| issue date = 08/31/2006 | | issue date = 08/31/2006 | ||
| title = Mid-cycle Performance Report and Inspection Plan - Three Mile Island Unit 1 | | title = Mid-cycle Performance Report and Inspection Plan - Three Mile Island Unit 1 | ||
| author name = Bellamy | | author name = Bellamy R | ||
| author affiliation = NRC/RGN-I/DRP/PB7 | | author affiliation = NRC/RGN-I/DRP/PB7 | ||
| addressee name = Crane C | | addressee name = Crane C | ||
| addressee affiliation = AmerGen Energy Co, LLC | | addressee affiliation = AmerGen Energy Co, LLC | ||
| docket = 05000289 | | docket = 05000289 | ||
Revision as of 12:33, 13 July 2019
| ML062430604 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 08/31/2006 |
| From: | Ronald Bellamy NRC/RGN-I/DRP/PB7 |
| To: | Crane C AmerGen Energy Co |
| bellamy r r | |
| References | |
| Download: ML062430604 (5) | |
Text
UNITE D STA TES NUCL EA R RE GULA TORY C OMMIS SI ON REGION I 475 AL LENDAL E ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-141 5 August 31, 2006 Mr. Christo pher M. C rane President and CEO AmerGen Energy C ompany, LLC 200 Ex elon Way, KSA 3-E Kennett Square, P A 19348 SUB JEC T: MID-CYCLE PERFORMANCE REVIEW AND INSPECTI ON PLAN - THREE MIL E IS LAN D UN IT 1 Dear Mr. C rane: On Augus t 9, 20 06, the NRC s taff compl eted i ts perfor mance r evie w of Thr ee M ile I sland Unit 1 for the first half of the cal endar year 2006 assessment cycle. Our technical s taff reviewed performance indica tors (PIs) for the most rec ent quarter and i nspection resu lts over the previous twelve months. The purpo se of this letter is to inform yo u of our assessment of your safet y perfo rmanc e during this peri od and our plans fo r fut ure inspe ctions a t your f acility.This performance rev iew and enclosed i nspection pl an do not i nclude phy sical protec tion information. A separat e letter designated and mar ked as "Exempt from Public Disclosure in accordance w ith 10 CFR 2.390" wi ll incl ude the phy sical protec tion revi ew and re sultant inspe ction plan. Plant performance for the most recent quarter at Three Mil e Island Un it 1 was within the Licensee R esponse col umn of the NRC' s Action M atrix, based on all i nspection findi ngs being class ified as hav ing v ery l ow sa fety si gnifica nce (Gre en) an d all PIs i ndica ting pe rformance at a level re quiring no addi tional NR C oversight (Gree n). Therefore, we p lan to condu ct the standa rd reac tor over sight process (ROP) ba seline insp ections at your f acility.The enclosed inspection plan detai ls the insp ections, les s those relate d to physi cal protectio n, scheduled th rough March 3 1, 2008. The i nspection pl an is prov ided to al low for the re solution of any schedu ling conflicts and personnel availa bility issues w ell in a dvance of in spector arriv al onsit e. Rou tine r eside nt ins pecti ons ar e not l isted due to their ongoi ng and conti nuous nature. The inspection s in the l ast nine months of the inspecti on plan are tentative and may be revised at th e end-of-cycle revie w.In accordance w ith 10 CFR 2.390 of the NR C's "Rules and Practice s," a copy o f this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or fr om the Publicly Available Records (PARS) component of NRC's document syste m (ADAMS).
ADAMS is accessi ble from the NRC Website at http://w ww.nrc.gov/readi ng-rm/ada ms.html (The Pu blic Elec tronic Readi ng Room).
C. M. Cran e 2 If circu mstance s aris e wh ich ca use us to cha nge the insp ectio n pla n, we wil l con tact y ou to discuss the c hange as soon as possibl
- e. Please contact me at 610
-337-5200 w ith any questio ns yo u may have regardi ng this lette r or the insp ectio n pla n. Sincere ly,/R A/Ronald R.
Bellamy, Chief Reactor Projects Branch 7 Divi sion of Reac tor Pro jects Docket No. 50-28 9 License No. DPR-50
Enclosure:
Thre e Mile Island, Uni t 1 Inspection
/ Activity Plan cc w/encl:
Chief Operating Officer, AmerGen Site Vice President - TM I Unit 1, AmerGen Plant M anager - TMI, Uni t 1, AmerGen Regulatory A ssurance M anager - TMI, Uni t 1, AmerGen Senior Vi ce President - Nuclear Se rvices, AmerGen Vice Presi dent - Mi d-Atlantic Ope rations, AmerGen Vice Presi dent - Operation s Support, AmerGen Vice Presi dent - Licens ing and Regula tory Affairs, AmerGen Director Lice nsing - AmerGen Manager Li censing - TMI, A merGen Vice Presi dent - General Counsel an d Secretary, AmerGen T. O'Neill, A ssociate Genera l Counsel , Exelon Generation Compa ny J. Fewell , Esq., Assistant Gen eral Counse l, Exelo n Nuclear Correspondence Control De sk - AmerGen Chair man, Bo ard of C ounty Commis sione rs of Da uphin Count y Chairman, Board of Supervisors of Londonderry Township R. Janati, Director, Bureau of Radiation Protection, State of PA J. Johnsrud, Na tional Ene rgy Committee E. Epstein, TMI-Alert (TMIA)
D. Allard, PADEP C. M. Cran e 3 Distribution w/encl:
S. Collins, RA M. Dapas, DRA B. Holian, DRP D. Lew, DRP R. Bellamy, DRP R. Fuhrmeister, DRP A. Rosebrook, DRP D. Kern, DRP , Senior Re sident Inspecto r J. Brand, DRP , Resident In spector TMI Re siden t OA B. Sos a, RI OE DO R. Laufer, NRR F. Saba, PM, NRR DRS Directo r, Region I DRS Deputy Director, Regi on I DRS Branch Chiefs (6)
RidsNrrDip mIipb@nrc.gov Instit ute of N uclea r Pow er Oper ation s (INP O)Region I Docket R oom (with c oncurrences)
SUNSI Rev iew Complete: ____RRB_
______ (Rev iewer's Initials)
D O C U M EN T NA M E: S:\R O P 7 M id C ycle Re vie w\2 00 6 R O P7 M id-C ycle Le tter s\T M I 20 06 M id-C ycle Lett er.wpd To re ceive a cop y of thi s docu ment, i ndicat e in t he box: " C" = Copy w ithout attachment/enclo sure " E" = Copy w ith attachment/enclosur e " N" = No copy OFFICE RI/DRP RI/DRP NAME ARosebrook/AAR RBellamy/RRB DATE 7/31/06 8/29/06 OFFICIAL RECORD COPY
Three Mile Island 1 Inspection / Activity Plan 07/01/2006
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/31/2006 09:45:53 Report 22 3 MODS-MODS AND 50.59 Baseline Inspections 07/24/2006 07/28/2006 1 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 07/24/2006 07/28/2006 1 7111117B IP Permanent Plant Modifications 2 71114-EP PRGM INSP & PI VERIFICATION Baseline Inspections 07/17/2006 07/21/2006 1 7111402 IP Alert and Notification System Testing Baseline Inspections 07/17/2006 07/21/2006 1 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 07/17/2006 07/21/2006 1 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 07/17/2006 07/21/2006 1 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 07/17/2006 07/21/2006 1 71151 IP Performance Indicator Verification 1 7112203-PUB RAD SAFETY - REMP Baseline Inspections 08/28/2006 09/01/2006 1 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 2 TI-169-MSPI VERIFICATION Safety Issues 09/01/2006 11/15/2006 1 2515/169 IP Mitigating Systems Performance Index Verification 1 71121-OCC RAD PROT Baseline Inspections 11/06/2006 11/10/2006 1 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/06/2006 11/10/2006 1 7112102 IP ALARA Planning and Controls Baseline Inspections 11/06/2006 11/10/2006 1 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 11/06/2006 11/10/2006 1 71151 IP Performance Indicator Verification 7 7111121-CDBI (COMPONENT DESIGN BASES INSPECTION)
Baseline Inspections 01/08/2007 01/12/2007 1 7111121 IP Component Design Bases Inspection Baseline Inspections 01/22/2007 01/26/2007 1 7111121 IP Component Design Bases Inspection Baseline Inspections 02/05/2007 02/09/2007 1 7111121 IP Component Design Bases Inspection Baseline Inspections 02/12/2007 02/16/2007 1 7111121 IP Component Design Bases Inspection 5 7111111B-L.O. REQUAL. PROG. + P/F REVIEW Baseline Inspections 02/19/2007 02/23/2007 1 7111111B IP Licensed Operator Requalification Program Baseline Inspections 02/26/2007 03/02/2007 1 7111111B IP Licensed Operator Requalification Program 1 7111112-MAINTENANCE RULE INSP Baseline Inspections 02/26/2007 03/02/2007 1 7111112B IP Maintenance Effectiveness 3 4/23+EXM-OPERATOR LICENSING INITIAL EXAMS Not Applicable 03/26/2007 03/30/2007 1 U01603 TMI INITIAL EXAM (6/07)
Not Applicable 04/23/2007 05/04/2007 1 U01603 TMI INITIAL EXAM (6/07) 1 71121-OCC RAD SAFETY Baseline Inspections 03/05/2007 03/09/2007 1 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/05/2007 03/09/2007 1 7112102 IP ALARA Planning and Controls Baseline Inspections 03/05/2007 03/09/2007 1 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Three Mile Island 1 Inspection / Activity Plan 07/01/2006
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/31/2006 09:45:53 Report 22 4 7111401-EP EXERCISE & PI VERIFICATION Baseline Inspections 04/16/2007 04/20/2007 1 7111401 IP Exercise Evaluation Baseline Inspections 04/16/2007 04/20/2007 1 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 04/16/2007 04/20/2007 1 71151-EP02 IP ERO Drill Participation Baseline Inspections 04/16/2007 04/20/2007 1 71151-EP03 IP Alert & Notification System 1 7112201-PUB RAD PROT - RETS Baseline Inspections 05/14/2007 05/18/2007 1 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1 7112202-PUB RAD SAFETY - RADWASTE Baseline Inspections 08/20/2007 08/24/2007 1 7112202 IP Radioactive Material Processing and Transportation 1 71121-OCC RAD SAFETY Baseline Inspections 10/01/2007 10/05/2007 1 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/01/2007 10/05/2007 1 7112102 IP ALARA Planning and Controls Baseline Inspections 10/01/2007 10/05/2007 1 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1 7111108P-IN-SERVICE INSPECTION Baseline Inspections 10/30/2007 11/02/2007 1 7111108P IP Inservice Inspection Activities - PWR Baseline Inspections 11/13/2007 11/16/2007 1 7111108P IP Inservice Inspection Activities - PWR 2 7111107-HEAT SINK INSP Baseline Inspections 11/05/2007 11/09/2007 1 7111107B IP Heat Sink Performance 1 71121-OCC RAD SAFETY Baseline Inspections 11/05/2007 11/09/2007 1 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/05/2007 11/09/2007 1 7112102 IP ALARA Planning and Controls Baseline Inspections 11/05/2007 11/09/2007 1 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1 TI-166-CONTAINMENT SUMP MODIFICATIONS Safety Issues 11/12/2007 11/19/2007 1 2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
1 71121-OCC RAD SAFETY Baseline Inspections 12/03/2007 12/07/2007 1 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 12/03/2007 12/07/2007 1 7112102 IP ALARA Planning and Controls Baseline Inspections 12/03/2007 12/07/2007 1 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 12/03/2007 12/07/2007 1 71151 IP Performance Indicator Verification 1 71121-OCC RAD SAFETY Baseline Inspections 03/03/2008 03/09/2008 1 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/03/2008 03/09/2008 1 7112102 IP ALARA Planning and Controls Baseline Inspections 03/03/2008 03/09/2008 1 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 4 71152B-PI&R Baseline Inspections 03/31/2008 04/04/2008 1 71152B IP Identification and Resolution of Problems This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.