ML12171A610: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 06/19/2012
| issue date = 06/19/2012
| title = Waste Confidence Secy Order - Order of Acting Secretary to the Parties Inviting Answers to Suspend Final Licensing Decisions by 12 PM Edt, Monday, June 25, 2012
| title = Waste Confidence Secy Order - Order of Acting Secretary to the Parties Inviting Answers to Suspend Final Licensing Decisions by 12 PM Edt, Monday, June 25, 2012
| author name = Bates A L
| author name = Bates A
| author affiliation = NRC/SECY
| author affiliation = NRC/SECY
| addressee name =  
| addressee name =  
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of  
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION
                                                        )
In the Matter of                                       )
                                                        )
CALVERT CLIFFS NUCLEAR PROJECT, L.L.C.                  ) Docket No. 52-016-COL (Calvert Cliffs Nuclear Power Plant, Unit 3)            )
                                                        )
DETROIT EDISON CO.                                      ) Docket No. 52-033-COL (Fermi Nuclear Power Plant, Unit 3)                    )
                                                        )
DUKE ENERGY CAROLINAS, L.L.C.                          ) Docket Nos. 52-018-COL, (William States Lee III Nuclear Station, Units 1 and 2) )            52-019-COL
                                                        )
ENTERGY OPERATIONS, INC.                                ) Docket No. 50-416-LR (Grand Gulf Nuclear Station, Unit 1)                    )
                                                        )
ENTERGY OPERATIONS, INC.                                ) Docket No. 52-024-COL (Grand Gulf Nuclear Station, Unit 3)                    )
                                                        )
FIRSTENERGY NUCLEAR OPERATING CO.                      ) Docket No. 50-346-LR (Davis-Besse Nuclear Power Station, Unit 1)            )
                                                        )
FLORIDA POWER AND LIGHT CO.                            ) Docket Nos. 52-040-COL, (Turkey Point, Units 6 and 7)                          )              52-041-COL
                                                        )
LUMINANT GENERATION CO. L.L.C.                          ) Docket Nos. 52-034-COL, (Comanche Peak Nuclear Power Plant, Units 3 and 4)      )              52-035-COL
                                                        )
NEXTERA ENERGY SEABROOK, L.L.C.                        ) Docket No. 50-443-LR (Seabrook Station, Unit 1)                              )
                                                        )
PACIFIC GAS AND ELECTRIC CO.                            ) Docket Nos. 50-275-LR, (Diablo Canyon Power Plant, Units 1 and 2)              )              50-323-LR
                                                        )
PPL BELL BEND, L.L.C.                                  ) Docket No. 52-039-COL (Bell Bend Nuclear Power Plant)                        )
                                                        )
PROGRESS ENERGY CAROLINAS, INC.                        ) Docket Nos. 52-022-COL, (Shearon Harris Nuclear Power Plant, Units 2 and 3)    )              52-023-COL
                                                        )
PROGRESS ENERGY FLORIDA, INC.                          ) Docket Nos. 52-029-COL, (Levy County Nuclear Power Plant, Units 1 and 2)        )              52-030-COL
                                                        )
SOUTH TEXAS PROJECT NUCLEAR OPERATING CO.              ) Docket Nos. 50-498-LR, (South Texas Project, Units 1 and 2)                    )              50-499-LR
                                                        )
                                                        )


CALVERT CLIFFS NUCLEAR PROJECT, L.L.C.
SOUTH TEXAS PROJECT NUCLEAR OPERATING CO.                      )
(Calvert Cliffs Nuclear Power Plant, Unit 3)
(South Texas Project, Units 3 and 4)                          )    Docket Nos. 52-012-COL,
DETROIT EDISON CO.
                                                              )                  52-013-COL TENNESSEE VALLEY AUTHORITY                                    )
(Fermi Nuclear Power Plant, Unit 3)  
(Bellefonte Nuclear Power Plant, Units 3 and 4)                )    Docket Nos. 52-014-COL,
                                                              )                  52-015-COL TENNESSEE VALLEY AUTHORITY                                    )
(Watts Bar, Unit 2)                                            )    Docket No. 50-391-OL
                                                              )
UNION ELECTRIC CO.                                             )
(Callaway Plant, Unit 1)                                      )    Docket No. 50-483-LR
                                                              )
VIRGINIA ELECTRIC AND POWER CO.                                )
d/b/a DOMINION VIRGINIA POWER and                              )    Docket No. 52-017-COL OLD DOMINION ELECTRIC COOPERATIVE                              )
(North Anna, Unit 3)                                           )
                                                              )
ORDER The Commission has received a series of substantively identical petitions to suspend final licensing decisions, and requesting additional related relief, in the captioned matters.1 Any answers to these petitions may be filed no later than 12:00 p.m. EDT, Monday, June 25, 2012.
Answers should not exceed ten pages. Replies to the answers will not be entertained.
This order is issued pursuant to my authority under 10 C.F.R. §§ 2.346(a) and (j).
IT IS SO ORDERED.
For the Commission
[NRC Seal]                                            /RA/
___________________________
Andrew L. Bates Acting Secretary of the Commission Dated at Rockville, Maryland, this 19th day of June, 2012 1
See, e.g., Petition to Suspend Final Decisions in All Pending Reactor Licensing Proceedings Pending Completion of Remanded Waste Confidence Proceedings (June 18, 2012).


DUKE ENERGY CAROLINAS, L.L.C.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of                                )
(William States Lee III Nuclear Station, Units 1 and 2)
                                                )
ENTERGY OPERATIONS, INC.
Entergy Operations, Inc.                         )  Docket No. 50-416-LR (Grand Gulf Nuclear Station, Unit 1)            )
(Grand Gulf Nuclear Station, Unit 1)
                                                )
(License Renewal)                              )
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing Order of the Acting Secretary to the parties inviting Answers to the petitions to suspend final licensing decisions by 12:00 p.m., EDT Monday, June 25, 2012, have been served upon the following persons by Electronic Information Exchange and by electronic mail as indicated by an asterisk*.
U.S. Nuclear Regulatory Commission                  U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board                    Office of the Secretary of the Commission Mail Stop T-3F23                                    Mail Stop O-16C1 Washington, DC 20555-0001                            Washington, DC 20555-0001 Hearing Docket: hearingdocket@nrc.gov E. Roy Hawkens, Chief Administrative Judge roy.hawkens@nrc.gov U.S. Nuclear Regulatory Commission                  U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication          Office of the General Counsel Mail Stop O-16C1                                    Mail Stop O-15D21 Washington, DC 20555-0001                            Washington, DC 20555-0001 OCAA Mail Center: ocaamail@nrc.gov                  Catherine Kanatas, Esq.
Beth Mizuno, Esq.
Edward Williamson, Esq.
Brian Newell, Paralegal catherine.kanatas@nrc.gov beth.mizuno@nrc.gov edward.williamson@nrc.gov brian.newell@nrc.gov OGC Mail Center: OGCMailCenter@nrc.gov


ENTERGY OPERATIONS, INC. (Grand Gulf Nuclear Station, Unit 3)
.Grand Gulf Nuclear Station, Units 1 Docket No. 50-416-LR Order of the Acting Secretary to the parties inviting Answers to the petitions to suspend final licensing decisions by 12:00 p.m., EDT Monday, June 25, 2012 Entergy Services, Inc.                             Beyond Nuclear 639 Loyola Avenue                                 6930 Carroll Avenue, Suite 400 New Orleans, LA 70113                              Takoma Park, MD 20912 Joseph A. Aluise                                  Paul Gunter, Director, Reactor Oversight Assistant General Counsel                          Project jaluise@entergy.com                              paul@beyondnuclear.org Erich Pica, President*
 
Friends of the Earth 1100 15th Street, NW 11th Floor Washington, D.C. 20555 mkeever@foe.org
FIRSTENERGY NUCLEAR OPERATING CO.
[original signed by R. Giitter           ]
(Davis-Besse Nuclear Power Station, Unit 1)
Office of the Secretary of the Commission Dated at Rockville, Maryland this 19th day of June, 2012 2}}
 
FLORIDA POWER AND LIGHT CO. (Turkey Point, Units 6 and 7)
 
LUMINANT GENERATION CO. L.L.C.
(Comanche Peak Nuclear Power Plant, Units 3 and 4)
 
NEXTERA ENERGY SEABROOK, L.L.C. (Seabrook Station, Unit 1)
 
PACIFIC GAS AND ELECTRIC CO.
(Diablo Canyon Power Plant, Units 1 and 2)
 
PPL BELL BEND, L.L.C. (Bell Bend Nuclear Power Plant)
 
PROGRESS ENERGY CAROLINAS, INC.
(Shearon Harris Nuclear Power Plant, Units 2 and 3)
PROGRESS ENERGY FLORIDA, INC.
(Levy County Nuclear Power Plant, Units 1 and 2)
 
SOUTH TEXAS PROJECT NUCLEAR OPERATING CO. (South Texas Project, Units 1 and 2)
 
) )
)
)
) ) )
)
)
)
) ) )
)
)
) ) )
)
)
)
) ) )
)
)
) ) )
)
)
)
) ) )
)
)
) ) )
)
)
) ) )
 
Docket No. 52-016-COL
 
Docket No. 52-033-COL
 
Docket Nos. 52-018-COL, 52-019-COL Docket No. 50-416-LR  
 
Docket No. 52-024-COL
 
Docket No. 50-346-LR
 
Docket Nos. 52-040-COL,                      52-041-COL
 
Docket Nos. 52-034-COL, 52-035-COL
 
Docket No. 50-443-LR
 
Docket Nos. 50-275-LR, 50-323-LR
 
Docket No. 52-039-COL
 
Docket Nos. 52-022-COL, 52-023-COL Docket Nos. 52-029-COL, 52-030-COL
 
Docket Nos. 50-498-LR,                      50-499-LR
 
SOUTH TEXAS PROJECT NUCLEAR OPERATING CO. (South Texas Project, Units 3 and 4)
 
TENNESSEE VALLEY AUTHORITY (Bellefonte Nuclear Power Plant, Units 3 and 4)
TENNESSEE VALLEY AUTHORITY (Watts Bar, Unit 2)
 
UNION ELECTRIC CO. (Callaway Plant, Unit 1)
 
VIRGINIA ELECTRIC AND POWER CO.
d/b/a DOMINION VIRGINIA POWER and OLD DOMINION ELECTRIC COOPERATIVE (North Anna, Unit 3) ) )
)
)
) ) )
)
)
) ) )
)
)
)
) )  Docket Nos. 52-012-COL, 52-013-COL
 
Docket Nos. 52-014-COL,                      52-015-COL
 
Docket No. 50-391-OL
 
Docket No. 50-483-LR
 
Docket No. 52-017-COL ORDER  The Commission has received a series of substantively identical petitions to suspend final licensing decisions, and requesting additional related relief, in the captioned matters.
1  Any answers to these petitions may be filed no later than 12:00 p.m. EDT, Monday, June 25, 2012.
Answers should not exceed ten pages. Replies to the answers will not be entertained. This order is issued pursuant to my authority under 10 C.F.R. §§ 2.346(a) and (j). IT IS SO ORDERED.      For the Commission [NRC Seal]   
/RA/              ___________________________      Andrew L. Bates      Acting Secretary of the Commission
 
Dated at Rockville, Maryland, this 19th day of June, 2012
 
1 See, e.g., Petition to Suspend Final Decisions in All Pending Reactor Licensing Proceedings Pending Completion of Remanded Waste Confidence Proceedings (June 18, 2012).
 
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )
)
Entergy Operations, Inc. ) Docket No. 50-416-LR (Grand Gulf Nuclear Station, Unit 1) )
)  (License Renewal)  )
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing Order of the Acting Secretary to the parties inviting Answers to the petitions to su spend final licensing decisions by 12:00 p.m., EDT Monday, June 25, 2012, have been served upon the following persons by Electronic Information Exchange and by electroni c mail as indicated by an asterisk*.
U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board
 
Mail Stop T-3F23 Washington, DC  20555-0001
 
E. Roy Hawkens, Chief Administrative Judge
 
roy.hawkens@nrc.gov
 
U.S. Nuclear Regulatory Commission Office of the Secretary of the Commission
 
Mail Stop O-16C1 Washington, DC  20555-0001 Hearing Docket:  hearingdocket@nrc.gov
 
U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Mail Stop O-16C1 Washington, DC  20555-0001 OCAA Mail Center:
ocaamail@nrc.gov U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O-15D21 Washington, DC  20555-0001 Catherine Kanatas, Esq.
 
Beth Mizuno, Esq. Edward Williamson, Esq.
Brian Newell, Paralegal catherine.kanatas@nrc.gov beth.mizuno@nrc.gov edward.williamson@nrc.gov brian.newell@nrc.gov
 
OGC Mail Center:
OGCMailCenter@nrc.gov
 
. Grand Gulf Nuclear Station, Units 1 Docket No. 50-416-LR  Order of the Acting Secretary to the parties inviting Answers to the petitions to suspend final licensing decisions by 12:00 p.m., EDT Monday, June 25, 2012 2Entergy Services, Inc. 639 Loyola Avenue New Orleans, LA  70113 Joseph A. Aluise Assistant General Counsel
 
jaluise@entergy.com Beyond Nuclear 6930 Carroll Avenue, Suite 400  
 
Takoma Park, MD 20912  
 
Paul Gunter, Director, Reactor Oversight  
 
Project paul@beyondnuclear.org Erich Pica, President*
Friends of the Earth  
 
1100 15 th Street, NW 11 th Floor Washington, D.C. 20555  
 
mkeever@foe.org
 
[original signed by R. Giitter         ]                                 Office of the Secretary of the Commission  
 
Dated at Rockville, Maryland  
 
this 19 th day of June, 2012}}

Latest revision as of 01:51, 12 November 2019

Waste Confidence Secy Order - Order of Acting Secretary to the Parties Inviting Answers to Suspend Final Licensing Decisions by 12 PM Edt, Monday, June 25, 2012
ML12171A610
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/19/2012
From: Bates A
NRC/SECY
To:
Entergy Operations, NRC/OGC
SECY RAS
References
License Renewal, RAS 22637, 50-416-LR
Download: ML12171A610 (4)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

)

In the Matter of )

)

CALVERT CLIFFS NUCLEAR PROJECT, L.L.C. ) Docket No. 52-016-COL (Calvert Cliffs Nuclear Power Plant, Unit 3) )

)

DETROIT EDISON CO. ) Docket No. 52-033-COL (Fermi Nuclear Power Plant, Unit 3) )

)

DUKE ENERGY CAROLINAS, L.L.C. ) Docket Nos. 52-018-COL, (William States Lee III Nuclear Station, Units 1 and 2) ) 52-019-COL

)

ENTERGY OPERATIONS, INC. ) Docket No. 50-416-LR (Grand Gulf Nuclear Station, Unit 1) )

)

ENTERGY OPERATIONS, INC. ) Docket No. 52-024-COL (Grand Gulf Nuclear Station, Unit 3) )

)

FIRSTENERGY NUCLEAR OPERATING CO. ) Docket No. 50-346-LR (Davis-Besse Nuclear Power Station, Unit 1) )

)

FLORIDA POWER AND LIGHT CO. ) Docket Nos. 52-040-COL, (Turkey Point, Units 6 and 7) ) 52-041-COL

)

LUMINANT GENERATION CO. L.L.C. ) Docket Nos. 52-034-COL, (Comanche Peak Nuclear Power Plant, Units 3 and 4) ) 52-035-COL

)

NEXTERA ENERGY SEABROOK, L.L.C. ) Docket No. 50-443-LR (Seabrook Station, Unit 1) )

)

PACIFIC GAS AND ELECTRIC CO. ) Docket Nos. 50-275-LR, (Diablo Canyon Power Plant, Units 1 and 2) ) 50-323-LR

)

PPL BELL BEND, L.L.C. ) Docket No. 52-039-COL (Bell Bend Nuclear Power Plant) )

)

PROGRESS ENERGY CAROLINAS, INC. ) Docket Nos. 52-022-COL, (Shearon Harris Nuclear Power Plant, Units 2 and 3) ) 52-023-COL

)

PROGRESS ENERGY FLORIDA, INC. ) Docket Nos. 52-029-COL, (Levy County Nuclear Power Plant, Units 1 and 2) ) 52-030-COL

)

SOUTH TEXAS PROJECT NUCLEAR OPERATING CO. ) Docket Nos. 50-498-LR, (South Texas Project, Units 1 and 2) ) 50-499-LR

)

)

SOUTH TEXAS PROJECT NUCLEAR OPERATING CO. )

(South Texas Project, Units 3 and 4) ) Docket Nos. 52-012-COL,

) 52-013-COL TENNESSEE VALLEY AUTHORITY )

(Bellefonte Nuclear Power Plant, Units 3 and 4) ) Docket Nos. 52-014-COL,

) 52-015-COL TENNESSEE VALLEY AUTHORITY )

(Watts Bar, Unit 2) ) Docket No. 50-391-OL

)

UNION ELECTRIC CO. )

(Callaway Plant, Unit 1) ) Docket No. 50-483-LR

)

VIRGINIA ELECTRIC AND POWER CO. )

d/b/a DOMINION VIRGINIA POWER and ) Docket No. 52-017-COL OLD DOMINION ELECTRIC COOPERATIVE )

(North Anna, Unit 3) )

)

ORDER The Commission has received a series of substantively identical petitions to suspend final licensing decisions, and requesting additional related relief, in the captioned matters.1 Any answers to these petitions may be filed no later than 12:00 p.m. EDT, Monday, June 25, 2012.

Answers should not exceed ten pages. Replies to the answers will not be entertained.

This order is issued pursuant to my authority under 10 C.F.R. §§ 2.346(a) and (j).

IT IS SO ORDERED.

For the Commission

[NRC Seal] /RA/

___________________________

Andrew L. Bates Acting Secretary of the Commission Dated at Rockville, Maryland, this 19th day of June, 2012 1

See, e.g., Petition to Suspend Final Decisions in All Pending Reactor Licensing Proceedings Pending Completion of Remanded Waste Confidence Proceedings (June 18, 2012).

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

Entergy Operations, Inc. ) Docket No. 50-416-LR (Grand Gulf Nuclear Station, Unit 1) )

)

(License Renewal) )

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing Order of the Acting Secretary to the parties inviting Answers to the petitions to suspend final licensing decisions by 12:00 p.m., EDT Monday, June 25, 2012, have been served upon the following persons by Electronic Information Exchange and by electronic mail as indicated by an asterisk*.

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Office of the Secretary of the Commission Mail Stop T-3F23 Mail Stop O-16C1 Washington, DC 20555-0001 Washington, DC 20555-0001 Hearing Docket: hearingdocket@nrc.gov E. Roy Hawkens, Chief Administrative Judge roy.hawkens@nrc.gov U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Office of the General Counsel Mail Stop O-16C1 Mail Stop O-15D21 Washington, DC 20555-0001 Washington, DC 20555-0001 OCAA Mail Center: ocaamail@nrc.gov Catherine Kanatas, Esq.

Beth Mizuno, Esq.

Edward Williamson, Esq.

Brian Newell, Paralegal catherine.kanatas@nrc.gov beth.mizuno@nrc.gov edward.williamson@nrc.gov brian.newell@nrc.gov OGC Mail Center: OGCMailCenter@nrc.gov

.Grand Gulf Nuclear Station, Units 1 Docket No. 50-416-LR Order of the Acting Secretary to the parties inviting Answers to the petitions to suspend final licensing decisions by 12:00 p.m., EDT Monday, June 25, 2012 Entergy Services, Inc. Beyond Nuclear 639 Loyola Avenue 6930 Carroll Avenue, Suite 400 New Orleans, LA 70113 Takoma Park, MD 20912 Joseph A. Aluise Paul Gunter, Director, Reactor Oversight Assistant General Counsel Project jaluise@entergy.com paul@beyondnuclear.org Erich Pica, President*

Friends of the Earth 1100 15th Street, NW 11th Floor Washington, D.C. 20555 mkeever@foe.org

[original signed by R. Giitter ]

Office of the Secretary of the Commission Dated at Rockville, Maryland this 19th day of June, 2012 2