ENS 54242: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 21: Line 21:
Due to the reactor protection system actuation while critical, this event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72(b)(2)(iv)(B) and in accordance with 10 CFR 50.72(b)(3)(iv)(A) as an event that results in a valid actuation of the AFW system.
Due to the reactor protection system actuation while critical, this event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72(b)(2)(iv)(B) and in accordance with 10 CFR 50.72(b)(3)(iv)(A) as an event that results in a valid actuation of the AFW system.
There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified."
There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified."
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/20190827en.html#en54242
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/20190828en.html#en54242
}}{{unit info
}}{{unit info
| Unit =  1  
| Unit =  1  

Revision as of 07:30, 28 August 2019

ENS 54242 +/-
Where
Sequoyah Tennessee Valley Authority icon.png
Tennessee (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-2.58 h-0.108 days <br />-0.0154 weeks <br />-0.00353 months <br />)
Opened: Robert Camenisch
02:34 Aug 27, 2019
NRC Officer: Andrew Waugh
Last Updated: Aug 27, 2019
54242 - NRC Website
Loading map...