ML17345A527: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:AC CELERATZD Ds IBUTION DEMONS A7JON SySTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8811160109 DOC.DATE: 88/10/31 NOTARIZED:
{{#Wiki_filter:AC CELERATZD             Ds     IBUTION       DEMONS           A7JON       SySTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO-DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-'251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION SAPORITO,T.J.
ACCESSION NBR:8811160109           DOC.DATE: 88/10/31     NOTARIZED: NO     -
Affiliation Not Assigned RECIP.NAME RECIPIENT AFFILIATION Region 2, Ofc of the Director  
DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light                   C 05000250 50-'251 Turkey Point Plant, Unit 4, Florida Power and Light                 C 05000251 AUTH. NAME           AUTHOR AFFILIATION SAPORITO,T.J.       Affiliation Not Assigned RECIP.NAME           RECIPIENT AFFILIATION Region 2, Ofc of the Director


==SUBJECT:==
==SUBJECT:==
Notifies of alleged activities at plant violating Info Notice 81-22 Section 235.DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD NRR MORISSEAU,D NRR/DLPQ/QAB 10 NRR/DREP/EPB 10 NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS2 RGN2 FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME EDISON,G DEDRO NRR/DLPQ/PEB 1 1 NRR/DOEA DIR 1 1 NRR/DREP/RPB 10 NRR/PMAS/I LRB 1 2 N)J EG L 02 NRC PDR RESL MARTIN,D COPIES LTTR ENCL 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 A NOTE'XO ALL ssRIDSss RECIPZEFK:
Notifies of alleged activities at plant violating Info Notice 81-22 Section 235.
S A PIZASE HELP US 10 REDUCE HASTE COl'ABACI IHE DOCUMEPZ CDNTROL DESKI ROOM Pl-37 (EXT.20079)TO ZZJlG2iATE YOUR NAME FROM DIPHGZKTZION LISTS FOR DOCUMENTS YOU DONIT NEEDs D S TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 22\@$0 g)  
DISTRIBUTION CODE: IE01D         COPIES RECEIVED:LTR         ENCL       SIZE:
TITLE: General     (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES RECIPIENT             COPIES            RECIPIENT            COPIES ID CODE/NAME         LTTR ENCL      ID  CODE/NAME        LTTR ENCL PD2-2 PD                   1    1    EDISON,G                  1      1 A
INTERNAL: AEOD                       1    1    DEDRO                    1      1 NRR MORISSEAU,D           1    1    NRR/DLPQ/PEB 1 1          1      1 NRR/DLPQ/QAB 10           1    1    NRR/DOEA DIR 1 1         1     1 NRR/DREP/EPB 10            1     1     NRR/DREP/RPB 10           2      2 NRR/DRIS DIR 9A            1    1                  I NRR/PMAS/ LRB 1 2         1      1 NUDOCS-ABSTRACT            1    1                    N) J     1     1 OGC/HDS2                  1     1       EG    L        02    1     1 RGN2      FILE    01      1     1 EXTERNAL: LPDR                        1     1     NRC PDR                  1     1 NSIC                      1     1     RESL MARTIN,D            1     1 S
A NOTE 'XO ALL ssRIDSss RECIPZEFK:
PIZASE HELP US 10 REDUCE HASTE     COl'ABACI IHE DOCUMEPZ CDNTROL DESKI D
ROOM Pl-37 (EXT. 20079) TO ZZJlG2iATE YOUR NAME FROM DIPHGZKTZION LISTS FOR DOCUMENTS YOU DONIT NEEDs                                               S TOTAL NUMBER OF COPIES REQUIRED: LTTR             22   ENCL     22
                                                                                                    \
0
                                                                                            @$   g)


US NRC Region II 191 Harieta St.N.b".Atlanta.Ga.39323 Thomas J.Saporito, Jr.1292 Sioux Street Jupiter, Florida 33450 Copies Hudibur g Beasley F.Conwav S.Odom Cross W.Kappe*Bladow QA C.Holiday L.Spring R.Curtis R.Bovle L.Hiegel File...N.L.R.B.re: Information Notice 881-22 sect.235 Oct.31, 1988 Please be advised and receive this letter as official notification of the following detailed events at vour licensee's (Florida Power (>Light)Turkev Point Nuclear Plant..Date: Oct.27, 1986 Event: The plant manager (Jim Cross)of the Turkey Point Nuclear Plant at approximately 1399 hours at a meeting held in his office at the plant site, stated that"I dogged"QA" off-thev're good at procedures etc.-not good at harassment charges." Date: Oct.31, 1986 Event: The Quality Assurance Department Head (J.Bladow)of the Turkey Point Nuclear Plant at.approximately 1499 hours at a meeting held on the 2nd floor of the nuclear training facility, stated that the Turkey Point Nuclear Plant Site Vic>>President (John Odom)had stopped the internal investigation being done by his department concerning the allegations made to th>>federal agencies.0 Vio Frag OO~O COV)CC>e Although?lr.Bladow maintains that he reports directly to a corporate person at the Juno offices of Florida Power 6 Light, I submit that~his individual has had an internal company investigation initiated by his department (Quality Assurance) interfered with and stopped at the direction of Turkey Point Nuclear Plant's (plant manager and site vice president)
US NRC   Region     IIN.b".              Copies      Hudibur g    C.Holiday 191 Harieta St.                                       Beasley      L.Spring Atlanta. Ga. 39323                               F.Conwav      R.Curtis S.Odom        R.Bovle Thomas J. Saporito,         Jr.                       Cross        L.Hiegel 1292 Sioux Street                                     W.Kappe*     File...
Jim Cross and John Odom r>>s)>ectfully.
Jupiter, Florida      33450                          Bladow QA    N.L.R.B.
I submit that this is in f'act a violation of the Ammendment to the Atomic Energy Act of 1954 United States NRC ICE Information Notice 081-22 section 235 dat d 97/31/81 and applicable to NRC Region II.
re: Information Notice 881-22 sect.235                           Oct.31, 1988 Please     be   advised and receive     this letter as   official notification   of the   following detailed events at             vour licensee's   (Florida Power (>
Page 2/2 In addition, I further submit that this encroachment into the behavior and actions of the Quality Assurance Department of Turkey Point Nuclear bv on site management deviates from the proper and correct methods of operation of the Quality Assurance Department.
Light) Turkev Point Nuclear Plant..
I further submit that I now have reason to believe that prior, actions or decisions made by the Qualitv Assurance Department's personnel may have been influenced or mandated bv on site management personnel as certainly one would have to now question the integritv of the entire Qualit'y Assurance Department.
Date: Oct. 27, 1986 Event:     The   plant manager (Jim Cross) of the Turkey Point Nuclear Plant at approximately 1399 hours at a meeting held in his office at the plant site, stated that "I dogged "QA" off thev're good at procedures etc. not good at harassment charges."
Furthermore, your licensee (Florida Power 6 Light)has contracted with and retained a legal firm from New Jersey (Stier,Anderson,Honroe) to investigate and report on the prior allegations forwarded to the YRC by Thomas Sapo>ito.During a questioning session with these attorney s on Oct.31, 1906, I learned that these attorney's enjoy a relationship with your licensee (Florida Power 6 Light.)and therefore client/lawver priviledge.
Date: Oct. 31, 1986 Event:     The   Quality Assurance Department       Head   (J. Bladow) of the Turkey Point   Nuclear     Plant     at. approximately 1499 hours at   a meeting held on the   2nd floor of the nuclear training facility, stated that the             Turkey Point   Nuclear     Plant     Site   Vic>> President   (John Odom) had stopped     the internal investigation being done by his department concerning the allegations made to th>> federal agencies.
Additionally, thev have met with and discussed the aforementioned allegati.ons reported to the NRC with Nr.J.Bladow of the Turkey Point Nuclear plant's, Qualitv Assurance Department and I therefore'ubmit that their purpose is self serving to your licensee (Florida Power G Light)and in collusion with their (QA)department.
Although     ?lr. Bladow maintains     that he reports directly to a corporate person at the Juno offices of Florida Power 6 Light, I submit that his            ~
I request that your department utilize to the fullest extent, it'resources to investigate and resolve these issues as the Health and Safetv of the Public relies on vour departments enforcement of the law.Regards}}
0 Vio  individual has had an internal company investigation initiated by his Frag OO
~O    department       (Quality Assurance) interfered with and stopped at the COV)
CC>e direction of Turkey Point Nuclear Plant's (plant manager and site vice president) Jim Cross and John Odom r>>s)>ectfully. I submit that this is in f'act a violation of the Ammendment to the Atomic Energy Act of 1954 United States NRC ICE Information Notice 081-22 section 235 dat d 97/31/81 and applicable to           NRC Region II.
 
Page 2/2 In   addition, I further submit that this encroachment into the behavior and actions       of the Quality Assurance Department           of Turkey Point Nuclear bv on site management deviates from the proper and correct methods of operation of the Quality Assurance Department. I further submit that I now have reason to believe that prior, actions or decisions made by the Qualitv Assurance Department's personnel may have been   influenced   or   mandated   bv   on site management   personnel as certainly     one   would   have to now question the integritv of the entire Qualit'y Assurance Department.
Furthermore,     your licensee   (Florida Power 6 Light) has contracted with and   retained a legal firm from New Jersey (Stier,Anderson,Honroe) to investigate and report on the prior allegations forwarded to the YRC by Thomas   Sapo> ito. During a questioning session with these attorney s on Oct. 31, 1906, I learned that these attorney's enjoy a relationship with your licensee (Florida Power 6 Light.) and therefore client/lawver priviledge.       Additionally, thev have met with and discussed the aforementioned allegati.ons reported to the NRC with Nr.J.Bladow of the Turkey Point Nuclear plant's, Qualitv Assurance Department and I therefore 'ubmit that their purpose is self serving to your licensee (Florida Power G Light) and in collusion with their (QA) department.
I request     that your department utilize to the fullest extent, it' resources     to investigate and resolve these issues as the Health and Safetv of the Public relies       on vour departments enforcement of the law.
Regards}}

Revision as of 09:02, 22 October 2019

Notifies of Alleged Activities at Plant Violating Info Notice 81-22,Section 235
ML17345A527
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/31/1988
From: Saporito T
AFFILIATION NOT ASSIGNED
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEIN-81-22, NUDOCS 8811160109
Download: ML17345A527 (4)


Text

AC CELERATZD Ds IBUTION DEMONS A7JON SySTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8811160109 DOC.DATE: 88/10/31 NOTARIZED: NO -

DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-'251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION SAPORITO,T.J. Affiliation Not Assigned RECIP.NAME RECIPIENT AFFILIATION Region 2, Ofc of the Director

SUBJECT:

Notifies of alleged activities at plant violating Info Notice 81-22 Section 235.

DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1 1 EDISON,G 1 1 A

INTERNAL: AEOD 1 1 DEDRO 1 1 NRR MORISSEAU,D 1 1 NRR/DLPQ/PEB 1 1 1 1 NRR/DLPQ/QAB 10 1 1 NRR/DOEA DIR 1 1 1 1 NRR/DREP/EPB 10 1 1 NRR/DREP/RPB 10 2 2 NRR/DRIS DIR 9A 1 1 I NRR/PMAS/ LRB 1 2 1 1 NUDOCS-ABSTRACT 1 1 N) J 1 1 OGC/HDS2 1 1 EG L 02 1 1 RGN2 FILE 01 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 RESL MARTIN,D 1 1 S

A NOTE 'XO ALL ssRIDSss RECIPZEFK:

PIZASE HELP US 10 REDUCE HASTE COl'ABACI IHE DOCUMEPZ CDNTROL DESKI D

ROOM Pl-37 (EXT. 20079) TO ZZJlG2iATE YOUR NAME FROM DIPHGZKTZION LISTS FOR DOCUMENTS YOU DONIT NEEDs S TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 22

\

0

@$ g)

US NRC Region IIN.b". Copies Hudibur g C.Holiday 191 Harieta St. Beasley L.Spring Atlanta. Ga. 39323 F.Conwav R.Curtis S.Odom R.Bovle Thomas J. Saporito, Jr. Cross L.Hiegel 1292 Sioux Street W.Kappe* File...

Jupiter, Florida 33450 Bladow QA N.L.R.B.

re: Information Notice 881-22 sect.235 Oct.31, 1988 Please be advised and receive this letter as official notification of the following detailed events at vour licensee's (Florida Power (>

Light) Turkev Point Nuclear Plant..

Date: Oct. 27, 1986 Event: The plant manager (Jim Cross) of the Turkey Point Nuclear Plant at approximately 1399 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.323195e-4 months <br /> at a meeting held in his office at the plant site, stated that "I dogged "QA" off thev're good at procedures etc. not good at harassment charges."

Date: Oct. 31, 1986 Event: The Quality Assurance Department Head (J. Bladow) of the Turkey Point Nuclear Plant at. approximately 1499 hours0.0173 days <br />0.416 hours <br />0.00248 weeks <br />5.703695e-4 months <br /> at a meeting held on the 2nd floor of the nuclear training facility, stated that the Turkey Point Nuclear Plant Site Vic>> President (John Odom) had stopped the internal investigation being done by his department concerning the allegations made to th>> federal agencies.

Although ?lr. Bladow maintains that he reports directly to a corporate person at the Juno offices of Florida Power 6 Light, I submit that his ~

0 Vio individual has had an internal company investigation initiated by his Frag OO

~O department (Quality Assurance) interfered with and stopped at the COV)

CC>e direction of Turkey Point Nuclear Plant's (plant manager and site vice president) Jim Cross and John Odom r>>s)>ectfully. I submit that this is in f'act a violation of the Ammendment to the Atomic Energy Act of 1954 United States NRC ICE Information Notice 081-22 section 235 dat d 97/31/81 and applicable to NRC Region II.

Page 2/2 In addition, I further submit that this encroachment into the behavior and actions of the Quality Assurance Department of Turkey Point Nuclear bv on site management deviates from the proper and correct methods of operation of the Quality Assurance Department. I further submit that I now have reason to believe that prior, actions or decisions made by the Qualitv Assurance Department's personnel may have been influenced or mandated bv on site management personnel as certainly one would have to now question the integritv of the entire Qualit'y Assurance Department.

Furthermore, your licensee (Florida Power 6 Light) has contracted with and retained a legal firm from New Jersey (Stier,Anderson,Honroe) to investigate and report on the prior allegations forwarded to the YRC by Thomas Sapo> ito. During a questioning session with these attorney s on Oct. 31, 1906, I learned that these attorney's enjoy a relationship with your licensee (Florida Power 6 Light.) and therefore client/lawver priviledge. Additionally, thev have met with and discussed the aforementioned allegati.ons reported to the NRC with Nr.J.Bladow of the Turkey Point Nuclear plant's, Qualitv Assurance Department and I therefore 'ubmit that their purpose is self serving to your licensee (Florida Power G Light) and in collusion with their (QA) department.

I request that your department utilize to the fullest extent, it' resources to investigate and resolve these issues as the Health and Safetv of the Public relies on vour departments enforcement of the law.

Regards