{{#Wiki_filter:May 1973 U.S. ATOMIC ENERGY COMMISSION
{{#Wiki_filter:May 1973 U.S. ATOMIC ENERGY COMMISSION
REGULATORY
                                REGULATORY
DIRECTORATE  
                                DIRECTORATE OF REGULATORY STANDARDS
OF REGULATORY  
                                                                                                                              GUIDE
STANDARDS GUIDE REGULATORY  
                                                                REGULATORY GUIDE 1.49 POWER LEVELS OF WATER-COOLED NUCLEAR POWER PLANTS
GUIDE 1.49 POWER LEVELS OF WATER-COOLED  
NUCLEAR POWER PLANTS  


==A. INTRODUCTION==
==A. INTRODUCTION==
It is the policy of the Atomic Energy Commission to encourage, support, and give priority consideration to activities leading to greater standardization of nuclear power plants. In a statement issued on March 5, 1973, implementing that policy, the Commission stated that the size of all new plants accepted for licensing review (both those proposed for review as standardized plants and those proposed for review in connection with a specific application for a construction permit) would be limited to power levels of less than 3,800 megawatts thermal.Section 50.34 of 10 CFR Part 50 requires that each application for a construction permit include a summary description and discussion of the facility with special attention to, among other things, the design and operating characteristics at the projected initial licensed power level. Section 50.34- also requires that the application include an analysis and evaluation of the major structures, systems, and components of the facility at the projected initial power level and at the ultimate power level which is contemplated by the applicant.
This guide describes acceptable maximum power levels for water-cooled nuclear power plants.


==B. DISCUSSION==
==B. DISCUSSION==
The power levels of water-cooled nuclear power plants have shown a continual increase from about 600 megawatts electric in 1965 to slightly above 1,300 megawatts electric in 1973. The continual increase in the size of these plants has resulted in plant design modifications and a large expenditure of' AEC staff review effort to assure the maintenance of a consistent level of safety. These numerous plant design variations, coupled with the rapidly increasing number of applications, have contributed to the steady growth in the required licensing ieview time to evaluate such applications.
It is the policy of the Atomic Energy Commission                                    The power levels of water-cooled nuclear power to encourage, support, and give priority consideration to                          plants have shown a continual increase from about 600
 
activities leading to greater standardization of nuclear                              megawatts electric in 1965 to slightly above 1,300
Until sufficient experience is gained with the design, construction, and operation of the larger plants, the size of these plants should be limited to current levels.C. REGULATORY
                                                                                    megawatts electric in 1973. The continual increase in the power plants. In a statement issued on March 5, 1973, size of these plants has resulted in plant design implementing that policy, the Commission stated that                                modifications and a large expenditure of' AEC staff the size of all new plants accepted for licensing review                            review effort to assure the maintenance of a consistent (both those proposed for review as standardized plants                              level of safety. These numerous plant design variations, and those proposed for review in connection with a                                  coupled with the rapidly increasing number of specific application for a construction permit) would be                            applications, have contributed to the steady growth in limited to power levels of less than 3,800 megawatts the required licensing ieview time to evaluate such applications. Until sufficient experience is gained with thermal.
POSITION The projected initial licensed power level of a water-cooled nuclear power. plant for which a construction permit application is filed pursuant to Section 50.34 of 10 CFR Part 50 should be limited to a reactor core power level of 3,800 megawatts thermal or less. The ultimate power level for which an analysis and evaluation ot the major structures, systems. and components is required should be limited to 4.100 megawatts thermal or les


====s. USAEC REGULATORY ====
the design, construction, and operation of the larger plants, the size of these plants should be limited to Section 50.34 of 10 CFR Part 50 requires that each                          current levels.
GUIDES Copies of published guides may be obtained by request indicating the divisions desired to the US. Atomic Energy Commission, Washington, D.C. 20545, Regulatory Guides are issued to describe and make available to the public Attention:
Director of Regulatory Standards.


Conments and suggestions for methods acceptable to the AEC Regulatory staff of implementing specific parts of improvements in these guides are encouraged and should be sent to the Secretary the Commission's regulations, to delineate techniques used by the staff in of the Commission, U.S. Atomic Energy Commission, Washington D.C. 20545, evaluating specific problems or postulated accidents, or to provide guidance to Attention:
application for a construction permit include a summary description and discussion of the facility with special                                             
Chief, Public Proceedings Staff.applicants.


Regulatory Guides are not substitutes for regulations and compliance with them is not required.
==C. REGULATORY POSITION==
attention to, among other things, the design and operating characteristics at the projected initial licensed                                The projected initial licensed power level of a power level. Section 50.34- also requires that the                                  water-cooled nuclear power. plant for which a application include an analysis and evaluation of the                                construction permit application is filed pursuant to major structures, systems, and components of the                                    Section 50.34 of 10 CFR Part 50 should be limited to a facility at the projected initial power level and at the                            reactor core power level of 3,800 megawatts thermal or ultimate power level which is contemplated by the                                  less. The ultimate power level for which an analysis and applicant. This guide describes acceptable maximum                                  evaluation        ot    the      major    structures,      systems.  and power levels for water-cooled nuclear power plants.                                components is required should be limited to 4.100
                                                                                    megawatts thermal or less.


Methods and solutions different from those set out in The guides are issued in the following ten broad divisions:
USAEC REGULATORY GUIDES                                      Copies of published guides may be obtained by request indicating the divisions desired to the US. Atomic Energy Commission, Washington, D.C. 20545, Regulatory Guides are issued to describe and make available to the public          Attention: Director of Regulatory Standards. Conments and suggestions for methods acceptable to the AEC Regulatory staff of implementing specific parts of  improvements in these guides are encouraged and should be sent to the Secretary the Commission's regulations, to delineate techniques used by the staff in          of the Commission, U.S. Atomic Energy Commission, Washington D.C. 20545, evaluating specific problems or postulated accidents, or to provide guidance to    Attention: Chief, Public Proceedings Staff.
the guides will be acceptable if they provide a basis for the findings requisite to the issuance or continuance of a permit or license by the Commission.


1. Power Reactors 6. Products 2. Research and Test Reactors 7. Transpcrtat,on
applicants. Regulatory Guides are not substitutes for regulations and compliance with them is not required. Methods and solutions different from those set out in    The guides are issued in the following ten broad divisions:
3. Fuels and Materials Facilities
the guides will be acceptable if they provide a basis for the findings requisite to the issuance or continuance of a permit or license by the Commission.               1. Power Reactors                         
8. Occupational Health Published guides will be revised periodically, as appropriate, to accommodate
4. Environmental and Siting 9. Antitrust Review comments and to reflect new information or experience.


5. Materials and Plant Protection  
===6. Products===
10. General}}
                                                                                      2. Research and Test Reactors              7. Transpcrtat,on
                                                                                      3. Fuels and Materials Facilities          8. Occupational Health Published guides will be revised periodically, as appropriate, to accommodate        4. Environmental and Siting                9. Antitrust Review comments and to reflect new information or experience.                              5. Materials and Plant Protection         10. General}}


{{RG-Nav}}
{{RG-Nav}}

Latest revision as of 22:02, 11 November 2019

Power Levels of Water-Cooled Nuclear Power Plants
ML12298A125
Person / Time
Issue date: 05/31/1973
From:
Office of Nuclear Regulatory Research, US Atomic Energy Commission (AEC)
To:
References
RG-1.049
Download: ML12298A125 (1)


May 1973 U.S. ATOMIC ENERGY COMMISSION

REGULATORY

DIRECTORATE OF REGULATORY STANDARDS

GUIDE

REGULATORY GUIDE 1.49 POWER LEVELS OF WATER-COOLED NUCLEAR POWER PLANTS

A. INTRODUCTION

B. DISCUSSION

It is the policy of the Atomic Energy Commission The power levels of water-cooled nuclear power to encourage, support, and give priority consideration to plants have shown a continual increase from about 600

activities leading to greater standardization of nuclear megawatts electric in 1965 to slightly above 1,300

megawatts electric in 1973. The continual increase in the power plants. In a statement issued on March 5, 1973, size of these plants has resulted in plant design implementing that policy, the Commission stated that modifications and a large expenditure of' AEC staff the size of all new plants accepted for licensing review review effort to assure the maintenance of a consistent (both those proposed for review as standardized plants level of safety. These numerous plant design variations, and those proposed for review in connection with a coupled with the rapidly increasing number of specific application for a construction permit) would be applications, have contributed to the steady growth in limited to power levels of less than 3,800 megawatts the required licensing ieview time to evaluate such applications. Until sufficient experience is gained with thermal.

the design, construction, and operation of the larger plants, the size of these plants should be limited to Section 50.34 of 10 CFR Part 50 requires that each current levels.

application for a construction permit include a summary description and discussion of the facility with special

C. REGULATORY POSITION

attention to, among other things, the design and operating characteristics at the projected initial licensed The projected initial licensed power level of a power level. Section 50.34- also requires that the water-cooled nuclear power. plant for which a application include an analysis and evaluation of the construction permit application is filed pursuant to major structures, systems, and components of the Section 50.34 of 10 CFR Part 50 should be limited to a facility at the projected initial power level and at the reactor core power level of 3,800 megawatts thermal or ultimate power level which is contemplated by the less. The ultimate power level for which an analysis and applicant. This guide describes acceptable maximum evaluation ot the major structures, systems. and power levels for water-cooled nuclear power plants. components is required should be limited to 4.100

megawatts thermal or less.

USAEC REGULATORY GUIDES Copies of published guides may be obtained by request indicating the divisions desired to the US. Atomic Energy Commission, Washington, D.C. 20545, Regulatory Guides are issued to describe and make available to the public Attention: Director of Regulatory Standards. Conments and suggestions for methods acceptable to the AEC Regulatory staff of implementing specific parts of improvements in these guides are encouraged and should be sent to the Secretary the Commission's regulations, to delineate techniques used by the staff in of the Commission, U.S. Atomic Energy Commission, Washington D.C. 20545, evaluating specific problems or postulated accidents, or to provide guidance to Attention: Chief, Public Proceedings Staff.

applicants. Regulatory Guides are not substitutes for regulations and compliance with them is not required. Methods and solutions different from those set out in The guides are issued in the following ten broad divisions:

the guides will be acceptable if they provide a basis for the findings requisite to the issuance or continuance of a permit or license by the Commission. 1. Power Reactors

6. Products

2. Research and Test Reactors 7. Transpcrtat,on

3. Fuels and Materials Facilities 8. Occupational Health Published guides will be revised periodically, as appropriate, to accommodate 4. Environmental and Siting 9. Antitrust Review comments and to reflect new information or experience. 5. Materials and Plant Protection 10. General