{{#Wiki_filter:Date: July 29, 2014  
{{#Wiki_filter:Date: July 29, 2014 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE - PNO-I-14-003 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. Some of the information may not yet be fully verified or evaluated by the Region I staff.
 
Facility                                               Licensee Emergency Classification Dominion Nuclear Connecticut, Inc.                     __ Notification of Unusual Event Millstone Power Station, Unit 2                         ___ Alert Waterford, CT                                           ___ Site Area Emergency Docket No.       50-336                                 ___ General Emergency License No. DPR-65                                     _X Not Applicable
PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE
  - PNO-I-14-003 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. Some of the information may not yet be fully verified or evaluated by the Region I staff.
 
Facility       Licensee Emergency Classification Dominion Nuclear Connecticut, Inc. __   Notification of Unusual Event Millstone Power Station, Unit 2   ___ Alert Waterford, CT     ___ Site Area Emergency   Docket No. 50-336     ___ General Emergency License No. DPR-65   _X   Not Applicable


==SUBJECT:==
==SUBJECT:==
MILLSTONE POWER STATION UNIT 2: SHUTDOWN GREATER THAN 72 HOURS DUE TO A TECHNICAL SPECIFICATIONS REQUIRED SHUTDOWN FOR THE TURBINE DRIVEN AUXILIARY FEEDWATER PUMP
MILLSTONE POWER STATION UNIT 2: SHUTDOWN GREATER THAN 72 HOURS DUE TO A TECHNICAL SPECIFICATIONS REQUIRED SHUTDOWN FOR THE TURBINE DRIVEN AUXILIARY FEEDWATER PUMP On July 23, 2014, Millstone Power Station Unit 2 entered Technical Specification 3.7.1.1, Action C, for the turbine-driven auxiliary feedwater pump due to insufficient pump flow in recirculating mode. At 2:11 p.m. on July 26, 2014, Millstone Unit 2 commenced the shutdown required by Technical Specifications using normal station procedures. Troubleshooting and repairs will continue to attempt to identify and correct the issue.
 
The unit is currently in Mode 4, and all safety-related systems and equipment required for safe plant shutdown are available.
On July 23, 2014, Millstone Power Station Unit 2 entered Technical Specification 3.7.1.1, Action C, for the turbine-driven auxiliary feedwater pump due to insufficient pump flow in recirculating mode. At 2:11 p.m. on July 26, 2014, Millstone Unit 2 commenced the shutdown required by Technical Specifications using normal station procedures. Troubleshooting and repairs will continue to attempt to identify and correct the issue.
The NRC resident inspectors are closely monitoring Dominions evaluation and repair activities.
 
This preliminary notification is issued for information only.
The unit is currently in Mode 4, and all safety-related systems and equipment required for safe plant shutdown are available.  
Region I received initial notification of this occurrence by telephone call from the licensee at approximately 2:00 p.m. on July 26, 2014. Connecticut officials have been notified.
 
The information presented herein has been discussed with the licensee and is current as of 11:00 a.m. on July 29, 2014.
The NRC resident inspectors are closely monitoring Dominion's evaluation and repair activities.
ADAMS Accession Number: ML14210A198 CONTACT:         Raymond McKinley, Projects Branch 5 (610) 337-5150 Raymond.McKinley@nrc.gov
 
This preliminary notification is issued for information only.  
 
Region I received initial notification of this occurrence by telephone call from the licensee at approximately 2:00 p.m. on July 26, 2014. Connecticut officials have been notified.               The information presented herein has been discussed with the licensee and is current as of 11:00 a.m. on July 29, 2014.  
 
ADAMS Accession Number: ML14210A198 CONTACT: Raymond McKinley, Projects Branch 5 (610) 337-5150 Raymond.McKinley@nrc.gov


ML14210A198 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/PAO RI/SLO RI/ORA NAME     RMcKinley/SWS for HNieh/MLS for DScrenci/NAS for NMcNamara/DBT for WDean/DCL for DATE 7/28/14 7/28/14 7/28/14 7/28/14 7/29/14}}
ML14210A198 Non-Sensitive                     Publicly Available SUNSI Review Sensitive                        Non-Publicly Available OFFICE     RI/DRP             RI/DRP           RI/PAO           RI/SLO                 RI/ORA NAME       RMcKinley/SWS for HNieh/MLS for     DScrenci/NAS for NMcNamara/DBT for       WDean/DCL for DATE       7/28/14           7/28/14           7/28/14         7/28/14                 7/29/14}}


{{PNO-Nav|region=I}}
{{PNO-Nav|region=I}}

Latest revision as of 03:02, 4 November 2019

PNO-I-14-003 - Millstone, Unit 2. Shutdown Greater than 72 Hours Due to TS-Required Shutdown for the TDAFW
ML14210A198
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/29/2014
From: Raymond Mckinley
NRC/RGN-I/DRP/PB5
To:
McKinley R
References
PNO-I-14-003
Download: ML14210A198 (2)


Date: July 29, 2014 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE - PNO-I-14-003 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. Some of the information may not yet be fully verified or evaluated by the Region I staff.

Facility Licensee Emergency Classification Dominion Nuclear Connecticut, Inc. __ Notification of Unusual Event Millstone Power Station, Unit 2 ___ Alert Waterford, CT ___ Site Area Emergency Docket No. 50-336 ___ General Emergency License No. DPR-65 _X Not Applicable

SUBJECT:

MILLSTONE POWER STATION UNIT 2: SHUTDOWN GREATER THAN 72 HOURS DUE TO A TECHNICAL SPECIFICATIONS REQUIRED SHUTDOWN FOR THE TURBINE DRIVEN AUXILIARY FEEDWATER PUMP On July 23, 2014, Millstone Power Station Unit 2 entered Technical Specification 3.7.1.1, Action C, for the turbine-driven auxiliary feedwater pump due to insufficient pump flow in recirculating mode. At 2:11 p.m. on July 26, 2014, Millstone Unit 2 commenced the shutdown required by Technical Specifications using normal station procedures. Troubleshooting and repairs will continue to attempt to identify and correct the issue.

The unit is currently in Mode 4, and all safety-related systems and equipment required for safe plant shutdown are available.

The NRC resident inspectors are closely monitoring Dominions evaluation and repair activities.

This preliminary notification is issued for information only.

Region I received initial notification of this occurrence by telephone call from the licensee at approximately 2:00 p.m. on July 26, 2014. Connecticut officials have been notified.

The information presented herein has been discussed with the licensee and is current as of 11:00 a.m. on July 29, 2014.

ADAMS Accession Number: ML14210A198 CONTACT: Raymond McKinley, Projects Branch 5 (610) 337-5150 Raymond.McKinley@nrc.gov