Regulatory Guide 1.95: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML12216A009
| number = ML12298A134
| issue date = 01/31/1977
| issue date = 01/31/1977
| title = Protection of Nuclear Power Plant Control Room Operators Against an Accidental Chlorine Release
| title = Protection of Nuclear Power Plant Control Room Operators Against an Accidental Chlorine Release
Line 14: Line 14:
| page count = 7
| page count = 7
}}
}}
{{#Wiki_filter:U.S. NUCLEAR REGULATORY  
{{#Wiki_filter:Revision 1 U.S. NUCLEAR REGULATORY COMMISSION                                                                                                               January 1977 REGULATORYGUIDE
COMMISSION
OFFICE OF STANDARDS DEVELOPMENT
REGULATORY
                                                              REGULATORY GUIDE 1.95 PROTECTION OF NUCLEAR POWER PLANT CONTROL ROOM
GUIDE OFFICE OF STANDARDS  
                              OPERATORS AGAINST AN ACCIDENTAL CHLORINE RELEASE
DEVELOPMENT
REGULATORY  
GUIDE 1.95 FROTECTION
OF NUCLEAR POWER PLANT CONTROL ROOM OPERATORS  
AGAINST AN ACCIDENTAL  
CHLORINE RELEASE Revision 1 January 1977


==A. INTRODUCTION==
==A. INTRODUCTION==
Criterion  
Regulatory Guide 1.78, "Assumptions for Evaluating the Habitability of a Nuclear Power Plant Criterion 4, "Environmental and missile design                                 Control Room During a Postulated Hazardous bases," of Appendix A, "General Design Criteria for                               Chemical Release," identifies chlorine as a hazardous Nuclear Power Plants," to 10 CFR Part 50, "Licens-                                chemical which, if present in the control room at- ing of Production and Utilization Facilities," re-                                 mosphere in sufficient quantity, could result in the quires, in part, that structures, systems, and compo-                              control room becoming uninhabitable. It is the pur- nents important to safety be designed to accom-                                   pose of this guide to describe specific design features modate the effects of and to be compatible with the                               and procedures that are acceptable to mitigate environmental conditions associated with operation,                               hazards to control room operators from an acciden- maintenance, testing, and postulated accidents.                                    tal chlorine release. Although this guide was Criterion 19, "Control room," requires that a control                              developed to provide protection from an onsite room be provided from which actions can be taken to                                chlorine release, the protection provisions described operate the nuclear power unit safely under normal                                here are also expected to be sufficient for an offsite conditions and to maintain it in a safe condition un-                              chlorine release. The positions stated in this guide are der accident conditions.                                                          based on the specific physical properties and physiological effects of chlorine.
4, "Environmental and missile design bases," of Appendix A, "General Design Criteria for Nuclear Power Plants," to 10 CFR Part 50, "Licens-ing of Production and Utilization Facilities," re-quires, in part, that structures, systems, and compo-nents important to safety be designed to accom-modate the effects of and to be compatible with the environmental conditions associated with operation, maintenance, testing, and postulated accidents.


Criterion
The release of chlorine could potentially result in the control room operators becoming incapacitated.                                    Two basic accident types can be postulated: a long- This guide describes design features and procedures                                term, low-leakage-rate release and a short-term puff that are acceptable to the NRC staff for the protec-                              release. The majority of chlorine releases experienced tion of nuclear plant control room operators against                              to date have been of the first type, involving leakage an accidental chlorine release. The Advisory Com-                                  from valves or fittings and resulting in a long-term mittee on Reactor Safeguards has been consulted                                    release with a leakage rate from near zero to less than concerning this guide and has concurred in the                                    one pound of chlorine per second. Given warning, regulatory position.                                                              only breathing apparatus is necessary to protect the control room operator from this kind of release.
19, "Control room," requires that a control room be provided from which actions can be taken to operate the nuclear power unit safely under normal conditions and to maintain it in a safe condition un-der accident conditions.


The release of chlorine could potentially result in the control room operators becoming incapacitated.
==B. DISCUSSION==
However, because such a release might continue un- abated for many hours, self-contained breathing ap- Many nuclear power plants use chlorine for water                              paratus, a t            sourc a.. :i.. mafo- outlets, or treatment in the circulating water system and in other                            equivalent protection capable of operation for an ex- auxiliary systems. Chlorine is normally stored on the                              tended period of time should be available.


This guide describes design features and procedures that are acceptable to the NRC staff for the protec-tion of nuclear plant control room operators against an accidental chlorine release. The Advisory Com-mittee on Reactor Safeguards has been consulted concerning this guide and has concurred in the regulatory position.
site as liquified gas in one-ton tanks or large railroad cars (typically 16 to 55 tons).                                                        A less probable but more severe accident would be the failure of a manhole cover on the chlorine con-
* Lines indicate substantive changes from previous issue.                          tainer or the outright failure of the container itself.


==B. DISCUSSION==
USNRC REGULATORY GUIDES                                          Comments should be sent to the Secretary of the Commission, U.S.         Nuclear Regulatory Commission. Washington, DC.          20555, Attention: Docketing and Regulatory Guides are issued to describe and make available to the public Service Section.
Many nuclear power plants use chlorine for water treatment in the circulating water system and in other auxiliary systems. Chlorine is normally stored on the site as liquified gas in one-ton tanks qr large railroad cars (typically
16 to 55 tons).* Lines indicate substantive changes from previous issue.Regulatory Guide 1.78, "Assumptions for Evaluating the Habitability of a Nuclear Power Plant Control Room During a Postulated Hazardous Chemical Release," identifies chlorine as a hazardous chemical which, if present in the control room at-mosphere in sufficient quantity, could result in the control room becoming uninhabitable.


It is the pur-pose of this guide to describe specific design features and procedures that are acceptable to mitigate hazards to control room operators from an acciden-tal chlorine release. Although this guide was developed to provide protection from an onsite chlorine release, the protection provisions described here are also expected to be sufficient for an offsite chlorine release. The positions stated in this guide are based on the specific physical properties and physiological effects of chlorine.Two basic accident types can be postulated:
methods acceptable to the NRC staff of implementing specific parts of the Commission's regulations, to delineate techniques used by the staff in evalu-       The guides are issued in the following ten broad divisions:
a long-term, low-leakage-rate release and a short-term puff release. The majority of chlorine releases experienced to date have been of the first type, involving leakage from valves or fittings and resulting in a long-term release with a leakage rate from near zero to less than one pound of chlorine per second. Given warning, only breathing apparatus is necessary to protect the control room operator from this kind of release.However, because such a release might continue un-abated for many hours, self-contained breathing ap-paratus, a tank source of air with manifold outlets, or equivalent protection capable of operation for an ex-tended period of time should be available.
ating specific problems or postulated accidents, or to provide guidance to appli cants. Regulatory Guides are not substitutes for regulations, and compliance        1. Power Reactors                      6. Products with them is not required. Maethods and solutions different from those set out in    2. Research and Test Reactors          7. Transportation the guides will be acceptable if they provide a basis for the findings requisite to the issuance or continuance of a permit or license by the Commission.


A less probable but more severe accident would be the failure of a manhole cover on the chlorine con-tainer or the outright failure of the container itself."*USNRC REGULATORY
3.
GUIDES Comments should be sent to the Secretary of the Commission.


U.S. Nuclear Regulatory Guides are Issued to describe and make available to the public Regulatory Commission,.
4.
Washington, D.C. 2055. Attention.


Docketing and methods acceptable to the NRC staff of implementing specific parts of the Service Section.Commission's regulations.
Fuels and Materials Facilities Environmental and Siting
                                                                                                                            8.


to delineate techniqyes used by the staff in evalu- The guides ate issued in the following ten broad divisions:
9.
ating specific problems or postulated accidents, or to provide guidance to appli-cents. Regulatory Guides are not substitutes for regulations, and compliance
1. Power Reactors 6. Products with them is not required.


Methods end solutions different from those set out in 2. Research end Test Reactors 7. Transportation the guides will be acceptable if they provide a basis for the findings requisite to 3. Fuels and Materials Facilities
Occupational Health Antitrust Review K
8. Occupational Health the issuance or continuance of a permit or license by the Commission.
Comments and suggestions for improvements in these guides are encouraged            5. Materials and Plant Protection      10. General at all times, and guides will be revised, as appropriate, to accommodate com- ments and to reflect new information or experience. This guide was revised as a      Copies of published guides may be obtained by written request indicating the result of substantive comments received from the public and additional staff        divisions desired to the U.S. Nuclear Regulatory Commission, Washington, D.C.


4. Environmental nd Siting 9. Antitrust Review Comments and suggestions for improvements in these guides are encouraged S. Materials and Plant Protection
review.                                                                             20555, Attention: Director. Office of Standards Development.
10. General at all times, and guides will be revised, as appropriate, to accommodate com-ments and to reflect new information or experience.


This guide was revised as a Copies of published guides may be obtained by written request indicating the result of substantive comments received from the public and additional staff divisions desired to the U.S. Nuclear Regulatory Commission.
Such failure could occur during the transportation of                    inlet (a 15-meter elevation from ground level was a container as a result of a handling mishap or could                    used). The maximum allowable chlorine weights were be due to naturally or accidently produced environ-                      determined by using worst case conditions for ments such as earthquakes, flooding, fire, explosive overpressure, or missiles. A failure of this type could calculating the control room concentrations (signifi- cant parameters being wind speed, cloud dimensions,            1 result in a puff release of about 25% of the chlorine.                    normal air exchange rate, time to isolate, and isolated The balance of the chlorine would be vaporized and                        air exchange rate). For certain control room released over an extended period of time. As a result                    characteristics and high wind speed, the maximum of the cloud formed by the release from such an acci-                    operator exposure occurs before isolation. For other dent, the chlorine concentration inside the control                      cases with other control room characteristics and low room might increase rapidly. In the absence of special                    wind speed, the maximum operator exposure occurs design measures to limit the buildup within the con-                      two minutes after isolation and is primarily due to in- trol room, the operators might be incapacitated                          filtration. The six control room types listed in the before they are able to don breathing apparatus.                         table span the expected range of protections required for most plants. Other combinations of the signifi- Adequate protection of the control room operators                      cant parameters are possible, but those listed in the against the types of accidental chlorine release discus-                  table should provide sufficient guidance for most sed above will be achieved if features are included in                    cases.


Washington.
the plant design to (1) automatically isolate the con- trol room if there is a release, (2) make the control                        This guide does not address the protection of in- room sufficiently leak tight, and (3) provide equip-                      dividuals either outside the control room or within ment and procedures for ensuring the use of                              the control room but not directly involved in reactor breathing apparatus by the control room operators.                        operations. Breathing apparatus should be provided Protection provisions adequate for the large instan-                      and be readily accessible throughout the plant in taneous release will also provide protection against                      order to eliminate the need for personnel to seek the low-leakage-rate release. Staff analysis of control                  shelter in the control room during a chlorine release.


D.C.review. 20656. Attention:
room designs and the degree of protection afforded by each design has resulted in criteria for acceptance,                      The features and procedures described in this guide as will be discussed in the next section. These criteria                  apply to plants having conventional ventilation are based on the limitation (given in Regulatory                          systems. Any different methods of protection Guide 1.78) that the chlorine concentration within                        proposed will be evaluated on a case-by-case basis.
Director.


Office of Standards Development.
the control room should not exceed 15 ppm by volume (45 mg/m 3) within two minutes after the operators are made aware of the presence of  


Such failure could occur during the transportation of a container as a result of a handling mishap or could be due to naturally or accidently produced environ-ments such as earthquakes, flooding, fire, explosive overpressure, or missiles.
==C. REGULATORY POSITION==
I
chlorine.' This concentration, the toxicity limit, is the                    Control room operators should be protected maximum concentration that can be tolerated for two                      against the effects of an accidental chlorine release as minutes without physical incapacitation of an                            described below.


A failure of this type could result in a puff release of about 25% of the chlorine.The balance of the chlorine would be vaporized and released over an extended period of time. As a result of the cloud formed by the release from such an acci-dent, the chlorine concentration inside the control room might increase rapidly. In the absence of special design measures to limit the buildup within the con-trol room, the operators might be incapacitated before they are able to don breathing apparatus.
average human (i.e., severe coughing, eye burn, or severe skin irritation).                                                      1. Liquified chlorine should not be stored within
                                                                          100 meters of a control room2 or its fresh air inlets.


Adequate protection of the control room operators.
Table 1 gives the maximum allowable weight of a                        (Small quantities for laboratory use, 20 lbs or less, are single container of chlorine as a function of distance                    exempt.)
from the control room for various control room types. It is based on an instantaneous release of 25%                        2. If a chlorine container having an inventory of of the contents of the chlorine container and an al-                      150 lbs or less is stored more than 100 meters from lowable chlorine concentration in the control room                        the control room or its fresh air inlets, the capability of 45 mg/m 3, the toxicity limit, for two minutes. The                    for manual isolation of the control room should be initial cloud dimensions assume expansion of the                          provided.


against the types of accidental chlorine release discus-sed above will be achieved if features are included in the plant design to (1) automatically isolate the con-trol room if there is a release, (2) make the control room sufficiently leak tight, and (3) provide equip-ment and 'procedures for ensuring the use of breathing apparatus by the control room operators.
chlorine gas into a spherical cloud having. a Gaussian concentration gradient. Dispersion of the cloud was                          3. For single container quantities exceeding 150 lb, calculated using the instantaneous release diffusion                      the maximum allowable chlorine inventory in a single model appearing in Appendix B of Regulatory Guide                        container stored at specified distances from the con-
1.78. For those cases where the control room was                        trol room or its fresh air inlet is given in Table 1 for located a short distance from the release point and                      control room Types I through VI (described below).
the amount of chlorine release was small, the model                      For each control room type, the maximum allowable was adjusted to allow for additional dispersion in the                  chlorine inventory in a single container is given as a vertical direction by assuming uniform mixing                            function of distance from the control room. If there between the ground and the elevation of the fresh air                    are several chlorine containers, only the failure of the largest container is normally considered unless the Two minutes is considered sufficient time for a trained operator to put a self-contained breathing apparatus into operation, if          2  Control room is defined to include all zones serviced by the these are to be used.                                                    emergency ventilation system.


Protection provisions adequate for the large instan-taneous release will also -provide protection against the low-leakage-rate release. Staff analysis of control ,room designs and the degree of protection afforded by each design has resulted in criteria for acceptance, as will be discussed in the next section. These criteria are based on the limitation (given in Regulatory Guide 1.78) that the. chlorine concentration within the control room should not exceed 15 ppm by volume (45 mg/m 3) within two minutes after the operators are made aware of the presence of chlorine.'
1.95-2
This concentration, the toxicity limit, is the maximum concentration that can be tolerated for two minutes without physical incapacitation of. an average human (i.e., severe coughing, eye burn, or severe skin irritation).
Table I. gives the maximum allowable weight of a single container of chlorine as a function of distance from the control room for various control room types. It is based on an instantaneous release of 25%of the contents of the chlorine container and an al-lowable chlorine concentration in the control room of 45; mg/mr, the toxicity limit, for two minutes. The initial cloud dimensions assume expansion of the chlorine gas into a spherical cloud having a Gaussian concentration gradient.


Dispersion of the cloud was calculated using the instantaneous release diffusion model appearing in Appendix B of Regulatory Guide 1.78. For those cases where the control room. was located a short distance from the release point and the amount of chlorine release was small, the model was adjusted to allow for additional dispersion in the vertical direction by assuming uniform mixing between the ground and the elevation of the fresh air Two minutes is considered sufficient time for a trained operator to put a self-contained breathing apparatus into operation, if these are to be used.inlet (a 15-meter elevation from ground level was used). The maximum allowable chlorine weights were determined by using worst case conditions for calculating the control room concentrations (signifi-cant parameters being wind speed, cloud dimensions, normal air exchange rate, time to isolate, and isolated air exchange rate).. For certain control room characteristics and high:.wind speed, the maximum operator exposure occurs before isolation.
,lo w
                                                                                                                                                                                  w TABLE 1 MAXIMUM ALLOWABLE CHLORINE INVENTORY IN A SINGLE CONTAINER
                                                      Control Room Characteristics Maximum Weight (1000 Ib) of Control                                            Isolation          Air Exchange              Air Exchange                            Chlorine as a Function of Distance Room              Local          Remote              Time            Rate - Normal            Rate - Isolated                                  from Control Rooma
                                                                                                            4 Type          Detectors      Detectors            (sec)                (hrI                      (hr )                100 m          200 m          300 m        500 m        2000 m )
                                                                                                                              (330 ft)       (660 ft)      (980 ft)    (1640 ft)     (6560 ft Yes              No                10                      1                  0.06                    0.5                2              4          10        1200
          II            Yes              No                  4                      1                  0.06                    1                  5            12          40        3400
*D
        III            Yes              No                10                  0.3                    0.06                    2                  6            14          36        2700
        IV              Yes              No                  4                  0.3                    0.015                  6                20              60          230      32000
        V              Yes              Yesb              10c                                          0.06                    8                20              50          120        5000
                                                                                    1 VI              Yes              Yesb              10c                                          0.015                70                180            380          1300      60000
  aTo determine allowable chlorine inventories for distances between those given in this table, log-log interpolation is acceptable.


For other cases with other control room characteristics and low wind speed, the maximum operator exposure occurs two minutes after isolation and is primarily due to in-filtration.
bsee Regulatory Position 3.e for an alternative to remote detectors.


The six control room types listed in the table span the expected range of protections required for most' plants. Other combinations of the signifi-cant parameters are possible, but those listed in the table should provide sufficient guidance for *most cases.This guide does not address the protection of in-dividuals either outside the control room or within the control room but not directly involved in reactor operations.
cThe isolation time of 10 seconds refers to detection by local detectors. If detection is by remote detectors, isolation time is effectively zero since detection and isolation will be accomplished before the chlorine reaches the control room isolation dampers.


Breathing apparatus should be provided and be readily accessible throughout the plant in order to eliminate the need for personnel to seek shelter in the control room during a chlorine release.The features and procedures described in this guide apply to plants, having conventional ventilation systems., Any. different methods of protection proposed Will be evaluated on a case-by-case basis.C. REGULATORY
containers are interconnected in such a manner that                      room before chlorine arrives at the isolation failure of a single container could cause a chlorine                     dampers. The detector trip signal should also set off release from several containers.                                         an alarm and provide a readout in the control room.
POSITION Control room operators'
should be protected against the effects of an accidental chlorine release as described below.1-. Liquified chlorine should not be stored within 100 meters of a control room 2 or its fresh air inlets.(Small quantities for laboratory use, 20lbs or less, are exempt.)2. If a.chlorine container having an inventory of 150 lbs or less is stored more than 100 meters from the control room or its fresh air inlets, the capability for manual isolation of the control room should be provided.3. For single container quantities exceeding
150 ib, the maximum allowable chlorine inventory in a single container
'stored at specified distances from the con-trol room or its fresh air 'inlet is given in Table I for control room Types I through VI (described below).For each'control room type, the maximum allowable chlorine inventory in a single container is given as a function of distance from the control room. If there are several chlorine containers, only the failure of the largest container is normally 'considered unless the Control room is defined to include all zones serviced by the emergency ventilation system.1.95-2 TABLE 1 MAXIMUM ALLOWABLE
CHLORINE INVENTORY
IN A SINGLE LJNTAINER Control Room Type IV III IV V VI Local Dete-*ors V Yes Yes Yes Yes Yes Control Room Characteristics Isolation.


Air Exchange Remote Time Rate -Normal Detectors (sec) (hr. )No No No No Yesb Yesb 10 4 10 4 10c 10c 1 0.3 0.3 1 1 Air Exchange Rate -Isolated (hr-1)0.06 0.06 0.06 0.015 0.06 0.015 100 m (330 ft)0.5 1 2 6 8 70 Maximum Weight (10001b) of Chlorine as a Function of Distance from Control Rooma 200 m 300 m 500 m (660 ft) (980 ft) (1640 ft)2 4 10 5 12 40 6 14 36 20 60 230 20 50 120 180 380 1300 2000 m (6560 ft)1200 3400 2700 32000 5000 60000 aTo determine allowable
An alternative to the installation of remote detectors a. Type I control rooms should include the follow- ing protective features:
;-.. inventories for distances between those given in this table, log-log interpolation is acceptable.
                                                                          would be to provide an isolation system using local detectors but having an isolation time of effectively  I
                                                                          zero. This can be accomplished by ensuring that the
      (1) Quick-response chlorine detectors located in                    time required for chlorine to travel from the chlorine the fresh air inlets. Within 10 seconds3 after arrival of                detector to the isolation damper, within the inlet the chlorine, detection should initiate complete                          ducting, is equal to or greater than the time required closure of isolation dampers to the control room.                        to detect the chlorine and close the isolation damper.


bsee Regulatory Positi .-.e for an alternative to remote detectors.
(2) A normal fresh air makeup rate of less than                        f. Type VI control rooms should include the one air change per hour. The fresh air inlet should be                    protective features in paragraph e except that the at least 15 meters above grade.                                          control room isolated air exchange rate should be reduced to 0.015 air change per hour or less. For
      (3) Low-leakage construction with an equivalent                    isolated exchange rates between 0.0 15 hr- ' and 0.06 air exchange rate of less than 0.06 hr-I when all                        hr-' , linear interpolation of the weights given for penetrations are exposed to a 1/8-inch water gage                        control room Types V and VI in Table 1 can be made.


CThe isolation tii ,e of .0 seconds refers to detection by local detectors.
pressure differential. Construction details should be                    Verification testing is required within this range of provided to show that this limit is met.                                  exchange rates (see Regulatory Position 5).
      (4) Low-leakage dampers or valves installed on                        4. The following should be applied to all control the upstream side of recirculation fans or other loca-                    room types (I through VI):
tions where negative systems pressure exists and where inleakage from chlorine-contaminated outside                          a. Immediately after control room isolation, the air is possible.                                                         emergency recirculating charcoal filter or equivalent equipment designed to remove or otherwise limit the b. Type II control rooms should include the                          accumulation of chlorine within the control room protective features of paragraph a except that the                        should be started up and operated.


If detection is by remote detectors, isolation time Ls effectively zero since detection and isolation accomplished before the chlorine reaches the control room isolation dampers.
isolation time should be 4 seconds or less rather than
10 seconds or less.                                                        b. Steps should be taken to ensure that the isolated exchange rate is not inadvertently increased by design c. Type III control rooms should include the protective features of paragraph a except that the or operating error. For instance, the following should be considered:
                                                                                                                                  4 normal fresh air makeup rate should be limited to 0.3 air change per hour or less.                                                  (1) An administrative procedure should require that all doors leading to the control room be kept d. Type IV control rooms should include the                          closed when not in use.


containers are interconnected in such a manner that failure of a single container could cause a chlorine release from several containers.
protective features of paragraph a except that the isolation time and the normal air exchange rate                                (2) Ventilation equipment for the control room should be equal to or less than 4 seconds and 0.3 air                    and for the adjacent zones should be reviewed to en- change per hour, respectively. In addition, the con-                      sure that enhanced air exchange between the isolated trol room isolated air exchange rate should be                            control room and the outside will not occur (e.g., if reduced to 0.015 air change per hour or less (see                        there is a chlorine release, exhaust fans should be description of required leak rate verification test in                    stopped and/or isolated from the control room ven- Regulatory Position 5).                                                  tilation zone by low-leakage dampers or valves).
    e. Type V control rooms should include theprotec-                          (3) A control room exit leading directly to the tive features of paragraph a with the addition of                        outside of the building should have two low-leakage remote chlorine -detectors located at the chlorine                        doors in series.


a. Type I control rooms should include the follow-ing protective features: (I) Quick-response chlorine detectors located in the fresh air inlets. Within 10 seconds' after arrival of the chlorine, detection should initiate complete closure of isolation dampers to the control room..(2) A normal fresh air makeup rate of less than one air change per hour. The fresh air inlet should be at least 15 meters above grade.(3) Low-leakage construction with an equivalent air exchange rate of less than 0.06 hr-1 when all penetrations are exposed to a 1/8-inch water gage pressure differential.
storage and unloading location. These additional detectors should be placed and the detector trip c. The use of full-face self-contained pressure- points adjusted so as to ensure detection of either a leak or a container rupture. A detector trip signal                      demand-type breathing apparatus (or the equivalent)
                                                                          and the use of protective clothing should be con- should accomplish automatic isolation of the control sidered in the development of a chlorine release This is the time interval between the time the chlorine                 emergency plan. Because calculations indicate that concentration exceeds 5 ppm at the isolation dampers and the            chlorine concentrations may increase rapidly, time the dampers are completely closed. Note that if the chlorine detectors are upstream from the isolation dampers, credit will be       emergency plan provisions and rehearsal of these allowed for the travel time between the detectors and the              provisions are necessary to ensure donning of dampers.                                                                breathing apparatus on detection of high chlorine
                                                                  1.95-4


Construction details should be provided to show that this limit is met.(4) Low-leakage dampers or valves installed on the upstream side of recirculation fans or other loca-tions where negative systems pressure exists and where inleakage from chlorine-contaminated outside air is possible.b, Type I] control rooms should include the protective features of paragraph a except that the isolation time should be 4 seconds or less rather than 10 seconds or less.c. Type III control rooms should include the protective features of paragraph a except that the normal fresh air makeup rate should be limited to 0.3 air change per hour or less.d, Type IV control rooms should include the protective features of paragraph a except that the isolation time and the normal air exchange rate should be equal to or less than 4 seconds and 0.3 air change per hour, respectively.
concentrations. Storage provisions for breathing ap-                (4) Seismic Qualification. The chlorine detection paratus and procedures for their use should be such            system should be designated as Seismic Category I
that operators can begin using the apparatus within            and be qualified as such.


In addition, the con-trol room isolated air exchange rate should be reduced to 0.015 air change per hour or less (see description of required leak rate verification test in Regulatory Position 5).e. Type V control rooms should include theprotec- tive features of paragraph a with the addition of remote chlorine detectors located at the chlorine storage and unloading location.
two minutes after an alarm. Adequate air capacity for the breathing apparatus (at least six hours) should be              (5) Environmental Qualification. The detection readily available onsite to ensure that sufficient time        system should be qualified for all expected environ- is available to transport additional bottled air from          ments and for severe environments that could clearly offsite locations. This offsite supply should be               lead to or be a result of a chlorine release. The instal- capable of delivering several hundred hours of bot-           lation of the detectors should ensure that they are tled air to members of the emergency crew. A                  protected from adverse temperature effects.


These additional detectors should be, placed and the detector trip points adjusted so as to ensure detection of either a leak or a container rupture. A detector trip signal should accomplish automatic isolation of the control This is the time interval between the time the chlorine concentration exceeds 5 ppm at the isolation dampers and the time the dampers are completely closed. Note that if the chlorine detectors are upstream from the isolation dampers, credit will be allowed for the travel time between the detectors and the dampers.room before chlorine arrives at the isolation dampers. The detector trip signal should also set off an alarm and provide a readout in the control room.An alternative to the installation of remote detectors would be to provide an isolation system using local detectors but having an isolation time of effectively zero. This can be accomplished by ensuring that the time required for chlorine to travel from the chlorine detector to the isolation damper, within the inlet ducting, is equal to or greater than the time required to detect the chlorine and close the isolation damper.f. Type VI control rooms should include the protective features in paragraph'
minimum emergency crew should consist of those personnel required to maintain the plant in a safe                  (6) Maintenance, Testing, and Calibration. The condition, including orderly shutdown or scram of              manufacturer's maintenance recommendations are the reactor. As a guideline, a minimum of five units          acceptable provided they follow sound engineering of breathing apparatus should be provided for the             practice and are compatible with the proposed ap- emergency crew.                                               plication. A routine operational check should be con- ducted at one-week intervals.
e except that the control room isolated air exchange rate should be reduced to 0.015 air change per hour or less. For isolated exchange rates between 0.0 15 hr-I and 0.06 hr' , linear interpolation of the weights given for control room Types V and VI in Table I can be made.Verification testing is required within this range of exchange rates (see Regulatory Position 5).4. The following should be applied to all control room types (I through VI): a. Immediately after control room isolation, the emergency recirculating charcoal filter or equivalent equipment designed to remove or otherwise limit the accumulation of chlorine withifi the control room should be started up and operated.b. Steps should be taken to ensure that the isolated exchange rate is not inadvertently increased by design or operating error. For instance, the following should be considered: (I) An administrative procedure should require that all doors leading to the control room be kept closed when not in use.(2) Ventilation equipment for the control room and for the adjacent zones should be reviewed to en-sure that enhanced air exchange between the isolated control room and the outside will not occur (e.g., if there is a chlorine release, exhaust fans should be stopped and/or isolated from the control room ven-tilation zone by low-leakage dampers or valves).(3) A control room exit leading directly to the outside of the building should have two low-leakage doors in series.c. The use of full-face self-contained pressure-demand-type breathing apparatus (or the equivalent)
and the use of protective clothing should be con-sidered in the development of a chlorine release emergency plan. Because calculations indicate that chlorine concentrations may increase rapidly, emergency plan provisions and rehearsal of these provisions are necessary to ensure donning of breathing apparatus on detection of high chlorine 1.95-4 concentrations.


Storage provisions for breathing ap-paratus and procedures for their use should be such that operators can begin using the apparatus within two minutes after an alarm. Adequate air capacity for the breathing apparatus (at least six hours) should be readily available onsite to ensure that sufficient time is available to transport additional bottled air from offsite locations.
d. The air supply apparatus should meet the single failure criterion and be designated Seismic Category                Verification testing and calibration of the I. (In the case of self-contained breathing apparatus,        chlorine detectors and verification testing of the the single failure criterion may be met by supplying          system response time should be conducted at six- one extra unit for every three units required.)               month intervals.


This offsite supply should be capable of delivering several hundred hours of bot-tled Ar to members of the emergency crew. A minimum emergency crew should consist of those personnel required to maintain the plant in a safe condition, including orderly shutdown or scram of the reactor. As a guideline, a minimum of five units of breathing apparatus should be provided for the emergency crew.d. The air supply apparatus should meet the single failure criterion and be designated Seismic Category 1. (In the case of self-contained breathing apparatus, the single failure criterion may be met by supplying one extra unit for every three units required.)
The isolation system components should be of a quality that ensures high reliability and availability.          5. The gross leakage characteristic of the control One method to meet these goals is to provide a                room should be determined by pressurizing the con- system that meets the requirements of IEEE-279,              trol room to 1/8-inch water gage and determining the
The isolation system components should be of a quality that ensures high reliability and availability.
"Criteria for Protection Systems for Nuclear Power            pressurization flow rate. (The use of a higher pressure Generating Stations." In all cases, the isolation            differential is acceptable provided the flow rate is system, recirculating filter system, and air condition-      conservatively adjusted to correspond to 1/8-inch ing system should meet IEEE-279 since they are re-            water gage.) For air exchange rates of less than 0.06 quired to maintain a habitable environment in the             hr -', periodic verification testing should be per- control room during design basis radiological events.         formed. An acceptable method for periodic testing would be the use of a permanently installed Specific acceptance criteria for the chlorine detec-       calibrated pressurization fan. The system would have tion system and allied actuating electronics are as fol-      a known pressure-versus-flow characteristic so that lows:                                                        the leak rate could be determined by measuring the control room pressure differentia


One method to meet these goals is to provide a system that meets the requirements of IEEE-279,"Criteria for Protection Systems for Nuclear Power Generating Stations." In all cases, the isolation system, recirculating filter system, and air condition- ing system should meet IEEE-279 since they are re-quired to maintain a habitable environment in the control room during design basis radiological events.Specific acceptance criteria for the chlorine detec-tion system and allied actuating electronics are as fol-lows: (1) Chlorine Concentration Level. Detectors should be able to detect and signal a chlorine con-centration of 5 ppm.(2) System Response Time. The system response time, which incorporates the detector response time, the valve closure time, and associated instrument delays, should be less than or equal to the required isolation time.(3) Single Failure Criteria.
====l. Testing should be====
    (1) Chlorine Concentration Level. Detectors               conducted at least every six months and after any ma- should be able to detect and signal a chlorine con-           jor alteration that may affect the control room centration of 5 ppm.                                         leakage.


The chlorine detection system should be redundant and physically separate to accomplish decoupling of the effects of unsafe en-vironmental factors, electric transients, physical acci-dents, and component failure.Local detectors should consist of two physically separate channels for each fresh air inlet. Each chan-nel should consist of a separate power supply, detec-tor, actuating electronics, and interconnecting ca-bling. Remote detectors should also consist of two separate channels having detectors located at the chlorine unloading facility.(4) Seismic Qualification.
(2) System Response Time. The system response                6. Emergency procedures to be initiated in the time, which incorporates the detector response time,         event of a chlorine release should be provided.


The chlorine detection system should be designated as Seismic Category I and be qualified as such.(5) Environmental Qualification.
the valve closure time, and associated instrument            Methods of detecting the event by station personnel, delays, should be less than or equal to the required          both during normal workday operation and during isolation time.                                               minimum staffing periods (late night and weekend shift staffing), should be discusse


The detection system should be qualified for all expected environ-ments and for severe environments that could clearly lead to or be a result of a chlorine release. The instal-lation of the detectors should ensure that they are protected from adverse temperature effects.(6) Maintenance, Testing, and Calibration.
====d. Instrumentation====
    (3) Single Failure Criteria.The chlorine detection       that has been provided for the detection of chlorine system should be redundant and physically separate            should be described including sensitivity; action in- to accomplish decoupling of the effects of unsafe en-        itiated by detecting instrument and level at which this vironmental factors, electric transients, physical acci-     action is initiated; technical specification limitations dents, and component failure.                                on instrument availability; and instructions for maintenance, calibration, and testing. Criteria should Local detectors should consist of two physically        be defined for the isolation of the control room, for separate channels for each fresh air inlet. Each chan-        the use of protective breathing apparatus and other nel should consist of a separate power supply, detec-         protective measures, and for maintenance of the tor, actuating electronics, and interconnecting ca-          plant in a safe condition including the capability for bling. Remote detectors should also consist of two            orderly shutdown or scram of the reactor. Criteria separate channels having detectors located at the            and procedures for evacuating nonessential personnel chlorine unloading facility.                                  from the station should also be defined.


The manufacturer's maintenance recommendations are acceptable provided they follow sound engineering practice and are compatible with the proposed ap-plication.
1.95-5


A routine operational check should be con-ducted at one-week intervals.
==D. IMPLEMENTATION==
cant proposes an acceptable alternative method for complying with specified portions of the Commis- The purpose of this section is to provide informa-        sion's regulations, the method described herein is be- tion to applicants regarding the NRC staff's plans for        ing and will continue to be used in the evaluation of using this regulatory guide.


Verification testing and calibration of the chlorine detectors and verification testing of the system response time should be conducted at six-month intervals.
This guide reflects current NRC staff practice.


5. The gross leakage characteristic of the control room should be determined by pressurizing the con-trol room to 1/8-inch water gage and determining the pressurization flow rate. (The use of a higher pressure differential is acceptable provided the flow rate is conservatively adjusted to correspond to 1/8-inch water gage.) For air exchange rates of less than 0.06 hr ', periodic verification testing should be per-formed. An acceptable method for periodic testing would be the use of a permanently installed calibrated pressurization fan. The system would have a known pressure-versus-flow characteristic so that the leak rate could be determined by measuring the control room pressure differential.
submittals for construction permit applications until this guide is revised as a result of suggestions from the I
                                                              public or additional staff review.


Testing should be conducted at least every six months and after any ma-jor alteration that may affect the control room leakage.6. Emergency procedures to be initiated in the event of a chlorine release should be provided.Methods of detecting the event by station personnel, both during normal workday operation and during minimum staffing periods (late night and weekend shift staffing), should be discussed.
Therefore, except in those cases in which the appli-
                                                                                                                        *1
                                                      1.95-6


Instrumentation that has been provided for the detection of chlorine should be described including sensitivity;
UNITED STATES
action in-itiated by detecting instrument and level at which this action is initiated;
NUCLEAR REGULATORY COMMISSION
technical sppcification limitations on instrument availability;
    WASHINGTON, 0. C. 20555                                     POSTAGE AND FEES PAID
and instructions for maintenance, calibration, and testing. Criteria should be defined for the isolation of the control room, for the use of protective breathing apparatus and other protective measures, and for maintenance of the plant in a safe condition including the capability for orderly shutdown or scram of the reactor. Criteria and procedures for evacuating nonessential personnel from the station should also be defined.I 1.95-5
                                                                U.S. NUCLEAR REGULATORY
 
      OFFICIAL BUSINESS                                               COMMISSION
==D. IMPLEMENTATION==
  PENALTY FOR PRIVATE USE, $300
The purpose of this section is to provide informa-tion to applicants regarding the NRC staff's plans for using this regulatory guide.This guide reflects current NRC staff practice.Therefore, except in those cases in which the appli-cant proposes an acceptable alternative method for complying with specified portions of the Commis-sion's regulations, the method described herein is be-ing and will continue to be used in the evaluation of submittals for construction permit applications until this guide is revised as a result of suggestions from the public or additional staff review.1.95-6 UNITED STATES NUCLEAR REGULATORY  
                                                                                        4
COMMISSION
                            194Z.60020012 - SN..:        0:177 U S NRC
WASHINGTON, D.C. 20555 OFFICIAL BUSINESS PENALTY FOR PRIVATE USE, $300 FIRST CLASS MAIL POSTAGE B FEES PAID USNRC PERMIT No. 0-67 0}}
                            OFFICE OF INSPECTION .&"'.ENFORCE
                            R J BORES
                            531 PARK AVENUE
                            KING OF 'PRUSSIA- PA '19406}}


{{RG-Nav}}
{{RG-Nav}}

Latest revision as of 22:02, 11 November 2019

Protection of Nuclear Power Plant Control Room Operators Against an Accidental Chlorine Release
ML12298A134
Person / Time
Issue date: 01/31/1977
From:
Office of Nuclear Regulatory Research, NRC/OSD
To:
References
RG-1.095, Rev 1
Download: ML12298A134 (7)


Revision 1 U.S. NUCLEAR REGULATORY COMMISSION January 1977 REGULATORYGUIDE

OFFICE OF STANDARDS DEVELOPMENT

REGULATORY GUIDE 1.95 PROTECTION OF NUCLEAR POWER PLANT CONTROL ROOM

OPERATORS AGAINST AN ACCIDENTAL CHLORINE RELEASE

A. INTRODUCTION

Regulatory Guide 1.78, "Assumptions for Evaluating the Habitability of a Nuclear Power Plant Criterion 4, "Environmental and missile design Control Room During a Postulated Hazardous bases," of Appendix A, "General Design Criteria for Chemical Release," identifies chlorine as a hazardous Nuclear Power Plants," to 10 CFR Part 50, "Licens- chemical which, if present in the control room at- ing of Production and Utilization Facilities," re- mosphere in sufficient quantity, could result in the quires, in part, that structures, systems, and compo- control room becoming uninhabitable. It is the pur- nents important to safety be designed to accom- pose of this guide to describe specific design features modate the effects of and to be compatible with the and procedures that are acceptable to mitigate environmental conditions associated with operation, hazards to control room operators from an acciden- maintenance, testing, and postulated accidents. tal chlorine release. Although this guide was Criterion 19, "Control room," requires that a control developed to provide protection from an onsite room be provided from which actions can be taken to chlorine release, the protection provisions described operate the nuclear power unit safely under normal here are also expected to be sufficient for an offsite conditions and to maintain it in a safe condition un- chlorine release. The positions stated in this guide are der accident conditions. based on the specific physical properties and physiological effects of chlorine.

The release of chlorine could potentially result in the control room operators becoming incapacitated. Two basic accident types can be postulated: a long- This guide describes design features and procedures term, low-leakage-rate release and a short-term puff that are acceptable to the NRC staff for the protec- release. The majority of chlorine releases experienced tion of nuclear plant control room operators against to date have been of the first type, involving leakage an accidental chlorine release. The Advisory Com- from valves or fittings and resulting in a long-term mittee on Reactor Safeguards has been consulted release with a leakage rate from near zero to less than concerning this guide and has concurred in the one pound of chlorine per second. Given warning, regulatory position. only breathing apparatus is necessary to protect the control room operator from this kind of release.

B. DISCUSSION

However, because such a release might continue un- abated for many hours, self-contained breathing ap- Many nuclear power plants use chlorine for water paratus, a t sourc a.. :i.. mafo- outlets, or treatment in the circulating water system and in other equivalent protection capable of operation for an ex- auxiliary systems. Chlorine is normally stored on the tended period of time should be available.

site as liquified gas in one-ton tanks or large railroad cars (typically 16 to 55 tons). A less probable but more severe accident would be the failure of a manhole cover on the chlorine con-

  • Lines indicate substantive changes from previous issue. tainer or the outright failure of the container itself.

USNRC REGULATORY GUIDES Comments should be sent to the Secretary of the Commission, U.S. Nuclear Regulatory Commission. Washington, DC. 20555, Attention: Docketing and Regulatory Guides are issued to describe and make available to the public Service Section.

methods acceptable to the NRC staff of implementing specific parts of the Commission's regulations, to delineate techniques used by the staff in evalu- The guides are issued in the following ten broad divisions:

ating specific problems or postulated accidents, or to provide guidance to appli cants. Regulatory Guides are not substitutes for regulations, and compliance 1. Power Reactors 6. Products with them is not required. Maethods and solutions different from those set out in 2. Research and Test Reactors 7. Transportation the guides will be acceptable if they provide a basis for the findings requisite to the issuance or continuance of a permit or license by the Commission.

3.

4.

Fuels and Materials Facilities Environmental and Siting

8.

9.

Occupational Health Antitrust Review K

Comments and suggestions for improvements in these guides are encouraged 5. Materials and Plant Protection 10. General at all times, and guides will be revised, as appropriate, to accommodate com- ments and to reflect new information or experience. This guide was revised as a Copies of published guides may be obtained by written request indicating the result of substantive comments received from the public and additional staff divisions desired to the U.S. Nuclear Regulatory Commission, Washington, D.C.

review. 20555, Attention: Director. Office of Standards Development.

Such failure could occur during the transportation of inlet (a 15-meter elevation from ground level was a container as a result of a handling mishap or could used). The maximum allowable chlorine weights were be due to naturally or accidently produced environ- determined by using worst case conditions for ments such as earthquakes, flooding, fire, explosive overpressure, or missiles. A failure of this type could calculating the control room concentrations (signifi- cant parameters being wind speed, cloud dimensions, 1 result in a puff release of about 25% of the chlorine. normal air exchange rate, time to isolate, and isolated The balance of the chlorine would be vaporized and air exchange rate). For certain control room released over an extended period of time. As a result characteristics and high wind speed, the maximum of the cloud formed by the release from such an acci- operator exposure occurs before isolation. For other dent, the chlorine concentration inside the control cases with other control room characteristics and low room might increase rapidly. In the absence of special wind speed, the maximum operator exposure occurs design measures to limit the buildup within the con- two minutes after isolation and is primarily due to in- trol room, the operators might be incapacitated filtration. The six control room types listed in the before they are able to don breathing apparatus. table span the expected range of protections required for most plants. Other combinations of the signifi- Adequate protection of the control room operators cant parameters are possible, but those listed in the against the types of accidental chlorine release discus- table should provide sufficient guidance for most sed above will be achieved if features are included in cases.

the plant design to (1) automatically isolate the con- trol room if there is a release, (2) make the control This guide does not address the protection of in- room sufficiently leak tight, and (3) provide equip- dividuals either outside the control room or within ment and procedures for ensuring the use of the control room but not directly involved in reactor breathing apparatus by the control room operators. operations. Breathing apparatus should be provided Protection provisions adequate for the large instan- and be readily accessible throughout the plant in taneous release will also provide protection against order to eliminate the need for personnel to seek the low-leakage-rate release. Staff analysis of control shelter in the control room during a chlorine release.

room designs and the degree of protection afforded by each design has resulted in criteria for acceptance, The features and procedures described in this guide as will be discussed in the next section. These criteria apply to plants having conventional ventilation are based on the limitation (given in Regulatory systems. Any different methods of protection Guide 1.78) that the chlorine concentration within proposed will be evaluated on a case-by-case basis.

the control room should not exceed 15 ppm by volume (45 mg/m 3) within two minutes after the operators are made aware of the presence of

C. REGULATORY POSITION

I

chlorine.' This concentration, the toxicity limit, is the Control room operators should be protected maximum concentration that can be tolerated for two against the effects of an accidental chlorine release as minutes without physical incapacitation of an described below.

average human (i.e., severe coughing, eye burn, or severe skin irritation). 1. Liquified chlorine should not be stored within

100 meters of a control room2 or its fresh air inlets.

Table 1 gives the maximum allowable weight of a (Small quantities for laboratory use, 20 lbs or less, are single container of chlorine as a function of distance exempt.)

from the control room for various control room types. It is based on an instantaneous release of 25% 2. If a chlorine container having an inventory of of the contents of the chlorine container and an al- 150 lbs or less is stored more than 100 meters from lowable chlorine concentration in the control room the control room or its fresh air inlets, the capability of 45 mg/m 3, the toxicity limit, for two minutes. The for manual isolation of the control room should be initial cloud dimensions assume expansion of the provided.

chlorine gas into a spherical cloud having. a Gaussian concentration gradient. Dispersion of the cloud was 3. For single container quantities exceeding 150 lb, calculated using the instantaneous release diffusion the maximum allowable chlorine inventory in a single model appearing in Appendix B of Regulatory Guide container stored at specified distances from the con-

1.78. For those cases where the control room was trol room or its fresh air inlet is given in Table 1 for located a short distance from the release point and control room Types I through VI (described below).

the amount of chlorine release was small, the model For each control room type, the maximum allowable was adjusted to allow for additional dispersion in the chlorine inventory in a single container is given as a vertical direction by assuming uniform mixing function of distance from the control room. If there between the ground and the elevation of the fresh air are several chlorine containers, only the failure of the largest container is normally considered unless the Two minutes is considered sufficient time for a trained operator to put a self-contained breathing apparatus into operation, if 2 Control room is defined to include all zones serviced by the these are to be used. emergency ventilation system.

1.95-2

,lo w

w TABLE 1 MAXIMUM ALLOWABLE CHLORINE INVENTORY IN A SINGLE CONTAINER

Control Room Characteristics Maximum Weight (1000 Ib) of Control Isolation Air Exchange Air Exchange Chlorine as a Function of Distance Room Local Remote Time Rate - Normal Rate - Isolated from Control Rooma

4 Type Detectors Detectors (sec) (hrI (hr ) 100 m 200 m 300 m 500 m 2000 m )

(330 ft) (660 ft) (980 ft) (1640 ft) (6560 ft Yes No 10 1 0.06 0.5 2 4 10 1200

II Yes No 4 1 0.06 1 5 12 40 3400

  • D

III Yes No 10 0.3 0.06 2 6 14 36 2700

IV Yes No 4 0.3 0.015 6 20 60 230 32000

V Yes Yesb 10c 0.06 8 20 50 120 5000

1 VI Yes Yesb 10c 0.015 70 180 380 1300 60000

aTo determine allowable chlorine inventories for distances between those given in this table, log-log interpolation is acceptable.

bsee Regulatory Position 3.e for an alternative to remote detectors.

cThe isolation time of 10 seconds refers to detection by local detectors. If detection is by remote detectors, isolation time is effectively zero since detection and isolation will be accomplished before the chlorine reaches the control room isolation dampers.

containers are interconnected in such a manner that room before chlorine arrives at the isolation failure of a single container could cause a chlorine dampers. The detector trip signal should also set off release from several containers. an alarm and provide a readout in the control room.

An alternative to the installation of remote detectors a. Type I control rooms should include the follow- ing protective features:

would be to provide an isolation system using local detectors but having an isolation time of effectively I

zero. This can be accomplished by ensuring that the

(1) Quick-response chlorine detectors located in time required for chlorine to travel from the chlorine the fresh air inlets. Within 10 seconds3 after arrival of detector to the isolation damper, within the inlet the chlorine, detection should initiate complete ducting, is equal to or greater than the time required closure of isolation dampers to the control room. to detect the chlorine and close the isolation damper.

(2) A normal fresh air makeup rate of less than f. Type VI control rooms should include the one air change per hour. The fresh air inlet should be protective features in paragraph e except that the at least 15 meters above grade. control room isolated air exchange rate should be reduced to 0.015 air change per hour or less. For

(3) Low-leakage construction with an equivalent isolated exchange rates between 0.0 15 hr- ' and 0.06 air exchange rate of less than 0.06 hr-I when all hr-' , linear interpolation of the weights given for penetrations are exposed to a 1/8-inch water gage control room Types V and VI in Table 1 can be made.

pressure differential. Construction details should be Verification testing is required within this range of provided to show that this limit is met. exchange rates (see Regulatory Position 5).

(4) Low-leakage dampers or valves installed on 4. The following should be applied to all control the upstream side of recirculation fans or other loca- room types (I through VI):

tions where negative systems pressure exists and where inleakage from chlorine-contaminated outside a. Immediately after control room isolation, the air is possible. emergency recirculating charcoal filter or equivalent equipment designed to remove or otherwise limit the b. Type II control rooms should include the accumulation of chlorine within the control room protective features of paragraph a except that the should be started up and operated.

isolation time should be 4 seconds or less rather than

10 seconds or less. b. Steps should be taken to ensure that the isolated exchange rate is not inadvertently increased by design c. Type III control rooms should include the protective features of paragraph a except that the or operating error. For instance, the following should be considered:

4 normal fresh air makeup rate should be limited to 0.3 air change per hour or less. (1) An administrative procedure should require that all doors leading to the control room be kept d. Type IV control rooms should include the closed when not in use.

protective features of paragraph a except that the isolation time and the normal air exchange rate (2) Ventilation equipment for the control room should be equal to or less than 4 seconds and 0.3 air and for the adjacent zones should be reviewed to en- change per hour, respectively. In addition, the con- sure that enhanced air exchange between the isolated trol room isolated air exchange rate should be control room and the outside will not occur (e.g., if reduced to 0.015 air change per hour or less (see there is a chlorine release, exhaust fans should be description of required leak rate verification test in stopped and/or isolated from the control room ven- Regulatory Position 5). tilation zone by low-leakage dampers or valves).

e. Type V control rooms should include theprotec- (3) A control room exit leading directly to the tive features of paragraph a with the addition of outside of the building should have two low-leakage remote chlorine -detectors located at the chlorine doors in series.

storage and unloading location. These additional detectors should be placed and the detector trip c. The use of full-face self-contained pressure- points adjusted so as to ensure detection of either a leak or a container rupture. A detector trip signal demand-type breathing apparatus (or the equivalent)

and the use of protective clothing should be con- should accomplish automatic isolation of the control sidered in the development of a chlorine release This is the time interval between the time the chlorine emergency plan. Because calculations indicate that concentration exceeds 5 ppm at the isolation dampers and the chlorine concentrations may increase rapidly, time the dampers are completely closed. Note that if the chlorine detectors are upstream from the isolation dampers, credit will be emergency plan provisions and rehearsal of these allowed for the travel time between the detectors and the provisions are necessary to ensure donning of dampers. breathing apparatus on detection of high chlorine

1.95-4

concentrations. Storage provisions for breathing ap- (4) Seismic Qualification. The chlorine detection paratus and procedures for their use should be such system should be designated as Seismic Category I

that operators can begin using the apparatus within and be qualified as such.

two minutes after an alarm. Adequate air capacity for the breathing apparatus (at least six hours) should be (5) Environmental Qualification. The detection readily available onsite to ensure that sufficient time system should be qualified for all expected environ- is available to transport additional bottled air from ments and for severe environments that could clearly offsite locations. This offsite supply should be lead to or be a result of a chlorine release. The instal- capable of delivering several hundred hours of bot- lation of the detectors should ensure that they are tled air to members of the emergency crew. A protected from adverse temperature effects.

minimum emergency crew should consist of those personnel required to maintain the plant in a safe (6) Maintenance, Testing, and Calibration. The condition, including orderly shutdown or scram of manufacturer's maintenance recommendations are the reactor. As a guideline, a minimum of five units acceptable provided they follow sound engineering of breathing apparatus should be provided for the practice and are compatible with the proposed ap- emergency crew. plication. A routine operational check should be con- ducted at one-week intervals.

d. The air supply apparatus should meet the single failure criterion and be designated Seismic Category Verification testing and calibration of the I. (In the case of self-contained breathing apparatus, chlorine detectors and verification testing of the the single failure criterion may be met by supplying system response time should be conducted at six- one extra unit for every three units required.) month intervals.

The isolation system components should be of a quality that ensures high reliability and availability. 5. The gross leakage characteristic of the control One method to meet these goals is to provide a room should be determined by pressurizing the con- system that meets the requirements of IEEE-279, trol room to 1/8-inch water gage and determining the

"Criteria for Protection Systems for Nuclear Power pressurization flow rate. (The use of a higher pressure Generating Stations." In all cases, the isolation differential is acceptable provided the flow rate is system, recirculating filter system, and air condition- conservatively adjusted to correspond to 1/8-inch ing system should meet IEEE-279 since they are re- water gage.) For air exchange rates of less than 0.06 quired to maintain a habitable environment in the hr -', periodic verification testing should be per- control room during design basis radiological events. formed. An acceptable method for periodic testing would be the use of a permanently installed Specific acceptance criteria for the chlorine detec- calibrated pressurization fan. The system would have tion system and allied actuating electronics are as fol- a known pressure-versus-flow characteristic so that lows: the leak rate could be determined by measuring the control room pressure differentia

l. Testing should be

(1) Chlorine Concentration Level. Detectors conducted at least every six months and after any ma- should be able to detect and signal a chlorine con- jor alteration that may affect the control room centration of 5 ppm. leakage.

(2) System Response Time. The system response 6. Emergency procedures to be initiated in the time, which incorporates the detector response time, event of a chlorine release should be provided.

the valve closure time, and associated instrument Methods of detecting the event by station personnel, delays, should be less than or equal to the required both during normal workday operation and during isolation time. minimum staffing periods (late night and weekend shift staffing), should be discusse

d. Instrumentation

(3) Single Failure Criteria.The chlorine detection that has been provided for the detection of chlorine system should be redundant and physically separate should be described including sensitivity; action in- to accomplish decoupling of the effects of unsafe en- itiated by detecting instrument and level at which this vironmental factors, electric transients, physical acci- action is initiated; technical specification limitations dents, and component failure. on instrument availability; and instructions for maintenance, calibration, and testing. Criteria should Local detectors should consist of two physically be defined for the isolation of the control room, for separate channels for each fresh air inlet. Each chan- the use of protective breathing apparatus and other nel should consist of a separate power supply, detec- protective measures, and for maintenance of the tor, actuating electronics, and interconnecting ca- plant in a safe condition including the capability for bling. Remote detectors should also consist of two orderly shutdown or scram of the reactor. Criteria separate channels having detectors located at the and procedures for evacuating nonessential personnel chlorine unloading facility. from the station should also be defined.

1.95-5

D. IMPLEMENTATION

cant proposes an acceptable alternative method for complying with specified portions of the Commis- The purpose of this section is to provide informa- sion's regulations, the method described herein is be- tion to applicants regarding the NRC staff's plans for ing and will continue to be used in the evaluation of using this regulatory guide.

This guide reflects current NRC staff practice.

submittals for construction permit applications until this guide is revised as a result of suggestions from the I

public or additional staff review.

Therefore, except in those cases in which the appli-

  • 1

1.95-6

UNITED STATES

NUCLEAR REGULATORY COMMISSION

WASHINGTON, 0. C. 20555 POSTAGE AND FEES PAID

U.S. NUCLEAR REGULATORY

OFFICIAL BUSINESS COMMISSION

PENALTY FOR PRIVATE USE, $300

4