|
|
(7 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 10/02/2017 | | | issue date = 10/02/2017 |
| | title = LTR-17-0391 - Roberta Pevear, Letter Seabrook Nuclear Plant Application for 20-Year Extension | | | title = LTR-17-0391 - Roberta Pevear, Letter Seabrook Nuclear Plant Application for 20-Year Extension |
| | author name = Pevear R C | | | author name = Pevear R |
| | author affiliation = Public Commenter | | | author affiliation = Public Commenter |
| | addressee name = Svinicki K L | | | addressee name = Svinicki K |
| | addressee affiliation = NRC/Chairman | | | addressee affiliation = NRC/Chairman |
| | docket = 05000443, 05000444 | | | docket = 05000443, 05000444 |
Line 14: |
Line 14: |
| | document type = Letter | | | document type = Letter |
| | page count = 2 | | | page count = 2 |
| | project = EPID:L2017-LLA-0160, CAC:MF9054, CAC:MF9055, CAC:MF9056, CAC:MF9057, CAC:MF9058, CAC:MF9059, CAC:MF9060, EPID:L-2017-LLA-0160
| |
| | stage =
| |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Hon. Roberta C. Pevear 7 River Woods Drive Apt 0125 Exeter, NH 03833 Hon. Kristine L. Svinicki, Chairman October 2, 2017 United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 In Re: Seabrook Nuclear Plant Application for 20-Year Extension Dear Chairman Svinicki: As a former 10-year member of the New Hampshire House of Representatives serving Hampton/Hampton Falls, and the former 10-year Hampton Falls Civil Defense Director, I support the request of "We The People" for a first sponder hearing for the Seabrook nuclear plant evacuation plan. I was the prime sponsor of the bill that gave us an ation plan; however, even though we got it up to ten miles, instead of two, as it came out it obviously could not work, and, as I understand it, it has never been tested. Since Seabrook has filed for a 20-year extension of their Operating License, after its current 2030 expiration, in spite of the degrading cement, "fake" parts, etc., etc., and keeping in mind past experiences with power outages caused by mega-storms, I believe we must protect people of Massachusetts and from what would be total tion to the entire area. When the NRC was set up, it was charged with protecting the Public, and I am asking that you do just that! cc: NRC Atomic Licensing Board FEMA Roberta C. Pevear () -7 7;). -0 'S <;, | | {{#Wiki_filter:Hon. Roberta C. Pevear 7 River Woods Drive Apt 0125 Exeter, NH 03833 October 2, 2017 Hon. Kristine L. Svinicki, Chairman United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 In Re: Seabrook Nuclear Plant Application for 20-Year Extension |
| re'-Hon. Roberta C. Pevear 7 River Woods Drive Apt 0125 Exeter, NH 03833 NH 03il..1 04 OCT 2017 3 t Hon. Kristine L. Svinicki, Chairman United States Nuclear Re9ulatory Commission Washington, D.C. 20555-0001 r.a&lr_J 2" 2i::555-C:C:C; i | | |
| * 111*I11111i111* iii 11iII1111! 1111i*III111J1Ilii1i I' ji l11111i ii Iii | | ==Dear Chairman Svinicki:== |
| }} | | |
| | As a former 10-year member of the New Hampshire House of Representatives serving Hampton/Hampton Falls, and the former 10-year Hampton Falls Civil Defense Director, I support the request of "We The People" for a first re-sponder hearing for the Seabrook nuclear plant evacuation plan. |
| | I was the prime sponsor of the bill that gave us an evacu-ation plan; however, even though we got it up to ten miles, instead of two, as it came out it obviously could not work, and, as I understand it, it has never been tested. |
| | Since Seabrook has filed for a 20-year extension of their Operating License, after its current 2030 expiration, in spite of the degrading cement, "fake" parts, etc., etc., |
| | and keeping in mind past experiences with power outages caused by mega-storms, I believe we must protect people of Massachusetts and ~. B~ from what would be total devasta-tion to the entire area. |
| | When the NRC was set up, it was charged with protecting the Public, and I am asking that you do just that! |
| | Roberta C. Pevear |
| | ~ () ~ - 7 7;). - 0 'S ~ <;, |
| | cc: NRC Atomic Licensing Board FEMA |
| | |
| | re '- |
| | ~- MA.ii~ H ESTER NH 03il..1 Hon. Roberta C. Pevear 7 River Woods Drive Apt 0125 04 OCT 2017 P~i 3 t Exeter, NH 03833 Hon. Kristine L. Svini cki, Chairman United States Nuclear Re9ulatory Commission Washington, D.C. 20555-0001 r.a&lr _J 2" 2i::555-C:C:C; i *111*I11111i111* iii 11iII1111! 1111i*III111J1Ilii1i I' ji l11111i ii Iii}} |
|
---|
Category:Letter
MONTHYEARML24254A2552024-09-25025 September 2024 Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) ML24232A1142024-08-21021 August 2024 Correction to Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . IR 05000443/20240022024-08-0606 August 2024 Integrated Inspection Report 05000443/2024002 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2024001 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-127, Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20240102024-05-29029 May 2024 Biennial Problem Identification and Resolution Inspection Report 05000443/2024010 IR 05000443/20240112024-05-24024 May 2024 Age-Related Degradation Inspection Report 05000443/2024011 IR 05000443/20240012024-05-13013 May 2024 Integrated Inspection Report 05000443/2024001 L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-078, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report L-2024-077, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000443/20245012024-04-22022 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2024501 L-2024-058, Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources2024-04-19019 April 2024 Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources SBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) L-2024-038, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-037, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0606 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24065A2522024-03-0505 March 2024 Notice of Enforcement Discretion for Seabrook Station, Unit No. 1 (EPID: L-2024-033) L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-033, Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B2024-03-0404 March 2024 Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B IR 05000443/20230062024-02-28028 February 2024 Annual Assessment Letter for Seabrook Station (Report 05000443/2023006) L-2024-019, Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-02-28028 February 2024 Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld L-2024-016, Radiological Emergency Plan (Ssrep), Revision 822024-02-13013 February 2024 Radiological Emergency Plan (Ssrep), Revision 82 IR 05000443/20230042024-02-12012 February 2024 Integrated Inspection Report 05000443/2023004 ML24009A1152024-01-29029 January 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule 2024-09-25
[Table view] |
Text
Hon. Roberta C. Pevear 7 River Woods Drive Apt 0125 Exeter, NH 03833 October 2, 2017 Hon. Kristine L. Svinicki, Chairman United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 In Re: Seabrook Nuclear Plant Application for 20-Year Extension
Dear Chairman Svinicki:
As a former 10-year member of the New Hampshire House of Representatives serving Hampton/Hampton Falls, and the former 10-year Hampton Falls Civil Defense Director, I support the request of "We The People" for a first re-sponder hearing for the Seabrook nuclear plant evacuation plan.
I was the prime sponsor of the bill that gave us an evacu-ation plan; however, even though we got it up to ten miles, instead of two, as it came out it obviously could not work, and, as I understand it, it has never been tested.
Since Seabrook has filed for a 20-year extension of their Operating License, after its current 2030 expiration, in spite of the degrading cement, "fake" parts, etc., etc.,
and keeping in mind past experiences with power outages caused by mega-storms, I believe we must protect people of Massachusetts and ~. B~ from what would be total devasta-tion to the entire area.
When the NRC was set up, it was charged with protecting the Public, and I am asking that you do just that!
Roberta C. Pevear
~ () ~ - 7 7;). - 0 'S ~ <;,
cc: NRC Atomic Licensing Board FEMA
re '-
~- MA.ii~ H ESTER NH 03il..1 Hon. Roberta C. Pevear 7 River Woods Drive Apt 0125 04 OCT 2017 P~i 3 t Exeter, NH 03833 Hon. Kristine L. Svini cki, Chairman United States Nuclear Re9ulatory Commission Washington, D.C. 20555-0001 r.a&lr _J 2" 2i::555-C:C:C; i *111*I11111i111* iii 11iII1111! 1111i*III111J1Ilii1i I' ji l11111i ii Iii