ML13050A197: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[PNO-I-13-001, D - Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo]]
| number = ML13050A197
| issue date = 02/19/2013
| title = PNO-I-13-001D - Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo
| author name = Bellamy R R
| author affiliation = NRC/RGN-I/DRP/PB5
| addressee name =
| addressee affiliation =
| docket = 05000293
| license number = DPR-035
| contact person = BELLAMY, RR
| document report number = PNO-I-13-001D
| document type = NRC Preliminary Notification of Event/Occurrence
| page count = 2
}}
 
=Text=
{{#Wiki_filter:February 19, 2013
 
PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE
- PNO-I-13-001D This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. Some of the information may not yet be fully verified or evaluated by the Region I staff (King of Prussia, PA)
 
Facility      Licensee Emergency Classification Entergy Nuclear Operations, Inc. _X_ Notification of Unusual Event Pilgrim Nuclear Power Station    ___ Alert Plymouth, MA      ___ Site Area Emergency  Docket No. 50-293    ___ General Emergency License No. DPR-35      ___ Not Applicable 
 
==SUBJECT:==
UPDATE - PILGRIM STATION: UNUSUAL EVENT DECLARED DUE TO  LOSS OF OFFSITE POWER DURING WINTER STORM NEMO This Preliminary Notification updates information discussed in PNO-I-13-001, PNO-I-13-001A, PNO-I-13-001B, and PNO-I-13-001C that discussed a Notification of Unusual Event declaration at Pilgrim Nuclear Power Station due to a loss of all three off-site power sources during Winter Storm Nemo. The licensee returned the plant to power operation on Friday, February 15, 2013, at 10:49 p.m. All three off-site power sources had been restored earlier in the week.
The NRC staff continues to closely follow Entergy's actions. NRC oversight is being conducted through the NRC's baseline inspection program.
 
Region I Public Affairs Officers have responded to media inquiries and have issued a press release. The NRC continues to keep the Commonwealth of Massachusetts and the Federal Emergency Management Agency (FEMA) informed of NRC and licensee response activities. The information presented herein has been discussed with Entergy and is current as of February 19, 2013, at 8:00 a.m. 
 
This preliminary notification is issued for information only and no further notification by the staff is anticipated.
ADAMS Accession Number:  ML 13050A197 CONTACT: Ron Bellamy, (610) 337-5200
 
ML 13050A197 SUNSI Review Non-Sensitive  Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/PAO  RI/SLO  RI/ORA NAME    RBellamy/RRB DRoberts/PRW DScrenci/ NSheehan for concurred via email  DTifft/ TCS for concurred via email DLew/DCL DATE 2/19  /13 2/ 19 /13 2/ 19 /13 2/19 /13 02/ 19 /13}}