ML18024B053: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:REGULATOR> | {{#Wiki_filter:REGULATOR> NFORMATIQN DISTRIBUTION S" EM (RIDS) | ||
NFORMATIQN DISTRIBUTION S" EM (RIDS)'CCESSION NBR: 7910160368 DOC.DATE: 79/10/10 NOTARIZED: | 'CCESSION NBR: 7910160368 DOC. DATE: 79/10/10 NOTARIZED: NO DOCKET 0 FACIL: 5 rowns Ferry Nuclear Power Stations Unit ii Tennessee 05000259 50 260 owns Ferry Nuclear Power Stations Unit 2i Tennessee 05000260 5 6 Browns Ferry Nuclear Power Stations Unit 3i Tennessee 05000296 AUTH. E AUTHOR AFFILIATION | ||
NO FACIL: 5 | *BERCROMBIEi H. L Tennessee Valley Authority | ||
*BERCROMBIEi H.L Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION, Office of Management and Program Analysis | <<: | ||
RECIP. NAME RECIPIENT AFFILIATION, Office of Management and Program Analysis | |||
==SUBJECT:== | ==SUBJECT:== | ||
Forwards monthly operating rept for Sept 1979.* | Forwards monthly operating rept for Sept 1979. | ||
* / L:~/Md TITLE: Annual',Semi-Annual 5 Monthly Operating Reports (QL Stag NOTES: | |||
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL ACTION: 05 BC OA 6 WH 6 6 INTERNAL: REG Fl 1 1 02 NRC PDR 1 1 2 2' 14 MPA 2 2 16 DIR DOR 1 1 18 ENGR BR 1 1 19 REAC SAFT BR 1 1 20 PLANT SYS BR 1 1 21 EEB 1 1 22 CORE PERF BR 1 1 23 EFFL TR SYS 1 EXTERNAL: 03 LPDR 1 1 04 NSIC 1 1 24 NATL LAB 1 1 25 BRQOKHAVEN 1 1 26 ACRS 15 15 TOTAL NUMBER OF COPIES REQUIRED: LTTR 38 ENCL 38 | |||
/ | / | ||
TENNESSEE VALLEY AUTHORITY Browns Ferry Nuclear Plant P.0.Box 2000 Decatur, Alabama 35602 OCT 101979 Nuclear Regulatory Commission Office of Management Information and Program Control Washington, DC 20555 Gentlemen: | TENNESSEE VALLEY AUTHORITY Browns Ferry Nuclear Plant P. 0. Box 2000 Decatur, Alabama 35602 OCT 101979 Nuclear Regulatory Commission Office of Management Information and Program Control Washington, DC 20555 Gentlemen: | ||
Enclosed is the September 1979 Monthly Operating Report for Browns Ferry Nuclear Plant Units 1, 2, and 3.Very truly yours, TENNESSEE VALLEY AUTHORITY C~g.H.L.Abercrombie Plant Superintendent Enclosure cc: Director, Region II Nuclear Regulatory Commission Office of Inspection and Enforcement 101 Marietta Street Suite 3100 Atlanta, GA 30303 (1 copy)Director, Office of Inspection and Enforcement Nuclear Regulatory Commission Washington, DC 20555 (10 copies)Mr.J.A.Prestele, Acting Director Nuclear Engineering and Operations Dept.Electric Power Research Institute P.0.Box 10412 Palo Alto, CA 94304 An Equal Opportunity Employer | Enclosed is the September 1979 Monthly Operating Report for Browns Ferry Nuclear Plant Units 1, 2, and 3. | ||
'I}} | Very truly yours, TENNESSEE VALLEY AUTHORITY C~g. | ||
H. L. Abercrombie Plant Superintendent Enclosure cc: Director, Region II Nuclear Regulatory Commission Office of Inspection and Enforcement 101 Marietta Street Suite 3100 Atlanta, GA 30303 (1 copy) | |||
Director, Office of Inspection and Enforcement Nuclear Regulatory Commission Washington, DC 20555 (10 copies) | |||
Mr. J. A. Prestele, Acting Director Nuclear Engineering and Operations Dept. | |||
Electric Power Research Institute P. 0. Box 10412 Palo Alto, CA 94304 An Equal Opportunity Employer | |||
'r 9101 60 + cv | |||
' | |||
I}} | |||
Revision as of 01:57, 22 October 2019
| ML18024B053 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 10/10/1979 |
| From: | Abercrombie H TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML18024B054 | List: |
| References | |
| NUDOCS 7910160368 | |
| Download: ML18024B053 (4) | |
Text
REGULATOR> NFORMATIQN DISTRIBUTION S" EM (RIDS)
'CCESSION NBR: 7910160368 DOC. DATE: 79/10/10 NOTARIZED: NO DOCKET 0 FACIL: 5 rowns Ferry Nuclear Power Stations Unit ii Tennessee 05000259 50 260 owns Ferry Nuclear Power Stations Unit 2i Tennessee 05000260 5 6 Browns Ferry Nuclear Power Stations Unit 3i Tennessee 05000296 AUTH. E AUTHOR AFFILIATION
- BERCROMBIEi H. L Tennessee Valley Authority
<<:
RECIP. NAME RECIPIENT AFFILIATION, Office of Management and Program Analysis
SUBJECT:
Forwards monthly operating rept for Sept 1979.
- / L:~/Md TITLE: Annual',Semi-Annual 5 Monthly Operating Reports (QL Stag NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL ACTION: 05 BC OA 6 WH 6 6 INTERNAL: REG Fl 1 1 02 NRC PDR 1 1 2 2' 14 MPA 2 2 16 DIR DOR 1 1 18 ENGR BR 1 1 19 REAC SAFT BR 1 1 20 PLANT SYS BR 1 1 21 EEB 1 1 22 CORE PERF BR 1 1 23 EFFL TR SYS 1 EXTERNAL: 03 LPDR 1 1 04 NSIC 1 1 24 NATL LAB 1 1 25 BRQOKHAVEN 1 1 26 ACRS 15 15 TOTAL NUMBER OF COPIES REQUIRED: LTTR 38 ENCL 38
/
TENNESSEE VALLEY AUTHORITY Browns Ferry Nuclear Plant P. 0. Box 2000 Decatur, Alabama 35602 OCT 101979 Nuclear Regulatory Commission Office of Management Information and Program Control Washington, DC 20555 Gentlemen:
Enclosed is the September 1979 Monthly Operating Report for Browns Ferry Nuclear Plant Units 1, 2, and 3.
Very truly yours, TENNESSEE VALLEY AUTHORITY C~g.
H. L. Abercrombie Plant Superintendent Enclosure cc: Director, Region II Nuclear Regulatory Commission Office of Inspection and Enforcement 101 Marietta Street Suite 3100 Atlanta, GA 30303 (1 copy)
Director, Office of Inspection and Enforcement Nuclear Regulatory Commission Washington, DC 20555 (10 copies)
Mr. J. A. Prestele, Acting Director Nuclear Engineering and Operations Dept.
Electric Power Research Institute P. 0. Box 10412 Palo Alto, CA 94304 An Equal Opportunity Employer
'r 9101 60 + cv
'
I