ML18254A225: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 09/11/2018
| issue date = 09/11/2018
| title = Inspection Manual Change Notice 18-031
| title = Inspection Manual Change Notice 18-031
| author name = Curran B T
| author name = Curran B
| author affiliation = NRC/NRR/DIRS/IRGB
| author affiliation = NRC/NRR/DIRS/IRGB
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket =  
| docket =  
| license number =  
| license number =  
| contact person = Curran B T
| contact person = Curran B
| case reference number = CN 18-031
| case reference number = CN 18-031
| package number = ML18254A122
| package number = ML18254A122
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:NRC INSPECTION MANUAL                                              DIRS Change Notice 18-031 DELETED:                                          TRANSMITTED:
Number                        Date              Number                        Date
: 1. IMC 2201 App A                11/09/16          IMC 2201 App A                09/11/18
: 2. OpESS 2007/02 Rev 2            12/20/06          OpESS 2007/02 Rev 3          09/11/18
: 3. OpESS 2007/03 Rev 2            09/12/08          OpESS 2007/03 Rev 3          09/11/18 TRAINING:      No special training is required for any documents issued with this Change Notice.
REMARKS:        IMC 2201 Appendix A, Security Baseline Inspection Program, has been revised in response to Staff Requirements - SECY 16-0073 and reviewed for redundancy and efficiencies in the IP 71130 series for power reactors.
OpESS 2007/02 Revision 3, Analysis of Flooding Vulnerabilities, has been revised to include post-Fukushima flooding walkdown lessons learned and include recent events and associated findings from IN 2015-01.
OpESS 2007/03 Revision 3, Crane and Heavy Lift Inspection, Supplemental Guidance to IP 71111.20, has been revised to include guidance on managing planned activities including those conducted by vendors/contractors.
DISTRIBUTION:
Standard Official Use Only (OUO)-Security Related Information.
Please contact: _______________ Phone: ________
END Issue Date: 09/11/18                              1                                      18-031}}

Latest revision as of 15:52, 20 October 2019

Inspection Manual Change Notice 18-031
ML18254A225
Person / Time
Issue date: 09/11/2018
From: Bridget Curran
NRC/NRR/DIRS/IRGB
To:
Curran B
Shared Package
ML18254A122 List:
References
CN 18-031
Download: ML18254A225 (1)


Text

NRC INSPECTION MANUAL DIRS Change Notice 18-031 DELETED: TRANSMITTED:

Number Date Number Date

1. IMC 2201 App A 11/09/16 IMC 2201 App A 09/11/18
2. OpESS 2007/02 Rev 2 12/20/06 OpESS 2007/02 Rev 3 09/11/18
3. OpESS 2007/03 Rev 2 09/12/08 OpESS 2007/03 Rev 3 09/11/18 TRAINING: No special training is required for any documents issued with this Change Notice.

REMARKS: IMC 2201 Appendix A, Security Baseline Inspection Program, has been revised in response to Staff Requirements - SECY 16-0073 and reviewed for redundancy and efficiencies in the IP 71130 series for power reactors.

OpESS 2007/02 Revision 3, Analysis of Flooding Vulnerabilities, has been revised to include post-Fukushima flooding walkdown lessons learned and include recent events and associated findings from IN 2015-01.

OpESS 2007/03 Revision 3, Crane and Heavy Lift Inspection, Supplemental Guidance to IP 71111.20, has been revised to include guidance on managing planned activities including those conducted by vendors/contractors.

DISTRIBUTION:

Standard Official Use Only (OUO)-Security Related Information.

Please contact: _______________ Phone: ________

END Issue Date: 09/11/18 1 18-031