{{#Wiki_filter:Code of Federal Regulations
{{#Wiki_filter:June 14, 2018 Mr. Doug Roszman Quality Assurance Manager Hayward-Tyler, Inc.
46 Roosevelt Hwy.
Colchester, VT 05446


/RA/ AArmstrong for}}
==SUBJECT:==
VENDOR INSPECTION OF HAYWARD-TYLER, INC.
Mr. Roszman:
This letter documents the U.S. Nuclear Regulatory Commission (NRC) staffs plan to perform an inspection of Hayward-Tyler Inc., at your Colchester facility to review implementation of your quality assurance program in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix B and 10 CFR Part 21. Specifically, the quality assurance program and Part 21 implementation, will be reviewed as they pertain to Hayward-Tyler, Inc.s: design, qualification, commercial grade dedication, and manufacturing of safety related pumps and other equipment for operating nuclear power plants. Also, the inspection will review the activities that address the Notices of Noncompliance (NONs) from the previous NRC inspection.
As discussed through conference call on June 6, 2018, the inspectors plan to arrive at the Colchester, VT facility, on Monday, July 16, 2018, and will conduct the inspection through Friday, July 20, 2018. Subsequent to the inspection, a report will be issued and transmitted to you via letter. The lead inspector for this effort is Jonathan Ortega; you may contact him at 301-415-1159 or via electronic mail at Jonathan.Ortega-Luciano@nrc.gov; or Thomas Herrity at (301) 415-2351 or Thomas.Herrity@nrc.gov.
This inspection activity has been assigned the following docket number: 999-00345. Please reference this number on any correspondence relating to this inspection activity sent to the NRC.
Sincerely,
                                              /RA/ AArmstrong for Kerri A. Kavanagh, Chief Quality Assurance Vendor Inspection Branch-2 Division of Construction Inspection and Operational Programs Office of New Reactors Docket No.: 99900345
 
ML18163A321                        NRO-002 OFFICE    NRO/DCIP/QVIB-2            NRO/DCIP/QVIB-2 NAME      JOrtega-Luciano (AKeim for) KKavanagh (AArmstrong for)
DATE      06/14/18                    06/14/18}}

Latest revision as of 23:27, 20 October 2019

Vendor Inspection of Hayward-Tyler, Inc
ML18163A321
Person / Time
Site: 99900345
Issue date: 06/14/2018
From: Kerri Kavanagh
NRC/NRO/DCIP/QVIB2
To: Roszman D
Hayward Tyler
Herrity T, NRO/DCIP
References
Download: ML18163A321 (2)


Text

June 14, 2018 Mr. Doug Roszman Quality Assurance Manager Hayward-Tyler, Inc.

46 Roosevelt Hwy.

Colchester, VT 05446

SUBJECT:

VENDOR INSPECTION OF HAYWARD-TYLER, INC.

Mr. Roszman:

This letter documents the U.S. Nuclear Regulatory Commission (NRC) staffs plan to perform an inspection of Hayward-Tyler Inc., at your Colchester facility to review implementation of your quality assurance program in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix B and 10 CFR Part 21. Specifically, the quality assurance program and Part 21 implementation, will be reviewed as they pertain to Hayward-Tyler, Inc.s: design, qualification, commercial grade dedication, and manufacturing of safety related pumps and other equipment for operating nuclear power plants. Also, the inspection will review the activities that address the Notices of Noncompliance (NONs) from the previous NRC inspection.

As discussed through conference call on June 6, 2018, the inspectors plan to arrive at the Colchester, VT facility, on Monday, July 16, 2018, and will conduct the inspection through Friday, July 20, 2018. Subsequent to the inspection, a report will be issued and transmitted to you via letter. The lead inspector for this effort is Jonathan Ortega; you may contact him at 301-415-1159 or via electronic mail at Jonathan.Ortega-Luciano@nrc.gov; or Thomas Herrity at (301) 415-2351 or Thomas.Herrity@nrc.gov.

This inspection activity has been assigned the following docket number: 999-00345. Please reference this number on any correspondence relating to this inspection activity sent to the NRC.

Sincerely,

/RA/ AArmstrong for Kerri A. Kavanagh, Chief Quality Assurance Vendor Inspection Branch-2 Division of Construction Inspection and Operational Programs Office of New Reactors Docket No.: 99900345

ML18163A321 NRO-002 OFFICE NRO/DCIP/QVIB-2 NRO/DCIP/QVIB-2 NAME JOrtega-Luciano (AKeim for) KKavanagh (AArmstrong for)

DATE 06/14/18 06/14/18