| issue date = 01/31/2012
| issue date = 01/31/2012
| title = Byron Station Shift Logs from 1/30/12-1/31/12
| title = Shift Logs from 1/30/12-1/31/12
| author name =  
| author name =  
| author affiliation = Exelon Generation Co, LLC
| author affiliation = Exelon Generation Co, LLC
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:logs Page 2 ot 24 (b)(4),(b)(6)
{{#Wiki_filter:logs                                                                             Page 2 ot 24 (b)(4),(b)(6)
.;nak~ .i lh rocord was dakied fIn 4=raw"i"1,-
                                                  .i lh rocord was dakied fIn
Fr,'edomn of Ifryr- ~POIfA/PA C http://esoms.exeloncorp.com~logs.aspx1//22 1/31/2012  
                                              .;nak~
". logs rage J or Z4 (b)(4),(b)(6) http://esoms.exeloncorp.conV/ogs.aspx1 1/31/2012  
4=raw"i"1,- Fr,'edomn of Ifryr-       ~
".logs oage 4 or L4 (b)(4)http://esoms.exeloncorp.com/logs.aspx1//22 1/31/2012 logs Page 5 of 24 http://esoms.exeloncorp.com/logs.aspx 1/31/2012  
POIfA/PA http://esoms.exeloncorp.com~logs.aspx1//22                                       1/31/2012 C
* .logs Page 6 of 24 Days 1/30/2012 10:01:00 AM Entered 2BOL 8.1 condition E due to the loss of Unit 2 SAT's @1009 and the 2B-DG inoperability.
 
The action is to restore the SAT's or the 2B-DG in 12 hours or be in mode 3 in 6 hours and In mode 5 In 36 hours.(b)(6)Days 1/30/2012 Entered O0BOL 11.b condition B,Dand F for the 2PRO13.10:01:00 AM The action is to suspend purging via this path immediately.
". logs                                 rage J or Z4 (b)(4),(b)(6) http://esoms.exeloncorp.conV/ogs.aspx1   1/31/2012
This action has been completed.
 
IR#1320145 Days 1/30/2012 Entered 1DPS 2BOL 3.9 conditions A and C for both trains 10:01:00 AM of BDPS. Condition A is to restore the train to operable in 72 hours. Condition C Is to Isolate unborated water sources in one hour and to perform a SDM In one hour.Log Date Entry 1/30/2012 10:30:00 SDM performed per SR3.1.1.1 and Is satisfactory for the next 12 AM hours.1/30/2012 10:56:00 Completed CO Hang for unborated water sources per C/O 96468 AM User Days 1/30/2012 10:01:00 AM 2PR11IJ is In unplanned LCO 2BOL 4.15 condition B. The action is to sample the affected train every 24 hours Rp and Chem has been contacted.
".logs                                     oage 4 or L4 (b)(4) http://esoms.exeloncorp.com/logs.aspx1//22 1/31/2012
Days 1/30/2012 Entered 1BOL 8.1 condition A due to the loss of Unit 2 10:01:00 AM SAT's @1009. The action Is to perform 1BOSR 8.1.1-1 in one hour and every 8 hours thereafter.
 
Surveillance 1BOSR 8.1.1-1 has been completed  
logs                                 Page 5 of 24 http://esoms.exeloncorp.com/logs.aspx   1/31/2012
@1054. The second action Is to restore the required qualified circuits In 72 hours or shut down the unit to mode 3 In 6 hours and to mode 5 in 36 hours.Days 1/30/2012 Unit 2 Rx trip 10:01:00 AM Log Date Entry User 1/30/2012 10:01:50 AM Entered 2BEP-0 Reactor Trip or Safety Injection b))1/30/2012 10:11:00 AM Transitloned to 2BEP ES-0.1 Rx trip Response (b)Days 1/30/2012 Unit 2 Reactor trip -Red First Out annunciator is RCP (6)10:01:33 AM Undervoltage Reactor trip. IR 1319908 and 1320006 written.Log Date Entry Based on a report of smoke, opened SAT 242-1 and SAT 242-2 feed breakers to 1/30/2012 BUS 241 (ACB 2412), BUS 242 (ACB 2422), BUS 243 (ACB 2432) and BUS 244 (ACB 10:09:00 AM 2442). Offsite power from the Unit 2 SATs has been disconnected.
 
2A and 28 D/Gs'started and are supplying BUS 241 and 242.1/30/2012 Declared an Unusual Event on Byron Unit 2 due to a loss of all otfsite power to ESF 10: 18:00 AM BUSes 241 and 242.1/30/2012 130:23:012 Nuclear Accident Reporting System (NARS) form communicated to Illinois EMA.10:23:00 AN 1/30/2012 http://esoms.exeloncorp.com/logs.aspx 1/31/2012
*.logs                                                                                                   Page 6 of 24 (b)
* logs Page 7 of 24 10:33:00 AN Completed Dialogic notification for Byron Unit 2 Unusual Event.S(b),(6)1030/2012 Completed NRC Event Notification EN# 47624.10:39:00 AM Days 1/30/2012 Entered PLANNED LCOAR OBOL 3.p, Condition A as 10:01:59 AM 2AR113 and 2AR123 setpoint are currently more than 10 mr/hr above background following U2 Rx trip Log Date Entry Entered LCOAR OBOL 3.p Condition B for required action and completion time of Condition A not met. Entered LCOAR 2BOL 3.6 Conditions A and B for 2ARO 113 and 2AR0123 inoperable as directed by OBOL 3.p. Entered LCOAR 2BOL 6.3 Condition B for 1/30/2012 all U-2 CNMT vent isolation valves inoperable as directed by 2BOL 3.6 Required action 2:01:59 PH of the two LCOAR's is to isolate the affected penetration flowpath by use of at least one closed and de-activated automatic valve. 2VQ001B and 002B are 0OS under an admin CO#94013230.
Days             1/30/2012           Entered 2BOL 8.1 condition E due to the loss of Unit 2           (6) 10:01:00 AM          SAT's @1009 and the 2B-DG inoperability. The action is to restore the SAT's or the 2B-DG in 12 hours or be in mode 3 in 6 hours and In mode 5 In 36 hours.
2VQ003, 004B and 2VQ005B fuses were previously pulled and are tracked for configuration control under ACPS#12-0026 Days 1/30/2012 Started 1A SX Pump and opened 1SX007 and 2SX007 to 10:04:54 AM supply SX to U2 due to no SX Pumps running on U2.Days 1/30/2012 10:05:32 AM Entered Unplanned 0BOL 11.a, Conditions B and D due to loss of Sample Flow on OPR10J.Days 1/30/2012 Secured Transfer of "GA" WX Monitor Tank (24%) to (b)(6)10:08:00 "OB" WX Monitor Tank (48%) per BOP WX-112.AM Days 1/30/2012 Both ESF Bus energized I(b)10:11:00 AM Days 1/30/2012 TSO (Mark 3enga) called to inquire about the loss of U-2 10:12:16 AM generation.
Days             1/30/2012           Entered O0BOL 11.b condition B,Dand F for the 2PRO13.
They stated that they lost Indication on C-phase of Bus 13. Told TSO that Byron Is addressing the loss of offslte power on Unit 2.Days 1/30/2012 Started "GA" GW Compressor for U-2 VCT Venting per (b( ]10:14:00 BOP GW-I. "" In Service GDT (36#), "" Cover GDT AM (85#) and Vent Header Pressure at (1.92#).Log Date Entry User 1/30/2012 Realigned GDT's per BOP GW-6 GDT OB (92#) is now In Storage for (b)(6)Decay. GOT OF (6#) is now the In Service GOT. "" GDT OC (5#) is 11:58:00 AM Aligned for Stand By.1/30/2012 Secured "0A" GW Compressor per BOP GW-1. "" In Service GDT (15#), [b(6 l 1:30:04 PM ". Cover GOT (85#) and Vent Header Pressure at (1.96#). I Days 1/30/2012 Offsite assistance requested C 10:23:00 AM Log Date Entry User 1/30/2012 10:48:00 AM Two Byron Fire Department trucks came Inside the protected area. Five trucks are waiting inside the parking lot area if necessary.
10:01:00 AM         The action is to suspend purging via this path immediately. This action has been completed.
1/30/2012 (b)(6)Byron Fire Department trucks are outside the protected area.http://esoms.exeloncorp.com/logs.aspx 1/31/2012  
IR#1320145 Days             1/30/2012           Entered 1DPS 2BOL 3.9 conditions A and C for both trains 10:01:00 AM         of BDPS. Condition A is to restore the train to operable in 72 hours. Condition C Is to Isolate unborated water sources in one hour and to perform a SDM In one hour.
.logs Page 8 of 24 (b)(4),(b)(6)
Log Date               Entry                                                                 User 1/30/2012 10:30:00     SDM performed per SR3.1.1.1 and Is satisfactory for the next 12 AM                     hours.
Days 1/30/2012 Re-aligned charging to the RWST due to the loss of the (6)10:25:00 AM Unit 2 SAT's and the loss of the Boric acid transfer pump.This was done prior to the auto swap-over.
1/30/2012 10:56:00     Completed CO Hang for unborated water sources per C/O 96468 AM Days             1/30/2012           2PR11IJ is In unplanned LCO 2BOL 4.15 condition B. The 10:01:00 AM        action is to sample the affected train every 24 hours Rp and Chem has been contacted.
Days 1/30/2012 Received permission from bulk power to deenergize BUS 10:28:06 AM 13 and isolate U2 Switchard from Line 0622 1(b)(6) j ff!Days 1/30/2012 SDM for Unit 2 good until 2201 1/30/12. SDM Completed 10:30:00 AM Days 1/30/2012 Secured both OA and OB SX Makeup pumps due to high 10:34:23 AM level in the SX Cooling Tower. These pumps were started in the emergency procedures.
Days           1/30/2012           Entered 1BOL 8.1 condition A due to the loss of Unit 2 10:01:00 AM         SAT's @1009. The action Is to perform 1BOSR 8.1.1-1 in one hour and every 8 hours thereafter. Surveillance 1BOSR 8.1.1-1 has been completed @1054. The second action Is to restore the required qualified circuits In 72 hours or shut down the unit to mode 3 In 6 hours and to mode 5 in 36 hours.
Days 1/30/2012 Notified Chemistry to sample for Boron every 15 min.10:36:00 AM Days 1/30/2012 RP notified to perform Tech spec samples for power drop 10:38:00 AM of greater than 15% in one hour.Days 1/30/2012 2BCSR 4.16.2-1 initiated for greater than a 15% power 10:38:00 AM change Days 1/30/2012 Notified NRC Operations Center of the Unit 2 reactor trip.10:39:24 AM ENS worksheet EN# 47624 transmitted via Red Phone.NRC requests periodic updates.Days 1/30/2012 Opened Swtlchyard breakers 7-13 and 12-13 to 10:41:14 AM deenergize U2 SAT high side windings.Days 1/30/2012 Opened U2 SAT MOD disconnects 242-1 and 242-2.10:41:41 AM Days 1/30/2012 Notified by Resident NRC Inspecto (b)(6) that the 10:49:04 AM NRC Is in Monitoring Mode.Days 1/30/2012 Completed 1BOSR 8.1.1-1 and 2BOSR 8.1.1-1, Normal 10:54:32 AM and Alternate Offsite Power Surveillances unsatisfactory.
Days           1/30/2012           Unit 2 Rx trip 10:01:00 AM Log Date                     Entry                                                     User 1/30/2012 10:01:50 AM         Entered 2BEP-0 Reactor Trip or Safety Injection           b))
1/30/2012 10:11:00 AM         Transitloned to 2BEP ES-0.1 Rx trip Response (b)
Days           1/30/2012           Unit 2 Reactor trip - Red First Out annunciator is RCP           (6) 10:01:33 AM         Undervoltage Reactor trip. IR 1319908 and 1320006 written.
Log Date       Entry Based on a report of smoke, opened SAT 242-1 and SAT 242-2 feed breakers to 1/30/2012     BUS 241 (ACB 2412), BUS 242 (ACB 2422), BUS 243 (ACB 2432) and BUS 244 (ACB 10:09:00 AM   2442). Offsite power from the Unit 2 SATs has been disconnected. 2A and 28 D/Gs' started and are supplying BUS 241 and 242.
1/30/2012     Declared an Unusual Event on Byron Unit 2 due to a loss of all otfsite power to ESF 10: 18:00 AM   BUSes 241 and 242.
1/30/2012 130:23:012     Nuclear Accident Reporting System (NARS) form communicated to Illinois EMA.
10:23:00 AN 1/30/2012 http://esoms.exeloncorp.com/logs.aspx                                                                     1/31/2012
* logs                                                                                                 Page 7 of 24 S(b) 10:33:00 AN                                                                                               ,(6)
Completed Dialogic notification for Byron Unit 2 Unusual Event.
1030/2012     Completed NRC Event Notification EN# 47624.
10:39:00 AM Days             1/30/2012           Entered PLANNED LCOAR OBOL 3.p, Condition A as 10:01:59 AM         2AR113 and 2AR123 setpoint are currently more than 10 mr/hr above background following U2 Rx trip Log Date     Entry Entered LCOAR OBOL 3.p Condition B for required action and completion time of Condition A not met. Entered LCOAR 2BOL 3.6 Conditions A and B for 2ARO 113 and 2AR0123 inoperable as directed by OBOL 3.p. Entered LCOAR 2BOL 6.3 Condition B for 1/30/2012   all U-2 CNMT vent isolation valves inoperable as directed by 2BOL 3.6 Required action 2:01:59 PH   of the two LCOAR's is to isolate the affected penetration flowpath by use of at least one closed and de-activated automatic valve. 2VQ001B and 002B are 0OS under an admin CO#94013230. 2VQ003, 004B and 2VQ005B fuses were previously pulled and are tracked for configuration control under ACPS#12-0026 Days             1/30/2012         Started 1A SX Pump and opened 1SX007 and 2SX007 to 10:04:54 AM       supply SX to U2 due to no SX Pumps running on U2.
Days             1/30/2012         Entered Unplanned 0BOL 11.a, Conditions B and D due to 10:05:32 AM        loss of Sample Flow on OPR10J.
Days         1/30/2012       Secured Transfer of "GA" WX Monitor Tank (24%) to             (b)(6) 10:08:00         "OB" WX Monitor Tank (48%) per BOP WX-112.
AM Days             1/30/2012         Both ESF Bus energized                                             I(b) 10:11:00 AM Days             1/30/2012         TSO (Mark 3enga) called to inquire about the loss of U-2 10:12:16 AM         generation. They stated that they lost Indication on C-phase of Bus 13. Told TSO that Byron Is addressing the loss of offslte power on Unit 2.
Days         1/30/2012       Started "GA" GW Compressor for U-2 VCT Venting per           (b(           ]
10:14:00         BOP GW-I. "" In Service GDT (36#), "" Cover GDT AM               (85#) and Vent Header Pressure at (1.92#).
Log Date         Entry                                                                       User 1/30/2012         Realigned GDT's per BOP GW-6 GDT OB (92#) is now In Storage for           (b)(6)
Decay. GOT OF (6#) is now the In Service GOT. "" GDT OC (5#) is 11:58:00 AM       Aligned for Stand By.
1/30/2012         Secured "0A" GW Compressor per BOP GW-1. "" In Service GDT (15#),         [b(6           l 1:30:04 PM         ". Cover GOT (85#) and Vent Header Pressure at (1.96#).                                   I Days             1/30/2012           Offsite assistance requested                                         C 10:23:00 AM Log Date           Entry                                                                           User 1/30/2012           Two Byron Fire Department trucks came Inside the protected area. Five           (b)(6) 10:48:00 AM        trucks are waiting inside the parking lot area if necessary.
Byron Fire Department trucks are outside the protected area.
1/30/2012 http://esoms.exeloncorp.com/logs.aspx                                                                   1/31/2012
 
. logs                                                                                         Page 8 of 24 (b)(4),(b)(6)
Days     1/30/2012     Re-aligned charging to the RWST due to the loss of the         (6) 10:25:00 AM   Unit 2 SAT's and the loss of the Boric acid transfer pump.
This was done prior to the auto swap-over.
Days     1/30/2012     Received permission from bulk power to deenergize BUS 10:28:06 AM   13 and isolate U2 Switchard from Line 0622 per*-
1(b)(6)   j                                         ff!
Days     1/30/2012     SDM for Unit 2 good until 2201 1/30/12. SDM Completed 10:30:00 AM Days     1/30/2012     Secured both OA and OB SX Makeup pumps due to high 10:34:23 AM   level in the SX Cooling Tower. These pumps were started in the emergency procedures.
Days     1/30/2012     Notified Chemistry to sample for Boron every 15 min.
10:36:00 AM Days     1/30/2012     RP notified to perform Tech spec samples for power drop 10:38:00 AM   of greater than 15% in one hour.
Days     1/30/2012     2BCSR 4.16.2-1 initiated for greater than a 15% power 10:38:00 AM   change Days       1/30/2012     Notified NRC Operations Center of the Unit 2 reactor trip.
10:39:24 AM   ENS worksheet EN# 47624 transmitted via Red Phone.
NRC requests periodic updates.
Days       1/30/2012     Opened Swtlchyard breakers 7-13 and 12-13 to 10:41:14 AM   deenergize U2 SAT high side windings.
Days     1/30/2012     Opened U2 SAT MOD disconnects 242-1 and 242-2.
10:41:41 AM Days     1/30/2012     Notified by Resident NRC Inspecto (b)(6)           that the 10:49:04 AM   NRC Is in Monitoring Mode.
Days     1/30/2012     Completed 1BOSR 8.1.1-1 and 2BOSR 8.1.1-1, Normal 10:54:32 AM   and Alternate Offsite Power Surveillances unsatisfactory.
U2 SAT Is de-energized.
U2 SAT Is de-energized.
Days 1/30/2012 All MSIV's were closed one at a time per procedure due to 10:56:00 AM the loss of the CW system and to minimize the water hammer from the MSIV system lines.Days 1/30/2012 Entered 2BEP ESO.2 due to the failure of the Unit 2 SAT's 11:00:00 AM Days 1/30/2012 2VPO3CB did not start after the failure of the SAT's on the 11:04:00 AM Unit 2 side. IR#Days 1/30/2012 Re-aligned charging to the VCT from the RWST.11:12:00 AM http://esoms.exeloncorp.conVIlogs.aspx13/22 1/31/2012  
Days     1/30/2012     All MSIV's were closed one at a time per procedure due to 10:56:00 AM   the loss of the CW system and to minimize the water hammer from the MSIV system lines.
'.logs Page 9 of 24 Days 1/30/2012 11: 17:51 AM TR Operator secured both Ul and U2 Hotwell Reject.Days 1/30/2012 Entered unplanned LCO 2BOL 5.2 condition A for the 2B-11:19:00 AM CV Pp. The 2B-CV Pp was placed in PTL since the 2B-DG Is running and on the sequencer.
Days     1/30/2012     Entered 2BEP ESO.2 due to the failure of the Unit 2 SAT's 11:00:00 AM Days     1/30/2012     2VPO3CB did not start after the failure of the SAT's on the 11:04:00 AM   Unit 2 side. IR#
2B CV pp remains AVAILABLE for ONLINE risk. The action Is toA train to operable in 7 days. Peer checked byI :7.1 Log Date Entry User 1/30/2012 11:19:00 AM Entered 28OL 1.d condition A for the 2B-CV Pp being placed In PTL due to Bus 242 being on the sequencer, The action Is to restore the pump to operable In 7 days.Days 1/30/2012 11:22:00 AM Started Transfer of "0B" WF Tank (37.7%) to "OA" WX Mon Tank (240/a) for Normal Water Processing per BOP WF-101. Swapped Inlet vlv to the "AO WF Tank.Log Date Entry User 1/30/2012 1:57:00 Secured Transfer of "OB" WF Tank (16%) to "OA' WX Mon Tank (b)(6)PM (21.3%) per BOP WF-101. I Days 1/30/2012 Chem reports that the Boron sample for Unit 2 is (b)(6)11:28:00 AM 1252ppm Days 1/30/2012 Chemistry reports that the Unit 2 Boric acid sample for 11:28:00 AM Unit 2 RCS Is 1252ppm Days 1/30/2012 (b)(6) called to Inquire if the Byron 11:29:44 AM Switchyard was In a condition that would allow the reclosure of the ring busses (i.e. Re-energize bus 11 and bus 13). I told them that if they provided switching orders, Byron could reenergize Bus 11. However, until the location of the problem on Bus 13 was identified and the bus was evaluated as acceptable, Byron would not accept switching orders for Bus 13. TSO agreed. Notified TSO that the Unit 2 SAT MODs were open. However, the location of the issue has not been identified yet.Days 1/30/2012 Restored OPR10J to green status from loss of flow.11:37:24 AM Days 1/30/2012 Unit 2 PRT Is at 95% started draining per BOP RY-4 11:42:00 AM Days 1/30/2012 Unit 2 FC Pp reported to be running without the cubical 11:45:00 AM cooler fans running.Log Date Entry User 1/30/2012 2:00:00 All unit 2 FC cubical fans are running. The thermal overloads were (b)(6)PM reset.Days 1/30/2012 Secured status trees per BAP 1310-10T2 per SM and US (b)(6)11:45:00 AM concurrence.
Days     1/30/2012     Re-aligned charging to the VCT from the RWST.
All Status trees are Green.Days 1/30/2012 Followup call made to NRC via Red Phone.http://esoms.exeloncorp.com/logs.aspx 1/31/2012  
11:12:00 AM http://esoms.exeloncorp.conVIlogs.aspx13/22                                                   1/31/2012
.logs Page 10 of 24 11:45:14 AM (b)(6)Days 1/30/2012 Chemistry reports that Unit 2 RCS Boron is 1409 PPM 11:53:00 AM Days 1/30/2012 Started 2B-RCFC 11:55:00 AM Days 1/30/2012 Started OA MUD Train to U2 CST, (80%).11:55:20 AM Days 1/30/2012 Commenced Unit 2 RCS Cooldown to 520 F on all S/G 11:58:00 AM PORV's unable to place Unit 2 Turbine on the gear.Log Date Entry use: 13/02 Commenced RCS depressurization per 2B3EP ES-O,2 Natural Circulation (b)(6)1/30/0102P Cooldown.
 
Opened Pressurizer Aux Spray valve 2CV8145. Started 2BOSR 4.C.2-1 Pzr Spray Water Temp Diff Limit Surv (During Aux Spray Operation) 1/30/2012 Commenced RCS cooldown per 2BEP ES-0.2 Natural Circulation Cooldown.Lt1L:58:01 AN Started 2BOSR 4.3.1-1 RCS Press/Temp Limit Surv.Days 1/30/2012 Restarted U2 SFP Cooling Pump. NLO reports not all 12:03:41 PM cubicle cooler fans are operating.
'.logs                                                                                                   Page 9 of 24 Days             1/30/2012           TR Operator secured both Ul and U2 Hotwell Reject.
Days 1/30/2012 Started Transfer of "OA" WX Mon Tank (24%) to "GB" (b)(t)12:04:00 WX Mon Tank (48%) Thru Vendor Demin for Normal PM Water Processing per BOP WX-112 Log Date Entry User 1/30/2012 Secured Transfer of "0A" WX Monitor Tank (11%) to "0B" WX (b)(6)5:35.00 PM Monitor Tank (88.81%) per BOP WX-112.Days 1/30/2012 Chemistry reports that the Unit 2 Boron sample is (b)(6)12:06:00 PM 1525ppm Days 1/30/2012 Followup call made to NRC via Red Phone.12:15:09 PM Days 1/30/2012 Chemistry reports that Unit 2 RCS Boron Concentration is 12:16:00 PM 1622 ppm Days 1/30/2012 Faxed ENS Worksheet EN# 47624 to the NRC Operations 12:18:35 PM Office.Days 1/30/2012 Started 2A Containment Chiller using BOP VP-1.12:31:10 PM Days 1/30/2012 PRT level is 73% secured draining the PRT.12:32:00 PM Days 1/30/2012 Chemistry reports Boron concentration results: U-1 RCS 12:32:40 PM @ 938 PPM, sample time was 0828 Verified/Adjusted Boric Acid Flow Control Potentiometer setting to the value of 3.83 per BOP CV-7.Days 1/30/2012 Received report that Unit 2 online risk was evaluated and http://esoms.exeloncorp.coni/logs.aspx 1/31/2012  
11: 17:51 AM Days             1/30/2012           Entered unplanned LCO 2BOL 5.2 condition A for the 2B-11:19:00 AM         CV Pp. The 2B-CV Pp was placed in PTL since the 2B-DG Is running and on the sequencer. 2B CV pp remains AVAILABLE for ONLINE risk. The action Is toA train to operable in 7 days. Peer checked byI       :7.1 Log Date           Entry                                                                             User Entered 28OL 1.d condition A for the 2B-CV Pp being placed In PTL due to 1/30/2012 Bus 242 being on the sequencer, The action Is to restore the pump to 11:19:00 AM operable In 7 days.
.logs Page 11 of 24 12:38:59 PM is Yellow.Days 1/30/2012 Started Transfer of "0B" HUT (50.8%) to "OA" AB Mon 12:45:00 Tank (69.7%) per BOP AB-101-1 Discharge Pressure PM (135#) and 58 GPM Flow Thru Condensate Demin.Log Date Entry User 1/30/2012 1:46:02 Secured Transfer of "OB" HUT (48.8%) to "0A" AB Mon Tank (b)(6)PM (85%).Days 1/30/2012 Water has been rerported locally on the 2A-RH Pp motor (b)(6)12:48:00 PM 2B-RH Pp Boron is 2166 and Boron for the 2A-RH Pp Is 2251 Log Date Entry Field Supervisor and PED ) jinvestigated water spray on 2A RH pump.1/30/2012 Reported back that the water spray does not impact the ability of the 2A RH pump to 1:20:00 PM run. The motor fins are directed downwards and the motor would blow any spray away. The electrical box connections are water tight. Ops and Maintenance will route water away from pump and motor. Maintenance to repair flood seal above pump.Days 1/30/2012 Chemistry reports that the Ult 2 Boron Is 1855 ppm 12:53:00 PM Days 1/30/2012 Received report that Unit 1 online risk was evaluated as 12:57:09 PM Yellow, due to loss of Unit 2 SATs.Days 1/30/2012 2B AF DO Day tank level low 1:12:00 PM Days 1/30/2012 Followup call made to NRC via Red Phone.1:15:11 PM Days 1/30/2012 Placed Boric add transfer pump in PTL swapped over to 1:16:00 PM RWST due to BDPS C/O Days 1/30/2012 Chemistry reports that Unit 2 RCS Boron Is 2141ppm 1:25:00 PM Days 1/30/2012 P-11 Blocks have been Imposed 1:30:00 PM Days 1/30/2012 Started "OA" GW Compressor for Vent Header Pressure (b)(6)1:35:00 PM Control per BOP GW-1. "" In Service GDT (25#), Cover GDT (84#).Log Date Entry User 1/30/2012 Secured "OA" GW Compressor per BOP GW-1. "" In Service GDT (29#), (b)(6)1:48:00 PH .... Cover GDT (84#) and Vent Header Pressure at (1.76#). 1 Days 1/30/2012 Started the 2B-CRDM Booster fan (b)(6)1:37:00 PM Days 1/30/2012 Secured 1A SX Pump using BOP SX-2. Closed 1SX007 and 1:40:01 PM 2SX007.http://esoms.exeloncorp.com/logs.aspx 1/31/2012 logs Page 12 of 24 1(b)(4) ,(b)(6)http://esoms.exeloncorp.com/logs.aspx 1/31/2012 logs Page 13 of 24 l(b)(4),(b)(6) http://esoms.exeloncorp.com/logs.aspx 1/31/2012  
Days           1/30/2012       Started Transfer of "0B" WF Tank (37.7%) to "OA" WX 11:22:00        Mon Tank (240/a) for Normal Water Processing per BOP AM                WF-101. Swapped Inlet vlv to the "AO WF Tank.
.logs Page 14 of 24 http://esoms.exeloncorp.com/logs.aspx 1/31/2012 logs Page 15 of 24 Rb)(4),(b)(6) http://esoms.exeloncorp.conVlogs.aspx1//22 1/31/2012 logs Page 16 of 24 http://esoms.exeloncorp.conliogs.aspx1//22 1/31/2012
Log Date             Entry                                                                   User 1/30/2012 1:57:00   Secured Transfer of "OB" WF Tank (16%) to "OA' WX Mon Tank             (b)(6)
* logs Page 17 of 24 l(b)(4),(b)(6) http://esoms.exeloncorp.com/logs.aspx 1/31/2012 logs Page 18 of 24 (b)(4),(b)(6) http://esoms.exeloncorp.con/1ogs.aspx 1/31/2012  
PM                   (21.3%) per BOP WF-101.                                                               I Days             1/30/2012           Chem reports that the Boron sample for Unit 2 is                 (b)(6) 11:28:00 AM         1252ppm Days             1/30/2012           Chemistry reports that the Unit 2 Boric acid sample for 11:28:00 AM         Unit 2 RCS Is 1252ppm Days             1/30/2012           (b)(6)               called to Inquire if the Byron 11:29:44 AM         Switchyard was In a condition that would allow the reclosure of the ring busses (i.e. Re-energize bus 11 and bus 13). I told them that if they provided switching orders, Byron could reenergize Bus 11. However, until the location of the problem on Bus 13 was identified and the bus was evaluated as acceptable, Byron would not accept switching orders for Bus 13. TSO agreed. Notified TSO that the Unit 2 SAT MODs were open. However, the location of the issue has not been identified yet.
.logs Page 19 of 24 (b)(4),(b)(6) http://esoms.exeloncorp.com/logs.aspx 1/31/2012 logs Page 20 of 24 1(b)(4),(b)(6) http://esoms.exeloncorp.com/logs.aspx 1/31/2012  
Days             1/30/2012           Restored OPR10J to green status from loss of flow.
.logs Page 21 of 24 (b)(4),(b)(6) http://esoms.exeloncorp.con/Iogs.aspx 1/31/2012 http://esoms.exeloncorp.com/logs.aspx 1/31/2012  
11:37:24 AM Days             1/30/2012           Unit 2 PRT Is at 95% started draining per BOP RY-4 11:42:00 AM Days             1/30/2012           Unit 2 FC Pp reported to be running without the cubical 11:45:00 AM         cooler fans running.
*logs Page 23 of 24 http://esoms.exeloncorp.com/logs.aspx 1/31/2012}}
Log Date               Entry                                                                 User 1/30/2012 2:00:00       All unit 2 FC cubical fans are running. The thermal overloads were   (b)(6)
PM                     reset.
Days             1/30/2012           Secured status trees per BAP 1310-10T2 per SM and US           (b)(6) 11:45:00 AM         concurrence. All Status trees are Green.
Days             1/30/2012           Followup call made to NRC via Red Phone.
http://esoms.exeloncorp.com/logs.aspx                                                                     1/31/2012
 
.logs                                                                                           Page 10 of 24 (b)(6) 11:45:14 AM Days             1/30/2012         Chemistry reports that Unit 2 RCS Boron is 1409 PPM 11:53:00 AM Days             1/30/2012         Started 2B-RCFC 11:55:00 AM Days             1/30/2012         Started OA MUD Train to U2 CST, (80%).
11:55:20 AM Days             1/30/2012         Commenced Unit 2 RCS Cooldown to 520 F on all S/G 11:58:00 AM       PORV's unable to place Unit 2 Turbine on the gear.
Log Date       Entry                                                                           use:
13/02     Commenced RCS depressurization per 2B3EP ES-O,2 Natural Circulation             (b)(6) 1/30/0102P     Cooldown. Opened Pressurizer Aux Spray valve 2CV8145. Started 2BOSR 4.C.2-1 Pzr Spray Water Temp Diff Limit Surv (During Aux Spray Operation) 1/30/2012       Commenced RCS cooldown per 2BEP ES-0.2 Natural Circulation Cooldown.
Lt1L:58:01 AN   Started 2BOSR 4.3.1-1 RCS Press/Temp Limit Surv.
Days             1/30/2012         Restarted U2 SFP Cooling Pump. NLO reports not all 12:03:41 PM       cubicle cooler fans are operating.
(b)(t)
Days         1/30/2012       Started Transfer of "OA" WX Mon Tank (24%) to "GB" 12:04:00       WX Mon Tank (48%) Thru Vendor Demin for Normal PM             Water Processing per BOP WX-112 Log Date           Entry                                                               User Secured Transfer of "0A" WX Monitor Tank (11%) to "0B" WX         (b)(6) 1/30/2012 5:35.00 PM         Monitor Tank (88.81%) per BOP WX-112.
Chemistry reports that the Unit 2 Boron sample is           (b)(6)
Days            1/30/2012 12:06:00 PM         1525ppm Days             1/30/2012         Followup call made to NRC via Red Phone.
12:15:09 PM Days             1/30/2012         Chemistry reports that Unit 2 RCS Boron Concentration is 12:16:00 PM         1622 ppm Days           1/30/2012           Faxed ENS Worksheet EN# 47624 to the NRC Operations 12:18:35 PM       Office.
Days           1/30/2012           Started 2A Containment Chiller using BOP VP-1.
12:31:10 PM Days           1/30/2012         PRT level is 73% secured draining the PRT.
12:32:00 PM Days           1/30/2012         Chemistry reports Boron concentration results: U-1 RCS 12:32:40 PM       @ 938 PPM, sample time was 0828 Verified/Adjusted Boric Acid Flow Control Potentiometer setting to the value of 3.83 per BOP CV-7.
Days           1/30/2012         Received report that Unit 2 online risk was evaluated and http://esoms.exeloncorp.coni/logs.aspx                                                             1/31/2012
 
.logs                                                                                               Page 11 of 24 12:38:59 PM         is Yellow.
Days           1/30/2012       Started Transfer of "0B" HUT (50.8%) to "OA" AB Mon 12:45:00         Tank (69.7%) per BOP AB-101-1 Discharge Pressure PM               (135#) and 58 GPM Flow Thru Condensate Demin.
Log Date                 Entry                                                             User 1/30/2012 1:46:02       Secured Transfer of "OB" HUT (48.8%) to "0A" AB Mon Tank         (b)(6)
PM                       (85%).
Days             1/30/2012           Water has been rerported locally on the 2A-RH Pp motor         (b)(6) 12:48:00 PM         2B-RH Pp Boron is 2166 and Boron for the 2A-RH Pp Is 2251 Log Date       Entry Field Supervisor and PED     )       jinvestigated water spray on 2A RH pump.
1/30/2012     Reported back that the water spray does not impact the ability of the 2A RH pump to 1:20:00 PM     run. The motor fins are directed downwards and the motor would blow any spray away. The electrical box connections are water tight. Ops and Maintenance will route water away from pump and motor. Maintenance to repair flood seal above pump.
Days             1/30/2012           Chemistry reports that the Ult 2 Boron Is 1855 ppm 12:53:00 PM Days             1/30/2012           Received report that Unit 1 online risk was evaluated as 12:57:09 PM         Yellow, due to loss of Unit 2 SATs.
Days             1/30/2012           2B AF DO Day tank level low 1:12:00 PM Days             1/30/2012           Followup call made to NRC via Red Phone.
1:15:11 PM Days             1/30/2012           Placed Boric add transfer pump in PTL swapped over to 1:16:00 PM         RWST due to BDPS C/O Days             1/30/2012           Chemistry reports that Unit 2 RCS Boron Is 2141ppm 1:25:00 PM Days             1/30/2012           P-11 Blocks have been Imposed 1:30:00 PM Days           1/30/2012       Started "OA" GW Compressor for Vent Header Pressure           (b)(6) 1:35:00 PM       Control per BOP GW-1. "" In Service GDT (25#),
Cover GDT (84#).
Log Date           Entry                                                                     User Secured "OA" GW Compressor per BOP GW-1. "" In Service GDT (29#),       (b)(6) 1/30/2012 1:48:00 PH         .... Cover GDT (84#) and Vent Header Pressure at (1.76#).                               1 Days             1/30/2012           Started the 2B-CRDM Booster fan                               (b)(6) 1:37:00 PM Days             1/30/2012           Secured 1A SX Pump using BOP SX-2. Closed 1SX007 and 1:40:01 PM           2SX007.
http://esoms.exeloncorp.com/logs.aspx                                                                     1/31/2012
 
logs                                 Page 12 of 24
                ,(b)(6) 1(b)(4) http://esoms.exeloncorp.com/logs.aspx   1/31/2012
 
logs                                 Page 13 of 24 l(b)(4),(b)(6) http://esoms.exeloncorp.com/logs.aspx   1/31/2012
 
.logs                                 Page 14 of 24 http://esoms.exeloncorp.com/logs.aspx   1/31/2012
 
logs                                     Page 15 of 24 Rb)(4),(b)(6) http://esoms.exeloncorp.conVlogs.aspx1//22   1/31/2012
 
logs                                     Page 16 of 24 http://esoms.exeloncorp.conliogs.aspx1//22   1/31/2012
* logs                                 Page 17 of 24 l(b)(4),(b)(6) http://esoms.exeloncorp.com/logs.aspx   1/31/2012
 
logs                                 Page 18 of 24 (b)(4),(b)(6) http://esoms.exeloncorp.con/1ogs.aspx   1/31/2012
 
.logs                                 Page 19 of 24 (b)(4),(b)(6) http://esoms.exeloncorp.com/logs.aspx   1/31/2012
 
logs                                 Page 20 of 24 1(b)(4),(b)(6) http://esoms.exeloncorp.com/logs.aspx   1/31/2012
 
. logs                                 Page 21 of 24 (b)(4),(b)(6) http://esoms.exeloncorp.con/Iogs.aspx   1/31/2012
 
http://esoms.exeloncorp.com/logs.aspx 1/31/2012
*logs                                 Page 23 of 24 http://esoms.exeloncorp.com/logs.aspx   1/31/2012}}

Latest revision as of 23:12, 11 November 2019

Shift Logs from 1/30/12-1/31/12
ML12268A152
Person / Time
Site: Byron Constellation icon.png
Issue date: 01/31/2012
From:
Exelon Generation Co
To:
NRC/RGN-III
References
FOIA/PA-2012-0287
Download: ML12268A152 (22)


Text

logs Page 2 ot 24 (b)(4),(b)(6)

.i lh rocord was dakied fIn

.;nak~

4=raw"i"1,- Fr,'edomn of Ifryr- ~

POIfA/PA http://esoms.exeloncorp.com~logs.aspx1//22 1/31/2012 C

". logs rage J or Z4 (b)(4),(b)(6) http://esoms.exeloncorp.conV/ogs.aspx1 1/31/2012

".logs oage 4 or L4 (b)(4) http://esoms.exeloncorp.com/logs.aspx1//22 1/31/2012

logs Page 5 of 24 http://esoms.exeloncorp.com/logs.aspx 1/31/2012

  • .logs Page 6 of 24 (b)

Days 1/30/2012 Entered 2BOL 8.1 condition E due to the loss of Unit 2 (6) 10:01:00 AM SAT's @1009 and the 2B-DG inoperability. The action is to restore the SAT's or the 2B-DG in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in mode 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and In mode 5 In 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

Days 1/30/2012 Entered O0BOL 11.b condition B,Dand F for the 2PRO13.

10:01:00 AM The action is to suspend purging via this path immediately. This action has been completed.

IR#1320145 Days 1/30/2012 Entered 1DPS 2BOL 3.9 conditions A and C for both trains 10:01:00 AM of BDPS. Condition A is to restore the train to operable in 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Condition C Is to Isolate unborated water sources in one hour and to perform a SDM In one hour.

Log Date Entry User 1/30/2012 10:30:00 SDM performed per SR3.1.1.1 and Is satisfactory for the next 12 AM hours.

1/30/2012 10:56:00 Completed CO Hang for unborated water sources per C/O 96468 AM Days 1/30/2012 2PR11IJ is In unplanned LCO 2BOL 4.15 condition B. The 10:01:00 AM action is to sample the affected train every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Rp and Chem has been contacted.

Days 1/30/2012 Entered 1BOL 8.1 condition A due to the loss of Unit 2 10:01:00 AM SAT's @1009. The action Is to perform 1BOSR 8.1.1-1 in one hour and every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. Surveillance 1BOSR 8.1.1-1 has been completed @1054. The second action Is to restore the required qualified circuits In 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or shut down the unit to mode 3 In 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and to mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

Days 1/30/2012 Unit 2 Rx trip 10:01:00 AM Log Date Entry User 1/30/2012 10:01:50 AM Entered 2BEP-0 Reactor Trip or Safety Injection b))

1/30/2012 10:11:00 AM Transitloned to 2BEP ES-0.1 Rx trip Response (b)

Days 1/30/2012 Unit 2 Reactor trip - Red First Out annunciator is RCP (6) 10:01:33 AM Undervoltage Reactor trip. IR 1319908 and 1320006 written.

Log Date Entry Based on a report of smoke, opened SAT 242-1 and SAT 242-2 feed breakers to 1/30/2012 BUS 241 (ACB 2412), BUS 242 (ACB 2422), BUS 243 (ACB 2432) and BUS 244 (ACB 10:09:00 AM 2442). Offsite power from the Unit 2 SATs has been disconnected. 2A and 28 D/Gs' started and are supplying BUS 241 and 242.

1/30/2012 Declared an Unusual Event on Byron Unit 2 due to a loss of all otfsite power to ESF 10: 18:00 AM BUSes 241 and 242.

1/30/2012 130:23:012 Nuclear Accident Reporting System (NARS) form communicated to Illinois EMA.

10:23:00 AN 1/30/2012 http://esoms.exeloncorp.com/logs.aspx 1/31/2012

  • logs Page 7 of 24 S(b) 10:33:00 AN ,(6)

Completed Dialogic notification for Byron Unit 2 Unusual Event.

1030/2012 Completed NRC Event Notification EN# 47624.

10:39:00 AM Days 1/30/2012 Entered PLANNED LCOAR OBOL 3.p, Condition A as 10:01:59 AM 2AR113 and 2AR123 setpoint are currently more than 10 mr/hr above background following U2 Rx trip Log Date Entry Entered LCOAR OBOL 3.p Condition B for required action and completion time of Condition A not met. Entered LCOAR 2BOL 3.6 Conditions A and B for 2ARO 113 and 2AR0123 inoperable as directed by OBOL 3.p. Entered LCOAR 2BOL 6.3 Condition B for 1/30/2012 all U-2 CNMT vent isolation valves inoperable as directed by 2BOL 3.6 Required action 2:01:59 PH of the two LCOAR's is to isolate the affected penetration flowpath by use of at least one closed and de-activated automatic valve. 2VQ001B and 002B are 0OS under an admin CO#94013230. 2VQ003, 004B and 2VQ005B fuses were previously pulled and are tracked for configuration control under ACPS#12-0026 Days 1/30/2012 Started 1A SX Pump and opened 1SX007 and 2SX007 to 10:04:54 AM supply SX to U2 due to no SX Pumps running on U2.

Days 1/30/2012 Entered Unplanned 0BOL 11.a, Conditions B and D due to 10:05:32 AM loss of Sample Flow on OPR10J.

Days 1/30/2012 Secured Transfer of "GA" WX Monitor Tank (24%) to (b)(6) 10:08:00 "OB" WX Monitor Tank (48%) per BOP WX-112.

AM Days 1/30/2012 Both ESF Bus energized I(b) 10:11:00 AM Days 1/30/2012 TSO (Mark 3enga) called to inquire about the loss of U-2 10:12:16 AM generation. They stated that they lost Indication on C-phase of Bus 13. Told TSO that Byron Is addressing the loss of offslte power on Unit 2.

Days 1/30/2012 Started "GA" GW Compressor for U-2 VCT Venting per (b( ]

10:14:00 BOP GW-I. "" In Service GDT (36#), "" Cover GDT AM (85#) and Vent Header Pressure at (1.92#).

Log Date Entry User 1/30/2012 Realigned GDT's per BOP GW-6 GDT OB (92#) is now In Storage for (b)(6)

Decay. GOT OF (6#) is now the In Service GOT. "" GDT OC (5#) is 11:58:00 AM Aligned for Stand By.

1/30/2012 Secured "0A" GW Compressor per BOP GW-1. "" In Service GDT (15#), [b(6 l 1:30:04 PM ". Cover GOT (85#) and Vent Header Pressure at (1.96#). I Days 1/30/2012 Offsite assistance requested C 10:23:00 AM Log Date Entry User 1/30/2012 Two Byron Fire Department trucks came Inside the protected area. Five (b)(6) 10:48:00 AM trucks are waiting inside the parking lot area if necessary.

Byron Fire Department trucks are outside the protected area.

1/30/2012 http://esoms.exeloncorp.com/logs.aspx 1/31/2012

. logs Page 8 of 24 (b)(4),(b)(6)

Days 1/30/2012 Re-aligned charging to the RWST due to the loss of the (6) 10:25:00 AM Unit 2 SAT's and the loss of the Boric acid transfer pump.

This was done prior to the auto swap-over.

Days 1/30/2012 Received permission from bulk power to deenergize BUS 10:28:06 AM 13 and isolate U2 Switchard from Line 0622 per*-

1(b)(6) j ff!

Days 1/30/2012 SDM for Unit 2 good until 2201 1/30/12. SDM Completed 10:30:00 AM Days 1/30/2012 Secured both OA and OB SX Makeup pumps due to high 10:34:23 AM level in the SX Cooling Tower. These pumps were started in the emergency procedures.

Days 1/30/2012 Notified Chemistry to sample for Boron every 15 min.

10:36:00 AM Days 1/30/2012 RP notified to perform Tech spec samples for power drop 10:38:00 AM of greater than 15% in one hour.

Days 1/30/2012 2BCSR 4.16.2-1 initiated for greater than a 15% power 10:38:00 AM change Days 1/30/2012 Notified NRC Operations Center of the Unit 2 reactor trip.

10:39:24 AM ENS worksheet EN# 47624 transmitted via Red Phone.

NRC requests periodic updates.

Days 1/30/2012 Opened Swtlchyard breakers 7-13 and 12-13 to 10:41:14 AM deenergize U2 SAT high side windings.

Days 1/30/2012 Opened U2 SAT MOD disconnects 242-1 and 242-2.

10:41:41 AM Days 1/30/2012 Notified by Resident NRC Inspecto (b)(6) that the 10:49:04 AM NRC Is in Monitoring Mode.

Days 1/30/2012 Completed 1BOSR 8.1.1-1 and 2BOSR 8.1.1-1, Normal 10:54:32 AM and Alternate Offsite Power Surveillances unsatisfactory.

U2 SAT Is de-energized.

Days 1/30/2012 All MSIV's were closed one at a time per procedure due to 10:56:00 AM the loss of the CW system and to minimize the water hammer from the MSIV system lines.

Days 1/30/2012 Entered 2BEP ESO.2 due to the failure of the Unit 2 SAT's 11:00:00 AM Days 1/30/2012 2VPO3CB did not start after the failure of the SAT's on the 11:04:00 AM Unit 2 side. IR#

Days 1/30/2012 Re-aligned charging to the VCT from the RWST.

11:12:00 AM http://esoms.exeloncorp.conVIlogs.aspx13/22 1/31/2012

'.logs Page 9 of 24 Days 1/30/2012 TR Operator secured both Ul and U2 Hotwell Reject.

11: 17:51 AM Days 1/30/2012 Entered unplanned LCO 2BOL 5.2 condition A for the 2B-11:19:00 AM CV Pp. The 2B-CV Pp was placed in PTL since the 2B-DG Is running and on the sequencer. 2B CV pp remains AVAILABLE for ONLINE risk. The action Is toA train to operable in 7 days. Peer checked byI :7.1 Log Date Entry User Entered 28OL 1.d condition A for the 2B-CV Pp being placed In PTL due to 1/30/2012 Bus 242 being on the sequencer, The action Is to restore the pump to 11:19:00 AM operable In 7 days.

Days 1/30/2012 Started Transfer of "0B" WF Tank (37.7%) to "OA" WX 11:22:00 Mon Tank (240/a) for Normal Water Processing per BOP AM WF-101. Swapped Inlet vlv to the "AO WF Tank.

Log Date Entry User 1/30/2012 1:57:00 Secured Transfer of "OB" WF Tank (16%) to "OA' WX Mon Tank (b)(6)

PM (21.3%) per BOP WF-101. I Days 1/30/2012 Chem reports that the Boron sample for Unit 2 is (b)(6) 11:28:00 AM 1252ppm Days 1/30/2012 Chemistry reports that the Unit 2 Boric acid sample for 11:28:00 AM Unit 2 RCS Is 1252ppm Days 1/30/2012 (b)(6) called to Inquire if the Byron 11:29:44 AM Switchyard was In a condition that would allow the reclosure of the ring busses (i.e. Re-energize bus 11 and bus 13). I told them that if they provided switching orders, Byron could reenergize Bus 11. However, until the location of the problem on Bus 13 was identified and the bus was evaluated as acceptable, Byron would not accept switching orders for Bus 13. TSO agreed. Notified TSO that the Unit 2 SAT MODs were open. However, the location of the issue has not been identified yet.

Days 1/30/2012 Restored OPR10J to green status from loss of flow.

11:37:24 AM Days 1/30/2012 Unit 2 PRT Is at 95% started draining per BOP RY-4 11:42:00 AM Days 1/30/2012 Unit 2 FC Pp reported to be running without the cubical 11:45:00 AM cooler fans running.

Log Date Entry User 1/30/2012 2:00:00 All unit 2 FC cubical fans are running. The thermal overloads were (b)(6)

PM reset.

Days 1/30/2012 Secured status trees per BAP 1310-10T2 per SM and US (b)(6) 11:45:00 AM concurrence. All Status trees are Green.

Days 1/30/2012 Followup call made to NRC via Red Phone.

http://esoms.exeloncorp.com/logs.aspx 1/31/2012

.logs Page 10 of 24 (b)(6) 11:45:14 AM Days 1/30/2012 Chemistry reports that Unit 2 RCS Boron is 1409 PPM 11:53:00 AM Days 1/30/2012 Started 2B-RCFC 11:55:00 AM Days 1/30/2012 Started OA MUD Train to U2 CST, (80%).

11:55:20 AM Days 1/30/2012 Commenced Unit 2 RCS Cooldown to 520 F on all S/G 11:58:00 AM PORV's unable to place Unit 2 Turbine on the gear.

Log Date Entry use:

13/02 Commenced RCS depressurization per 2B3EP ES-O,2 Natural Circulation (b)(6) 1/30/0102P Cooldown. Opened Pressurizer Aux Spray valve 2CV8145. Started 2BOSR 4.C.2-1 Pzr Spray Water Temp Diff Limit Surv (During Aux Spray Operation) 1/30/2012 Commenced RCS cooldown per 2BEP ES-0.2 Natural Circulation Cooldown.

Lt1L:58:01 AN Started 2BOSR 4.3.1-1 RCS Press/Temp Limit Surv.

Days 1/30/2012 Restarted U2 SFP Cooling Pump. NLO reports not all 12:03:41 PM cubicle cooler fans are operating.

(b)(t)

Days 1/30/2012 Started Transfer of "OA" WX Mon Tank (24%) to "GB" 12:04:00 WX Mon Tank (48%) Thru Vendor Demin for Normal PM Water Processing per BOP WX-112 Log Date Entry User Secured Transfer of "0A" WX Monitor Tank (11%) to "0B" WX (b)(6) 1/30/2012 5:35.00 PM Monitor Tank (88.81%) per BOP WX-112.

Chemistry reports that the Unit 2 Boron sample is (b)(6)

Days 1/30/2012 12:06:00 PM 1525ppm Days 1/30/2012 Followup call made to NRC via Red Phone.

12:15:09 PM Days 1/30/2012 Chemistry reports that Unit 2 RCS Boron Concentration is 12:16:00 PM 1622 ppm Days 1/30/2012 Faxed ENS Worksheet EN# 47624 to the NRC Operations 12:18:35 PM Office.

Days 1/30/2012 Started 2A Containment Chiller using BOP VP-1.

12:31:10 PM Days 1/30/2012 PRT level is 73% secured draining the PRT.

12:32:00 PM Days 1/30/2012 Chemistry reports Boron concentration results: U-1 RCS 12:32:40 PM @ 938 PPM, sample time was 0828 Verified/Adjusted Boric Acid Flow Control Potentiometer setting to the value of 3.83 per BOP CV-7.

Days 1/30/2012 Received report that Unit 2 online risk was evaluated and http://esoms.exeloncorp.coni/logs.aspx 1/31/2012

.logs Page 11 of 24 12:38:59 PM is Yellow.

Days 1/30/2012 Started Transfer of "0B" HUT (50.8%) to "OA" AB Mon 12:45:00 Tank (69.7%) per BOP AB-101-1 Discharge Pressure PM (135#) and 58 GPM Flow Thru Condensate Demin.

Log Date Entry User 1/30/2012 1:46:02 Secured Transfer of "OB" HUT (48.8%) to "0A" AB Mon Tank (b)(6)

PM (85%).

Days 1/30/2012 Water has been rerported locally on the 2A-RH Pp motor (b)(6) 12:48:00 PM 2B-RH Pp Boron is 2166 and Boron for the 2A-RH Pp Is 2251 Log Date Entry Field Supervisor and PED ) jinvestigated water spray on 2A RH pump.

1/30/2012 Reported back that the water spray does not impact the ability of the 2A RH pump to 1:20:00 PM run. The motor fins are directed downwards and the motor would blow any spray away. The electrical box connections are water tight. Ops and Maintenance will route water away from pump and motor. Maintenance to repair flood seal above pump.

Days 1/30/2012 Chemistry reports that the Ult 2 Boron Is 1855 ppm 12:53:00 PM Days 1/30/2012 Received report that Unit 1 online risk was evaluated as 12:57:09 PM Yellow, due to loss of Unit 2 SATs.

Days 1/30/2012 2B AF DO Day tank level low 1:12:00 PM Days 1/30/2012 Followup call made to NRC via Red Phone.

1:15:11 PM Days 1/30/2012 Placed Boric add transfer pump in PTL swapped over to 1:16:00 PM RWST due to BDPS C/O Days 1/30/2012 Chemistry reports that Unit 2 RCS Boron Is 2141ppm 1:25:00 PM Days 1/30/2012 P-11 Blocks have been Imposed 1:30:00 PM Days 1/30/2012 Started "OA" GW Compressor for Vent Header Pressure (b)(6) 1:35:00 PM Control per BOP GW-1. "" In Service GDT (25#),

Cover GDT (84#).

Log Date Entry User Secured "OA" GW Compressor per BOP GW-1. "" In Service GDT (29#), (b)(6) 1/30/2012 1:48:00 PH .... Cover GDT (84#) and Vent Header Pressure at (1.76#). 1 Days 1/30/2012 Started the 2B-CRDM Booster fan (b)(6) 1:37:00 PM Days 1/30/2012 Secured 1A SX Pump using BOP SX-2. Closed 1SX007 and 1:40:01 PM 2SX007.

http://esoms.exeloncorp.com/logs.aspx 1/31/2012

logs Page 12 of 24

,(b)(6) 1(b)(4) http://esoms.exeloncorp.com/logs.aspx 1/31/2012

logs Page 13 of 24 l(b)(4),(b)(6) http://esoms.exeloncorp.com/logs.aspx 1/31/2012

.logs Page 14 of 24 http://esoms.exeloncorp.com/logs.aspx 1/31/2012

logs Page 15 of 24 Rb)(4),(b)(6) http://esoms.exeloncorp.conVlogs.aspx1//22 1/31/2012

logs Page 16 of 24 http://esoms.exeloncorp.conliogs.aspx1//22 1/31/2012

logs Page 18 of 24 (b)(4),(b)(6) http://esoms.exeloncorp.con/1ogs.aspx 1/31/2012

.logs Page 19 of 24 (b)(4),(b)(6) http://esoms.exeloncorp.com/logs.aspx 1/31/2012

logs Page 20 of 24 1(b)(4),(b)(6) http://esoms.exeloncorp.com/logs.aspx 1/31/2012

. logs Page 21 of 24 (b)(4),(b)(6) http://esoms.exeloncorp.con/Iogs.aspx 1/31/2012

http://esoms.exeloncorp.com/logs.aspx 1/31/2012