| issue date = 01/31/2018
| issue date = 01/31/2018
| title = Corrected Interim Endorsement of NEI 17-01, Industry Guideline for Implementing the Requirements of 10 CFR Part 54 for Subsequent License Renewal and NEI 17-04, Model Slr New and Significant Assessment Approach for SAMA
| title = Corrected Interim Endorsement of NEI 17-01, Industry Guideline for Implementing the Requirements of 10 CFR Part 54 for Subsequent License Renewal and NEI 17-04, Model SLR New and Significant Assessment Approach for SAMA
| author name = Wilson G A
| author name = Wilson G
| author affiliation = NRC/NRR/DMLR
| author affiliation = NRC/NRR/DMLR
| addressee name = Hanson J E, Ranek N L
| addressee name = Hanson J, Ranek N
| addressee affiliation = Nuclear Energy Institute (NEI)
| addressee affiliation = Nuclear Energy Institute (NEI)
| docket =  
| docket =  
| license number =  
| license number =  
| contact person = Brady B M, NRR-DMLR 415-2981
| contact person = Brady B, NRR-DMLR 415-2981
| case reference number = NEI 17-01, NEI 17-04
| case reference number = NEI 17-01, NEI 17-04
| document type = Letter
| document type = Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:      
{{#Wiki_filter:January 31, 2018
 
                                                .
January 31, 2018 . Mr. Jerud E. Hanson Senior Project Manager Nuclear Energy Institute 1201 F. St, NW, Suite 1100 Washington, DC 20004-1218 Ms. Nancy L. Ranek Senior Project Manager Nuclear Energy Institute 1201 F. St, NW, Suite 1100 Washington, DC 20004-1218  
Mr. Jerud E. Hanson Senior Project Manager Nuclear Energy Institute 1201 F. St, NW, Suite 1100 Washington, DC 20004-1218 Ms. Nancy L. Ranek Senior Project Manager Nuclear Energy Institute 1201 F. St, NW, Suite 1100 Washington, DC 20004-1218


==SUBJECT:==
==SUBJECT:==
INTERIM ENDORSEMENT OF NEI 17-01, INDUSTRY GUIDELINE FOR IMPLEMENTING THE REQUIREMENTS OF 10 CFR PART 54 FOR SUBSEQUENT LICENSE RENEWAL AND NEI 17-04, MODEL SLR NEW AND SIGNIFICANT ASSESSMENT APPROACH FOR SAMA
INTERIM ENDORSEMENT OF NEI 17-01, INDUSTRY GUIDELINE FOR IMPLEMENTING THE REQUIREMENTS OF 10 CFR PART 54 FOR SUBSEQUENT LICENSE RENEWAL AND NEI 17-04, MODEL SLR NEW AND SIGNIFICANT ASSESSMENT APPROACH FOR SAMA


==Dear Mr. Hanson and Ms. Ranek:==
==Dear Mr. Hanson and Ms. Ranek:==


The Nuclear Regulatory Commission (NRC) received your letters dated December 5, 2017, available at AgencyWide Documents Access and Management System (ADAMS) Accession No. ML17339A596 and June 29, 2017, at ADAMS Accession No. ML17181A468, requesting endorsement of the attached Nuclear Energy Institute's (NEI's) NEI 17-01, "Industry Guideline for Implementing the Requirements of 10 CFR Part 54 for Subsequent License Renewal," and NEI 17-04, "Model SLR New and Significant Assessment Approach for SAMA, Revision 0,"
The Nuclear Regulatory Commission (NRC) received your letters dated December 5, 2017, available at AgencyWide Documents Access and Management System (ADAMS) Accession No. ML17339A596 and June 29, 2017, at ADAMS Accession No. ML17181A468, requesting endorsement of the attached Nuclear Energy Institutes (NEIs) NEI 17-01, Industry Guideline for Implementing the Requirements of 10 CFR Part 54 for Subsequent License Renewal, and NEI 17-04, Model SLR New and Significant Assessment Approach for SAMA, Revision 0, respectively. These guidance documents are available at ADAMS Accession Nos.
respectively. These guidance documents are available at ADAMS Accession Nos. ML17339A599 and ML17181A470.
ML17339A599 and ML17181A470.
The staff has reviewed the NEI 17-01 document to ensure that prior NRC comments provided in public meetings on August 24, 2017 (ADAMS Accession No. ML17257A299) and November 14, 2017 (ADAMS Accession No. ML17346B294) were adequately addressed. The revised version of NEI 17-01 provided in your letter adequately addresses the staff comments and the agreements made at the November 14, 2017, meeting. The NRC will determine whether to formally endorse NEI 17-01 through the revision process for Regulatory Guide 1.188. In the interim, the NRC finds NEI 17-01, dated December 2017, acceptable for use by the four licensees that have already communicated to the NRC their intent to apply for SLR before the end of calendar year 2019. The document will provide sound, clear interim guidance to these SLR applicants while formal NRC endorsement of the NEI guidance document is considered through the Regulatory Guide revision process. The NRC expects that the formal revision to Regulatory Guide 1.188 and its issuance for use will supersede the approval for interim use by this letter on or before December 2019.
The staff has reviewed the NEI 17-01 document to ensure that prior NRC comments provided in public meetings on August 24, 2017 (ADAMS Accession No. ML17257A299) and November 14, 2017 (ADAMS Accession No. ML17346B294) were adequately addressed. The revised version of NEI 17-01 provided in your letter adequately addresses the staff comments and the agreements made at the November 14, 2017, meeting. The NRC will determine whether to formally endorse NEI 17-01 through the revision process for Regulatory Guide 1.188. In the interim, the NRC finds NEI 17-01, dated December 2017, acceptable for use by the four licensees that have already communicated to the NRC their intent to apply for SLR before the end of calendar year 2019. The document will provide sound, clear interim guidance to these SLR applicants while formal NRC endorsement of the NEI guidance document is considered through the Regulatory Guide revision process. The NRC expects that the formal revision to Regulatory Guide 1.188 and its issuance for use will supersede the approval for interim use by this letter on or before December 2019.
No clarifications are needed at this time although changes may be made as the NRC goes through our revision and approval of Regulatory Guide 1.188, "Standard Format and Content J. Hanson and N. Ranek       For Applications to Renew Nuclear Power Plant Operating Licenses," including changes to respond to public comments.
No clarifications are needed at this time although changes may be made as the NRC goes through our revision and approval of Regulatory Guide 1.188, Standard Format and Content
 
J. Hanson and N. Ranek                         For Applications to Renew Nuclear Power Plant Operating Licenses, including changes to respond to public comments.
The staff has also reviewed the NEI 17-04 document, dated June 29, 2017, and finds it acceptable for interim use by the same four licensees that have communicated their intent to apply for SLR before December 31, 2019. The document provides sound, clear guidance to SLR applicants while formal NRC endorsement of NEI 17-04 is proceeding by revision to Supplement 1 to Regulatory Guide 4.2. The NRC expects that issuance of the formal revision to the regulatory guide on or before December 31, 2019 will supersede the approval for interim use granted by this letter.
The staff has also reviewed the NEI 17-04 document, dated June 29, 2017, and finds it acceptable for interim use by the same four licensees that have communicated their intent to apply for SLR before December 31, 2019. The document provides sound, clear guidance to SLR applicants while formal NRC endorsement of NEI 17-04 is proceeding by revision to Supplement 1 to Regulatory Guide 4.2. The NRC expects that issuance of the formal revision to the regulatory guide on or before December 31, 2019 will supersede the approval for interim use granted by this letter.
No clarifications on NEI 17-04 are needed at this time although changes may be made as the NRC revises Supplement 1 to Regulatory Guide 4.2, "Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications," including changes in response to public comments.
No clarifications on NEI 17-04 are needed at this time although changes may be made as the NRC revises Supplement 1 to Regulatory Guide 4.2, Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications, including changes in response to public comments.
This letter is being reissued to correct ADAMS Accession No. ML17341B105 for referenced documents and supersedes the previous letter issued on December 20, 2017.
This letter is being reissued to correct ADAMS Accession No. ML17341B105 for referenced documents and supersedes the previous letter issued on December 20, 2017.
Please contact Bennett Brady of my staff by telephone at 301-415-2981 or by e-mail at Bennett.Brady@nrc.gov on questions related to NEI 17-01 or Jeffrey Rikhoff by telephone at 301-415-1090 or by e-mail at Jeffrey.Rikhoff@nrc.gov on questions related to NEI 17-04. Sincerely,                     /RA/       George A. Wilson Jr., Director       Division of Materials and License Renewal       Office of Nuclear Reactor Regulation
Please contact Bennett Brady of my staff by telephone at 301-415-2981 or by e-mail at Bennett.Brady@nrc.gov on questions related to NEI 17-01 or Jeffrey Rikhoff by telephone at 301-415-1090 or by e-mail at Jeffrey.Rikhoff@nrc.gov on questions related to NEI 17-04.
 
Sincerely,
J. Hanson and N. Ranek       
                                            /RA/
 
George A. Wilson Jr., Director Division of Materials and License Renewal Office of Nuclear Reactor Regulation
==SUBJECT:==
INTERIM ENDORSEMENT OF NEI 17-01, INDUSTRY GUIDELINE FOR IMPLEMENTING THE REQUIREMENTS OF 10 CFR PART 54 FOR SUBSEQUENT LICENSE RENEWAL AND NEI 17-04, MODEL SLR NEW AND SIGNIFICANT ASSESSMENT APPROACH FOR SAMA DISTRIBUTION: E-MAIL: PUBLIC RidsNrrDmlrMrpb Resource RidsNrrDmlrMphb Resource RidsNrrDmlrMenb Resource RidsNrrDmlrMvib Resource RidsNrrDmlrMccb Resource RidsNrrDeResource ---------------------------------- ABilloch-Colon BBrady JRikhoff EOesterle BBeasley JDonoghue GWilson


ADAMS Accession No. ML18029A368 OFFICE PM:DMLR:MRPB LA:DMLR:MRPB PM:DMLR:MENB BC:DMLR:MENB NAME BBrady YEdmonds JRikhoff BBeasley DATE 12/15/2017 12/15/2017 12/15/2017 12/19/2017 OFFICE BC:DMLR:MRPB D:DMLR NAME EOesterle GWilson DATE 1/31/18 1/31/18 OFFICIAL RECORD COPY 
ML18029A368 OFFICE PM:DMLR:MRPB               LA:DMLR:MRPB   PM:DMLR:MENB BC:DMLR:MENB NAME         BBrady               YEdmonds       JRikhoff       BBeasley DATE         12/15/2017           12/15/2017     12/15/2017     12/19/2017 OFFICE BC:DMLR:MRPB               D:DMLR NAME         EOesterle             GWilson DATE         1/31/18               1/31/18}}
}}

Latest revision as of 01:54, 22 October 2019

Corrected Interim Endorsement of NEI 17-01, Industry Guideline for Implementing the Requirements of 10 CFR Part 54 for Subsequent License Renewal and NEI 17-04, Model SLR New and Significant Assessment Approach for SAMA
ML18029A368
Person / Time
Issue date: 01/31/2018
From: George Wilson
Division of Materials and License Renewal
To: Hanson J, Ranek N
Nuclear Energy Institute
Brady B, NRR-DMLR 415-2981
References
NEI 17-01, NEI 17-04
Download: ML18029A368 (3)


Text

January 31, 2018

.

Mr. Jerud E. Hanson Senior Project Manager Nuclear Energy Institute 1201 F. St, NW, Suite 1100 Washington, DC 20004-1218 Ms. Nancy L. Ranek Senior Project Manager Nuclear Energy Institute 1201 F. St, NW, Suite 1100 Washington, DC 20004-1218

SUBJECT:

INTERIM ENDORSEMENT OF NEI 17-01, INDUSTRY GUIDELINE FOR IMPLEMENTING THE REQUIREMENTS OF 10 CFR PART 54 FOR SUBSEQUENT LICENSE RENEWAL AND NEI 17-04, MODEL SLR NEW AND SIGNIFICANT ASSESSMENT APPROACH FOR SAMA

Dear Mr. Hanson and Ms. Ranek:

The Nuclear Regulatory Commission (NRC) received your letters dated December 5, 2017, available at AgencyWide Documents Access and Management System (ADAMS) Accession No. ML17339A596 and June 29, 2017, at ADAMS Accession No. ML17181A468, requesting endorsement of the attached Nuclear Energy Institutes (NEIs) NEI 17-01, Industry Guideline for Implementing the Requirements of 10 CFR Part 54 for Subsequent License Renewal, and NEI 17-04, Model SLR New and Significant Assessment Approach for SAMA, Revision 0, respectively. These guidance documents are available at ADAMS Accession Nos.

ML17339A599 and ML17181A470.

The staff has reviewed the NEI 17-01 document to ensure that prior NRC comments provided in public meetings on August 24, 2017 (ADAMS Accession No. ML17257A299) and November 14, 2017 (ADAMS Accession No. ML17346B294) were adequately addressed. The revised version of NEI 17-01 provided in your letter adequately addresses the staff comments and the agreements made at the November 14, 2017, meeting. The NRC will determine whether to formally endorse NEI 17-01 through the revision process for Regulatory Guide 1.188. In the interim, the NRC finds NEI 17-01, dated December 2017, acceptable for use by the four licensees that have already communicated to the NRC their intent to apply for SLR before the end of calendar year 2019. The document will provide sound, clear interim guidance to these SLR applicants while formal NRC endorsement of the NEI guidance document is considered through the Regulatory Guide revision process. The NRC expects that the formal revision to Regulatory Guide 1.188 and its issuance for use will supersede the approval for interim use by this letter on or before December 2019.

No clarifications are needed at this time although changes may be made as the NRC goes through our revision and approval of Regulatory Guide 1.188, Standard Format and Content

J. Hanson and N. Ranek For Applications to Renew Nuclear Power Plant Operating Licenses, including changes to respond to public comments.

The staff has also reviewed the NEI 17-04 document, dated June 29, 2017, and finds it acceptable for interim use by the same four licensees that have communicated their intent to apply for SLR before December 31, 2019. The document provides sound, clear guidance to SLR applicants while formal NRC endorsement of NEI 17-04 is proceeding by revision to Supplement 1 to Regulatory Guide 4.2. The NRC expects that issuance of the formal revision to the regulatory guide on or before December 31, 2019 will supersede the approval for interim use granted by this letter.

No clarifications on NEI 17-04 are needed at this time although changes may be made as the NRC revises Supplement 1 to Regulatory Guide 4.2, Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications, including changes in response to public comments.

This letter is being reissued to correct ADAMS Accession No. ML17341B105 for referenced documents and supersedes the previous letter issued on December 20, 2017.

Please contact Bennett Brady of my staff by telephone at 301-415-2981 or by e-mail at Bennett.Brady@nrc.gov on questions related to NEI 17-01 or Jeffrey Rikhoff by telephone at 301-415-1090 or by e-mail at Jeffrey.Rikhoff@nrc.gov on questions related to NEI 17-04.

Sincerely,

/RA/

George A. Wilson Jr., Director Division of Materials and License Renewal Office of Nuclear Reactor Regulation