ML18086A826: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 03/27/2018
| issue date = 03/27/2018
| title = NRC Topics of Interest Part 2
| title = NRC Topics of Interest Part 2
| author name = Cowdrey C B
| author name = Cowdrey C
| author affiliation = NRC/NRR/DIRS/IOLB
| author affiliation = NRC/NRR/DIRS/IOLB
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket =  
| docket =  
| license number =  
| license number =  
| contact person = Cushing E J, NRR/DIRS, 415-1064
| contact person = Cushing E, NRR/DIRS, 415-1064
| document type = Slides and Viewgraphs
| document type = Slides and Viewgraphs
| page count = 9
| page count = 9
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:NRC Topics of InterestPart 2Chris Cowdrey, Senior Reactor EngineerOperator Licensing BranchOffice of Nuclear Reactor Regulation Overview*ACAD 10-001 and Eligibility  
{{#Wiki_filter:NRC Topics of Interest Part 2 Chris Cowdrey, Senior Reactor Engineer Operator Licensing Branch Office of Nuclear Reactor Regulation
*NRC Forms 396 and 398
 
*Operator Digitized Docket Operator Licensing Program FeedbackOLPF 202.20
Overview
: revised to include discussion of latest revision to ACAD 10-001-ACAD 10-001, Rev. 1 (Nov 2016) is acceptable for meeting 10 CFR 55.31
* ACAD 10-001 and Eligibility
-ACAD 10-001, Rev. 0 (Feb 2010) is acceptable for final applications received through May 29, 2018
* NRC Forms 396 and 398
-Intended, in part, to reduce need for eligibility waivers and deferrals Operator Licensing Program Feedback
* Operator Digitized Docket
*OLPF 202.21: provides clarification and guidance for which forms to use when revisions to NRC Forms 396 and 398 have been issued  
 
*OLPF 202.22: highlights and summarizes the noteworthy changes made to NRC Form 396 and NRC Form 398 as a result of the October 2017 revisions NRC Form 396
Operator Licensing Program Feedback OLPF 202.20: revised to include discussion of latest revision to ACAD 10-001
*Added an applicant/operator mailing address block*Added a 10 CFR Part 52 Facility Docket check box to support operator license applications for those facilities licensed under 10 CFR 52*Updated the "GUIDANCE USED" check blocks to allow applicants to certify their medical status using the most recent revision of ANSI/ANS standards
  - ACAD 10-001, Rev. 1 (Nov 2016) is acceptable for meeting 10 CFR 55.31
*Added Physician's Certification Date -the date on which the facility licensee's MRO makes the final certification of the applicant/operator's medical suitability  
  - ACAD 10-001, Rev. 0 (Feb 2010) is acceptable for final applications received through May 29, 2018
*Added an applicant/operator acknowledgement statement NRC Form 398
  - Intended, in part, to reduce need for eligibility waivers and deferrals
*Added an "E
 
-mail Address box" to allow for additional communication options for correspondence with licensed operators and applicants
Operator Licensing Program Feedback
*Added Deferral/Excusal/Waiver check boxes to better align with the 10 CFR 55.35 (excusals) and 10 CFR 55.47 (waivers) processes and the terminology used in NUREG
* OLPF 202.21: provides clarification and guidance for which forms to use when revisions to NRC Forms 396 and 398 have been issued
-1021, Rev. 11*Added 10 CFR Part 52 Facility Docket check boxes to support license applications for those facilities licensed under 10 CFR 52*Updated form instructions to better reflect new form and NUREG
* OLPF 202.22: highlights and summarizes the noteworthy changes made to NRC Form 396 and NRC Form 398 as a result of the October 2017 revisions
-1021 requirements
 
*Added an "Electronic Correspondence Option" certification check box to support current effort to develop an electronic correspondence option for initial operator license applications Operator Digitized Docket
NRC Form 396
*Modernization of the operator license application process*Allows for voluntary electronic submission, routing, and docketing of operator license applications
* Added an applicant/operator mailing address block
*Paired with revisions to Forms 396 and 398  
* Added a 10 CFR Part 52 Facility Docket check box to support operator license applications for those facilities licensed under 10 CFR 52
*Primarily to be used for initial applications
* Updated the GUIDANCE USED check blocks to allow applicants to certify their medical status using the most recent revision of ANSI/ANS standards
*2017 Sequoyah Initial Exam served as pilot test platform*Expanded pilot testing for all four regions to occur in Spring 2018
* Added Physicians Certification Date - the date on which the facility licensees MRO makes the final certification of the applicant/operators medical suitability
*Expect to go live in September 2018 Operator Digitized DocketAutomation of several components within the Operator Licensing process:
* Added an applicant/operator acknowledgement statement
-Electronic document delivery mechanism which is a cost-effective, secure, and timely delivery of documents to NRC
 
-Data extraction solution which allows data from images and PDFs to be parsed and delivered to the Reactor Program System -Operator Licensing (RPS
NRC Form 398
-OL) module Questions}}
* Added an E-mail Address box to allow for additional communication options for correspondence with licensed operators and applicants
* Added Deferral/Excusal/Waiver check boxes to better align with the 10 CFR 55.35 (excusals) and 10 CFR 55.47 (waivers) processes and the terminology used in NUREG-1021, Rev. 11
* Added 10 CFR Part 52 Facility Docket check boxes to support license applications for those facilities licensed under 10 CFR 52
* Updated form instructions to better reflect new form and NUREG-1021 requirements
* Added an Electronic Correspondence Option certification check box to support current effort to develop an electronic correspondence option for initial operator license applications
 
Operator Digitized Docket
* Modernization of the operator license application process
* Allows for voluntary electronic submission, routing, and docketing of operator license applications
* Paired with revisions to Forms 396 and 398
* Primarily to be used for initial applications
* 2017 Sequoyah Initial Exam served as pilot test platform
* Expanded pilot testing for all four regions to occur in Spring 2018
* Expect to go live in September 2018
 
Operator Digitized Docket Automation of several components within the Operator Licensing process:
  - Electronic document delivery mechanism which is a cost-effective, secure, and timely delivery of documents to NRC
  - Data extraction solution which allows data from images and PDFs to be parsed and delivered to the Reactor Program System - Operator Licensing (RPS-OL) module
 
Questions}}

Latest revision as of 14:31, 21 October 2019

NRC Topics of Interest Part 2
ML18086A826
Person / Time
Issue date: 03/27/2018
From: Cowdrey C
NRC/NRR/DIRS/IOLB
To:
Cushing E, NRR/DIRS, 415-1064
References
Download: ML18086A826 (9)


Text

NRC Topics of Interest Part 2 Chris Cowdrey, Senior Reactor Engineer Operator Licensing Branch Office of Nuclear Reactor Regulation

Overview

  • Operator Digitized Docket

Operator Licensing Program Feedback OLPF 202.20: revised to include discussion of latest revision to ACAD 10-001

- ACAD 10-001, Rev. 1 (Nov 2016) is acceptable for meeting 10 CFR 55.31

- ACAD 10-001, Rev. 0 (Feb 2010) is acceptable for final applications received through May 29, 2018

- Intended, in part, to reduce need for eligibility waivers and deferrals

Operator Licensing Program Feedback

  • OLPF 202.21: provides clarification and guidance for which forms to use when revisions to NRC Forms 396 and 398 have been issued
  • OLPF 202.22: highlights and summarizes the noteworthy changes made to NRC Form 396 and NRC Form 398 as a result of the October 2017 revisions

NRC Form 396

  • Added an applicant/operator mailing address block
  • Added a 10 CFR Part 52 Facility Docket check box to support operator license applications for those facilities licensed under 10 CFR 52
  • Updated the GUIDANCE USED check blocks to allow applicants to certify their medical status using the most recent revision of ANSI/ANS standards
  • Added Physicians Certification Date - the date on which the facility licensees MRO makes the final certification of the applicant/operators medical suitability
  • Added an applicant/operator acknowledgement statement

NRC Form 398

  • Added an E-mail Address box to allow for additional communication options for correspondence with licensed operators and applicants
  • Added Deferral/Excusal/Waiver check boxes to better align with the 10 CFR 55.35 (excusals) and 10 CFR 55.47 (waivers) processes and the terminology used in NUREG-1021, Rev. 11
  • Added 10 CFR Part 52 Facility Docket check boxes to support license applications for those facilities licensed under 10 CFR 52
  • Updated form instructions to better reflect new form and NUREG-1021 requirements
  • Added an Electronic Correspondence Option certification check box to support current effort to develop an electronic correspondence option for initial operator license applications

Operator Digitized Docket

  • Modernization of the operator license application process
  • Allows for voluntary electronic submission, routing, and docketing of operator license applications
  • Paired with revisions to Forms 396 and 398
  • Primarily to be used for initial applications
  • 2017 Sequoyah Initial Exam served as pilot test platform
  • Expanded pilot testing for all four regions to occur in Spring 2018
  • Expect to go live in September 2018

Operator Digitized Docket Automation of several components within the Operator Licensing process:

- Electronic document delivery mechanism which is a cost-effective, secure, and timely delivery of documents to NRC

- Data extraction solution which allows data from images and PDFs to be parsed and delivered to the Reactor Program System - Operator Licensing (RPS-OL) module

Questions