{{#Wiki_filter:ES-301 Control Room/In
{{#Wiki_filter:ES-301                           Control Room/In-Plant Systems Outline                             Form ES-301-2 Facility: Clinton                                                       Date of Examination: 8/22/2011 Exam Level: RO           SRO-I     SRO-U                             Operating Test Number: 2011-301
-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I   SRO-U Operating Test Number:
                            @
2011-301   Control Room Systems
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
@ (8 for RO); (7 for SRO
Safety System / JPM Title                                       Type Code*
-I); (2 or 3 for SRO
Function
-U, including 1 ESF)
: a. 202001 A4.01 3.7 / JPM 448 Transfer RR pumps from Fast to Slow                           M,S             1 speed
System / JPM Title Type Code*
: b. 217000 A4.04 3.6 / JPM 204 Manually Startup RCIC System                               A,D,EN,L,S         2
Safety Function a. 202001 A 4.0 1 3.7 / JPM 448 Transfer RR pumps from Fast to Slow speed  M , S 1 b. 217000 A4.04 3.6 / JPM 2 04 Manually Startup RCIC System A, D, EN,L,S 2 c. 239001 A4.01 4.2 / JPM 447 Perform RPS MSIV Channel Functional D,S 3 d. 203000 A4.02 4.1 / JPM 440 SX Injection Through RHR B A, N, L, S 4 e. 22 3 00 2 A4.0 1 3.6 / JPM 45 2 Verify a Group 3 Isolation A, N ,EN, L, S 5 f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A, D, P ,S 6 g. 212000 A4.14 3.8 / JPM 449 Reset a Reactor SCRAM per CPS No. 4100.01 D,L, S 7 h. 2 72000 A 1.0 1 3.2 / JPM 453 Shifting O ff-G as Post Treatment Process Radiation Monitors A, D ,S 9 In-Plant Systems
: c. 239001 A4.01 4.2 / JPM 447 Perform RPS MSIV Channel Functional                             D,S           3
@ (3 for RO); (3 for SRO
: d. 203000 A4.02 4.1 / JPM 440 SX Injection Through RHR B                                   A,N,L,S           4
-I); (3 or 2 for SRO
: e. 223002 A4.01 3.6 / JPM 452 Verify a Group 3 Isolation                                 A,N,EN,L,S         5
-U) i. 262002 2.1.30 4.4 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6 j. 295016 AA1.07 4.2 / JPM 454 RSP  
: f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power                             A,D,P,S           6
- Div 1 LPCI Operation E,L,N,R,S 7 k. 286000 2.4.25 3.3 / JPM 455 Emergency Initiation of the Div 2 DG Room CO2 System A ,E,N, R 8 @ All RO and SRO
: g. 212000 A4.14 3.8 / JPM 449 Reset a Reactor SCRAM per CPS No.                             D,L,S           7 4100.01
-I control room (and in
: h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process                       A,D,S           9 Radiation Monitors
-plant) systems must be different and serve different safety functions; all 5 SRO
                    @
-U systems must serve different safety functions; in
In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
-plant systems and functions may overlap those tested in the control room.
: i. 262002 2.1.30 4.4 / JPM 026 Manual Transfer of Distribution Panel Loads                   D,R            6 (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER
* Type Codes Criteria for RO / SRO
: j. 295016 AA1.07 4.2 / JPM 454 RSP - Div 1 LPCI Operation                                 E,L,N,R,S         7
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
: k. 286000 2.4.25 3.3 / JPM 455 Emergency Initiation of the Div 2 DG Room                   A,E,N,R           8 CO2 System
-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
  @       All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3  < 9 / < 8 / < 4  > 1 / > 1 / > 1   - /   - / > 1 (control room system
* Type Codes                                   Criteria for RO / SRO-I / SRO-U (A)lternate path                                                     4-6 /  4-6 / 2-3 (C)ontrol room (D)irect from bank                                                   <9 /    <8    / <4 (E)mergency or abnormal in-plant                                     >1 /   >1     / >1 (EN)gineered safety feature                                            - /     -   / > 1 (control room system (L)ow-Power / Shutdown                                                >1 /   >1     / >1 (N)ew or (M)odified from bank including 1(A)                         >2 /   >2     / >1 (P)revious 2 exams                                                    <3/     <3     / < 2 (randomly selected)
  > 1 / > 1 / > 1  > 2 / > 2 / > 1  < 3 / < 3 / < 2 (randomly selected)
(R)CA                                                                >1 /   >1     / >1 (S)imulator ES-301, Page 23 of 27
  > 1 / > 1 / > 1   ES-301, Page 23 of 27 ES-301 Control Room/In
-Plant Systems Outline Form ES-301-2  Facility: Clinton  Date of Examination: 8/22/2011  Exam Level:  RO SRO-I  SRO-U  Operating Test Number:
2011-301  Control Room Systems
@ (8 for RO); (7 for SRO
-I); (2 or 3 for SRO
-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function a. 202001 A 4.0 1 3.7 / JPM 448 Transfer RR pumps from Fast to Slow speed  M , S 1 b. 217000 A4.04 3.6 / JPM 2 04 Manually Startup RCIC System A, D, EN,L,S 2 c. 239001 A4.01 4.0 / JPM 447 Perform RPS MSIV Channel Functional D,S 3 d. 203000 A4.02 4.1 / JPM 440 SX Injection through RHR B A, N, L, S 4 e. 223002 A4.01 3.
5 / JPM 45 2 Verify a Group 3 Isolation A,N,EN,L,S 5 f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A, D, P ,S 6 g.                  h. 272000 A1.01 3.2 / JPM 453 Shifting O ff-Gas Post Treatment Process Radiation Monitors A, D ,S 9 In-Plant Systems
@ (3 for RO); (3 for SRO
-I); (3 or 2 for SRO
-U) i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6 j. 295016 AA1.07 4.
3 / JPM 454 RSP
- Div 1 LPCI Operation E,L,N,R,S 7 k. 286000 2.4.25 3.
7 / JPM 455 Emergency Initiation of the Div 2 DG Room CO2 System A,E,N,R 8 @ All RO and SRO
-I control room (and in
-plant) systems must be different and serve different safety functions; all 5 SRO
-U systems must serve different safety functions; in
-plant systems and functions may overlap those tested in the control room.
* Type Cod es Criteria for RO / SRO
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3  < 9 / < 8 / < 4  > 1 / > 1 / > 1    - /  - / > 1 (control room system
  > 1 / > 1 / > 1  > 2 / > 2 / > 1  < 3 / < 3 / < 2 (randomly selected)
  > 1 / > 1 / > 1   ES-301, Page 23 of 27


ES-301 Control Room/In
ES-301                           Control Room/In-Plant Systems Outline                             Form ES-301-2 Facility: Clinton                                                       Date of Examination: 8/22/2011 Exam Level: RO           SRO-I     SRO-U                             Operating Test Number: 2011-301
-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I   SRO-U Operating Test Number:
                            @
2011-301   Control Room Systems
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
@ (8 for RO); (7 for SRO
Safety System / JPM Title                                       Type Code*
-I); (2 or 3 for SRO
Function
-U, including 1 ESF)
: a. 202001 A4.01 3.7 / JPM 448 Transfer RR pumps from Fast to Slow                            M,S            1 speed
System / JPM Title Type Code*
: b. 217000 A4.04 3.6 / JPM 204 Manually Startup RCIC System                              A,D,EN,L,S          2
Safety Function a.                   b.                   c.                   d. 203000 A4.02 4.1 / JPM 440 SX Injection through RHR B A,N,L,S 4 e. 223002 A4.01 3.5 / JPM 45 2 Verify a Group 3 Isolation A,N,EN,L,S 5 f.                   g.                   h. 272000 A1.01 3.2 / JPM 453 Shifting Off
: c. 239001 A4.01 4.0 / JPM 447 Perform RPS MSIV Channel Functional                            D,S            3
-Gas Post Treatment Process Radiation Monitors A,D,S 9 In-Plant Systems
: d. 203000 A4.02 4.1 / JPM 440 SX Injection through RHR B                                   A,N,L,S           4
@ (3 for RO); (3 for SRO
: e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation                                 A,N,EN,L,S         5
-I); (3 or 2 for SRO
: f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power                            A,D,P,S          6 g.
-U) i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER D,R 6 j. 295016 AA1.07 4.3 / JPM 454 RSP  
: h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process                       A,D,S           9 Radiation Monitors
- Div 1 LPCI Operation E,L,N,R,S 7 k.                  @ All RO and SRO
                    @
-I control room (and in
In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
-plant) systems must be different and serve different safety functions; all 5 SRO
: i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads                   D,R            6 (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER
-U systems must serve different safety functions; in
: j. 295016 AA1.07 4.3 / JPM 454 RSP - Div 1 LPCI Operation                                 E,L,N,R,S         7
-plant systems and functions may overlap those tested in the control room.
: k. 286000 2.4.25 3.7 / JPM 455 Emergency Initiation of the Div 2 DG Room                   A,E,N,R          8 CO2 System
* Type Codes Criteria for RO / SRO
  @       All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
* Type Codes                                   Criteria for RO / SRO-I / SRO-U (A)lternate path                                                     4-6 /  4-6 / 2-3 (C)ontrol room (D)irect from bank                                                   <9 /    <8    / <4 (E)mergency or abnormal in-plant                                     >1 /    >1    / >1 (EN)gineered safety feature                                           - /      -    / > 1 (control room system (L)ow-Power / Shutdown                                               >1 /    >1    / >1 (N)ew or (M)odified from bank including 1(A)                         >2 /    >2    / >1 (P)revious 2 exams                                                   <3/    <3    / < 2 (randomly selected)
-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) (P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3   < 9 / < 8 / < 4 > 1 / > 1 / > 1   - /   - / > 1 (control room system
(R)CA                                                                 >1 /    >1    / >1 (S)imulator ES-301, Page 23 of 27
  > 1 / > 1 / > 1 > 2 / > 2 / > 1 < 3 / < 3 / < 2 (randomly selected)
 
  > 1 / > 1 / > 1   ES-301, Page 23 of 27}}
ES-301                          Control Room/In-Plant Systems Outline                            Form ES-301-2 Facility: Clinton                                                      Date of Examination: 8/22/2011 Exam Level: RO            SRO-I      SRO-U                              Operating Test Number: 2011-301
                            @
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title                                      Type Code*
Function a.
b.
c.
: d. 203000 A4.02 4.1 / JPM 440 SX Injection through RHR B                                  A,N,L,S          4
: e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation                                A,N,EN,L,S          5 f.
g.
: h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process                      A,D,S            9 Radiation Monitors
                    @
In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads                  D,R            6 (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER
: j. 295016 AA1.07 4.3 / JPM 454 RSP - Div 1 LPCI Operation                                E,L,N,R,S          7 k.
  @      All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes                                    Criteria for RO / SRO-I / SRO-U (A)lternate path                                                      4-6 /   4-6 / 2-3 (C)ontrol room (D)irect from bank                                                    <9 /   <8     / <4 (E)mergency or abnormal in-plant                                      >1 /   >1     / >1 (EN)gineered safety feature                                            - /     -   / > 1 (control room system (L)ow-Power / Shutdown                                                >1 /   >1     / >1 (N)ew or (M)odified from bank including 1(A)                          >2 /   >2     / >1 (P)revious 2 exams                                                    <3/     <3     / < 2 (randomly selected)
(R)CA                                                                >1 /   >1     / >1 (S)imulator ES-301, Page 23 of 27}}

Revision as of 08:10, 12 November 2019

2011 Clinton Power Station Initial License Examination Revised Forms ES-301-2
ML12046A837
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/29/2011
From: Bielby M
Operations Branch III
To:
Exelon Nuclear
Shared Package
ML11354A098 List:
References
ES-301, ES-301-2
Download: ML12046A837 (3)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301

@

Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

Safety System / JPM Title Type Code*

Function

a. 202001 A4.01 3.7 / JPM 448 Transfer RR pumps from Fast to Slow M,S 1 speed
b. 217000 A4.04 3.6 / JPM 204 Manually Startup RCIC System A,D,EN,L,S 2
c. 239001 A4.01 4.2 / JPM 447 Perform RPS MSIV Channel Functional D,S 3
d. 203000 A4.02 4.1 / JPM 440 SX Injection Through RHR B A,N,L,S 4
e. 223002 A4.01 3.6 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5
f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A,D,P,S 6
g. 212000 A4.14 3.8 / JPM 449 Reset a Reactor SCRAM per CPS No. D,L,S 7 4100.01
h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process A,D,S 9 Radiation Monitors

@

In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. 262002 2.1.30 4.4 / JPM 026 Manual Transfer of Distribution Panel Loads D,R 6 (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER
j. 295016 AA1.07 4.2 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7
k. 286000 2.4.25 3.3 / JPM 455 Emergency Initiation of the Div 2 DG Room A,E,N,R 8 CO2 System

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)

(R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301

@

Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

Safety System / JPM Title Type Code*

Function

a. 202001 A4.01 3.7 / JPM 448 Transfer RR pumps from Fast to Slow M,S 1 speed
b. 217000 A4.04 3.6 / JPM 204 Manually Startup RCIC System A,D,EN,L,S 2
c. 239001 A4.01 4.0 / JPM 447 Perform RPS MSIV Channel Functional D,S 3
d. 203000 A4.02 4.1 / JPM 440 SX Injection through RHR B A,N,L,S 4
e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5
f. 264000 A4.04 3.7 / JPM 414 Parallel DG1B with Offsite Power A,D,P,S 6 g.
h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process A,D,S 9 Radiation Monitors

@

In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads D,R 6 (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER
j. 295016 AA1.07 4.3 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7
k. 286000 2.4.25 3.7 / JPM 455 Emergency Initiation of the Div 2 DG Room A,E,N,R 8 CO2 System

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)

(R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 8/22/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: 2011-301

@

Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

Safety System / JPM Title Type Code*

Function a.

b.

c.

d. 203000 A4.02 4.1 / JPM 440 SX Injection through RHR B A,N,L,S 4
e. 223002 A4.01 3.5 / JPM 452 Verify a Group 3 Isolation A,N,EN,L,S 5 f.

g.

h. 272000 A1.01 3.2 / JPM 453 Shifting Off-Gas Post Treatment Process A,D,S 9 Radiation Monitors

@

In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. 262002 2.1.30 4.0 / JPM 026 Manual Transfer of Distribution Panel Loads D,R 6 (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER
j. 295016 AA1.07 4.3 / JPM 454 RSP - Div 1 LPCI Operation E,L,N,R,S 7 k.

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)

(R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27