ML16209A045: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(10 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML16209A045 | | number = ML16209A045 | ||
| issue date = 07/26/2016 | | issue date = 07/26/2016 | ||
| title = | | title = License Amendment to Adopt TSTF-425 Non-Concurrence | ||
| author name = Pulvirenti A | | author name = Pulvirenti A | ||
| author affiliation = NRC/NRR/DORL/LPLIV-2 | | author affiliation = NRC/NRR/DORL/LPLIV-2 | ||
| addressee name = | | addressee name = | ||
Line 9: | Line 9: | ||
| docket = 05000382 | | docket = 05000382 | ||
| license number = NPF-038 | | license number = NPF-038 | ||
| contact person = Pulvirenti A | | contact person = Pulvirenti A | ||
| case reference number = CAC MF6366, NCP-2016-012 | | case reference number = CAC MF6366, NCP-2016-012 | ||
| document type = Non-Concurrence Process | | document type = Non-Concurrence Process | ||
| page count = 13 | | page count = 13 | ||
| project = CAC:MF6366 | |||
| stage = Other | |||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:NCP-2016-012 Section C As the NCP Approver, I have read and considered the submission from EEEB staff. Prior to discussion of the issues, I would like to acknowledge the work of the EEEB staff and recognize that it is good that they are exercising their ability to register their concerns through the NRCs non-concurrence process. | |||
Summary of Issues The EEEB staff is objecting to the issuance of the amendment to the Waterford license to implement TSTF-425 (Risk-Informed Surveillance Frequencies). The EEEB Non-concurrence has four core objections to the proposed license amendment request (LAR): | |||
: 1. The proposed amendment would modify the NMP Technical Specifications (TSs) in a manner that doesnt meet the current licensing basis of NMP and NRC regulatory requirements. Specifically, General Design Criterion (GDC) 17, GDC 18, 10 CFR 50.36(c)(3), and 10 CFR Appendix B Criterion III. | |||
: 2. The Topical Report (TR) Safety Evaluation (SE) was not reviewed by the Office of the General Counsel (OGC). | |||
: 3. There are no backstops provided for the Surveillance Requirement (SR) frequencies that would be relocated to the licensee controlled document. | |||
: 4. The proposed amendment is risk-based, not risk-informed. | |||
Evaluation of Non-Concurrence The objections raised in this non-concurrence are identical to those raised by EEEB staff during the NRC review of a TSTF-425 LAR for the Perry Nuclear Power Plant, Unit 1 (NCP-2015-012). | |||
The non-concurrence, including the NRCs response to the non-concurrence is available under Agencywide Documents Access and Management System Accession No. ML16033A197. As no new issues have been raised by the current non-concurrence, nor has additional technical justification for the issues been provided, I find that the previous resolution of the issues remains valid. Thus, the NRC staff should proceed with issuance of the LAR.}} |
Latest revision as of 16:09, 30 October 2019
ML16209A045 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 07/26/2016 |
From: | April Pulvirenti Plant Licensing Branch IV |
To: | Entergy Operations |
Pulvirenti A | |
References | |
CAC MF6366, NCP-2016-012 | |
Download: ML16209A045 (13) | |
Text
NCP-2016-012 Section C As the NCP Approver, I have read and considered the submission from EEEB staff. Prior to discussion of the issues, I would like to acknowledge the work of the EEEB staff and recognize that it is good that they are exercising their ability to register their concerns through the NRCs non-concurrence process.
Summary of Issues The EEEB staff is objecting to the issuance of the amendment to the Waterford license to implement TSTF-425 (Risk-Informed Surveillance Frequencies). The EEEB Non-concurrence has four core objections to the proposed license amendment request (LAR):
- 1. The proposed amendment would modify the NMP Technical Specifications (TSs) in a manner that doesnt meet the current licensing basis of NMP and NRC regulatory requirements. Specifically, General Design Criterion (GDC) 17, GDC 18, 10 CFR 50.36(c)(3), and 10 CFR Appendix B Criterion III.
- 2. The Topical Report (TR) Safety Evaluation (SE) was not reviewed by the Office of the General Counsel (OGC).
- 3. There are no backstops provided for the Surveillance Requirement (SR) frequencies that would be relocated to the licensee controlled document.
- 4. The proposed amendment is risk-based, not risk-informed.
Evaluation of Non-Concurrence The objections raised in this non-concurrence are identical to those raised by EEEB staff during the NRC review of a TSTF-425 LAR for the Perry Nuclear Power Plant, Unit 1 (NCP-2015-012).
The non-concurrence, including the NRCs response to the non-concurrence is available under Agencywide Documents Access and Management System Accession No. ML16033A197. As no new issues have been raised by the current non-concurrence, nor has additional technical justification for the issues been provided, I find that the previous resolution of the issues remains valid. Thus, the NRC staff should proceed with issuance of the LAR.