ML18092B106: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 14: Line 14:
| page count = 1
| page count = 1
}}
}}
See also: [[followed by::IR 07200201/1980001]]
See also: [[see also::IR 07200201/1980001]]


=Text=
=Text=
{{#Wiki_filter:NRC FORM 591M PART 1 (07-2012)*  
{{#Wiki_filter:NRC FORM 591M PART 1                                                                                       U.S. NUCLEAR REGULATORY COMMISSION
10 CFR 2.201 U.S. NUCLEAR REGULATORY
(07-2012)*
COMMISSION
10 CFR 2.201
SAFETY INSPECTION  
                                    SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION
REPORT AND COMPLIANCE  
  1. LICENSEE/LOCATION INSPECTED:                                                 2. NRG/REGIONAL OFFICE
INSPECTION  
    GeoEngineering, LLC
1. LICENSEE/LOCATION  
    P.O. Box 270328
INSPECTED:  
                                                                                      U.S. Nuclear Regulatory Commission
GeoEngineering, LLC P.O. Box 270328 San Juan, Puerto Rico 00927 REPORT NUMBER(S)
    San Juan, Puerto Rico 00927
2018-001 3. DOCKET NUMBER(S)
                                                                                      Region I, 2100 Renaissance Blvd, Suite 100
30-35572 LICENSEE: , 4. 2. NRG/REGIONAL
                                                                                      King of Prussia, Pennsylvania 19406-2713
OFFICE LICENSE NUMBER(S)
    REPORT NUMBER(S) 2018-001
52-25266-01
                                                                                                                  DATE(S) OF INSPECTION
U.S. Nuclear Regulatory  
3. DOCKET NUMBER(S)                                  , 4. LICENSE NUMBER(S)                                  15.    February 14, 2018
Commission
                      30-35572                                    52-25266-01
Region I, 2100 Renaissance  
  LICENSEE:
Blvd, Suite 100 King of Prussia, Pennsylvania  
  The inspection was an examination of the activities conducted under your license as they relate to radiation safety and to compliance with the Nuclear
19406-2713  
  Regulatory Commission (NRC) rules and regulations and the conditions of your license. The inspection consisted of selective examinations of
15. DATE(S) OF INSPECTION  
  procedures and representative records, interviews with personnel, and observations by the inspector. The inspection findings are as follows:
February 14, 2018 The inspection  
      X     1. Based on the inspection findings, no violations were identified.
was an examination  
        !   2. Previous violation(s) closed.
of the activities  
            3. The violation(s), specifically described to you by the inspector as non-cited violations, are not being cited because they were self-
conducted  
                identified, non-repetitive, and corrective action was or is being taken, and the remaining criteria in the NRC Enforcement Policy, to
under your license as they relate to radiation  
                exercise discretion, were satisfied.
safety and to compliance  
                          Non-cited violation(s) were discussed involving the following requirement(s) and corrective action(s):
with the Nuclear Regulatory  
        !   4. During this inspection, certain of your activities, as described below and/or attached, were in violation of NRC requirements and are being
Commission (NRC) rules and regulations and  
        i     cited in accordance with the NRC Enforcement Policy. This form is a NOTICE OF VIOLATION, which may be subject to posting in
the conditions  
                accordance with 10 CFR 19.11. (Violations and Corrective Actions)
of your license. The inspection  
                                                            Statement of Corrective Actions
consisted  
  I hereby state that, within 30 days, the actions described by me to the Inspector will be taken to correct the violations identified. This statement of
of selective  
  corrective actions is made in accordance with the requirements of 10 CFR 2.201 (corrective steps already taken, corrective steps which will be taken,
examinations  
  date when full compliance will be achieved). I understand that no further written response to NRC will be required, unless specifically requested.
of procedures  
1--------T_it_le_ _ _ _ _ _+---_ _ _ _ _P_r_in_t_e_d_N_a_m_e_ _ _ _ _ _+-_ _ _ _ _S_ig~n_a_t_ur_e_ _ _ _ _-+_____                                 D_at_e____ _
and representative  
  LICENSEE'S REPRESENTATIVE
records, interviews  
            NRC INSPECTOR                                                                         I P.
with personnel, and observations  
---------------~C_ra_ig_G_o_rd_o_n_,s_r_._He_a_lt_h_P_hy_s_ic_is_t-~---'J_~llf.~~)~-~-'-------+--3-/1-5/_1_8.--~
by the inspector.  
                                                                                                                ~)    L
The inspection  
            BRANCH CHIEF                     Art Burritt, Chief, CIRDA                                                                   I 3/(:/18
findings are as follows: X 1. Based on the inspection  
                                                                                                    ~JJ\~
findings, no violations  
  *NRC FORM 591M PART 1 (07-2012) (RI Rev. 09/12/2013)                         G:\WordDocs\Current\lnsp Record\R52-25266-01.2018-001 591 M-Part1 .doc
were identified.  
  SUNSI Review Completed By:                 / RA I CG                                                             0       Public   Q     Non-Sensitive
! 2. Previous violation(s)  
                                  This document becomes an NRC Official Agency Record once it is signed by the Branch Chief
closed. 3. The violation(s), specifically  
described  
to you by the inspector  
as non-cited  
violations, are not being cited because they were identified, non-repetitive, and corrective  
action was or is being taken, and the remaining  
criteria in the NRC Enforcement  
Policy, to exercise discretion, were satisfied.  
Non-cited  
violation(s)  
were discussed  
involving  
the following  
requirement(s)  
and corrective  
action(s):  
! 4. During this inspection, certain of your activities, as described  
below and/or attached, were in violation  
of NRC requirements  
and are being i cited in accordance  
with the NRC Enforcement  
Policy. This form is a NOTICE OF VIOLATION, which may be subject to posting in accordance  
with 10 CFR 19.11. (Violations  
and Corrective  
Actions) Statement  
of Corrective  
Actions I hereby state that, within 30 days, the actions described  
by me to the Inspector  
will be taken to correct the violations  
identified.  
This statement  
of corrective  
actions is made in accordance  
with the requirements  
of 10 CFR 2.201 (corrective  
steps already taken, corrective  
steps which will be taken, date when full compliance  
will be achieved).  
I understand  
that no further written response to NRC will be required, unless specifically  
requested.  
1--------T_it_le
______ +---_____ P_r_in_t_e_d_N_a_m_e
______ +-_____ S_ig~n_a_t_ur_e
_____ -+ _____ D_at_e ____ _ LICENSEE'S  
REPRESENTATIVE  
NRC INSPECTOR  
I P. ~) L ---------------~C_ra_ig_G_o_rd_o_n_, s_r_. _He_a_lt_h
_P_hy_s_ic_is_t
-~---'J_~llf.~~)~-~-'-------+--3-/1-5/_1_8.  
--~ ~JJ\~ BRANCH CHIEF Art Burritt, Chief, CIRDA I 3/(:/18 *NRC FORM 591M PART 1 (07-2012) (RI Rev. 09/12/2013)  
G:\WordDocs\Current\lnsp  
Record\R52-25266-01.2018-001  
591 M-Part1 .doc SUNSI Review Completed  
By: / RA I CG 0 Public Q Non-Sensitive  
This document becomes an NRC Official Agency Record once it is signed by the Branch Chief
}}
}}

Latest revision as of 12:04, 21 October 2019

Geoengineering, LLC, NRC Form 591 Part 1, Inspection Report 03035572/2018001
ML18092B106
Person / Time
Site: 03035572
Issue date: 02/14/2018
From: Craig Gordon
NRC Region 1
To: Rodriguez C
Geo Engineering
References
IR 2018001
Download: ML18092B106 (1)


See also: IR 07200201/1980001

Text

NRC FORM 591M PART 1 U.S. NUCLEAR REGULATORY COMMISSION

(07-2012)*

10 CFR 2.201

SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION

1. LICENSEE/LOCATION INSPECTED: 2. NRG/REGIONAL OFFICE

GeoEngineering, LLC

P.O. Box 270328

U.S. Nuclear Regulatory Commission

San Juan, Puerto Rico 00927

Region I, 2100 Renaissance Blvd, Suite 100

King of Prussia, Pennsylvania 19406-2713

REPORT NUMBER(S) 2018-001

DATE(S) OF INSPECTION

3. DOCKET NUMBER(S) , 4. LICENSE NUMBER(S) 15. February 14, 2018

30-35572 52-25266-01

LICENSEE:

The inspection was an examination of the activities conducted under your license as they relate to radiation safety and to compliance with the Nuclear

Regulatory Commission (NRC) rules and regulations and the conditions of your license. The inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and observations by the inspector. The inspection findings are as follows:

X 1. Based on the inspection findings, no violations were identified.

! 2. Previous violation(s) closed.

3. The violation(s), specifically described to you by the inspector as non-cited violations, are not being cited because they were self-

identified, non-repetitive, and corrective action was or is being taken, and the remaining criteria in the NRC Enforcement Policy, to

exercise discretion, were satisfied.

Non-cited violation(s) were discussed involving the following requirement(s) and corrective action(s):

! 4. During this inspection, certain of your activities, as described below and/or attached, were in violation of NRC requirements and are being

i cited in accordance with the NRC Enforcement Policy. This form is a NOTICE OF VIOLATION, which may be subject to posting in

accordance with 10 CFR 19.11. (Violations and Corrective Actions)

Statement of Corrective Actions

I hereby state that, within 30 days, the actions described by me to the Inspector will be taken to correct the violations identified. This statement of

corrective actions is made in accordance with the requirements of 10 CFR 2.201 (corrective steps already taken, corrective steps which will be taken,

date when full compliance will be achieved). I understand that no further written response to NRC will be required, unless specifically requested.

1--------T_it_le_ _ _ _ _ _+---_ _ _ _ _P_r_in_t_e_d_N_a_m_e_ _ _ _ _ _+-_ _ _ _ _S_ig~n_a_t_ur_e_ _ _ _ _-+_____ D_at_e____ _

LICENSEE'S REPRESENTATIVE

NRC INSPECTOR I P.


~C_ra_ig_G_o_rd_o_n_,s_r_._He_a_lt_h_P_hy_s_ic_is_t-~---'J_~llf.~~)~-~-'-------+--3-/1-5/_1_8.--~

~) L

BRANCH CHIEF Art Burritt, Chief, CIRDA I 3/(:/18

~JJ\~

  • NRC FORM 591M PART 1 (07-2012) (RI Rev. 09/12/2013) G:\WordDocs\Current\lnsp Record\R52-25266-01.2018-001 591 M-Part1 .doc

SUNSI Review Completed By: / RA I CG 0 Public Q Non-Sensitive

This document becomes an NRC Official Agency Record once it is signed by the Branch Chief