ML19056A364: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:NRC INSPECTION MANUAL                                                  DIRS Change Notice 19-008 DELETED:                                          TRANSMITTED:
Number                        Date                Number                          Date
: 1. IMC 0310                      12/04/14            IMC 0310                        02/25/19
: 2. IMC 0609 App H                05/06/04            IMC 0609 App H                  02/25/19 TRAINING:      No special training is required for any documents issued with this Change Notice.
REMARKS:        IMC 0310, Aspects Within the Cross Cutting Areas, has been revised based on the title change to IMC 0612 and other edits based on the NRC Style Guide, NUREG-1379 IMC 0609 Appendix H, Containment Integrity Significant Determination Process, has been revised to remove all references to obsolete Phase 2 system notebooks, add SRA to the list of people that can perform a Phase 3 analysis, add a reminder that SAPHIRE can now be used to perform LERF calculations, remove the step to multiply the LERF score by a factor of 3.3 from table 5.3 (now Table 6.3) since it is not correct to do so, revise Figure 5.1 (now Table 6.1) so it no longer mentions SDP Phase 2 notebooks, provide new definitions for close in population and effective evacuation, create a new Attachment 1 to provide guidance for assessing the timing of protective actions in detailed risk evaluations, address feedback form 0609H-2225, add a new section (Section 0609H-05) for C-SGTR, and revised Table 6.1 to add a row for Combustion Engineering plants. As a result of adding section 0609H-05, subsequent sections and table numbers were changed. Table 7.1 has been revised to add a new column for ice condenser flow blockage. Added a note to Tables 7.2 and 7.4 to provide more information on failure of multiple igniters for Ice Condenser and BWR Mark III plants. Added a new Section 01.05 regarding the use of licensee-provided LERF information. Revised definition for shutdown operation to better align with IMC 0609, Appendix G.
EDITORIAL REVISIONS FROM PREVIOUS CHANGE NOTICES (As Required):
DISTRIBUTION:
Standard Official Use Only (OUO)-Security Related Information.
Please contact: _______________ Phone: ________
END Issue Date: 02/25/19                                1                                        19-008}}

Latest revision as of 01:18, 20 October 2019

Inspection Manual Change Notice 19-008
ML19056A364
Person / Time
Issue date: 02/25/2019
From: Bridget Curran
NRC/NRR/DIRS/IRGB
To:
Curran B
Shared Package
ML19056A350 List:
References
CN 19-008
Download: ML19056A364 (1)


Text

NRC INSPECTION MANUAL DIRS Change Notice 19-008 DELETED: TRANSMITTED:

Number Date Number Date

1. IMC 0310 12/04/14 IMC 0310 02/25/19
2. IMC 0609 App H 05/06/04 IMC 0609 App H 02/25/19 TRAINING: No special training is required for any documents issued with this Change Notice.

REMARKS: IMC 0310, Aspects Within the Cross Cutting Areas, has been revised based on the title change to IMC 0612 and other edits based on the NRC Style Guide, NUREG-1379 IMC 0609 Appendix H, Containment Integrity Significant Determination Process, has been revised to remove all references to obsolete Phase 2 system notebooks, add SRA to the list of people that can perform a Phase 3 analysis, add a reminder that SAPHIRE can now be used to perform LERF calculations, remove the step to multiply the LERF score by a factor of 3.3 from table 5.3 (now Table 6.3) since it is not correct to do so, revise Figure 5.1 (now Table 6.1) so it no longer mentions SDP Phase 2 notebooks, provide new definitions for close in population and effective evacuation, create a new Attachment 1 to provide guidance for assessing the timing of protective actions in detailed risk evaluations, address feedback form 0609H-2225, add a new section (Section 0609H-05) for C-SGTR, and revised Table 6.1 to add a row for Combustion Engineering plants. As a result of adding section 0609H-05, subsequent sections and table numbers were changed. Table 7.1 has been revised to add a new column for ice condenser flow blockage. Added a note to Tables 7.2 and 7.4 to provide more information on failure of multiple igniters for Ice Condenser and BWR Mark III plants. Added a new Section 01.05 regarding the use of licensee-provided LERF information. Revised definition for shutdown operation to better align with IMC 0609, Appendix G.

EDITORIAL REVISIONS FROM PREVIOUS CHANGE NOTICES (As Required):

DISTRIBUTION:

Standard Official Use Only (OUO)-Security Related Information.

Please contact: _______________ Phone: ________

END Issue Date: 02/25/19 1 19-008