?  We dont pay any attention to that 21 [unintelligible] regs.
22            SUSAN UTALL:  I dont know where [inaudible] and thats why 23 [inaudible] looking, were going to look for it. But in practice the, the 24 licensees do update their application and quite frequently frankly and Ill ask 25 the staff, you know --
611 1            CHAIRMAN KARLIN:  Okay.
2            SUSAN UTALL:  -- the basis of that.
3            CHAIRMAN KARLIN:  One page on the question we just addressed in 4 five days [unintelligible], yeah. With that, anything else, Judge Abramson?
5            DR. PAUL ABRAMSON:  One sentence, not one [inaudible].
6            CHAIRMAN KARLIN:  One sentence, less. All right, well we thank you 7 all for your patient answers. Its taken a little longer than some of us 8 hoped, but we got through it so we now stand adjourned. Thank you.
9            (Whereupon, at 4:31 p.m. the above-entitled matter was concluded) 10                      E-N-D-P-R-O-F-P-R-O-C-D-E-E-D-I-N-G-S 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of                                )
                                                )
PACIFIC GAS AND ELECTRIC COMPANY                )    Docket Nos. 50-275-LR and 50-323-LR
                                                )
(Diablo Canyon Nuclear Power Plant,              )
Units 1 and 2)                                )
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing OFFICIAL TRANSCRIPT OF THE LICENSING BOARD ORAL ARGUMENT ON OCTOBER 13, 2011, have been served upon the following persons by the Electronic Information Exchange.
U.S. Nuclear Regulatory Commission              U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel        Office of the General Counsel Mail Stop: T-3F23                              Mail Stop: O-15D21 Washington, DC 20555-0001                      Washington, DC 20555-0001 Alex S. Karlin, Chair                          Edward L. Williamson, Esq.
Administrative Judge                            E-mail: edward.williamson@nrc.gov E-mail: alex.karlin@nrc.gov                    Susan Uttal, Esq.
E-mail: susan.uttal@nrc.gov Nicholas G. Trikouros                          Maxwell Smith, Esq.
Administrative Judge                            E-mail: maxwell.smith@nrc.gov E-mail: nicholas.trikouros@nrc.gov              Lloyd Subin, Esq.
E-mail: lloyd.subin@nrc.gov Paul B. Abramson                                Megan Wright, Esq.
Administrative Judge                            E-mail: megan.wright@nrc.gov E-mail: pba@nrc.gov                            Richard Harper, Esq.
paul.abramson@nrc.gov                          richard.harper@nrc.gov Lauren Woodall, Esq.
Jonathan Eser, Law Clerk                        lauren.woodall@nrc.gov E-mail: jonathan.eser@nrc.gov                  Brian Newell, Paralegal Lauren Woodall, Law Clerk                      E-mail: bpn1@nrc.gov E-mail: lauren.woodall@nrc.gov                  OGC Mail Center E-mail: OGCMailCenter@nrc.gov U.S. Nuclear Regulatory Commission              U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication    Office of the Secretary of the Commission Mail Stop: O-16C1                              Mail Stop: O-16C1 Washington, DC 20555-0001                      Washington, DC 20555-0001 OCAA Mail Center                                Hearing Docket E-mail: ocaamail@nrc.gov                        E-mail: hearingdocket@nrc.gov
2 Diablo Canyon Nuclear Power Plant - Docket Nos. 50-275-LR and 50-323-LR OFFICIAL TRANSCRIPT OF THE LICENSING BOARD ORAL ARGUMENT ON OCTOBER 13, 2011 Counsel for Pacific Gas and                San Luis Obispo Mothers for Peace Electric Company                          1123 Flora Road Winston & Strawn, LLP                      Arroyo Grande, CA 93420 101 California Street                      Jill ZamEk, Esq.
San Francisco, CA 94111-5802                jzk@charter.net David A. Repka, Esq.
E-mail: drepka@winston.com Tyson Smith, Esq.                          Counsel for San Luis Obispo Mothers E-mail: trsmith@winston.com                  For Peace Carlos Sisco, Senior Paralegal              Harmon, Curran, Spielberg, and Eisenberg E-mail: csisco@winston.com                  1726 M Street, N.W., Suite 600 Washington, DC 20036 Winston & Strawn, LLP                      Diane Curran, Esq.
1700 K Street, NW                          dcurran@harmoncurran.com Washington, DC 20006 Rachel Miras-Wilson, Esq.
E-mail: rwilson@winston.com
[Original signed by R. Giitter            ]
Office of the Secretary of the Commission Dated at Rockville, Maryland this 20th day of October 2011}}

Latest revision as of 14:12, 12 November 2019

Transmittal of Hearing Transcript in the Matter of Pacific Gas & Electric Company, Diablo Canyon, Units 1 and 2
ML11293A206
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/20/2011
From:
Atomic Safety and Licensing Board Panel
To:
SECY RAS
References
RAS 21278, 50-275-LR, 50-323-LR, ASLBP 10-900-01-LR-BD01
Download: ML11293A206 (91)


Text

523 1 United States of America 2 Nuclear Regulatory Commission 3 + + + + +

4 ATOMIC SAFETY AND LICENSING BOARD PANEL 5 HEARING 6

7 8 IN THE MATTER OF DOCKET NO: 50-275-LR and 9 PACIFIC GAS & ELECTRIC COMPANY 50-323-LR 10 (Diablo Canyon Nuclear Power Plant, ASLBP No. 10-890-01-LR-BD01 11 Units 1 and 2) 12 13 14 15 Thursday, 16 October 13, 2011 17 + + + + +

18 Rockville, Maryland 19 The trial commenced in Room T-3B45 of Two White Flint 20 North, Rockville Pike, Rockville, Maryland, at 10:00 a.m.

21 22 BEFORE:

23 Alex S. Karlin, Chairman 24 Nicholas G. Trikouros 25 Dr. Paul B. Abramson 26

524 1 Diablo Canyon Power Plant -- Docket Nos. 50-275-LR and 50-323-LR 2 ORDER (Scheduling Oral Argument) 3 4 Counsel for Pacific Gas and Electric Company 5 Winston & Strawn, LLP 6 101 California Street 7 San Francisco, CC 94111-5802 8 David, E. Repka, Esq.

9 10 Winston & Strawn, LLP 11 1700 K Street, NW 12 Washington, DC 20006 13 Rachel Miras-Wison, Esq.

14 15 San Luis Obispo Mothers for Peace 16 1123 Flora Road 17 Arroyo Grande, CA 93420 18 Jill ZamEk, Esq.

19 20 Counsel for San Luis Obispo Mothers for Peace 21 Harmon, Curran, Spielberg, and Eisenberg 22 MORGAN, LEWIS & BOCKIUS LLP 23 1726 M Street, N.W., Suite 600 24 Washington, DC 20036 25 Diane Curran, Esq.

525 1 P-R-O-C-E-E-D-I-N-G-S 2 1:30 p.m.

3 CHAIRMAN KARLIN: Good afternoon. My name is Alex 4 Karlin. We are going on the record, court reporter. This an oral argument in 5 the matter of Pacific Gas & Electric Company application for a renewal of its 6 license for the San Luis Obispo Diablo Canyon nuclear power plants two nuclear 7 reactors. For the record, the docket number of this matter is 50-275-LR and 8 50-323-LR. And the ASLBP number is 10-890-01-LR-BD01. This oral argument is 9 being held pursuant to an order that this court issued on September 30th of this 10 year. Todays date is October 13th. This proceeding is hopefully being 11 webcast.

12 Normally, we try to hold as many of our proceedings in the vicinity 13 of the proposed -- or the existing power plant as possible. Because of the 14 relatively short notice for this particular argument, we decided to hold it 15 here in Washington in our Rockville hearing room. And thus, we have been able 16 to webcast this, hopefully, to the people out West who might be interested in 17 this matter.

18 At this point Id like to introduce -- call for introductions, 19 first of the board. To begin, Im Alex Karlin. Im one of the legal members 20 of judges, and to my right is Dr. Paul Abramson, and to my left is Nick 21 Trikouros. These are other judges. We also have Jonathan Ezer, who is the 22 lawyer and law clerk who is assisting us and other people in the room, 23 including Karen Valloch as an administrative assistant who is helping.

24 The petitioners, San Luis Obispo Mothers for Peace, Ms. Curran, 25 youre sitting there alone, but do you care to introduce your team or yourself.

526 1 DIANE CURRAN: Good afternoon. Im Diane Curran with the law firm 2 of Harmon, Curran, Spielberg and Eisenberg. And Im her representing the San 3 Luis Obispo Mothers for Peace.

4 CHAIRMAN KARLIN: Thank you. Now, the applicant is Pacific Gas &

5 Electric. Mr. Repka, would you like to introduce your team?

6 DAVID REPKA: Yes. My name is David Repka, and Im counsel for 7 Pacific Gas & Electric Company, and with me today is my associate at the law 8 firm of Winston & Strawn. Rachel Miras-Wilson.

9 CHAIRMAN KARLIN: Okay, thank you. Welcome. And the staff, Ms.

10 Utall?

11 SUSAN UTALL: Good afternoon. My name is Susan Utall. I am with 12 the Office of General Counsel at the Nuclear Regulatory Commission. I 13 represent the Nuclear Regulatory Commission staff. With me is Richard Harper, 14 also of the Office of General Counsel. Mr. Harper will be presenting the 15 staffs position today.

16 CHAIRMAN KARLIN: All right, thank you. Before we begin, I think 17 its worth reviewing a little bit of the background of this case. This is a 18 license renewal proceeding, as I mentioned. And the applicant, Pacific Gas &

19 Electric, submitted its application to renew its license in 2009. In January 20 of 2010, the NRC staff issued a notice in the Federal Register informing the 21 public that anyone who had any issues with regard to this proposed license 22 renewal should speak now or forever hold your peace, raise your concerns and 23 request a hearing. And indeed, the San Luis Obispo Mothers for Peace did file 24 a petition for a hearing and five proposed contentions in, I guess it was March 25 2010.

527 1 Pursuant to that request, the parties briefed the contention 2 admissibility and standing issues, and we had an oral argument in San Luis 3 Obispo on this matter in May of 2010, and then in August, issued a decision 4 admitting four of the proposed contentions and finding that one of the -- the 5 fifth contention was not admissible and did not meet the admissibility 6 criteria. Im not going to go into the details of that decision. But it does 7 turn out that the staff and the applicant appealed all or parts of that 8 decision quite promptly in September of 2010. And yesterday, the Commission, 9 14 months later, issued its ruling on the appeals of the admission of those 10 contentions. Essentially the Commission threw out all of the contentions 11 except for one. And so there is still one contention in the proceeding.

12 But thats not why were here today. Today were looking at a new 13 contention that the Mothers for Peace -- and Im going to refer to them as 14 Mothers for Peace, if thats okay. Its a little shorter than San Luis Obispo 15 Mothers for Peace. They recently filed a new contention in August -- August 16 11th of 2011, and its related to the tragic events that occurred in Japan, 17 associated with the Fukushima Daiichi Nuclear Power Plants and the earthquake 18 and the tsunami and then the nuclear power plant problems that occurred out 19 there. And so, thats how we come here today.

20 Now, a little bit of review on that. The Fukushima Daiichi 21 accident and the earthquake and the tsunami occurred on March 11th of 2011. On 22 April 14th of 2011, the Mothers for Peace and others filed a petition with the 23 Commission to suspend all the licensing proceedings in light of the Fukushima 24 Daiichi situation. The Commission did not act upon that for several months.

25 And so, in the meantime, on August 11th, the Mothers for Peace filed this

528 1 contention in this proceeding. And its the similar contention was filed in 2 many other adjudicatory proceedings by boards of reactor cases.

3 But meanwhile, on September 9th, the Commission did rule on the 4 earlier petition to suspend all the proceedings in a decision that were going 5 to call -- or Im going to refer to as COI 11-5. Thats the Commissions 6 decision. And they, among other things, the Commission denied the petition to 7 suspend all the adjudications. And so we are continuing obviously with this 8 adjudication. And thats what were here to do today, is proceed with this 9 adjudication and this contention, this -- what Im sometimes refer to as the 10 Fukushima contention.

11 The purpose of this oral argument is to hear from the lawyers 12 regarding the admissibility of the Fukushima contention. Weve read their 13 briefs. Weve studied the issues. And I think we understand much of what 14 theyve covered, but we have some questions that would help us in trying to 15 decide the admissibility of this contention. And thats important for everyone 16 to know. This proceeding is only dealing with the admissibility of the 17 contention, whether its timely, whether its admissible under the criteria of 18 the NRC regs, 10CFR 2.309 is the particular reg. And it lays out criteria such 19 as the contention must be within the scope of the licensing renewal proceeding.

20 And it must be supported by alleged facts or expert opinion. And there are 21 other relatively technical criteria that a contention must meet in order to be 22 deemed admissible. The point is we are not here to decide the merits of the 23 contention, whether its meritorious, whether it is, in fact -- should be 24 ultimately supported, but only whether its admissible and timely.

25 And we are not here to discuss something else, the decision that

529 1 the Commission issued yesterday regarding the four contentions and the appeal 2 of the four contentions. So I dont see us really confronting or addressing 3 that at all. We have not asked the parties to address that, and I dont think 4 were fully prepared to do that either.

5 So if we find this contention, this Fukushima contention admissible 6 and timely, we would admit it and hold an evidentiary hearing later. This is 7 just the oral argument. So, how are we going to proceed at the moment is that 8 we would ask for the parties to deliver opening statements of not greater than 9 five minutes. Please come to the podium when you do that. Well start with 10 the petitioners, the Mothers for Peace, and then the applicant, Pacific Gas &

11 Electric, and then the staff. After that, we will commence with questions 12 essentially in the same order as the intervener, the applicant and the staff.

13 And we may then ask some rebuttal questions as well.

14 Do either of my colleagues have any additional remarks or -- that 15 they would like to make?

16 NICHOLAS TRIKOUROS: I dont.

17 DR. PAUL ABRAMSON: I do.

18 CHAIRMAN KARLIN: Okay, great.

19 DR. PAUL ABRAMSON: For the record, Judge Abramson. Let me just 20 ask the lawyers who are here who are going to comment in their pleadings to 21 confine their statements to descriptions of whats in the pleading. Its 22 important because this is oral argument on whats in the pleading. Its not an 23 opportunity to make a new case.

24 CHAIRMAN KARLIN: Very good. Ms. Curran, please take the podium 25 and --

530 1 DIANE CURRAN: Thank you. Im very grateful that youve allowed us 2 to make an opening statement because I believe there are many members of the 3 Mothers for Peace in California and other neighbors of the Diablo Canyon plant 4 that are very interested in the outcome of this proceeding, how the contention 5 is handled, whether were going to be able to litigate Fukushima-related issues 6 with respect to this coastal nuclear plant. And so thank you very much.

7 As the world knows, seven months ago, a serious radiological 8 accident began at the Fukushima Daiichi Nuclear Power Plant complex in Japan.

9 The accident itself involved a serious earthquake and a tsunami. The response 10 to the accident revealed a pronounced inability of safety systems to prevent or 11 to stop the release of significant quantities of radioactive materials to the 12 environment. The NRC Commissioners recognized immediately that the Fukushima 13 accident could have significant implications for the safety of U.S. reactors.

14 Therefore, it assembled a high-level task force, composed of its most talented 15 and experienced regulators and asked them to provide a systematic and 16 methodical review of NRC processes and regulations in order to determine 17 whether the agency should make additional improvements to its regulatory 18 system.

19 In July of this year, the task force came back to the NRC 20 Commissioners with a report that included a very significant conclusion, that 21 the NRCs safety approach -- that was in quotes, safety approach -- is 22 incomplete without a strong program for dealing with the unexpected, including 23 severe accidents. And as we know, the NRCs safety program currently has very 24 little in the way of mandatory programs to address severe accidents, and thus 25 the task force was commenting that more is needed.

531 1 The report also found -- made findings on a number of significant 2 issues that are extremely important for Diablo Canyon. One is that there may 3 be significant differences between plants and the way they protect against 4 earthquakes and against floods and the adequacy of the safety margin involved.

5 The task force also found that measures for mitigating station blackout events 6 needed to be improved, and therefore the task force recommended the NRC address 7 the concerns raised in the report by adopting a series of new regulatory 8 measures.

9 While the Commission is studying these recommendations, to a large 10 extent, they have not yet been adopted. It appears that rulemakings to adopt 11 these recommendations under the NRCs Atomic Energy Act safety program may take 12 years. In the meantime, the license renewal proceeding for Diablo Canyon 13 proceeds.

14 We are here to seek enforcement of the National Environmental 15 Policy Act, which requires that environmental issues that pertain to major 16 federal decisions with significant potential impacts on the environment --

17 those environmental issues have to be addressed before the licensing decision 18 is made. Its not okay under the National Environmental Policy Act to postpone 19 consideration of these issues until after licensing. Were not here to argue 20 about what the Atomic Energy Act requires, but its very clear the NRC has a 21 non-discretionary duty to consider the environmental impacts of this licensing 22 actions before making the decision, the purpose, of course, being to prevent 23 harmful decisions from being made and then rationalized in hindsight without 24 really dealing with the environmental risks.

25 The Mothers for Peace believe that the Task Force Report has

532 1 enormous implications with respect to the adequacy of the environmental 2 analysis for the Diablo Canyon Nuclear Plant. What do I got? One minute?

3 CHAIRMAN KARLIN: Yeah, one minute.

4 DIANE CURRAN: Okay. And really, theres a number of 5 recommendation that the task force makes, but there is an overarching 6 recommendation that has huge significance which is that the current safety 7 systems, the current regulatory system under the Atomic Energy Act is not broad 8 enough to embrace all of the types of accidents that need to be addressed in a 9 safety regulatory scheme. If this issue -- if this issue is not addressed 10 under the Atomic Energy Act, then NEPA requires that it must be addressed under 11 -- in the environmental analysis for this plant. And therefore, we urge the 12 licensing board to admit our contention. Thank you.

13 CHAIRMAN KARLIN: Thank you. Mr. Repka?

14 DAVID REPKA: Thank you and good afternoon. And Ill try to be 15 brief and stick to some -- what I think are the key points that are in our 16 written filings. First, I want to say that the issue before us is not whether 17 the tragic events in Japan at Fukushima need to be addressed by the NRC or by 18 the nuclear industry in the United States. The issue before us is whether or 19 not they need to be addressed under NEPA in this license renewal site-specific 20 case and in the -- the answer to that question is no, they do not. Certainly 21 the issues at Fukushima will be addressed by the industry and by PG&E and the 22 NRC, but this license renewal proceeding is not the appropriate forum.

23 The contention before us from the Mothers for Peace is based 24 entirely on the NRCs own task force, the Near-Term Task Force Report. And that 25 particular report does not say anything about seismic hazards at Diablo Canyon.

533 1 It doesnt address anything about equipment at the Diablo Canyon. It doesnt 2 address anything about particular severe accident mitigation alternatives at 3 Diablo Canyon, nor does it address even environmental impacts of the accident 4 in Japan.

5 The issue of severe accidents, which must be addressed under the 6 National Environmental Policy Act, is addressed in the generic environmental 7 impact statement for license renewal, the so-called GEIS. There is a 8 substantial analysis of severe accident impacts, including severe accident 9 mitigation alternatives. The Task Force Report does not address that in any 10 way and does not portend to be an environmental analysis. Severe accident 11 mitigation alternatives are addressed in the site-specific Diablo Canyon 12 environmental report to support license renewal. That analysis includes 13 measures related to seismic risks. It includes measures related to off-site 14 power. And the Task Force Report doesnt in any way address those issues.

15 So the issue is, for us, does further analysis need to be conducted 16 in this context related to environmental impacts of license renewal? And the 17 answer is no. Those issues have been addressed. And the sole basis for the 18 contention, the Task Force Report, provides no new information on those points.

19 As we talked about in our pleadings, and I wont belabor this, the NRC has a 20 very -- a carefully crafted regulatory structure related to license renewal, 21 including generic evaluations of environmental impacts of severe accidents, 22 including severe accidents related to spent fuel pools. And those issues have 23 been addressed. And certainly to the extent that as evaluations of the 24 Fukushima accident go forward, if new and significant environmental information 25 were to arise from those ongoing studies, that would be evaluated, and

534 1 supplements would be considered if necessary. But as the Commission recognized 2 in TLI 11-05, the Commissions ruling on the petitions for suspension of all 3 proceedings, the Task Force Report has revealed -- provided no information on 4 environmental impacts at this point and any obligation with respect to -- or 5 any assertion that theres an obligation to address new and significant 6 information is simply premature. And on that basis, there can be no contention 7 of omission in this case at this time, and the contention should not be 8 admitted.

9 CHAIRMAN KARLIN: Thank you, Mr. Repka. Yes, staff? Its Mr.

10 Harper, right? Okay, thank you.

11 RICHARD HARPER: Good afternoon. Thank you for this opportunity to 12 come in and rehash a few of the points in our pleading. Specifically, your 13 honors, the NRC staff opposes the admission of this contention, primarily on 14 the basis that it does not meet the requirements under 10CFR 2.3091.

15 Specifically, the contention attempts to introduce issues that are 16 outside the scope of license renewal. It states that the license renewal 17 application must deal with the recommendations in the Task Force Reports when 18 those recommendations are planned to be dealt with generically by the 19 Commission and implemented on all the plants regardless of licensing status.

20 Additionally, it challenges regulations in generic determinations as a whole.

21 It attempts to raise emergency planning issues, which are clearly outside the 22 scope of license renewal. And it constitutes -- as a whole, it generalizes 23 attack on the NRC safety regulations. Additionally, the contention does not 24 present a material issue with the license renewal application. The Task Force 25 Report makes safety recommendations that dont relate directly to the

535 1 contention, potentially based primarily on environmental considerations under 2 NEPA. The contention also does not identify specific portions of the 3 applications which are flawed or which require correction. The contention 4 additionally challenges issues that are dealt with generically in the GEIS as 5 well as in 10 CFR Part 51, Subpart A, Appendix B. And its -- the SAMA 6 challenges within the contention are not material because NEPA does not require 7 implementation of any mitigation measures. And the contention does not 8 identify any faults with any specific SAMA. Additionally the contention relies 9 on insufficial [spelled phonetically] factual basis. The contention deals 10 directly with SAMAs. The SAMAs are not dealt with or referenced in the Task 11 Force Report. Additionally, the Mahajani declaration whereupon the contention 12 relies does not provide adequate support for the contention. Additionally, the 13 contention misrepresents the Task Force Report by claiming it questions whether 14 the NRC, under the current regulatory structure and team, can continue on with 15 licensing activities. Finally, the contention for reliance on the MARSH 16 standard for the examination of new and significant information is misplaced.

17 Also, the staff challenges the admissibility of the contention under the timing 18 requirements for new contentions of 10CFR 23092, and those requirements for 19 non-timely filings in 10CFR 2.3092. In light of the recent Commission 20 decisions, the staff wishes to reemphasize that the Task Force Report presents 21 no new and significant information which triggers the nuclear review under 22 these circumstances. And additionally, that the Commission plans 23 [unintelligible] and will address and implement the recommendations in the Task 24 Force Report generically and generally to all plants regardless of license and 25 status. For these reasons, the staff opposes admission of the contention.

536 1 Thank you.

2 CHAIRMAN KARLIN: Thank you, Mr. Harper. Okay, Ms. Curran, we have 3 a few questions for you. If you would please go to the podium.

4 DIANE CURRAN: Oh, sure.

5 CHAIRMAN KARLIN: I have a question to start with, and I think I 6 would refer you to the Commissions decision denying your petition to suspend 7 the adjudicatory proceedings, CLI-11-5. Mr. Repka alluded to this in his 8 opening statement. And I think it is something that is -- something Id like 9 to ask a question about. On Page 30, it seems to me, of that decision is some 10 of the key language. And Im going to read that, and Im going to ask you to 11 help us understand how this contention can survive after the Commission makes 12 this ruling. And I quote, on Page 30 of the CLI-11-5, the Commission was asked 13 to deal with -- Im not quoting at this point -- whether or not you asking the 14 Commission to update its generic environmental impact statement to take into 15 account Fukushima-related events. And the Commission said, quote, Petitioners 16 request that the NRC conduct a separate generic NEPA analysis regarding whether 17 the Fukushima events constitute, quote, new and significant information, 18 close quote, under NEPA that must be analyzed as a part of the environmental 19 review for new reactor and license renewal decisions, close quote. And it 20 jumps down to later on that same page, quote, This request is premature.

21 Although the task force completed its review and provided its recommendations 22 to us, the agency continues to evaluate the accident and its implications for 23 U.S. facilities. And the full picture of what happened at Fukushima is still 24 far from clear. In short, we do not know today the full implications of the 25 Japan events for U.S. facilities. Therefore, any generic NEPA duty, if one

537 1 were appropriate at all, does not accrue now, period, close quote. How does -

2 - how do you confront that? Youre now asking us to deal with an individual 3 environmental impact statement or ER and have that be updated, and you claim 4 that there is new and significant information requiring that it be updated.

5 Could you please help with that?

6 DIANE CURRAN: Well, I think the key is that the word generic is 7 used uniformly to modify what the Commission isnt prepared to do. The 8 Commission does not want to do a generic -- you know, it describes what the 9 request is for a generic analysis and says we are not prepared to do a generic 10 analysis. That is something thats completely in the discretion of the 11 Commission, whether to do a site-specific analysis or a generic analysis. The 12 courts have been very clear that no one really has anything to say about that.

13 Thats the Commissions call. So theyve made their call. And then, you know, 14 with respect to, okay, what about this particular case, if you turn to Page 35, 15 then theres language there saying we think that if individual parties want to 16 raise issues in individual licensing cases, the hearing process is sufficient 17 to deal with those concerned. So if the decision is consistent with what we 18 did.

19 Another thing is that one would expect where there has been -- if 20 the Commission was going to make a determination that theres no new and 21 significant information, period, there would be some technical discussion. And 22 it isnt there on Pages 30 and 31. And it seems to be more linked with two 23 issues. One is were not prepared to do anything generic. And then the second 24 issue is many of these license renewal decisions wont be made very 25 immediately, so we have time.

538 1 CHAIRMAN KARLIN: So are you suggesting that if the Commission 2 wanted to rule that none of the individual contentions could be admitted then 3 because theres no new and significant information, they could have done so, 4 but rather than doing that, they said on Page 35 to go ahead with the 5 individual adjudications.

6 DIANE CURRAN: Right. And, you know, you have to remember, too, 7 that this contention wasnt before them when they made that decision. The 8 timings been a little odd, right, because we filed the emergency petition in 9 April, and then after months passed in which the Commission made no decision --

10 you know, a number of groups got together and said lets ask the Commission for 11 guidance here, because its not really clear. Nothings been said about NEPA.

12 How are we supposed to raise NEPA issues? Because we all know NEPA applies 13 before licensing decisions are made. And the Commission didnt rule. So after 14 the Task Force Report came out and had some very significant conclusions in it, 15 the same groups submitted contentions raising the issue. Then, some months 16 later -- that was in August. Then the next month, September, the Commission 17 issued a decision on the April petition, basically saying, yeah, you were right 18 to go ahead with these individual cases. Thats how it should be determined.

19 CHAIRMAN KARLIN: Well, let me ask -- you say, well, that was a 20 generic determination. And on Page 15 of your motion, your contention, Im 21 going to ask, is there something site-specific about this contention for Diablo 22 Canyon? Here you say, quote, Yet the task force found that significant 23 differences may exist between plants and the way they protect against design 24 basis natural phenomenon, including seismic and flooding hazards and the safety 25 margin provided. Ill delete the sites. For instance, while tsunami hazards

539 1 have been considered in the design basis for operating plants sited on the 2 Pacific Ocean, the same cannot be said for those on the Atlantic Coast.

3 Accordingly, the task force recommended that licensees reevaluate the seismic 4 and flooding hazards at their sites. Now, are you -- is there something site-5 specific about this contention for this proceeding?

6 DIANE CURRAN: It is site-specific in the sense that always under 7 NEPA the decision is site-specific. There is no generic NEPA decisions to 8 relicense our reactors. There is one decision to relicense Diablo Canyon, and 9 what our contention is saying with great specificity is in this decision for 10 Diablo Canyon, there is no reference to a major report that has significant 11 implications with respect to this licensing decision, and certainly the report 12 was written in generic terms. Mr. Repka said, the report doesnt talk about 13 Diablo Canyon. But the report talks about issues that are applicable to Diablo 14 Canyon, and therefore its site-specific.

15 NICHOLAS TRIKOUROS: Well, Id like to explore that a little more.

16 You use terminology -- you say that an analysis of the environmental 17 implications of the Task Force Report should be performed. Now were talking 18 site-specific -- plant-specific here. What analysis are you referring to? Are 19 you referring to -- if I looked at the Mahajani declaration and I look at your 20 motion, I could see two things. I could see an alternatives analysis and a 21 SAMA analysis. Are those the two -- is that the analysis that youre referring 22 to? Are there others that I didnt mention?

23 DIANE CURRAN: Well, there is -- its an implicit statement in the 24 Task Force Report. The task force does not explicitly state we consider the 25 current regulatory regime to be inadequate, but its a necessary inference of

540 1 what theyre saying. When they say we think that what now constitutes a scope 2 of safety regulations to protect against design basis accidents needs to be 3 extended, the flip side -- the necessary conclusion is we think theres a 4 problem here. This is not, you know, the safety regulations are what is 5 considered necessary by the NRC. The task force basically said, hey, 30 years 6 ago after Three Mile Island, you were told, NRC commissioners, you really need 7 to strengthen you regulatory program. It does not encompass enough of a 8 spectrum of accidents. And now, theyre saying it again. This second accident 9 has confirmed that.

10 NICHOLAS TRIKOUROS: Im going to interrupt you because I know 11 where youre going with this. I understand that. I think everybody 12 understands that there are significant issues. Theyre being dealt with in 13 other forums. Im more interested in this question specifically how one would 14 fit the Task Force Report recommendations to the Diablo Canyon license renewal.

15 Thats our job now.

16 DIANE CURRAN: Okay. I mean, heres another example. The ones 17 that you gave, those are --

18 PAUL B. ABRAMSON: Ms. Curran, as you address these questions, 19 would you try to point us to where in your pleadings these things are answered?

20 We are not permitted to take new information. So show us where in your 21 pleadings this sort of stuff is addressed.

22 DIANE CURRAN: Sure. I just have to find my contention. Im 23 sorry. Oh, here it is. Okay, first example is on Page 12 of the contention, 24 where we discuss the fact that in the generic EIS for license renewal, most of 25 the accidents that are considered are design-basis accidents. And they are

541 1 considered to be adequately dealt with by compliance with NRC safety 2 regulations. So theres a conclusion there that the environmental impacts of 3 accidents, design-basis accidents are small. Well, what if the design basis is 4 too small? What if the -- if you think of the Atomic Energy Act regulations 5 and NEPA as circles, okay, and the Atomic Energy Act is the inner circle --

6 DR. PAUL ABRAMSON: Show us in the pleadings, please.

7 CHAIRMAN KARLIN: I think thats permissible for her to argue.

8 DIANE CURRAN: I mean, Im trying to -- its in the pleading, and 9 Im just trying to give you an illustration of how this works in my mind. The 10 Atomic Energy Act safety regulations are a smaller circle inside a bigger 11 circle that includes -- that NEPAs bigger because NEPA covers not just design-12 basis accidents, but severe accidents. So theyre all included inside NEPA, 13 but the Atomic Energy Act design basis is within NEPA. So in that margin 14 around the Atomic Energy Act safety program, you have severe accidents. The 15 way severe accidents are handled is that mitigation measures are considered to 16 be optional in the sense that if theyre too expensive, they dont have to be 17 carried out. So they might not happen because theyre too expensive. And what 18 the task force is saying is the circles too small for the Atomic Energy Act 19 safety regulations. They need more, more accidents covered by mandatory 20 regulations. Thats huge. That is enormously significant from both the Atomic 21 Energy Act standpoint and NEPA. Theyre very -- theyre overlapping statutes.

22 NICHOLAS TRIKOUROS: But, again, let me rephrase my question in 23 this way. If we were to ask the applicant to modify their license renewal 24 application to accommodate the Task Force Report recommendations, what would 25 you think that they would provide us?

542 1 DR. PAUL ABRAMSON: Sorry, before we go there, can you point us to 2 legal authority where the applicant is required to do that, to modify its ER?

3 Isnt NEPA a duty of the agency, not of the applicant?

4 DIANE CURRAN: Well, Judge Abramson, youre raising a good 5 question. You know, the -- its kind of like the rough draft of the EIS thats 6 prepared by the applicant. And that becomes the basis for the environmental 7 impact statement. Now, Im not quite sure exactly how this would work. I 8 think there is a requirement in -- its in 51.53, yes, that environmental 9 reports must consider new and significant information. As a practical matter, 10 it might be that the staff ended up doing it. I dont know how it will work 11 out as a practical matter. Thats more kind of inside the agency. How does 12 the agency want to do this? Our concern is that it needs to be considered.

13 And Id also like just to start by saying, Judge Trikouros, I can 14 suggest some ideas of how this would happen. One of our main points here is it 15 is not the publics job to do this analysis for the NRC. Its what the -- what 16 the interested members of the public are doing here is putting the issue of 17 NEPA compliance before the agency and saying, You need to do this. You need 18 to show us that you are addressing this. You need to say something about this 19 that we could respond to. We are not the experts but we do know the law.

20 NICHOLAS TRIKOUROS: Well, the -- again, the agency has a 21 responsibility with respect to the current licensing basis of Diablo Canyon.

22 And you know this argument well, that they are doing that, they will do that, 23 but again, Im looking at the license renewal issue because we are narrowly 24 focused in that area here. And they could modify the current licensing basis 25 of this plant significantly, but none of that has an impact on this proceeding.

543 1 So I just dont want to mix the apples and the oranges here. I 2 understand there are big issues, significant changes are likely coming, all of 3 that. But were dealing with a contention on license renewal, and Im trying 4 to understand how it fits.

5 DIANE CURRAN: I need -- Id like to ask you a question. Are you -

6 - in your question, I hear you suggesting that maybe the scope of this 7 proceeding is limited to safety issues related to aging and degradation and not 8 the current licensing basis. Because I wasnt -- I mean, to me, whatever it is 9 in the current licensing basis is maybe relevant here, but the central question 10 is the environmental analysis.

11 NICHOLAS TRIKOUROS: Right. The -- in the environmental analysis, 12 I identified what I saw as two potential areas, alternatives and SAMA. A party 13 might even argue that alternatives is not an appropriate analysis area for this 14 application. Do you agree with that, that it would be limited to SAMA and 15 alternatives?

16 DIANE CURRAN: No, I think it would include SAMA and alternatives, 17 but also would include a discussion of how the task forces evaluation of the 18 Fukushima accident should affect the discussion of environmental impact.

19 Because if the scope of design-basis accidents is really too small, then the 20 findings in the generic EIS of that -- if a licensee complies with safety 21 requirements, it has adequately protected against accidents is now subject to 22 question and needs to be addressed. And Im not saying what the outcome of 23 that analysis should be. But we are saying it needs to be addressed.

24 DR. PAUL ABRAMSON: So, am I correct in reading into what youre 25 saying? And maybe you can point to me how you get this out of your pleading,

544 1 that the contention asks this board to consider, as a preliminary matter, 2 whether the scope of the design-basis accidents, currently considered, is 3 inadequate and therefore needs to be expanded?

4 DIANE CURRAN: What were asking the board to do is to consider 5 whether we have raised a genuine and material dispute about that, such that the 6 question should be admitted whether the implications of the accident and the 7 Task Force Report rise to the level of something that needs to be addressed.

8 DR. PAUL ABRAMSON: So youre saying that because the Task Force 9 Report makes a statement to the effect that theyre concerned about the scope 10 of design-basis accidents, that that is a foundation for admission of a 11 contention that challenges it? Is that right? And that that is -- thats the 12 linkage between the Task Force Report and this license renewal?

13 DIANE CURRAN: Yes, that our contention is based on two technical 14 documents -- the Task Force Report and its conclusions and Dr. Mahajanis 15 declaration, which essentially affirms his belief that this report raises 16 significant environmental issues. And he explains how he thinks some of the 17 environmental analyses for any nuclear plant would change if the task force 18 recommendations were taken into account. But again, I dont think it is our 19 burden here to show how it would change. What we need to show is that it could 20 change, that theres a significant potential that it could change because the 21 basic assumptions, the inputs to the environmental analysis are changing.

22 DR. PAUL ABRAMSON: Let me, if I may focus us back on -- your 23 motion to file the new contention or the contention itself is described as a 24 NEPA contention. And thats what it is, right? Its not a safety contention, 25 correct?

545 1 DIANE CURRAN: Right.

2 DR. PAUL ABRAMSON: Its a NEPA contention. And the contention is 3 stated at Page 4, and Im going to read it because I have some questions about 4 that. On Page 4 of your motion, it is, quote, Statement of contention. The 5 ER for Diablo Canyon license renewal fails to satisfy the requirements of NEPA 6 because it does not address the new and significant environmental implications 7 of the findings and recommendations raised by the NRCs Fukushima Task Force 8 Report, period. As required by NEPA and the NRC regulations, these 9 implications must be addressed in the ER, close quote, and thats the end of 10 your statement of the contention. As I -- let me just ask this. What, when 11 you talk about the findings and recommendations raised by the Task Force 12 Report, are they -- is that the new and significant information, the findings 13 and recommendations? Or is it the Fukushima event itself?

14 DIANE CURRAN: Well, its a combination because the task force was 15 -- they were assigned to evaluate --

16 DR. PAUL ABRAMSON: Yeah, but be careful there -- be careful there 17 because CLI-11-5, the Commission just said -- and at that point, the Commission 18 was just dealing with the Fukushima events as I understand it, and the quote is 19 from CLI-11-5, Page 30, Petitioners request that the NRC conduct a separate 20 generic analysis regarding whether the Fukushima events constitute new and 21 significant information. So there you were saying the Fukushima events 22 constitute new and significant information. Here you have -- the contention 23 says the findings and recommendations are the new and significant information.

24 I think that works. But is that what youre saying? I mean, thats what 25 youve been saying in your pleading?

546 1 DIANE CURRAN: Yes. We based the contention on the conclusion of 2 the NRCs own experts about the significance of the Fukushima accident. So the 3 contention is based on those conclusions.

4 DR. PAUL ABRAMSON: Right, right. So if I understand the logic of 5 this contention, it is sort of as follows. First, the task force recommends 6 what you describe as a complete overhaul of the safety regulations. Second, 7 that the complete over -- and this is found at motion Page 13 and thereabouts, 8 14 -- first, that the task force has recommendations, two -- second, that the 9 recommendations are going to be costly, three, that the cost-benefit analysis 10 of NEPA and the alternatives analysis of NEPA and the SAMA analysis of NEPA 11 needs to be updated to reflect those additional costs. And therefore, this is 12 new and significant information, and the ER, the EIS needs to incorporate that.

13 Is that -- thats how I understand your logic. Is that right basically?

14 DIANE CURRAN: Yes, Im not sure it completely covers everything in 15 the contention because we would like to see a discretion of how the conclusions 16 of the task force affects the conclusions about the significance of 17 environmental impacts. And I think the issue of cost is -- I think that it 18 would be handled in several potentially different ways. The concepts raised by 19 the task force are all about safety and safety requirements. And the task 20 force distinguishes between mandatory safety requirements and discretionary 21 requirements, things like SAMAs that are subject to cost-benefit analysis.

22 Well, NEPA is all about cost-benefit analysis. Theres no requirements under 23 NEPA.

24 So then the question is how do you do a NEPA analysis when you just 25 -- and apply it to a question -- or a conclusion like youve got from the task

547 1 force? Well, one way you might do it is you weight the benefit side of the 2 SAMA so much that its going to come out to be almost inevitable that its 3 cost-effective. I dont know how it would be done, but it would involve that 4 sort of reasoning.

5 NICHOLAS TRIKOUROS: When I read the task force recommendations, I 6 dont see them the way that you describe in your pleading. The -- if a severe 7 accident is moved into the design basis space, its no longer a SAMA issue 8 because theres no cost-benefit anymore. You have to do it. Its -- at least 9 right now, its deterministic and not even risk-informed to any large extent, 10 so you have to do it. If all severe accidents were moved into design basis 11 space as you, you know, seem to be implying is the recommendation, then there 12 would be no need for a SAMA.

13 DIANE CURRAN: Thats right. And then we would have no contention.

14 DR. PAUL ABRAMSON: Do you see -- do you see --

15 NICHOLAS TRIKOUROS: This is circular reasoning.

16 DR. PAUL ABRAMSON: Do you see any conflict between your position 17 that the task force is saying the regulatory scheme needs to be completely 18 overhauled and we need to -- this is your interpretation, I think -- that we 19 need to bring severe accidents into design basis-basis space? Do you see any 20 conflict between that and the quite plain statement that the task force made 21 that theres no problem with existing plants?

22 DIANE CURRAN: No, I dont because the task force was talking in 23 terms of imminent risk. And that is a term of art that is used in enforcement 24 cases to decide whether immediate shutdown is warranted. And I think what they 25 were saying there was, We dont see any reason to shut down any of these

548 1 plants, but thats really different from the question of, over time, is our 2 regulatory scheme good enough to protect against nuclear power plant accidents, 3 and I think they were saying no, its not.

4 And if I could go back to what Judge Trikouros was talking about, 5 the problem, the reason that were here under NEPA is because we dont have 6 confidence that all these recommendations that the task force has proposed are 7 going to be incorporated or adopted before Diablo Canyon is relicensed and also 8 because were obligated to raise our concerns as quickly as they come up. And 9 so, if, as we believe, NEPA requires that environmental issues have to be dealt 10 with at the time of licensing, we want to be sure that we get before you our 11 claim that these issues have to be dealt with before Diablo Canyon is 12 relicensed. If the NRC wants to take these severe accidents and make them 13 design-basis accidents, well, then do it before Diablo Canyon is licensed. Or 14 if theyre not ready to do that yet, then do an environmental analysis that 15 shows this has been taken into consideration.

16 NICHOLAS TRIKOUROS: Which gets us back to my initial questions --

17 youre talking about redoing the SAMA analysis with some additional assumptions 18 or with a new set of assumptions. Thats where you --

19 DIANE CURRAN: Thats one thing, yes.

20 CHAIRMAN KARLIN: But arent you saying that if the recommendations 21 of the task force are implemented, then the costs of meeting the minimal design 22 basis requirements will increase substantially? You say that. And that 23 increased cost needs to be factored into the NEPA analysis of whether nuclear 24 power is better or worse than some other alternative and whether any particular 25 severe accident mitigation alternative is worth it or not.

549 1 DIANE CURRAN: Thats true, yes.

2 CHAIRMAN KARLIN: So the NEPA contention, its not a safety 3 contention.

4 DIANE CURRAN: Its not a safety contention.

5 NICHOLAS TRIKOUROS: Well, as a break, Ill ask another slightly 6 varied question here. In your pleading -- in your motion, again, I think its 7 Page 5, 6, you make this argument about the task force finding no imminent risk 8 was posed. You also indicate that they found that operation is not inimical to 9 the common defense and security but that they failed to indicate that the 10 operation of the plants would not be inimical to public health and safety.

11 Could you help me to understand the implications of that that youre trying to 12 make in your pleading?

13 DIANE CURRAN: I think that the task force avoided saying that the 14 current regulations are adequate to protect public health and safety in 15 licensing decisions. They couched their language in enforcement terms.

16 Theres no imminent risk that would cause us to recommend a shutdown of these 17 plants. But underlying this report, there is a very strong inference that 18 this task force does not believe that the current body of regulations, safety 19 regulations, is adequate. And this is borne out for them by the Three Mile 20 Island accident and the Fukushima accident. I think that is a fair reading of 21 the Task Force Report.

22 NICHOLAS TRIKOUROS: All right, but how does that relate to 23 contention admissibility here?

24 DIANE CURRAN: Because what this contention is discussing is the 25 entire scope of accidents that are covered by NEPA. That includes severe

550 1 accidents and it includes design-basis accidents. It includes the process for 2 considering SAMAs and it includes the process for determining that plants are 3 safe, because NEPAs all about public health, the human environment. So NEPA 4 covers the question of whether or not nuclear plant licensing poses undue risk.

5 So its -- if they had said, well, we think that a nuclear plant today could be 6 relicensed or licensed and that the regulations are perfectly adequate to 7 support that finding, we might be in a different place. But they didnt say 8 that.

9 NICHOLAS TRIKOUROS: And so, if -- go ahead.

10 DR. PAUL ABRAMSON: Ms. Curran, is there not a carve-out from NEPA 11 for remote and speculative events, that theres not required to consider under 12 NEPA the environmental impacts of remote and speculative events?

13 DIANE CURRAN: Yes, thats right.

14 DR. PAUL ABRAMSON: And is it not possible that many -- some severe 15 accidents are so unlikely as to be remote and speculative? In other words, not 16 every severe accident would avoid the exclusion.

17 DIANE CURRAN: Thats always been true. But I think that what 18 weve seen at the NRC over the years since the severe accident report was 19 prepared in Reg 1150, since the Three Mile Island accident, since Chernobyl, is 20 this increasing acknowledgement that what was initially -- initially no severe 21 accidents were considered credible. They were considered impossible. And then 22 that -- the understanding of whats possible keeps growing and growing, and the 23 understanding of whats likely is changing too. And I think thats the sea 24 change that we see in the Task Force Report. Thats why its so significant.

25 Now, the Commission -- the Commission may end up saying the task force, We

551 1 totally disagree with the task force. We think this is really wrong. But 2 under NEPA, the NRC cant ignore what the conclusions of their hand-picked 3 technical experts that theyve got a problem.

4 CHAIRMAN KARLIN: As I see it in the Task Force Report 5 recommendation number one, the central thrust of that is to say that we need --

6 that they recommend that the agency redraw the line of what they denominate as 7 adequate protection and that many things that are now not comprehended within 8 the design basis, which is required without regard to probability -- its just 9 deterministically required that you must meet the design basis -- the task 10 force recommendation number one talks about defense-in-depth, mentions the word 11 dozens of time and says essentially we should move the adequate protection 12 standards further over and capture more things, and they call that, quote, 13 extended design basis, that basically what youre doing is capturing severe 14 accidents, which were formally severe accidents, and now calling them design 15 basis, right?

16 DIANE CURRAN: I think thats correct, yes.

17 CHAIRMAN KARLIN: And so youre thrust is that when you do that, 18 when you push the, quote, adequate protection standard further down the line 19 and include more severe accident events, deterministically, no probabilistic 20 about it, just include it, thats going to increase costs. And increased costs 21 is going to change SAMAs, its going to change alternatives.

22 DIANE CURRAN: Yes.

23 CHAIRMAN KARLIN: Thats what you say in -- and that is indeed what 24 you say at Page 13 to 14 of your motion. And I think I understand that.

25 DIANE CURRAN: And it might also change discretion of the

552 1 environmental impacts as well.

2 CHAIRMAN KARLIN: Let me ask this, if I may. As I truly see it, 3 your contention says that the findings and recommendations of the task force 4 are the new and significant information. You repeat that many times. You said 5 that in your reply. How can recommendations be, quote, new and significant 6 information? Arent they just words piece -- you know, ideas? They may never 7 come to pass.

8 DIANE CURRAN: Well, we rely on the conclusions of the task force, 9 which are interpretations of --

10 CHAIRMAN KARLIN: All right. Where are the conclusions? I mean, I 11 can read in the Task Force Report, theres a section, Recommendations, 1 12 through 12 and I can read -- I dont know what section is the conclusions or 13 the findings. You used both of those words, and Im not sure -- I didnt find 14 a conclusions or findings section.

15 DIANE CURRAN: Well, theyre in each -- in relation to each 16 recommendation, theres a discussion. And the task force explains how it 17 arrived at the recommendation. And we rely on both. I mean, the 18 recommendations got to come from somewhere.

19 CHAIRMAN KARLIN: Okay, but these are recommendations -- they are 20 conclusions, theyre findings, theyre recommendations, theyre words.

21 DIANE CURRAN: Theyre interpretations --

22 CHAIRMAN KARLIN: How does that constitute new and significant 23 information, environmental information that needs to be -- requires the 24 supplementation of an ER or EIS?

25 DIANE CURRAN: Well, I dont think you can divorce the

553 1 recommendations from the actual occurrence of the accident. This is -- when we 2 -- just to give you a little background, right after the accident, of course, 3 members of the public were very concerned, wanted to raise their concerns 4 before the NRC, get these addressed. And the answer was, well, this accident 5 is progressing. We just dont know whats happening. We havent analyzed it 6 yet. Well, then somebody analyzed it, and that was the task force. And not 7 only did they analyze it, but they were the best people the NRC had. They 8 analyzed it, and they came up with some pretty earth-shattering conclusions and 9 recommendations.

10 CHAIRMAN KARLIN: But Im not sure whether you can have it both 11 ways. The Commission ruled on September 9th that the events at Fukushima are so 12 evolving and unclear that revising the generic EISs would be inappropriate at 13 this time because its premature. We dont know enough about -- the 14 information is not clear. So if its the events of Fukushima, then its 15 premature. If its the recommendations of the task force, then at least thats 16 something that happened on July 12th and its in black and white, and we know 17 what those recommendations are. So its not premature, but the question is, is 18 a recommendation new and significant information if its just a recommendation?

19 DIANE CURRAN: Well, I think a couple things. First of all, 20 getting back to what we were talking about before, that conclusion in CLI-11-05 21 is that it is not appropriate to do a generic analysis at this point. And the 22 Commission does talk about the Task Force Report, but in point of fact, the 23 Task Force Report was not presented to the Commission in April because it 24 didnt -- it hadnt been written yet. So the Commission has made a decision 25 about whether to proceed generically or not, and its made a characterization

554 1 of the Task Force Report for generic purposes. I dont see anywhere in the --

2 in CLI-11-05 where the Commission says we have made a determination that in no 3 case does the Task Force Report present new and significant information. And 4 as a matter of fact, the Commission says we know that there has been 5 contentions filed in individual cases, and were asking the licensing board to 6 go ahead with their regular processes.

7 CHAIRMAN KARLIN: Maam, I grant you that on Page 35, they direct 8 us to -- all the adjudicatory -- all the boards to continue with their 9 adjudications. So, if the Commission wanted to tell us that it was premature, 10 they had a great opportunity to, and they didnt. So, they told us to go 11 ahead. But I mean, this is another issue -- recommendations. Im still 12 focusing on whether words on a piece of paper can constitute new and 13 significant information requiring a NEPA supplement or update, and theres lots 14 of recommendations that fly around. On July 12th, the task force issued its 15 report and its recommendations. You know, then the Commission had a meeting 16 and directed the staff to prioritize those recommendations. And what was it?

17 The ACRS met, and they studied the recommendations and they discussed it and 18 said some things. And on October 3rd of 2011, a few days ago, the staff issued 19 a memo prioritizing the task forces recommendations on making some of its own 20 recommendations.

21 Now, is there every time the staff or anybody makes some 22 recommendations, does that automatically trigger the requirement to do -- that 23 its new and significant information that triggers a need to supplement the EIS 24 every time? Certainly, you cant say that. How do we draw a line between 25 recommendations that trigger -- that constitute new and significant

555 1 information, triggering the duty to supplement and some second lieutenant in 2 the bowels of NRC making some, you know, stray recommendation, and does that 3 trigger the duty to supplement?

4 DIANE CURRAN: Well, I think its possible that it does. I guess 5 it would depend on -- for instance, with the SECY paper that the staff issued 6 on October 3rd, Im not sure that does because its really --

7 CHAIRMAN KARLIN: That does what?

8 DIANE CURRAN: Would trigger a new obligation because it really is 9 just kind of developing a further analysis and a plan, a plan for how the 10 staff, under a safety regime, is going to address the recommendations.

11 But it seems to me that all -- that there is kind of a point of 12 departure for us anyway, that the first opportunity where we had a high-level 13 body in the Commission sanctioned by the NRC Commissioners evaluating the 14 significance of the Fukushima accident. We are obligated, theres no question 15 of our obligation to put that before you and to ask you to admit a contention.

16 Now, if, you know, if you want to tell us we think its premature, we would 17 appreciate knowing when its right because were not getting any guidance from 18 anybody. And its got to be right sometime before this license renewal 19 decision is made.

20 CHAIRMAN KARLIN: We will address that here before the end of the 21 day.

22 DR. PAUL ABRAMSON: Didnt the Commission in either CLI-11-5 or 11-23 11 say something to the effect that theyre confident that the plants can keep 24 operating as they are and that if were going to make changes, well do it with 25 our regs and our normal course just like we did with DMI [spelled phonetically]

556 1 and we will -- and theres nothing that will -- in fact, theres nothing to 2 prohibit us and we expect to make changes in regulation for plants whether 3 theyre relicensed or not? Isnt that essentially is what they said?

4 DIANE CURRAN: Judge Abramson, I think I remember language like 5 that in the discussion of the safety regulations and how the safety regime 6 works, the NRCs process for regulating plants under the Atomic Energy Act. If 7 you notice -- and thats CLI-11-05. Most of that decision is devoted to safety 8 issues. Theres two pages for NEPA, and so, you know, thats -- we are not --

9 another time maybe well make an argument about the Atomic Energy Act. Thats 10 not what were bringing to you. Were asking you to enforce NEPA here.

11 CHAIRMAN KARLIN: On the safety issue, both the applicant and the 12 staff make a point that -- well, the Task Force Report upon which you rely 13 deals with safety issues. That doesnt say anything they say about 14 environmental or environmental issues. So, ipso facto, in NEPA -- you cant 15 base a NEPA contention on recommendations that only deal with safety. How do 16 you respond to that?

17 DIANE CURRAN: Well, as we were discussing before, NEPA embraces 18 safety issues. If safety issues arent addressed in the context of the safety 19 regulatory scheme, then they have to be addressed under NEPA. And this 20 contention is really directed towards circumstances where the agency doesnt --

21 does not address the issues in a timely way under the Atomic Energy Act. For 22 instance, if the NRC were to just say today, Were adopting all of the task 23 force recommendations under our safety programs, I dont think wed have a 24 contention. Our contention raises the concern that the NRCs -- the NRC has no 25 timetable for addressing these safety issues, but NEPA does have a timetable,

557 1 and that is it has to be done before the license renewal decision.

2 CHAIRMAN KARLIN: Well, isnt the simpler answer something to the 3 effect that, well, if the NRC, for safety reasons, said that the Diablo Canyon 4 Nuclear Power Plant needed to be moved 500 feet up the bluff, and if some 5 endangered snail guarder [spelled phonetically] lived 500 feet up the bluff, 6 then there might be some environmental implications associated with that even 7 though the direction was safety-related, it never mentioned the endangered 8 snail guarder.

9 DIANE CURRAN: Well, thats true.

10 CHAIRMAN KARLIN: So a report need not necessarily mention 11 environmental to have environmental to have environmental implications.

12 DIANE CURRAN: Thats true.

13 CHAIRMAN KARLIN: Okay.

14 NICHOLAS TRIKOUROS: Im going to take you back to Page 14 again.

15 It seems to be a favorite area that -- of your motion --

16 MALE SPEAKER: -- of what?

17 NICHOLAS TRIKOUROS: Page 14 of your motion.

18 MALE SPEAKER: Okay.

19 NICHOLAS TRIKOUROS: You say where SAMA is imposed as mandatory 20 measures, the outcome of the ER and subsequently the EIS for Diablo Canyon 21 could be affected significantly and then you go on to describe having to make 22 modifications and the cost implications of that, et cetera. Those words --

23 first of all, was this then sort of a thinking out loud stream of consciousness 24 writing or was there something associated with this contention that I need --

25 Id like to understand about this, because when you say where SAMA has imposed

558 1 these mandatory measures, I assume youre saying that if the SAMA is found to 2 be cost beneficial, it would be required to be implemented in some reasonable 3 timeframe. Is that what youre saying there?

4 DIANE CURRAN: Well, if -- this is going to the question under the 5 case law and the regulation that new information doesnt have to be considered 6 unless its significant, in other words unless it could affect the outcome of 7 the environmental analysis or the -- it could affect the licensing decision.

8 So, Im sorry if it was hard to understand, but what we were trying to get at 9 was that if SAMAs were imposed as mandatory measures, it could make the plant 10 safer, which would be a good outcome. It would change the licensing division.

11 NICHOLAS TRIKOUROS: Are you talking about all SAMAs or cost 12 beneficial SAMAs?

13 DIANE CURRAN: Well, we were saying if -- supposing they were 14 effectively made mandatory. In other words, you did a cost benefit analysis 15 and you waived the benefits by so much that it ended up being mandatory, 16 because thats kind of the implication of the task force report.

17 NICHOLAS TRIKOUROS: But, this has really no direct implication to 18 the --

19 DIANE CURRAN: Well, what were trying to say is that it would make 20 a big difference in the outcome of the environmental analysis for Diablo Canyon 21 if these issues were taken into account --

22 NICHOLAS TRIKOUROS: Okay, but --

23 DIANE CURRAN: -- it could.

24 NICHOLAS TRIKOUROS: Thats not the situation, so its just sort of 25 wishful thinking?

559 1 CHAIRMAN KARLIN: Well, may I? On Page 19 of your motion you make 2 a statement that we referenced and that the applicant and staff references 3 that, quote, "Of course the Commission could moot the contention by adopting 4 all of the task forces recommendations," close quote. Now, I just dont 5 understand that comment at all and let me explain why. It seems to me that the 6 contention is that the recommendations, task force made recommendations, if 7 those recommendations are implemented, costs will increase and therefore the ER 8 and the EIS cost benefit analysis need to reflect that. So, it seems like the 9 contention assumes that the recommendations will be, or hopes that the 10 recommendations will be implemented and in implementing them, the cost goes up 11 and the environmental impact statement needs to be revised. So, rather than 12 mooting the contention, the NEPA contention, the -- if the Commission adopted 13 all of the recommendations, it would support the contention and say, Wow, 14 Voila! Yes, the costs have increased and therefore the alternatives need to be 15 reanalyzed.

16 DIANE CURRAN: I see now that I think youre right.

17 CHAIRMAN KARLIN: I dont know -- yeah. I just dont understand 18 it, the mooting. I think you may -- what you probably meant is if the 19 Commission adopted all the recommendations, youd be very happy --

20 DIANE CURRAN: Yeah, but --

21 CHAIRMAN KARLIN: -- but not necessarily --

22 DIANE CURRAN: No, no, the Mothers for Peace, their main concern is 23 safety and protecting the environment. Theyre not here to have an academic 24 debate. They want to make Diablo Canyon safer and so that was what -- that 25 argument was driving that was if the Commission adopted all those task force

560 1 recommendations, then I agree with you, Judge Karlin. You pointed out 2 something I didnt see. Yes, it would change the ultimate cost benefit 3 analysis, but it would remove the issue of SAMAs. Thats what it would do, 4 because theyd be required --

5 CHAIRMAN KARLIN: Well, it wouldnt remove the issue of SAMAs.

6 They would still be -- it move the issue of SAMAs down further along the pike, 7 because once they drew the line, there would still be severe accidents out 8 there and there would still need to be a SAMA analysis as to whether any 9 particular mitigation measure was worth it or not.

10 DIANE CURRAN: That true, yeah.

11 NICHOLAS TRIKOUROS: On Page 15 of your motion, you say the NRC 12 cannot meet the fundamental purposes of NEPA if it does not include all of the 13 costs associated with required mitigative measures. You say there can be no 14 hard look at the cost and benefits unless costs are disclosed.

15 DIANE CURRAN: Im sorry, what page are you on?

16 NICHOLAS TRIKOUROS: Page 15 of your motion and the question I have 17 for you regarding that was that lets assume its correct, we agree, et cetera, 18 Im not saying it, but assuming we did, then are we at the point where we can 19 say that we know what all the costs are going to be?

20 DIANE CURRAN: Well, probably, no. We dont know at this point, 21 because the analysis hasnt been done.

22 NICHOLAS TRIKOUROS: Right, so what you are saying thats required 23 to do the hard look wont be known for some period of time into the future?

24 DIANE CURRAN: Well, okay theres -- I was answering a question as 25 to whether we know right now in the context of all the analysis hasnt been

561 1 done, so we dont know and I think what you might have been asking was because 2 we dont know everything about the accident, Fukushima accident, that we wont, 3 or we dont -- Im not sure.

4 NICHOLAS TRIKOUROS: It goes to the issue of ripeness. This --

5 there will come a time when all of this information is known, but now is not 6 that time.

7 DIANE CURRAN: Well, NEPA does require that an agency use the best 8 information thats available to it at the time. So, I dont think that it's 9 allowed under NEPA to say we are not going to talk about the Fukushima accident 10 at all because we still dont know everything about it. I think under NEPA 11 its clear, the case law is clear that the agency should use the best 12 information available to it and inform its decision as well as possible, using 13 what it knows.

14 DR. PAUL ABRAMSON: And what new information about environmental 15 impacts of the accidents at Fukushima is revealed by a report, not the 16 recommendations, by the report, what new information is revealed and what 17 information is revealed therein about the environmental impacts one might 18 expect at Diablo Canyon?

19 DIANE CURRAN: Well --

20 DR. PAUL ABRAMSON: And where did you mention it in your pleadings?

21 DIANE CURRAN: Id like to point you to paragraph seven of Dr.

22 Mahajanis declaration, where --

23 DR. PAUL ABRAMSON: I read Dr. Mahajanis --

24 DIANE CURRAN: Because that -- at the end of that paragraph, he 25 said, Adequate protection of the public is incompatible with the NRCs

562 1 continued reliance on voluntary evaluation of severe external and internal 2 events, voluntary adoption of the indicated measures or the use of cost benefit 3 analysis to evaluate their desirability. What I think the Fukushima task 4 force observed was that the system --

5 DR. PAUL ABRAMSON: Thats not my question --

6 DIANE CURRAN: All right.

7 DR. PAUL ABRAMSON: -- and I understand what Dr. Mahajanis 8 speculates, but what Im asking you is where in your pleadings do you talk 9 about new information about environmental impacts, actual new information on 10 environmental impacts from the Fukushima Daiichi accidents and how, if you 11 didnt mention it, where do you discuss its relevance and the projected 12 environmental impacts for Diablo Canyon; and if the answer is we didn't, thats 13 okay. I just want to know where you did, if you did.

14 MALE SPEAKER: [inaudible] but we will in a minute.

15 DR. PAUL ABRAMSON: Counselor, my colleague advises that we are 16 going to take a break in some short period of time and when we do, perhaps it 17 might be appropriate for you during the break, to plow through your pleadings 18 and answer that question later.

19 CHAIRMAN KARLIN: Okay, great. Yeah, I think we were gone a little 20 while, but lets go until 3:00, an hour and a half. Youve been in the hot 21 seat for a while, Ms. Curran. You might share the wealth with others in a 22 moment or two, but right now I have a question for you. PG&E in its answer on 23 Page 11 raises something that I think is quite important and its a question of 24 whether or not you have an impermissible challenge to the regulations, whether 25 this contention represents an impermissible challenge to the regulation, and

563 1 Im going to set aside the argument of impermissible challenge of the safety 2 regulations because I dont really see that at the moment, but I do see a 3 problem with regard to the environmental regulations, Part 51 and they point 4 out in Page 11 of the PG&E answer, quote, "Absent action by the Commission, 5 Category 1 environmental issues, including the environmental impacts of design 6 basis accidents, severe accidents, and onsite storage of spent fuel do not need 7 to be addressed in a site specific environmental review and cannot be 8 adjudicated in a plant specific license renewal proceeding, even if based on 9 allegedly new and significant information," and a quote, a case I am familiar 10 with, which is Vermont Yankee and the Commissions decision in COI 07-3. So, 11 isnt it true that --

12 MALE SPEAKER: [inaudible]

13 CHAIRMAN KARLIN: -- Yes, isnt it true that that entire -- you 14 cant challenge anything thats a Category 1 issue and under Part 1, and once 15 you ask for a waiver and you havent done that here.

16 DIANE CURRAN: We absolutely did ask for a waiver.

17 CHAIRMAN KARLIN: Asked for a waiver and the prior one --

18 DIANE CURRAN: No.

19 CHAIRMAN KARLIN: -- wheres the waiver here?

20 DIANE CURRAN: Its attached to the contention.

21 CHAIRMAN KARLIN: You had a -- I didnt see anything that looked 22 like a waiver.

23 DIANE CURRAN: Oh, Im sorry, Im sorry --

24 [talking simultaneously]

25 CHAIRMAN KARLIN: It was a rulemaking --

564 1 DIANE CURRAN: It was a rulemaking --

2 [talking simultaneously]

3 CHAIRMAN KARLIN: Yeah, yeah, yeah.

4 DIANE CURRAN: -- issue that was attached to this contention. We 5 just couldnt see how it was --

6 CHAIRMAN KARLIN: You couldnt come up with something site specific 7 or unique to this site?

8 [talking simultaneously]

9 DIANE CURRAN: Not site specific about the task force --

10 CHAIRMAN KARLIN: Right.

11 DIANE CURRAN: -- overall recommendation, until we did a rulemaking 12 petition and that is now before the staff.

13 CHAIRMAN KARLIN: Right, so, but my question therefore, still 14 remains. Absent -- this does appear to me to be at least with regard to 15 Category 1 issues for license renewal, a challenge to the regulations Part 1, 16 you know regulations and therefore would have to be stripped entirely from this 17 contention, if it survives at all.

18 DIANE CURRAN: Wed ask you to make a ruling that except for the 19 Category 1 issue, that you otherwise would find the issue admissible, and await 20 the --

21 CHAIRMAN KARLIN: It would be with regard to Category 2 issues?

22 DIANE CURRAN: Yeah --

23 CHAIRMAN KARLIN: I dont know.

24 DIANE CURRAN: -- but I agree with you that you couldnt consider 25 the issue.

565 1 CHAIRMAN KARLIN: Well, let me ask this, is an alternative -- NEPA 2 requires -- our regs require, and you talk about the need to revise the 3 alternatives analysis, whether nuclear is cost effective after you add all 4 these additional supposed costs that are going to be imposed. Is the 5 alternatives analysis a Category 1 or a Category 2 issue? Im going to ask Mr.

6 Repka and others, I dont know where -- it doesnt look like its either one, 7 but I dont know.

8 DIANE CURRAN: Honestly, Im not sure.

9 CHAIRMAN KARLIN: Okay, well that may be something that you can put 10 in -- and if you can find anything on that, great, after the break.

11 DIANE CURRAN: Judge Karlin, I just wanted to add that we consider 12 ourselves obligated to raise our concerns when they arise and that you know, 13 this is part and parcel of our contention, and so we know we were -- we 14 explained how the -- even if in making an analysis of whether it matters to the 15 environmental impact statement, thats part of what you have to evaluate in 16 admitting -- deciding whether to admit this contention. It seems to me that it 17 is appropriate to consider whether it could change some part of the analysis 18 that is maybe subject to Category 1 because you know, Category 1 is -- it isnt 19 set in stone. It can be changed and NEPA requires that Category 1, it cant 20 hold if there is new and significant information that disturbs it. Thats --

21 it cant be used as a block to that --

22 CHAIRMAN KARLIN: Well --

23 DIANE CURRAN: -- and perhaps you dont have the authority to 24 change it, but I dont think that this precludes you from considering how that 25 analysis might change.

566 1 CHAIRMAN KARLIN: Okay, well I think the law is pretty clear and 2 the Commission has spoken emphatically several times on the category one issue 3 in Vermont, Yankee, and elsewhere, but one further question that I have before 4 we take a break and its something that was alluded to earlier. In your reply, 5 at Page 9, and I -- when I say reply, Im generally going to be referring to 6 your reply memorandum. You have two documents you filed at that moment. You 7 filed a reply and then you filed an attached reply memorandum, which is 8 something I think that was filed in many of the cases, right?

9 DIANE CURRAN: Yes.

10 CHAIRMAN KARLIN: So, Im referring to the reply memorandum, I 11 guess, and in that section, you attack as it were the applicants and you say, 12 quote, "Applicants erroneously conflate interveners responsibility under NEPA 13 with those of the agency," close quote. And there youre arguing that you 14 shouldnt have the burden of doing the EIS and you dont have to prove that 15 this juncture you know, that its going to make a necessarily big difference if 16 the agency thats responsible -- and you quote on Page 10, the case law, quote, 17 "As courts have made abundantly clear," quote, "it is the agency not an 18 environmental plaintiff that has the continuing duty to gather and evaluate new 19 information relevant to the environmental impacts of its actions," close quote.

20 And then you go on to say quote, "Compliance with NEPA is a primary duty of 21 every federal agency," close quote. Okay, if thats true, I have a problem 22 with your contention, which says the applicant has to update the ER in order to 23 reflect the new and significant information. Now, I can composited that the 24 NRC may have to update or include in its EIS -- because thats what NEPA 25 imposes the duties on the agency in Marsh versus Oregon, it imposes the duty on

567 1 the agency, but where is there any duty on the applicant to update its ER?

2 DIANE CURRAN: I believe it is in 51.53 and I think its cited in 3 the contention. Ill find that for you.

4 CHAIRMAN KARLIN: Yes, it is cited in the contention and its -- I 5 will read it here if I can find it and I think its not as helpful as it might 6 be. I will note that 10 CFR 51.72 A deals with the supplement to the draft 7 EIS, and I will quote it to say that the staff will prepare a supplement if 8 quote "there are significant new circumstances or information relevant to the 9 environmental concerns and varying on the proposed action or its impacts,"

10 close quote. Staff will update the EIS. We turn to the closest analog in the 11 ER context. It is 10 CFR 51.53 C 3 iv, or little four, quote. "The 12 environmental report must contain any new and significant information regarding 13 these environmental impacts of license renewal of which the applicant is 14 aware." So, it doesnt really say you have to supplement the ER. It just says 15 the ER should contain that from the get go it seems. Is that the section 16 youre relying on?

17 DIANE CURRAN: Yes, and we are confined to Section 10 CFR 2.309 to 18 facing environmental contentions on the environmental document thats available 19 to us and there are only two right now that I did, one is the environmental 20 report and one is the License Renew GI Act.

21 CHAIRMAN KARLIN: But, does that -- think about it this way, the 22 applicant has done an ER, you -- let us posit subsequent to that ER, new and 23 significant information has arisen; let's posit that. The staff will be 24 issuing a draft environmental impact statement some day, a draft supplemental 25 environmental impact statement, I guess. Isnt your juncture for filing this

568 1 contention when the staff issues its draft environmental impact statement?

2 DIANE CURRAN: The way that members of the public interpret 10 CFR 3 2.309 is that youd better file an contingent --

4 CHAIRMAN KARLIN: Right.

5 DIANE CURRAN: As soon as you have the information --

6 [talking simultaneously]

7 CHAIRMAN KARLIN: Youre dealing with --

8 [talking simultaneously]

9 DIANE CURRAN: If you [inaudible] it is at your peril.

10 CHAIRMAN KARLIN: So, youre dealing with the Mike Farrar [spelled 11 phonetically] Machs [spelled phonetically] Case catch 22. Youre concerned 12 about the catch 22, so you filed now?

13 DIANE CURRAN: It is not a good bargain to guess about those things 14 that are --

15 [talking simultaneously]

16 CHAIRMAN KARLIN: Understood.

17 DIANE CURRAN: -- filed early and have the board say, Youre too 18 early, come back, and all were asking is if youre going to tell us that, 19 give us some guidance on when to come back.

20 DR. PAUL ABRAMSON: If the applicant were to take the position that 21 the ER is prepared, does consider all of the significant information of which 22 it is aware, is that the end of it, because its the applicant who has to 23 decide of which it is aware, significant information of which it is aware. So, 24 it can say we -- it seems to me and thats what I want to ask, is that 25 something that from your perspective, if the applicant says, Weve looked at

569 1 whats available from Fukushima. Weve considered everything thats available 2 to us about Fukushima. Weve looked at the task force report. Weve 3 considered what we think is relevant from that and our ER encompasses that, is 4 that the end of the applicants obligation under that -- under the clause we 5 were reading before?

6 DIANE CURRAN: Well, then the question is how do you interpret of 7 which the applicant is aware, the information about the task force report is 8 publically available. You can presume the applicants aware of it. I think --

9 DR. PAUL ABRAMSON: But, the question is what does it do to its ER, 10 and thats why I was asking you earlier can you show me what environmental 11 impacts information you have from either the task force report -- from the task 12 force report and where you have referred to it in your pleadings, because that 13 to me is crucial to this.

14 DIANE CURRAN: [affirmative].

15 CHAIRMAN KARLIN: At this juncture itd probably be a good idea to 16 take a break. Its 3:05 or so, 3:03. Why dont we take a 10 minute break and 17 its going to be relatively Chris [phonetic], so well be back in 10 minutes.

18 Im not sure, Ill consult with my fellow board members, but we may at that 19 point, although we may not be finished entirely with you, Ms. Curran, we may --

20 you are going to be coming up for rebuttal, so we may ask Mr. Repka at that 21 point to start, but Ill have to consult with them first. So, everybody stand 22 by and well adjourn for 10 minutes. Thank you.

23 (Whereupon, a short recess was taken) 24 CHAIRMAN KARLIN: Okay, please be seated. Thank you. Were 25 [unintelligible] licensing board in the Pacific Gas and Electric case is now

570 1 reconvening and well go back on the record. Ive consulted with my colleagues 2 and though we still may have a couple of questions for Ms. Curran, were going 3 to turn to Mr. Repka and ask him to take the podium and maybe we can ask some 4 questions of you, sir.

5 Id like to start with the same question I think we started with 6 Ms. Curran, was just to focus on the meaning of CLI 11-5, Page 30 and where the 7 Commission talks about prematurity I guess, and Im not going to re-quote it, 8 but I do want to refer to your sur-reply. We ask you, each party, to address 9 the meaning of CLI 11-5. You all submitted a sur-reply and on Page 2, you talk 10 about this Page 30, and you say, the contention is premature, quote, "The 11 Commission specifically held however, that requests for a NEPA supplement based 12 on the Fukushima event are premature. The conclusion applies equally to the 13 current proposed contention, close quote, and so this is part of -- my 14 question is you say the Commission ruled that requests for a NEPA supplement 15 based on the Fukushima event are premature. The contention, as I read it, says 16 that the -- is based upon the recommendations of the task force report. Do you 17 see that difference? Is it about a difference that makes any difference?

18 DAVID REPKA: Its a difference that makes no difference. The 19 Commissions statement in CLI 1105 was made in September. The Commission says 20 in full, The request is premature, although the task force completed its 21 review and provided its recommendations to us. So, they had the task force 22 report in hand and they concluded that they had, they, the Commission, the NRC, 23 had no new and significant environmental information based on either the 24 Fukushima accident itself or the task force report and recommendations, and 25 that makes sense, because the obligation to complete a supplement to the

571 1 generic environmental impact statement is one that belongs to the Commission.

2 The request that was being addressed in CLI 1105 was one about setting off to 3 do exactly that, updating the generic environmental impact statement to address 4 Fukushima, and so the Commission had to address that based on everything it 5 knew as of September of whatever the date of CLI 1105 is, and they did that, 6 and they specifically referenced the fact that they had the recommendations in 7 hand.

8 CHAIRMAN KARLIN: Yes, you are correct that they referenced the 9 fact that theres a task force and that it issued a report, but in context it 10 says further on there, In short, we do not know today the full implications of 11 the Japan events for U.S. facilities. So, theyre really talking about, in 12 the petition to suspend was based upon the events at Fukushima. Do you pause 13 at that? I mean the task force report didnt even exist at the time --

14 [talking simultaneously]

15 DAVID REPKA: When the petition was filed, thats correct.

16 CHAIRMAN KARLIN: -- and then subsequently the task force report 17 came out, but the petitioners there were not relying upon the task force 18 report. They were relying upon the events of Fukushima and it is those events 19 which it seems the Commission is saying, well, its premature. A picture of 20 what happened at Fukushima is far from clear, but the picture of what the task 21 force recommended is absolutely clear, isnt it?

22 DAVID REPKA: And based on that, the Commission said, today, 23 September 20th, or whatever the date was, they said, "Today, the full 24 implications are not clear. They didnt have enough information as of that 25 point, based on both the event and the task force report, and recommendations

572 1 if there was any significant, new environmental impact information, and to step 2 back for a minute and look at what we in fact have in front of us, based upon 3 the event and the task force report. We have nothing in the event itself 4 thats any -- the event itself stands for the fact that there was a severe 5 accident, a beyond design basis accident in Japan. Thats precisely the issue 6 thats addressed in the generic environmental impact statement, among other 7 things, and Ms. Curran gave some misleading information about the fact that the 8 analysis was done was about design basis accident thats simply not true. Its 9 a very comprehensive evaluation beyond design basis events. So, based on the 10 event, was there anything there to say that theres something new that hasnt 11 been addressed? No. Based upon the task force report coming out and the 12 recommendations, which the Commission had in front of them, they said, no, we 13 still have no new environmental information bearing on the project and its 14 environmental impact. Yes, theres recommendation related to our regulatory 15 structure, but nothing there specific to the environmental impacts of --

16 CHAIRMAN KARLIN: I understand there is recommendations to deal 17 with safety issues versus environmental issues, and thats another issue we may 18 get into, but okay, COI 11-5, on Page 30 says this is all premature. On Page 19 35, and Ms. Curran has pointed this too, the Commission says, reactor 20 adjudication to go forward related to Fukushima. Quote, "Reactor adjudication 21 should go forward, including those that may involve proposed contentions based 22 on the issues implicated at the Fukushima events," close quote. If -- that 23 doesnt make any sense, if the Commission just said Fukushima contentions are 24 all premature.

25 DAVID REPKA: No, the Commission didn't say Fukushima contentions

573 1 are all premature, and what it said was that the adjudications could go 2 forward. There could be many different types of issues arising out of the 3 Fukushima event and they said, Go forward, consider those various issues.

4 CHAIRMAN KARLIN: Why didnt they just say thats all premature, I 5 mean they could have put us all out of our misery basically, by saying this 6 whole entire thing is premature and none of these -- because they knew when 7 they issued this decision that in 21 different adjudicatory proceedings or 8 boards had a Fukushima contention and all they had to do was say, Its all 9 premature, and they didnt do that.

10 DAVID REPKA: I think what they did was they said, with respect to 11 the NEPA claim, that theres new and significant information, they did put you 12 out of your misery. They did tell you, you dont have to deal with that. Its 13 premature.

14 CHAIRMAN KARLIN: Why did they tell us to go --

15 DAVID REPKA: We have a petition thats affecting countless dockets 16 with --

17 CHAIRMAN KARLIN: Right.

18 DAVID REPKA: -- with all manner of different regulatory approvals 19 involved, and so the Commission wasnt trying to address every single issue 20 that could be raised and every single regulatory content. It simply said, 21 boards go do that, but certainly take into account what weve just said here 22 today in COI 1105, and one of the things they specifically addressed was the 23 environmental new information issue.

24 CHAIRMAN KARLIN: Let me ask you another potential difference with 25 regard to this case and COI 11-5, okay.

574 1 DR. PAUL ABRAMSON: Judge Karlin, before you go to that, can I just 2 follow up for a second on --

3 CHAIRMAN KARLIN: Oh, sure, sure.

4 DR. PAUL ABRAMSON: -- on the underlying questions. Mr. Repka, I 5 think Judge Karlins been talking at length about the distinction between a 6 challenged based on Fukushima and a challenge based on the task force report, 7 and you said theres -- its a distinction without any meaning. What would be 8 required in -- of the task force report? Whats missing from the task force 9 report that would make such a distinction meaningful? In other words, what 10 would the task force report have to have had in it for there to be a foundation 11 for a NEPA contention?

12 DAVID REPKA: Okay, broadly speaking, it would have to address the 13 environmental impacts of a project, so thats the parameters. Now, what would 14 specifically get to that? One thing that would address that is if the task 15 force report was analyzed and the consequences of the Fukushima accident, which 16 is something I dont think that anybody has a clear handle on yet, today, and I 17 think the Commission acknowledges that. So, if a report were to come out and 18 say the consequences of this accident were this, that, and the other thing in 19 terms of land contamination goes to the public, whatever it might be, the 20 source term material released, then that would have to be compared against what 21 was already analyzed in the generic environmental impact statement for severe 22 accidents, and so then there might be new information.

23 DR. PAUL ABRAMSON: So, there would need to be the technical 24 information, either leading to or providing an environmental impact, the basics 25 of an environmental impact from that event, right?

575 1 DAVID REPKA: Correct.

2 DR. PAUL ABRAMSON: Would you also need to know the sequence in the 3 events that led to that, so that you could factor into some sort of severe 4 accident analysis or could you start simply from the environmental impacts? In 5 other words, they got radiation measurements; weve seen it in a number of 6 petitions. Could those -- could, would that enable an environmental impact 7 number from which one could somehow back out some NEPA claim?

8 DAVID REPKA: Perhaps, its very difficult to speculate in a 9 vacuum, but you have a severe accident model thats used by the NRC in a 10 generic environmental impact statement based on standard codes, based on 11 certain assumptions, and so you would need to know enough about the accident 12 and perhaps its sequence of events and source term -- and again, make a 13 comparison, some amount of technical information to say does that challenge the 14 model, did that challenge the analysis that was conducted for a severe 15 accident.

16 DR. PAUL ABRAMSON: And was there anything in the task force report 17 that addressed any of that?

18 DAVID REPKA: No, nothing at all.

19 CHAIRMAN KARLIN: Now, today were here as I think I said in the 20 intro, to deal with the issue of contention, admissibility, and timeliness, 21 right? Were not here to address the merits of the contention, just whether it 22 meets 2.309 F1 and F2, and C, and whatever other provisions that apply to 23 contention admissibility. So, Id like you to think about the focus on Page 30 24 of CLI 11-5. Wasnt that a ruling on the merits? The Commission was asked to 25 undertake a new generic environmental impact statement immediately and the

576 1 Commission on the merits, said it, wasnt going to do that. So, the question 2 whether or not something is new and significant information is a merits 3 determination, isnt it?

4 DAVID REPKA: It could be, but it could also be a basis for a 5 contention argument. It could -- because of the contention admissibility 6 requirements require a genuine dispute on a material issue. So, the issue 7 raised in the petition is one that we -- theres new and significant 8 information that triggers the NEPA obligation. The Commission says there 9 isnt. It is a factual statement that goes to the adequacy, not only of the 10 basis for the petition, but goes to the same -- the adequacy of the basis for 11 the present contention, and so the board is allowed to look behind the 12 contention to determine whether or not that basis is real. The Commission has 13 given an indication and it relies on the task force report, and the Fukushima 14 event, the Commission has already looked at the documents relied upon and said 15 that this doesnt say anything about that and made the conclusion that the 16 contention is premature. So, they have made that finding and I think the 17 licensing board is certainly allowed to credit that finding, and should credit 18 that finding.

19 Secondarily, even if the Commission had not said that in CLI 1105 20 the licensing board in making an admissibility determination is always free to 21 look at the documents that are being offered as the basis for the contention 22 and determine whether there really is a basis there for the contention, and I 23 think this is exactly the point that the task force report doesnt provide a 24 basis on environmental impact. Its simply not an environmental --

25 CHAIRMAN KARLIN: Okay, well I asked this of Ms. Curran, which is

577 1 the fact that the task force report focuses on safety doesnt mean, or does it 2 mean, that it necessarily cannot have environmental implications?

3 DAVID REPKA: An event may have environmental implications, but we 4 dont know what those are, based upon that report and that report doesnt 5 advance the ball or provide any evidence on that.

6 CHAIRMAN KARLIN: Well, thats why I was talking and asking Ms.

7 Curran, I mean Ive read the contention and it doesnt say the Fukushima 8 events, it says, the task force recommendations and findings," and as I 9 understand the logic that they articulate, she articulates in that motion, the 10 recommendations, if implemented, will be very costly. Those costs will drive 11 up the cost of the reactor and our continuing to operate the facility, which 12 will then affect the SAMA analysis and the alternatives analysis, and that is 13 something that must be done in the NEPA space. So, the fact that the 14 recommendations are safety related does not in itself mean that it doesnt have 15 environmental implications. Talk me through your response to that. It seems 16 to be your logic and Id like to understand how you would respond.

17 DAVID REPKA: Well, lets review the bidding and start at the 18 beginning: severe accidents is a Category 1 issue. Its addressed in the TEIS.

19 CHAIRMAN KARLIN: But I thought it was a Category 2 on the part 20 Table B1, severe accident is a Category 2 issue.

21 DAVID REPKA: Only to the extent that it relates to active 22 mitigation alternatives.

23 CHAIRMAN KARLIN: Wasnt that what their contentions about?

24 DAVID REPKA: Their contention is about new and significant 25 information related to environmental consequences and it does raise among many,

578 1 many other things, it does raise alternative issues, but --

2 CHAIRMAN KARLIN: Yeah, I mean part Table B1 says, severe 3 accidents, category two, the probability of weighted consequences of the 4 atmospheric release," et cetera, "however alternatives to mitigate severe 5 accidents must be considered for all plants that have not considered such 6 alternatives, and thats whats happening here. Is it not? I mean there was 7 a SAMA analysis in the ER --

8 DAVID REPKA: Right.

9 CHAIRMAN KARLIN: -- but the -- so thats a Category 2 issue.

10 DAVID REPKA: The SAMA issue is severe accident mitigation 11 alternatives issue, not the consequence issues because the consequence issues 12 is addressed in dozens of pages in the GIS.

13 Now, with respect to alternatives, theres two things here that are 14 being muddled together. One is the projects alternatives and the overall cost 15 benefit of the project, and this is an issue I think the staff addressed very 16 well in their response. NRC regulations on license renewal dont require an 17 environmental report or an environmental analysis to address the overall cost 18 and benefits of the project, and thats 5145 C and 5153 C in 10 CRF. So, that 19 issue of the idea that -- and this is certainly in the Mark Ajani Affidavit --

20 that the task force is going to require all these things that are going to 21 drive up the cost of the project and somehow thats going to change the overall 22 cost benefit. Thats simply not a license renewal issue.

23 So, the second alternative issue is the SAMA issue of lets accept 24 that there are severe accidents. What can we do to address beyond design basis 25 events and what might be cost effective, and you know, certainly the task force

579 1 report says nothing about that. The environmental report for Diablo Canyon 2 says a lot about that and the contention says nothing about that, and doesnt 3 suggest anything thats wrong with that evaluation. So --

4 CHAIRMAN KARLIN: But doesnt the -- let me ask this if I may.

5 Doesnt the task force report say that there needs to be this new category of 6 extended design basis? The design basis is not sufficient at this point and 7 they recommend that some things that are now beyond design basis, i.e. severe 8 accidents be moved into the mandatory, Defense-in-Depth, deterministic, must be 9 done regardless of probability or not, so many things like the task force 10 report recommendations were implemented, things that are now considered severe 11 accidents and only need to be dealt with if theyre cost effective mitigation 12 measures. Now would be mandatory and have to be imposed. So, it moves a 13 number of things which were severe accidents into the design basis mandatory 14 category.

15 DAVID REPKA: Yes, I see that, but that doesnt --

16 [talking simultaneously]

17 CHAIRMAN KARLIN: So, it increases the cost.

18 [talking simultaneously]

19 DAVID REPKA: It would raise the cost of -- there would be a cost 20 associated with implementing those measures and number one, those measures that 21 would be a current operating regulatory issue. It would be a challenge; it 22 would relate to the existing regulations and therefore is outside the scope of 23 license renewal. To the extent its related to the overall cost of the 24 project, its not even linked to license renewal. So, to say that thats a 25 cost of license renewal is inaccurate. That would be a cost of a project.

580 1 That would be a cost of ongoing compliance with the project and the regulations 2 on license renewal, the ones I just cited in Part 51 dont require that overall 3 cost related --

4 CHAIRMAN KARLIN: Let me point you to another reg that concerns me 5 and help me with this, 5153 do you have it in front of you? Do you have the 6 regs? 5153 C, thats the Operating License Renewal Stage Environmental Report, 7 5153 C 2 and about half way through it, its a long provision and this is what 8 the staff I believe refers to in its brief. Quote, "The report is not --" this 9 is talking about the environmental report right? Quote, "The report is not 10 required to include discussion of the need for power or the economic costs and 11 economic benefits of the proposed action or of alternatives to the proposed 12 action, except in so far as such cost and benefits are either essential for 13 determination regarding the inclusion of an alternative in the range of 14 alternatives considered or relevant to mitigation." So, doesnt that exception 15 undermine what you just said? Its like well, okay its relevant to 16 alternatives --

17 [talking simultaneously]

18 DAVID REPKA: Not at all.

19 CHAIRMAN KARLIN: -- and its relevant to mitigation.

20 DAVID REPKA: Not at all. That section is a referral to the 21 consideration of alternatives in the SAMA context, not overall project costs.

22 So, not lets look at SAMAs, because thats the second part of this piece that 23 --

24 [talking simultaneously]

25 CHAIRMAN KARLIN: Does it say that?

581 1 DAVID REPKA: Well, it references or its relevant to including an 2 alternative in the range of alternatives considered. Thats for SAMA or 3 relevant to mitigation. Thats itself, you have to decide what alternatives 4 are going to be potentially relevant and will be considered in your SAMA 5 evaluation, and then you address those, the benefits and costs of those, 6 because their beyond design basis. So, I believe thats what thats a 7 reference to. In the SAMA evaluation process, if the recommendation of the 8 task force were adopted and more events are considered design basis and plant 9 [inaudible] are required to bring those within the design basis, again thats a 10 current operating issue, not linked in any way to license renewal, but for 11 environmental purposes or safety purposes, but that would have the effect of 12 taking them -- and I think Judge Trikouros alluded to this earlier, they would 13 no longer be SAMA. They would be things that would be part of the design basis 14 and they would be excluded from the SAMA pool. So, we would continue to still 15 look at things that go beyond that new design basis for cost design basis prime 16 [spelled phonetically] and do the same SAMA evaluation on whatevers left 17 there, but --

18 CHAIRMAN KARLIN: But it would increase the total cost of the 19 facility of operating it --

20 [talking simultaneously]

21 DAVID REPKA: But that's not a relevant number.

22 CHAIRMAN KARLIN: Well, it is relevant to alternatives analysis.

23 DAVID REPKA: No, its not.

24 CHAIRMAN KARLIN: Why not?

25 DAVID REPKA: Its relevant to a projects alternative --

582 1 CHAIRMAN KARLIN: Yes.

2 DAVID REPKA: -- perhaps, but thats not a license renewal relevant 3 issue.

4 CHAIRMAN KARLIN: Well, but its -- the license renewal as I 5 understand that Turkey Point and others have taught us that you know, when you 6 get into license renewal space safety issues exclude current licensing basis 7 issues --

8 DAVID REPKA: Right.

9 CHAIRMAN KARLIN: -- NEPA does not so circumscribe any additional 10 costs or you know, can be you know or environmental impacts can be covered 11 within the NEPA analysis for a license renewal, right?

12 DAVID REPKA: Im sorry, I [inaudible] --

13 [talking simultaneously]

14 CHAIRMAN KARLIN: Turkey Point the Commission taught that there is 15 a distinction in license renewal. Safety issues are limited to aging 16 management issues and they are not to include current licensing basis issues.

17 NEPA issues in license renewal are not so constrained and can cover any 18 environmental impact that might be associated in some way with the license 19 renewal, whether its aging management related or not.

20 DAVID REPKA: Thats correct. It relates to the impact of 21 continued operations, not necessarily the impact of plant retrofits that are 22 being made or being considered under the current operating [inaudible] of the 23 plant.

24 [talking simultaneously]

25 DR. PAUL ABRAMSON: Help me, Mr. Repka, with this one. What were

583 1 talking about it sounds to me is expanding the events that fall into design 2 basis by adding in some severe accidents of probabilities -- probably higher 3 probabilities than one in a million per year.

4 DAVID REPKA: Thats correct, or you need --

5 DR. PAUL ABRAMSON: -- so they claim 6 [talking simultaneously]

7 DAVID REPKA: -- and that are currently dealt with as a you know, 8 that may be for some plants not dealt with --

9 DR. PAUL ABRAMSON: Right.

10 DAVID REPKA: -- like design basis and station blackout.

11 [talking simultaneously]

12 DR. PAUL ABRAMSON: So we would expand those in the design basis by 13 having the design deal with those by putting the plant mods in place or 14 retrofits in place to deal with those, would the effect not be to reduce the 15 environmental impact, because of whats left out there for SAMA is a smaller 16 set?

17 DAVID REPKA: Thats correct, for sure. That would have that 18 affect of reducing certainly the likelihood and consequences of an offsite --

19 of a severe, beyond design basis accident. That is accurate, but I think that 20 going to Judge Karlins point again that the concept of the project 21 alternatives and what could be done to improve the project or instead of the --

22 what other things could be done other than license renewal and relative cost 23 and benefits of those, that's just something thats not considered here in this 24 context under the regulations and --

25 DR. PAUL ABRAMSON: So, your view is that that regulation takes

584 1 such events, such considerations off the table for license renewal, whether or 2 not theres safety, takes them off the table for NEPA also?

3 DAVID REPKA: And thats correct, because again, its -- theres a 4 linkage here between those are issues that are really being dealt with in the 5 regulatory process as current operating issues.

6 NICHOLAS TRIKOUROS: Can I? This new and significant information 7 under NEPA, your pleading, your sur-reply I believe indicates that Mothers for 8 Peace would have an opportunity to challenge the lack or quality of a NEPA 9 supplement if new and significant information, environmental information 10 applicable to Diablo Canyon is ever identified and its pretty clear that both 11 the staff and PG&E feel that the task force recommendations do not introduce 12 any new and significant environmental information, and really never will. I 13 mean --

14 [talking simultaneously]

15 DAVID REPKA: Well, the recommendations in and of themselves dont 16 do that and never will, but certainly the analysis of the event if it goes 17 forward if it -- as I talked about in responding to Judge Abramsom, if there 18 was some new consequence data that came out of ongoing studies where there was 19 new seismic information out of Japan that said that you know, thats relevant 20 to Diablo Canyon or new tsunami data that says a 46 foot tsunami was going to -

21 -

22 NICHOLAS TRIKOUROS: Well, let me address that specifically then 23 with respect to the recommendations that we have now from the task force. In 24 all of the meetings that are taking place discussing these recommendations and 25 prioritizing them, its becoming very clear that the 50.50 4(hh) equipment

585 1 requirements, the station blackout efforts that are now proceeding, that would 2 -- that might have say diesel fuel requirements for portable pumps, that -- all 3 of that is indicating that if we're a multi-unit site, which is one of the task 4 force recommendations, I think its in four somewhere, that the consequences to 5 be considered would be for multi-unit sites would be higher than for single 6 unit sites. So, for example at Diablo Canyon all of the SAMA analysis that are 7 done in the environmental report deal with one core-melt all of the costs 8 associated with the cost benefit analysis is one core-melt, but the 9 recommendations are clearly indicating that consideration should be given to, 10 in the case of Diablo Canyon, two core-melts. So, do you consider that a -- do 11 you not see that as new and significant information with respect to this 12 situation?

13 DAVID REPKA: Not at the present time and certainly dont see it as 14 an issue that was raised in either of the contention or the Mark Ajani 15 declaration and I think that was the point that we -- why we included some 16 excerpts from the SAMA evaluation, showing the range of some of the 17 alternatives that were considered because they go to, you know albeit with a 18 one core-melt event, but go to some of those precise issues, like offsite power 19 station blackout, hydrogen control, and so those are things that are 20 specifically considered in the SAMA evaluation already, and you know nothing 21 in the declaration at all or the contention engages that and says you know, 22 this is whats wrong. This is what needs to be considered in addition.

23 CHAIRMAN KARLIN: Somewhat -- well, this may be a slightly 24 different area, but as I understand it, your position as stated in the sur-25 reply is that along with CLI 11-5, you agree with the Commission that Fukushima

586 1 related contentions are premature at this point.

2 DAVID REPKA: Fukushima related contentions that assert theres a 3 need for a supplemented environmental impact statement based on new and 4 significant information are premature at this point.

5 CHAIRMAN KARLIN: Okay, okay. Fair clarification, I appreciate 6 that, and Ms. Curran sites to the Machs case about the catch 22 problem, which 7 is -- commonly we see interveners trying to grapple with timeliness in terms of 8 filing their contentions, new contentions and they are faced with double whammy 9 of the -- well, its late and its premature, and so we grapple with -- we all 10 try to deal with when -- what is the moment in time when its right or 11 appropriate?

12 Now, the Commission in CLI 11-5, on Page 33 states, and theyre 13 dealing with this issue about whether or not -- when the contention should be 14 filed, and at that point to the interveners, Im sorry, the petitioners had 15 asked the Commission to set up, as I understand it, issue some schedule or 16 guidance as to when it would be mature, when Fukushima related contentions 17 ought to be filed. And Id like your help here, because the Commission 18 declines to do that and says, Respondents disagree, arguing, quote 19 "Respondents disagree, arguing that," quote "NRC regulations and case law 20 already provide clear and uniform standards to determine the timeliness of 21 motions to add new contentions or to reopen the record, and this situation 22 should not be treated differently. As a general matter we agree with the 23 respondents assessment." Being a respondent, can you help us understand what 24 these clear and uniform standards are as to when these Fukushima contentions 25 ought to be filed?

587 1 DAVID REPKA: Well, I think its referenced at 2.309 and the 2 requirements in the -- for new or amended contentions and it talked about 3 basically timely relative to when new information is available and without 4 reading those requirements, I believe thats what its a reference to. I think 5 that it has to be read in concert, too, though with the requirements for 6 updating -- the staffs update and when an update to the environmental impact 7 statement or draft environmental impact statement would be required and the 8 Commission sites those regulations 51 71 2A, which talks about their 9 substantial changes in the proposed action that are relevant to environmental 10 concerns. Well, thats not happening here and --

11 CHAIRMAN KARLIN: Well, that wouldnt apply here yet, although I 12 value that comment, because they havent even done their EIS or draft EIS, yet.

13 DAVID REPKA: Or there are significant new circumstances or 14 information relevant to environmental concerns, and bearing on the proposed 15 action are impacts. So, I think if you look at -- that would be the basis for 16 a contention if there needs to be an update, assuming there hasnt been an 17 update, and --

18 CHAIRMAN KARLIN: Let me stop you there. I mean so youre -- the 19 clear and uniform standards are 2.309 F2.

20 DAVID REPKA: Right.

21 CHAIRMAN KARLIN: Well, I know that only came into effect in 2004, 22 but there must be literally hundreds of cases where the boards grappled with 23 applying that regulation and its predecessors, and theyre all over the boards 24 in terms of whether theres something's timely or not, and in fact the parties, 25 the applicant and the staff, commonly, almost uniformly argue that its not

588 1 timely and or its premature, the catch 22 Judge Ferrara was referring to. So, 2 youre suggesting that that standard is clear and what is the word clear in 3 uniform standards? Have we achieved clarity and uniformity with the hundreds 4 of LBPs that have been issued on that reg.?

5 DAVID REPKA: I wont get between the licensing board and the 6 Commission on that one. I think the Commission views it as clear and uniform, 7 but I understand the licensing board views may differ, but I think those are 8 the requirements and I think it certainly accepted that if some new report were 9 to come out with environmental impact information, that was germane to a plant 10 in the United States based on Fukushima, you know certainly the standard, 11 acceptable standard is if you file within 30 days of a new report, it will be 12 considered timely and thats what happened here, and Ill just point out the 13 PG&E did not object on the basis of timeliness.

14 CHAIRMAN KARLIN: Right. You ultimately -- well, let me just 15 continue that then. The staff has an answer, page -- staff answer at Page 33 16 and 34, the staff sites to the Commission decision in Oyster Creek, quote, "Our 17 contention admissibility and timeliness rules require a high degree of 18 discipline and preparation by petitioners who must examine the public available 19 material and set forth their claims at the outset. Now, on Page 34 they refer 20 to this old canard that the interveners have a quote, "Iron clad obligation to 21 examine the publicly available documentary material." Given that the -- are 22 the interviews supposed to be omniscient or something? The Commission itself 23 doesnt even know whats happening at Fukushima or what happened and they are 24 saying its premature. How in the world can an impecunious intervener have an 25 iron clad obligation to know everything that happened at Fukushima?

589 1 DAVID REPKA: Well, certainly the citation to the case and the 2 obligation is an accurate one. Its an argument Im not making and PG&E is not 3 making, so Im not going to defend it.

4 CHAIRMAN KARLIN: Well, perhaps you could help us then. What --

5 lets say we wanted to issue -- back up for a second. There are many regs that 6 deal with safety issues and though they aren't black and white, CFR Part 50, 7 Part 52, Part 54, and the Commission issues many, many guidance documents, 8 NUREGS and other guidance documents as to how to apply and comply with those 9 regs. Now, here we have 10 CFR, Part 2.309F2 and the Commission doesnt want 10 to issue any guidance document, but if we were to issue some scheduling order 11 trying to lay out some objectively determinable events by which we could assess 12 the timeliness of any Fukushima related contentions. What -- help us -- what 13 do you think we should come up with for objectively determinable events rather 14 than some subjective fight about it? Is there anything you can help us with?

15 DAVID REPKA: I cant anticipate what all the new -- what form the 16 new information might take and Id rather not, but certainly an example would 17 be some specific report that a petitioner or an intervener is going to rely 18 upon as a basis for a contention. I think that creates the obligation to then 19 timely file and thats routinely interpreted as 30 days, but I think that 20 ultimately it has to be filed within 30 days of the information being available 21 and thats the regulatory standard and I really dont see the difficulty in 22 that being the standard.

23 CHAIRMAN KARLIN: Well, in Fukushima perhaps the information is 24 coming out over time and its clarity is getting better perhaps, and then our 25 knowledge or the information is becoming better, but isnt it kind of a very

590 1 slippery slope as to what the moment in time is when the contention should be 2 filed?

3 DAVID REPKA: And perhaps thats because its a very much a fact-4 based determination and then and thats why the regulations read the way they 5 are and Im, I dont know --

6 CHAIRMAN KARLIN: Would this be --

7 DAVID REPKA: -- how we could be otherwise.

8 CHAIRMAN KARLIN: Would this be a situation where even if it might 9 arguably not be timely there might be good cause for not filing it precisely 10 when somebody thought they should of if you know it was coming out through the 11 smoke and the haze gradually?

12 DAVID REPKA: Thats always part of the showing and so thats 13 certainly they exist.

14 CHAIRMAN KARLIN: Okay. Yeah, go ahead.

15 NICHOLAS TRIKOUROS: Lets see, in your -- Mr. Repka, your answer, 16 Pages 13, 14, its -- you were talking about having considered in the SAMA 17 analysis for Diablo Canyon station blackout and seismic related SAMAs you, in 18 fact, included an attachment to your pleading that identified all of those 19 SAMAs that were specifically related to station blackout and seismic, but all 20 of those were rejected as being not required or not cost beneficial.

21 DAVID REPKA: Thats correct.

22 NICHOLAS TRIKOUROS: And would that -- is that still true today in 23 light of the task force recommendations that were dealing with here?

24 DAVID REPKA: I dont know how the task force recommendations would 25 change that particular calculus. You know, the SAMA evaluation is done based

591 1 upon the models as they exist, based upon the PRA and the offsite consequences, 2 and the recommendations go to whether or not additional design-basis measures 3 should be required. But putting that aside, if youre looking at it still on a 4 purely cost-benefit, beyond-design basis, you know everything that goes in that 5 calculation would be the same today as it was you know a year ago.

6 You know, again, based on what we know today. If there were 7 something that changed the seismic hazard or changed the, changed the, you 8 know, something that would lead to a conclusion that at Diablo Canyon there was 9 a greater than assumed potential for core melt, containment failure, offsite 10 consequences, those would be the things that would change the SAMA results and 11 we just dont have anything that says that that would be true.

12 CHAIRMAN KARLIN: One or two more questions perhaps. The 13 interveners assert that the environmental report needs to be supplemented or 14 updated in light of this new and significant information. Im not sure I see 15 where -- I understand that NEPA requires EISs to be supplemented and updated if 16 new and significant information arises. Let us posit for a moment that there 17 is new and significant information. Did you argue in any of your answers that, 18 well it doesnt apply to the ER anyway because were not subject to any of 19 those requirements?

20 DAVID REPKA: I dont believe we made that argument.

21 CHAIRMAN KARLIN: So are we disallowed from rejecting the 22 contention on that basis, because you didnt make the argument according to 23 Judge Abramson?

24 DAVID REPKA: Im --

25 [laughter]

592 1 DR. PAUL ABRAMSON: According to -- according to the footnote 133 2 in CLI-11-11 you are.

3 DAVID REPKA: Right and thats a different -- I mean thats the 4 point the Commission is making if there is no new and significant information.

5 You know if there were new, then again --

6 CHAIRMAN KARLIN: [inaudible]

7 DAVID REPKA: -- as to what would happen if there was something 8 else that happened next week or next month or next year that said there is new 9 or significant information. It -- thats again that contention could be filed 10 at that time. Number two is, is there an obligation that runs the PG&E 11 independent of the NRC staff to say something at that time? I actually think, 12 and I couldnt find this over the break, but I believe that we are subject to 13 an annual update of the license renewal application environmental report at 14 least until the draft environmental impact statement comes out. I couldnt 15 find the citation for that. So if at some point PG&E thought there was new and 16 significant information, you know we would put that in such an update, and even 17 if there were not such an update requirement if we found -- made that 18 determination having a complete and accurate application in all material 19 respects may lead us to make that kind of notification to the NRC. So I think 20 there are obligations on PG&Es part, its just we havent -- there -- that 21 doesnt exist right now.

22 DR. PAUL ABRAMSON: Counselor, just one point of clarification if I 23 may. Lets suppose that Diablo Canyon -- that no new and significant 24 information on environmental impacts arises before the license is actually 25 renewed, and there are some plants as you know that are in the queue that are

593 1 going to be done soon. Yours is some years away perhaps. What would then be 2 the recourse? This proceeding would be closed because the license renewal 3 would be issued. So at that point contention admissibility they dont file a 4 contention because a proceedings done. What would happen at that point? What 5 would be the remedy available to the interveners if they thought there was new 6 information at that point?

7 DAVID REPKA: I guess there would -- and its a question I have not 8 thought a lot about.

9 DR. PAUL ABRAMSON: But it seems to me thats part of whats 10 concerning.

11 DAVID REPKA: That is -- there would be no licensing action, no 12 major federal action before the NRC that would trigger an environmental impact 13 statement or environmental assessment obligation, but I dont think that 14 theres anything that would prevent a petitioner from filing a petition for 15 rulemaking to update the generic environmental impact statement or to ask the 16 Commission to conduct a generic environmental impact statement related to 17 continued operations you know [inaudible].

18 DR. PAUL ABRAMSON: How about for Diablo Canyon per se? Could they 19 -- would they -- could they would the process be for them to petition the 20 Commission for a back fit or for some modification to the license to, to adapt 21 to deal with new and significant information? How would that work?

22 DAVID REPKA: I do not believe there would be a NEPA obligation 23 that would exist at that point, but could there be some petition some, some 24 request that would trigger some Commission obligation to look at that? Its 25 possible, I just dont know what that would be.

594 1 DR. PAUL ABRAMSON: Thanks.

2 CHAIRMAN KARLIN: Any more questions for Mr. Repka? Okay, thank 3 you Mr. Repka. I think were done with you. [laughter] Mr. Harper?

4 Mr. Repka -- Im sorry, Mr. Harper. Weve talked about whether 5 its premature and whether its timely and weve gotten through that a little 6 bit. Im going to skip past some of that discussion. In the staff -- but in 7 the staffs SER reply on Page 4 you say based on CLI-11-5 that the contention 8 is premature. Meanwhile, on Page 35 of your answer, I think Ive got this cite 9 right, you say that its not timely. The issues presented here in the 10 proffered contention were readily available and discussed by the interveners 11 expert more than four months ago. At that time the intervener chose to forgo 12 filing the contentions. As such the late filed contention is not timely and 13 should be denied. So which is it? Isnt this exactly the catch 22? Its not 14 timely, its late and oh, by the way, its premature. Youve said both, which 15 one is it?

16 RICHARD HARPER: Yes, I think it would cover both, your honor. Let 17 me explain how that would be. The argument on timeliness that it is not a 18 timely submission based on the opinions of the underlying presumption in the 19 task force. As the, Dr. Mahajanis declaration states the task force supports 20 his opinions that were submitted four -- or four months ago at that time, so in 21 April, and our argument is based there on that if those opinions were available 22 and were expressed at that time, and the report is basically a confirmation of 23 those opinions and, therefore, it is not timely.

24 CHAIRMAN KARLIN: Well lets go back to the contention. The 25 contention is that not based on the task force report. The contention is based

595 1 upon new and significant environmental implications of the findings and 2 recommendations of the Task Force Report. So the contention is not based on 3 Fukushima, its based on the time -- findings and recommendations of task force 4 report.

5 RICHARD HARPER: Correct, your honor, and as I believe in the 6 petitioners reply they clarify that and state that the contention is based on 7 the conclusions and recommendations within the task force [inaudible].

8 CHAIRMAN KARLIN: Same thing arent they?

9 RICHARD HARPER: Thats more of ancillary point. Kind of going 10 towards that what Im, what were arguing at the staff is that the underlying 11 opinions for those conclusions and for the recommendation are similar if not, 12 you know, are similar in essence to those opinions that were expressed four 13 months earlier. Id like to also add at this time that even if the board were 14 to decide that the contention is timely it does not defeat all of our other 15 arguments that the contention is inadmissible.

16 CHAIRMAN KARLIN: I understand, I understand its a different 17 issue. Okay, lets ask the question I think we need to ask of everyone, which 18 is -- and I want to refer to your answer at Page 33 and 34 again. And here you 19 say theres an ironclad obligation on the part of the intervener and its a 20 high standard of discipline they must undertake. In this context, in the 21 situation where the Fukushima events are coming out and the information is 22 coming out, what objectively determinable events could we use in the scheduling 23 order to specify when, if ever, these kinds of contentions become mature or 24 ripe?

25 RICHARD HARPER: I think it would be difficult to compile a

596 1 conclusive list but I think, you know, based on Mr. Repkas comments I think 2 thats a good starting point. Some type of official report that outlines the 3 findings. You know, as the Commission said findings as they are right now, the 4 picture is not clear which implies that you know that the clarification process 5 is ongoing, and there will be certain steps along the way where information 6 will be released. At that time, I would say would be an appropriate time for 7 the clock to start ticking if you will.

8 CHAIRMAN KARLIN: Well heres, I think you make this argument in 9 your pleadings which is well, this report is just a compilation of information 10 that was previously available. So the issuance of the report is meaningless.

11 The information was already floating around out there and so the contention 12 shouldve been filed earlier. Is that what youre arguing with regard to the 13 Task Force Report?

14 RICHARD HARPER: I would go back to my earlier comment that the 15 recommendations in the underlying opinions of the task force, yes, I would say 16 that was the case is that those were available, the information -- the task 17 force report is a compilation of the information and opinions, recommendations 18 based on that information. As far as the contention is based on that then I 19 would say yes.

20 CHAIRMAN KARLIN: And so that the issuance of reports does not 21 necessarily provide us a crisp, objectionably determinable event from which 22 contentions could be filed?

23 RICHARD HARPER: I think its, its difficult to wrap this all up 24 in a nice package. I think it depends on the situation. Here we have, you 25 know -- the Fukushima disaster was very well chronicled and the information the

597 1 NRC gained at the time as it was presented was made public. The Task Force 2 Report made its recommendations based on that public information. It compiled 3 that information and expressed opinions that according to Dr. Mahajani coincide 4 with what you -- he established four months earlier.

5 CHAIRMAN KARLIN: Let me ask this. I believe you do make the 6 argument that under the regs there is no duty imposed upon the applicant to 7 update its environmental report, even if there is new and significant 8 information, right?

9 RICHARD HARPER: I believe thats correct.

10 CHAIRMAN KARLIN: And so the applicant has no duty to update its 11 environmental report even if there is new and significant information. So --

12 DR. PAUL ABRAMSON: No, its a question up to the applicant to 13 decide whether its new and significant. Isnt that what the reg says?

14 CHAIRMAN KARLIN: No, not necessarily. Im just trying -- the reg 15 does not say that it says the environmental report must include new and 16 significant information. It does not say that the environmental report 17 thereafter must be supplemented or updated. So weve got an environmental 18 report, lets posit that it doesnt have to be updated because Part 51 doesnt 19 require that and NEPA doesnt apply to applicants anyway. So the environmental 20 report doesnt need to be updated, but the draft EIS is coming out someday, 21 right?

22 RICHARD HARPER: That, that is correct, your honor.

23 CHAIRMAN KARLIN: And when that report comes out if Ms. Curran and 24 her client are unhappy with the contents of that draft environmental report, 25 i.e. it doesnt discuss the recommendations of the task force or whatever else,

598 1 presumably they can challenge it at that point. Right?

2 RICHARD HARPER: They can challenge the findings in the 3 supplemental environmental impact statement.

4 CHAIRMAN KARLIN: Right, and would that be timely then?

5 RICHARD HARPER: It certainly depends on the information and the 6 challenges they are bringing up. I am hesitant to say absolutely yes.

7 DR. PAUL ABRAMSON: Thats fine. Mr. Harper, can I just pick this 8 up for a second? I cant help clarifying this question. If the EIS, or 9 whatever it is, supplement draft, whatever form it comes out, only uses 10 information that was used in preparation of the ER and does not use -- and 11 theres no new say specific technical report that comes out between then and --

12 between today and the issuance of this staff document that regards the 13 consequences or the environmental impacts of Fukushima vis--vis Diablo Canyon.

14 If -- would it be timely for the filing of a contention claiming that the EIS, 15 this staff document, does not consider the recommendations of the Task Force 16 Report since it has already filed that contention now and were looking at 17 that? In other words theres nothing new other than a claim that they didnt -

18 - that now the ER needs to include it and it doesnt and that sometime in the 19 future when the staff document comes out can they make the same claim? They 20 raised it timely in accordance with the regs now. If we reject it now would it 21 be timely in the future?

22 RICHARD HARPER: Just, just to make sure I understand your 23 question. I apologize.

24 DR. PAUL ABRAMSON: Same, same challenge. Its just the only new -

25 -

599 1 RICHARD HARPER: Yeah, same challenge only I [inaudible] --

2 DR. PAUL ABRAMSON: Not yet, no new, nothing new under the sun 3 between then and the time they raise the challenge to the staff EIS or DEIS or 4 supplement. If all that theyre -- if they want to challenge just the 5 exclusion of consideration or failure to consider this task force report and 6 its already been dealt with by us and they challenged it now is that timely to 7 raise then?

8 RICHARD HARPER: I would say yes, simply because the draft 9 supplemental environmental, impact statement would be the document that starts 10 the clock, that allows for the time to proceed from then. So the appropriate 11 time to challenge the NRCs failure to include or lack of inclusion of that --

12 those -- that information would be at that time.

13 DR. PAUL ABRAMSON: Even though theyve challenged it now, which 14 seems to be the ER. Theyve made the same challenge to the ER. Todays 15 challenge is the ER doesnt consider the recommendations of the Task Force 16 Report. We for some reason -- if we find its premature for whatever reason 17 then youre saying its okay to raise the challenge later when the -- when the 18 ER -- when the staffs document comes out.

19 RICHARD HARPER: Well clearly it would have to be a different 20 challenge. The challenge currently is the challenge that the environmental 21 report is not including consideration. At that time the challenge would need 22 to be structured that the staff has not included consideration of those 23 elements within the environmental impact statement.

24 CHAIRMAN KARLIN: Yeah, all right, and I think in addition setting 25 aside whether its premature, I mean its to dispense with that entirely if we

600 1 rule there is no duty to up -- as we see it in Part 51, to up -- to supplement 2 the ER. It was filed. It was what it was. Theres no duty to supplement it.

3 No contention could be raised about supplementing the ER, but when the draft 4 EIS comes out if that doesnt have the right stuff in it then thats the time 5 for this contention to be filed or some -- any contention to be filed about 6 that.

7 Now, when is the draft supplemental environmental impact statement 8 going -- I know you all get to file this monthly report and its very helpful, 9 but I think you kind of finessed that one. You talk about the final being, 10 what is it February to May of 2014? [laughter]

11 RICHARD HARPER: Your honor, Ill admit I was not -- I did not 12 [inaudible].

13 CHAIRMAN KARLIN: [inaudible] Okay. All right, well it will be 14 whatever it is but --

15 RICHARD HARPER: It will be released, that is simply the 16 information [inaudible].

17 CHAIRMAN KARLIN: You will have to issue a draft supplemental 18 environmental impact statement first and therell be a final. Okay. Im not 19 sure I have any more questions.

20 NICHOLAS TRIKOUROS: With respect to this question of the duty of 21 the applicant, with respect to the environmental report. So if theres a 22 significant issue, a significant environmental piece of information, they have 23 no obligation to incorporate that into their environmental report as a 24 supplement. The DEIS comes out and doesnt include it because frankly the 25 staff had -- didnt know about it. Does that make sense? It doesnt to me.

601 1 RICHARD HARPER: Based on the conversation and discussion weve 2 just had, your honor, and the regulations that outline the applicants 3 responsibilities whether or not they should update or theyre required to 4 update the environmental report, the logical next step is -- for contention to 5 be raised would be at the issuance of the draft supplemental environmental 6 statement. It doesnt mean that that time necessarily that --

7 CHAIRMAN KARLIN: The part, the ER is a creature of Part 51 and 8 only of Part 51, not of NEPA, and unless theres a duty in Part 51 to 9 supplement I am concerned whether there is any duty to supplement the ER, and 10 we have to study 51.53.C34 and see if that covers it.

11 DR. PAUL ABRAMSON: Would the staffs RAI process -- say the staff 12 thought there was new and significant information for the ER, for the 13 environmental side. Would the staff -- is it the staffs practice to ask the 14 applicant to advise them how that would impact the ER through an RAI or some 15 other method?

16 RICHARD HARPER: Your honor, I dont know that off the top of my 17 head. If I may consult with my lead counsel?

18 DR. PAUL ABRAMSON: Please.

19 CHAIRMAN KARLIN: Can we proceed, Mr. Harper? Ill ask the 20 reporter to read back the question. No, no thats [inaudible]. What was the 21 question?

22 RICHARD HARPER: That may be helpful. First as a point of 23 clarification based on the last question, the applicant has a yearly 24 responsibility to update their application which includes update of the 25 environmental [inaudible].

602 1 CHAIRMAN KARLIN: Where is that in the regs?

2 RICHARD HARPER: Part 54. I apologize, I dont --

3 DR. PAUL ABRAMSON: Let them find it for us as we move along. Go 4 ahead with your next point, Mr. Harper.

5 RICHARD HARPER: Along with that that would include any type of new 6 and significant information. With response to the question on whether an RAIs 7 -- our responses to RAIs and perhaps -- perhaps if you could ask your question 8 again, your honor. I apologize.

9 DR. PAUL ABRAMSON: My question is if the staff becomes aware of 10 some information it feels is new and significant vis--vis its EIS, would the 11 staff customarily ask the applicant -- provide the applicant with a request 12 for, with a request for additional information which is what RAI is, and let 13 the applicant deal with that or is it the sort of thing the staff would just 14 deal with on its own in the EIS?

15 RICHARD HARPER: Yes, well the staff would definitely consult with 16 the applicant and request further information clarifying information from that.

17 DR. PAUL ABRAMSON: Okay, so that if it comes up and the reason it 18 what, it -- for example, if some report that comes out from some experts who 19 looked at all the data coming out of Fukushima and said heres the 20 environmental impact from Fukushima and heres how we think it will impact U.S.

21 plants. That sounds like new and significant information to me. Is that the 22 sort of thing that then the staff would ask the applicant address it in its ER 23 one way or another, right? Thank you.

24 RICHARD HARPER: [inaudible]

25 CHAIRMAN KARLIN: Yeah, there are regs I found that the staff can

603 1 ask the applicant to update its ER. Thats a may, not a shall, and so I think 2 its the contention hinges upon a shall and so at least thats one way to read 3 it. Is there a reg in 10 CFR Part 54 or 51 that you can cite as to that says 4 the applicant must annually update its ER?

5 DR. PAUL ABRAMSON: Theyre looking for it.

6 RICHARD HARPER: Can we get back to your [inaudible].

7 CHAIRMAN KARLIN: Okay. Okay. Id be very much interested in 8 finding that out because that could make a difference. I think were going to 9 go back. Were probably done with you, Mr. Harper. We have some other 10 questions that wed have some fun with but were not going to ask them so --

11 RICHARD HARPER: I appreciate that.

12 CHAIRMAN KARLIN: You can sit down.

13 RICHARD HARPER: Thank you.

14 CHAIRMAN KARLIN: When Ms. Curran comes back [inaudible]. Oh, 15 yeah, well. Ms. Curran could you come back to the podium? We have a couple of 16 further questions for you. One of them was my -- one of my earlier questions, 17 one of my first questions and Im not sure I got an answer. I dont know that 18 I did. Which is, the Commission dealt with the generic EIS in the context of 19 CLI-11-5 and said no were not going to update, -- were not going to initiate 20 a revised generic EIS, its premature. You filed this contention -- we filed 21 it before that decision came down saying, well this environmental impact 22 statement or ER at this site and needs to be implemented -- updated because 23 theres new and significant information. Now my question at that point was on 24 Page 15 of your motion and also at Page 17 you talk about -- you refer to some 25 things that are sort of site specific. Let me see if I can pull that up.

604 1 Sorry, its going to take me a moment.

2 DR. PAUL ABRAMSON: While youre looking for that, Judge Karlin, 3 Ms. Curran did you have any answers for my earlier questions that we deferred?

4 DIANE CURRAN: I did.

5 DR. PAUL ABRAMSON: Okay, lets address this.

6 CHAIRMAN KARLIN: Yeah, go ahead. Im sorry.

7 DR. PAUL ABRAMSON: While were waiting.

8 CHAIRMAN KARLIN: Good idea.

9 DIANE CURRAN: I hope this is responsive to your question, Judge 10 Abramson. On Page 12 to 13, we talk about the NRCs determination that the 11 environmental impacts of both design-basis accidents and severe accidents are 12 small. And so the Task Force Report provides new and significant information 13 suggesting that the environmental impacts of severe accidents are not 14 necessarily small because there, because the task force suggests that they 15 should be included within the realm of accidents for which mitigation is 16 required. In other words, it --.

17 DR. PAUL ABRAMSON: Okay, I understand that.

18 DIANE CURRAN: [inaudible] is considered to have small impacts 19 because theyre very unlikely to happen. Thats the general idea and what the 20 implication of the task force report is --

21 DR. PAUL ABRAMSON: Implication.

22 DIANE CURRAN: -- more likely --

23 DR. PAUL ABRAMSON: Implication.

24 DIANE CURRAN: -- than that.

25 DR. PAUL ABRAMSON: Implication.

605 1 DIANE CURRAN: The implication. Its a strong implication.

2 DR. PAUL ABRAMSON: I understand that, and thats what you have?

3 DIANE CURRAN: Yes.

4 DR. PAUL ABRAMSON: Thank you.

5 CHAIRMAN KARLIN: Okay, my -- Im referring to Page 15 of your 6 motion and 17 also, but the question is, is this contention based upon any kind 7 of sort of site-specific environmental impacts or issues? Because the problem 8 is the Commission has dealt with the generic issue and said no, thats 9 premature. So how can you -- is the survival of this contention founded upon 10 it being site-specific to Diablo Canyon in some way?

11 DIANE CURRAN: Well, as I think I said previously, its not 12 necessary for the task force conclusions to be site specific for those 13 conclusions to have site-specific ramification and that is what is discussed in 14 the contention at Pages 15 and 16. In other words, the Task Force Report 15 expressed concern about seismic risk, about risk of flooding. Well we have 16 here a nuclear plant -- Im as close to California in an earthquake zone. So 17 we made a connection between that general concern of the task force and the 18 specific circumstances of the Diablo Canyon plant, and then another example is 19 station blackout. Well thats generally expressed concerned in the task force 20 report but it is -- it has a site specific application to Diablo Canyon.

21 CHAIRMAN KARLIN: Oh, okay. So youre saying you dont have any --

22 that the task force report findings and recommendations, although generic, have 23 site specific effects or implications or potentially and thats how youre 24 approaching this?

25 DIANE CURRAN: Right.

606 1 CHAIRMAN KARLIN: Okay. I think thats [inaudible]

2 DIANE CURRAN: This task force report has environmental 3 implications, major environmental implications. The Commission has a choice.

4 It could deal with them generically. It could deal with them on a case-by-case 5 basis in pending license renewal cases. In CLI-11-05 the Commission decided 6 not to deal with those generically, and we would submit to you then that leaves 7 only one choice, which is deal with them on a case-by-case basis. But the NRC 8 must deal with them somehow.

9 CHAIRMAN KARLIN: Okay, I understand that. I want to ask the 10 question that weve asked the others and, you know, what objectively 11 determinable events can we, could we craft, would you suggest that we put into 12 -- if we were going to do a case management order, a scheduling order -- here 13 is the win, the Fukushima contention should, would be timely, or here are the 14 criteria that would be used in determining whether theyre timely. You dont 15 want to be in the catch 22. Youve said that. I understand that. I mean, is 16 there anything you would suggest?

17 DIANE CURRAN: Well I guess in the course of the answering that Id 18 like to address two predicates.

19 CHAIRMAN KARLIN: All right but. Go ahead.

20 DIANE CURRAN: Issue one is, if the Board ends up ruling that 21 theres no obligation, no legal obligation to supplement an environmental 22 report then it seems to me that the logical conclusion is that the next 23 juncture at which it would be appropriate to submit a contention is when the 24 supplemental EIS comes out. Then and at that point we would submit the task 25 force report and anything else that had happened in the meantime that we

607 1 thought was relevant. That one seems clear to me. The issue of whether or not 2 this is just premature because not enough was known about the Fukushima 3 accident or because theres something in CLI-11-05 that suggests that -- first 4 of all I dont think CLI-11-05 says that and second, I think its really basic 5 to this case, to NEPA, to this contention that a group of experts within the 6 NRC has issued an expert opinion about the implications of the task --

7 Fukushima accident. About you know what, what does it mean for U.S. reactors?

8 Even if the Commission somewhere say between now and the issuance of the draft 9 EIS, the Commission says we reviewed the Task Force Report.

10 We think theyre full of beans and were not regarding this unless 11 they make a real technical determination of that and say we hereby determine 12 this is not new, this is not significant. They cant just wish it away. Its 13 been said by credible experts within the agency so it must be dealt with on a 14 NEPA.

15 CHAIRMAN KARLIN: Okay, any other questions?

16 DR. PAUL ABRAMSON: No.

17 CHAIRMAN KARLIN: Questions? Thank you, Ms. Curran.

18 DIANE CURRAN: Oh, I have one more thing, Judge Karlin.

19 CHAIRMAN KARLIN: What?

20 DIANE CURRAN: And thats just, just to comment on what you, you 21 had said wouldnt you do an EIS anyway supposing the Commission adopted all 22 these recommendations? And I just happened to notice while I was sitting there 23 a footnote in PG&Es response on Page 14 that -- I havent read these cases, 24 but it seems to give the answer that if the supplement to an EIS would make the 25 environment better then it doesnt need to be supplemented. I think thats

608 1 where our -- anyway I hate give that away but I think thats, you know.

2 DR. PAUL ABRAMSON: Thats, thats, thats kind of where I was 3 going earlier, right? You put more in the design basis, the environmental 4 impact gets less.

5 DIANE CURRAN: Yeah.

6 CHAIRMAN KARLIN: Okay, thank you Ms. Curran.

7 DIANE CURRAN: Thank you.

8 CHAIRMAN KARLIN: Mr. Harper, do you have that cite for us?

9 RICHARD HARPER: Your honor, in 54.13(b) it says each applicant 10 shall notify the Commission of [inaudible].

11 CHAIRMAN KARLIN: I see it, let me get it, 54.13?

12 RICHARD HARPER: (b).

13 CHAIRMAN KARLIN: (b), yes. Each applicant shall notify --

14 RICHARD HARPER: The Commission of information identified by the 15 applicant as having for the regulated activity a significant implication for 16 public health and safety or common defense and security.

17 DR. PAUL ABRAMSON: Identified by the applicant.

18 RICHARD HARPER: Identified by the applicant.

19 DR. PAUL ABRAMSON: So if they dont think it does, they dont 20 notify you. Right?

21 CHAIRMAN KARLIN: Well, okay, but that -- there could be question 22 whether thats a subjective standard or an objective standard, you know. But, 23 but the point lets -- is that what youre relying on for the annual updates?

24 SUSAN UTALL: No, I couldnt find [inaudible].

25 CHAIRMAN KARLIN: [laughter] Yeah because, yeah okay, because.

609 1 SUSAN UTALL: Have to send it on.

2 CHAIRMAN KARLIN: Each applicant shall notify the Commission of 3 information identified there as having for the regulated activity significant 4 implication of or common defense and security. Thats the completeness and 5 accurate -- so thats your basic completeness and accuracy provision that comes 6 in every Part 30, Part 40, Part 50, Part 70.

7 SUSAN UTALL: Its the same as 50.9.

8 CHAIRMAN KARLIN: Yeah, yeah.

9 DAVID REPKA: Judge Karlin, thats part of what I alluded to.

10 CHAIRMAN KARLIN: Yeah.

11 DAVID REPKA: [inaudible] material information but I did allude to 12 my recollection of an annual update. I havent been able to find that citation 13 either and I can certainly -- Im willing to take that as homework to see if I 14 can find more [inaudible].

15 DR. PAUL ABRAMSON: Let them both e-mail it.

16 CHAIRMAN KARLIN: Well lets see here. Let me just try -- let me 17 look at one thing here. [inaudible]

18 [laughter]

19 Well there is 54.21(b), which talks about CLB changes during the 20 NRC review of the application. Each year following the submittal of the 21 license renewal application, blah, blah, blah, the application -- amendment to 22 the renewal application must be submitted that identifies any changes to the 23 CLB the. Is that what were talking about? There is an annual update relating 24 to CLB, not environmental. Maybe that --

25 DAVID REPKA: That may be what I was recollecting.

610 1 CHAIRMAN KARLIN: Yeah. I mean it could be in guidance, which 2 isnt going to cut it really in terms of a mandatory Part 51, but Okay. Well 3 why dont -- I dont -- I hate to end this and say, okay, submit this, you 4 know, post-hearing briefs on anything. This is not to be long, this is a one 5 page or less and -- and that you can submit lets say in five days, would you 6 please, and all three of you may submit that. Is there and the only question 7 is, is there a reg? What reg, if any, requires the environmental report to be 8 supplemented or updated annually or whatever other time?

9 SUSAN UTALL: Can I add --

10 DR. PAUL ABRAMSON: Can I make that more specific? Provide the --

11 identify any regulation which requires.

12 CHAIRMAN KARLIN: Yeah, okay, here lets --

13 DR. PAUL ABRAMSON: And you dont need a page, either there is or 14 there isnt.

15 CHAIRMAN KARLIN: And Ms. Curran will be incentivized to find that 16 reg as well, so all three of you would be, you know, submit what there is on 17 that. Ms. Utall, yes?

18 SUSAN UTALL: Yeah, Id like to make one point regarding what is 19 done in practice because the licensees [inaudible].

20 CHAIRMAN KARLIN: Practice? We dont pay any attention to that 21 [unintelligible] regs.

22 SUSAN UTALL: I dont know where [inaudible] and thats why 23 [inaudible] looking, were going to look for it. But in practice the, the 24 licensees do update their application and quite frequently frankly and Ill ask 25 the staff, you know --

611 1 CHAIRMAN KARLIN: Okay.

2 SUSAN UTALL: -- the basis of that.

3 CHAIRMAN KARLIN: One page on the question we just addressed in 4 five days [unintelligible], yeah. With that, anything else, Judge Abramson?

5 DR. PAUL ABRAMSON: One sentence, not one [inaudible].

6 CHAIRMAN KARLIN: One sentence, less. All right, well we thank you 7 all for your patient answers. Its taken a little longer than some of us 8 hoped, but we got through it so we now stand adjourned. Thank you.

9 (Whereupon, at 4:31 p.m. the above-entitled matter was concluded) 10 E-N-D-P-R-O-F-P-R-O-C-D-E-E-D-I-N-G-S 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

PACIFIC GAS AND ELECTRIC COMPANY ) Docket Nos. 50-275-LR and 50-323-LR

)

(Diablo Canyon Nuclear Power Plant, )

Units 1 and 2) )

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing OFFICIAL TRANSCRIPT OF THE LICENSING BOARD ORAL ARGUMENT ON OCTOBER 13, 2011, have been served upon the following persons by the Electronic Information Exchange.

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel Office of the General Counsel Mail Stop: T-3F23 Mail Stop: O-15D21 Washington, DC 20555-0001 Washington, DC 20555-0001 Alex S. Karlin, Chair Edward L. Williamson, Esq.

Administrative Judge E-mail: edward.williamson@nrc.gov E-mail: alex.karlin@nrc.gov Susan Uttal, Esq.

E-mail: susan.uttal@nrc.gov Nicholas G. Trikouros Maxwell Smith, Esq.

Administrative Judge E-mail: maxwell.smith@nrc.gov E-mail: nicholas.trikouros@nrc.gov Lloyd Subin, Esq.

E-mail: lloyd.subin@nrc.gov Paul B. Abramson Megan Wright, Esq.

Administrative Judge E-mail: megan.wright@nrc.gov E-mail: pba@nrc.gov Richard Harper, Esq.

paul.abramson@nrc.gov richard.harper@nrc.gov Lauren Woodall, Esq.

Jonathan Eser, Law Clerk lauren.woodall@nrc.gov E-mail: jonathan.eser@nrc.gov Brian Newell, Paralegal Lauren Woodall, Law Clerk E-mail: bpn1@nrc.gov E-mail: lauren.woodall@nrc.gov OGC Mail Center E-mail: OGCMailCenter@nrc.gov U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Office of the Secretary of the Commission Mail Stop: O-16C1 Mail Stop: O-16C1 Washington, DC 20555-0001 Washington, DC 20555-0001 OCAA Mail Center Hearing Docket E-mail: ocaamail@nrc.gov E-mail: hearingdocket@nrc.gov

2 Diablo Canyon Nuclear Power Plant - Docket Nos. 50-275-LR and 50-323-LR OFFICIAL TRANSCRIPT OF THE LICENSING BOARD ORAL ARGUMENT ON OCTOBER 13, 2011 Counsel for Pacific Gas and San Luis Obispo Mothers for Peace Electric Company 1123 Flora Road Winston & Strawn, LLP Arroyo Grande, CA 93420 101 California Street Jill ZamEk, Esq.

San Francisco, CA 94111-5802 jzk@charter.net David A. Repka, Esq.

E-mail: drepka@winston.com Tyson Smith, Esq. Counsel for San Luis Obispo Mothers E-mail: trsmith@winston.com For Peace Carlos Sisco, Senior Paralegal Harmon, Curran, Spielberg, and Eisenberg E-mail: csisco@winston.com 1726 M Street, N.W., Suite 600 Washington, DC 20036 Winston & Strawn, LLP Diane Curran, Esq.

1700 K Street, NW dcurran@harmoncurran.com Washington, DC 20006 Rachel Miras-Wilson, Esq.

E-mail: rwilson@winston.com

[Original signed by R. Giitter ]

Office of the Secretary of the Commission Dated at Rockville, Maryland this 20th day of October 2011