| issue date = 09/15/2016
| issue date = 09/15/2016
| title = EN-16-021, Issuance of Final Significance Determination and Notice of Violation to Ginna, (EA-16-128)
| title = EN-16-021, Issuance of Final Significance Determination and Notice of Violation to Ginna, (EA-16-128)
| author name = Fretz R J
| author name = Fretz R
| author affiliation = NRC/OE
| author affiliation = NRC/OE
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000244
| docket = 05000244
| license number =  
| license number =  
| contact person = Marenchin T J
| contact person = Marenchin T
| case reference number = EA-16-128
| case reference number = EA-16-128
| document report number = EN-16-021
| document report number = EN-16-021
| document type = Enforcement Notification
| document type = Enforcement Notification
| page count = 2
| page count = 2
| project =
| stage = Approval
}}
}}
=Text=
{{#Wiki_filter:September 15, 2016 EN 16-021 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:      Exelon Generation Company, LLC                                        EA-16-128 R.E. Ginna Nuclear Power Plant Docket No.: 50-244
==Subject:==
ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation will be issued on or about September 20, 2016, to Exelon Generation Company, LLC (Exelon) for a violation associated with a White Significance Determination Process finding identified during an inspection of the R.E. Ginna Nuclear Power Plant (Ginna). This White finding, an issue of low to moderate safety significance, will require additional U.S. Nuclear Regulatory Commission (NRC) inspections.
The finding involves an inadvertent change Exelon made that introduced an error to the Ginna Emergency Plan. Specifically, Exelon implemented a revision to the emergency action level (EAL) table for the fission product barrier matrix that was incorrect with respect to the EAL threshold associated with a potential loss of containment barrier. This could have resulted in an untimely declaration of a General Emergency or a failure to declare a Site Area Emergency during an actual event.
A Notice of Violation is included based on Exelons failure to meet 10 CFR Part 50.54(q)(2),
which requires that a holder of a license under this part shall follow and maintain the effectiveness of an emergency plan that meets the requirements in Appendix E to this part; and for nuclear power reactor licensees, the planning standards of 10 CFR 50.47(b). In accordance with the NRC Enforcement Policy, the NOV is considered an escalated enforcement action because it is associated with a White finding.
The NRC issued a preliminary determination letter for this issue on August 18, 2016. On August 25, 2016, in a telephone conversation Exelon indicated that they did not contest the characterization of the risk significance of this finding and declined the opportunity to discuss this issue at a Regulatory Conference or to provide a written response. After considering the information developed during the inspection, the staff concluded that the finding is appropriately characterized as White.
It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:
Mailing of Final Significance Determination            September 20, 2016 Telephone Notification of Licensee                    September 20, 2016 The State of New York will be notified.
CONTACTS: Thomas Marenchin, OE                                Robert Fretz, OE (301) 415-2979                                (301) 415-1980
Distribution: EN-16-021, September 15, 2016 Chairman Burns        EDO            OCFO      Regional Offices Comm. Svinicki        DEDR            OIS      RI      RII Comm. Baran          DEDM            RES      RIII    RIV SECY                  OE              ACRS OCA                  OGC            NRO      MAIL OPA                  NRR            NMSS      ADAMS OIP                  OI              NSIR      OE staff OIG            OP Center Electronic DISTRIBUTION:
P. Holahan, OE R. Fretz, OE T. Marenchin, OE OE r/f EN binder X PUBLIC X NON-SENSITIVE ADAMS ML16258A386 OFFICE        OE:ES            OE:BC NAME          TMarenchin      RFretz DATE          9/14/2016        9/15/2016 OFFICIAL RECORD COPY}}

Latest revision as of 15:07, 30 October 2019

EN-16-021, Issuance of Final Significance Determination and Notice of Violation to Ginna, (EA-16-128)
ML16258A386
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/15/2016
From: Robert Fretz
NRC/OE
To:
Exelon Generation Co
Marenchin T
References
EA-16-128 EN-16-021
Download: ML16258A386 (2)


Text

September 15, 2016 EN 16-021 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Exelon Generation Company, LLC EA-16-128 R.E. Ginna Nuclear Power Plant Docket No.: 50-244

Subject:

ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation will be issued on or about September 20, 2016, to Exelon Generation Company, LLC (Exelon) for a violation associated with a White Significance Determination Process finding identified during an inspection of the R.E. Ginna Nuclear Power Plant (Ginna). This White finding, an issue of low to moderate safety significance, will require additional U.S. Nuclear Regulatory Commission (NRC) inspections.

The finding involves an inadvertent change Exelon made that introduced an error to the Ginna Emergency Plan. Specifically, Exelon implemented a revision to the emergency action level (EAL) table for the fission product barrier matrix that was incorrect with respect to the EAL threshold associated with a potential loss of containment barrier. This could have resulted in an untimely declaration of a General Emergency or a failure to declare a Site Area Emergency during an actual event.

A Notice of Violation is included based on Exelons failure to meet 10 CFR Part 50.54(q)(2),

which requires that a holder of a license under this part shall follow and maintain the effectiveness of an emergency plan that meets the requirements in Appendix E to this part; and for nuclear power reactor licensees, the planning standards of 10 CFR 50.47(b). In accordance with the NRC Enforcement Policy, the NOV is considered an escalated enforcement action because it is associated with a White finding.

The NRC issued a preliminary determination letter for this issue on August 18, 2016. On August 25, 2016, in a telephone conversation Exelon indicated that they did not contest the characterization of the risk significance of this finding and declined the opportunity to discuss this issue at a Regulatory Conference or to provide a written response. After considering the information developed during the inspection, the staff concluded that the finding is appropriately characterized as White.

It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:

Mailing of Final Significance Determination September 20, 2016 Telephone Notification of Licensee September 20, 2016 The State of New York will be notified.

CONTACTS: Thomas Marenchin, OE Robert Fretz, OE (301) 415-2979 (301) 415-1980

Distribution: EN-16-021, September 15, 2016 Chairman Burns EDO OCFO Regional Offices Comm. Svinicki DEDR OIS RI RII Comm. Baran DEDM RES RIII RIV SECY OE ACRS OCA OGC NRO MAIL OPA NRR NMSS ADAMS OIP OI NSIR OE staff OIG OP Center Electronic DISTRIBUTION: