| issue date = 10/11/2006
| issue date = 10/11/2006
| title = Draft Regulatory Guide DG-1164, Meteorological Monitoring Programs for Nuclear Power Plants (Proposed Revision 1 of Regulatory Guide 1.23)
| title = Draft Regulatory Guide DG-1164, Meteorological Monitoring Programs for Nuclear Power Plants (Proposed Revision 1 of Regulatory Guide 1.23)
| author name = Harvey R B
| author name = Harvey R
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
| addressee name =  
| addressee name =  

Revision as of 13:10, 13 July 2019

Draft Regulatory Guide DG-1164, Meteorological Monitoring Programs for Nuclear Power Plants (Proposed Revision 1 of Regulatory Guide 1.23)
ML062540408
Person / Time
Issue date: 10/11/2006
From: Harvey R
Office of Nuclear Reactor Regulation
To:
Harvey Brad , SPSB/DSSA/NRR, 415-4118
References
DG-1164 RG-1.023, Rev 1
Download: ML062540408 (24)


Text

This regulatory guide is being issued in draft form to involve the public in the early stages of the development of a regulatory positionin this area. It has not received staff review or approval and does not represent an official NRC staff position.Public comments are being solicited on this draft guide (including any implementation schedule) and its associated regulatoryanalysis or value/impact statement. Comments should be accompanied by appropriate supporting data. Written comments may besubmitted to the Rules and Directives Branch, Office of Administration, U.S. Nuclear Regulatory Commission, Washington, DC20555-0001. Comments may be submitted electronically through the NRC's interactive rulemaking Web page athttp://www.nrc.gov/what-we-do/regulatory/rulemaking.html. Copies of comments received may be examined at the NRC'sPublic Document Room, 11555 Rockville Pike, Rockville, MD. Comments will be most helpful if received by November 27, 2006

.Requests for single copies of draft or active regulatory guides (which may be reproduced) or placement on an automatic distribution listfor single copies of future draft guides in specific divisions should be made to the U.S. Nuclear Regulatory Commission,Washington, DC 20555, Attention: Reproduction and Distribution Services Section, or by fax to (301) 415-2289; or by emailto Distribution@nrc.gov. Electronic copies of this draft regulatory guide are available through the NRC's interactive rulemakingWeb page (see above); the NRC's public Web site under Draft Regulatory Guides in the Regulatory Guides document collectionof the NRC's Electronic Reading Room at http://www.nrc.gov/reading-rm/doc-collections/; and the NRC's Agencywide DocumentsAccess and Management System (ADAMS) at http://www.nrc.gov/reading-rm/adams.html, under Accession No. ML062540408.

U.S. NUCLEAR REGULATORY COMMISSION October 2006OFFICE OF NUCLEAR REACTOR REGULATION Division 1 DRAFT REGULATORY GUIDEContact: R.B. Harvey(301) 415-4118DRAFT REGULATORY GUIDE DG-1164[Third Proposed Revision 1 of Regulatory Guide 1.23 (Safety Guide 23), dated February 1972]METEOROLOGICAL MONITORING PROGRAMSFOR NUCLEAR POWER PLANTSA. INTRODUCTIONFor stationary power reactor site applications submitted before January 10, 1997, Title 10,Section 100.10(c)(2), of the Code of Federal Regulations [10 CFR 100.10(c)(2)] states thatmeteorological conditions at the site and in the surrounding area should be considered in determining the acceptability of a site for a power reactor. As an aid in evaluating a proposed site, 10 CFR 100.11(a)states that meteorological conditions pertinent to the site should be used, along with an assumed fission product release from the core and the expected containment leak rate, to ensure that prescribed dose limits for the exclusion area and low-population zone, as defined in 10 CFR 50.2, "Definitions," are met.For stationary power reactor site applications submitted on or after January 10, 1997,10 CFR 100.20(c)(2) requires consideration of the meteorological characteristics of the site that are necessary for safety analysis or that may have an impact upon plant design in determining the acceptability of a site for a nuclear power plant. In addition, 10 CFR 100.21(c) requires the evaluationof site atmospheric dispersion characteristics and the establishment of dispersion parameters such that (1) radiological effluent release limits associated with normal operation from the type of facility proposed to be located at the site can be met for any individual located off site, and (2) radiological doseconsequences of postulated accidents meet the prescribed dose limits at the exclusion area and low-population zone distances set forth in 10 CFR 50.34(a)(1).

1The ERDS is a direct, near-real-time electronic data link between the licensee's onsite computer system and the NRCOperations Center that provides for the automated transmission of a limited data set of selected plant parameters in theevent of a radiological emergency.DG-1164, Page 2The "General Design Criteria [GDC] for Nuclear Power Plants" set forth in Appendix Ato 10 CFR Part 50, "Domestic Licensing of Production and Utilization Facilities," establish minimum requirements for the principal design criteria for water-cooled nuclear power plants. Specifically, GDC 19, "Control Room," of Appendix A requires that a control room be provided from which actions can be taken to operate the nuclear power unit safely under normal conditions and to maintain it in a safe condition under accident conditions. Adequate radiation protection must be provided to permit access to and occupancy of the control room for the duration of accident conditions. For plants that use alternate source terms, 10 CFR 50.67(b)(2)(iii) provides similar criteria. Atmospheric dispersion estimates are significant inputs in assessments performed to demonstrate compliance with this requirement.In 10 CFR Part 50, Paragraphs 50.47(b)(4), 50.47(b)(8), and 50.47(b)(9), as well asSection IV.E.2 of Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities," require each applicant for an operating license or combined license to describe its plans for coping with radiological emergencies. These plans must include provisions for equipment for determining the magnitude and continuously assessing the impact of the release of radioactive materials to the environment. These plans must also include a standard emergency classification and action level scheme for determining minimum initial offsite response measures. In addition, if plant meteorological program parameters (i.e., wind speed, wind direction, and an indicator of atmospheric stability) are available on in-plant computer systems, they must be made available in a digital data stream to the Emergency Response Data System (ERDS) maintained by the U.S. Nuclear Regulatory Commission (NRC), pursuant to Section VI of Appendix E to 10 CFR Part 50.

1 In this regard, it is necessary for theapplicant to establish and maintain a meteorological program capable of rapidly assessing critical meteorological parameters.In addition, in 10 CFR Part 50, Appendix I, "Numerical Guides for Design Objectivesand Limiting Conditions for Operation to Meet the Criterion 'As Low as is Reasonably Achievable' for Radioactive Material in Light-Water-Cooled Nuclear Power Reactor Effluents," provides numerical guidance for the design objectives of equipment intended to control releases of radioactive material in effluents from nuclear power reactors. An assessment of the maximum potential annual radiation dose to the public resulting from the routine release of radioactive materials in gaseous effluents is required to assist in demonstrating that operations will be or are being conducted within the limits of 10 CFR Part 20, "Standards for Protection Against Radiation," and Appendix I to 10 CFR Part 50 and to ensure that effluent control equipment design objectives and proposed operating procedures meet the Commission's requirements for keeping levels of radioactive material in effluents to unrestricted areas as low as practicable. In addition, 10 CFR 50.36a(a)(2) requires nuclear power plant licensees to submit a report to the Commission annually that specifies the quantity of each of the principal radionuclides released to unrestricted areas in liquid and gaseous effluents during the previous 12 months, including any other information that the Commission may need to estimate maximum potential annual radiation doses to the public resulting from effluent releases. A knowledge of meteorological conditions in the vicinity of thereactor is important to provide the basis for estimating maximum potential annual radiation doses resulting from radioactive materials released in gaseous effluents.

DG-1164, Page 3In order for the Commission to fulfill its responsibilities under the National EnvironmentalPolicy Act of 1969, as amended, and in accordance with the requirements of Subpart A, "National Environmental Policy Act - Regulations Implementing Section 102(2)," of 10 CFR Part 51, "Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions,"

basic meteorological information must be available for use in assessing (1) the environmental effects of radiological and nonradiological emissions and effluents resulting from the construction or operation of anuclear power plant and (2) the benefits of design alternatives.Thus, each nuclear power plant site has multiple needs for an onsite program to measure anddocument basic meteorological data. These data may be used to develop atmospheric transport and diffusion parameters that, with appropriate atmospheric dispersion models, may be used to estimate potential radiation doses to the public resulting from actual routine or accidental releases of radioactive materials to the atmosphere or to evaluate the potential dose to the public and control room as a result of hypothetical reactor accidents. These data may also be used to assess nonradiological environmental effects resulting from the construction or operation of a nuclear power plant, such as the impacts of the plant's heat dissipation system. This regulatory guide describes a suitable onsite program to provide meteorological data needed to estimate these potential impacts.The NRC issues regulatory guides to describe to the public methods that the staff considersacceptable for use in implementing specific parts of the agency's regulations, to explain techniques that the staff uses in evaluating specific problems or postulated accidents, and to provide guidance to applicants. Regulatory guides are not substitutes for regulations, and compliance with regulatory guides is not required. The NRC issues regulatory guides in draft form to solicit public comment and involve the public in developing the agency's regulatory positions. Draft regulatory guides have not received complete staff review and, therefore, they do not represent official NRC staff positions.This regulatory guide contains information collections that are covered by the requirementsof 10 CFR Parts50 and 52, which the Office of Management and Budget (OMB) has approved under OMB control numbers 3150-0011 and 3150-0151, respectively. The NRC may neither conduct nor sponsor,and a person is not required to respond to, an information collection request or requirement unless the requesting document displays a currently valid OMB control number.

2Regulatory Guide 1.145, "Atmospheric Dispersion Models for Potential Accident Consequence Assessments atNuclear Power Plants," Revision 1, issued November 1982, provides specific guidance on atmospheric dispersion modeling for evaluating the potential offsite radiological consequences of design-basis reactor accidents.

3Regulatory Guide 1.111, "Methods for Estimating Atmospheric Transport and Dispersion of Gaseous Effluents in Routine Releases from Light-Water-Cooled Reactors," Revision 1, issued July 1977, provides specific guidance onatmospheric dispersion modeling for evaluating the potential offsite radiological consequences of routine releases frompower reactors.

4Regulatory Guide 1.194, "Atmospheric Relative Concentrations for Control Room Radiological HabitabilityAssessments at Nuclear Power Plants," issued June 2003, provides specific guidance on atmospheric dispersion modeling for design-basis control room radiological habitability assessment. Regulatory Guide 1.78, "Evaluating the Habitability of a Nuclear Power Plant Control Room During a Postulated Hazardous Chemical Release," Revision 1,issued December 2001, provides guidance on assessing the habitability of the control room during and after apostulated external release of hazardous chemicals.DG-1164, Page 4B. DISCUSSIONAn onsite meteorological measurements program at a nuclear power plant site should be capableof providing the meteorological information needed to make the following assessments:*a conservative assessment by both the applicant and the regulatory staff of the potentialdispersion of radioactive material from, and the radiological consequences of, design-basis accidents to aid in evaluating the acceptability of a site and the adequacy of engineered safety features for a nuclear power plant in accordance with 10 CFR Part 100 criteria 2*an assessment by both the applicant and the regulatory staff of the maximum potential annualradiation dose to the public resulting from the routine release of radioactive materials in gaseous effluents to assist in demonstrating that operations will be or are being conducted within the limits of 10 CFR Part 20 and Appendix I to 10 CFR Part 50, and to ensure that effluent control equipment design objectives and proposed operating procedures meet the Commission's requirements for keeping levels of radioactive material in effluents to unrestricted areas as low as practicable 3*a conservative assessment by both the applicant and the regulatory staff of the habitability of thecontrol room during postulated design-basis radiological accidents and hazardous chemical releases to demonstrate that the control room can remain occupied under accident conditions in accordance with GDC 19 4*a near-real-time ongoing assessment by the licensee of atmospheric transport and diffusionimmediately following an accidental release of airborne radioactive materials to provide input to the evaluation of the consequences of radioactive releases to the atmosphere and to aid in the implementation of emergency response decisions in accordance with the requirements in Appendix E to 10 CFR Part 50*an assessment by the licensee of natural phenomena being experienced or projected beyond usuallevels (e.g., high winds) for the purposes of emergency classification in accordance with 10 CFR 50.47(b)(4) and Section IV.B of Appendix E to 10 CFR Part 50 DG-1164, Page 5*a realistic assessment by both the applicant and the regulatory staff of the potential dispersion ofradioactive materials from, and the radiological consequences of, a spectrum of accidents to aid in evaluating the environmental risk posed by a nuclear power plant in accordance with Subpart A to 10 CFR Part 51*a realistic assessment by both the applicant and the regulatory staff of nonradiologicalenvironmental effects, such as fogging, icing, and salt drift from cooling towers or ponds, to aid in evaluating the environmental impact of a nuclear power plant in accordance with Subpart A to 10 CFR Part 51While the specific types of meteorological information needed differ for each of the aboveassessments, a single set of instruments can generally be used to obtain the basic data needed for all of them. For this reason, when establishing a meteorological program for an initial site survey, careful consideration should be given to the operational needs for meteorological information. In particular, care should be taken to locate the instrumentation where the measurements will accurately represent the overall site meteorology and, if possible, where singular topographic features and vegetation or the construction of additional structures at a later date will not significantly influence wind patterns.The minimum amount of meteorological data needed at docketing for a construction permit is arepresentative consecutive 12-month period. The minimum amount of meteorological data needed at docketing for an operating license, early site permit, or combined license that does not reference an early site permit is a representative consecutive 24-month period, including the most recent 1-year period.

However, 3 or more years of data are preferable and, if available, should be submitted with the application.

DG-1164, Page 6C. REGULATORY POSITIONThis section describes a suitable onsite program to collect the basic meteorological data neededto determine the environmental impacts of the plant, perform consequence assessments supporting routine release and design-basis accident evaluations, and support emergency preparedness programs and other applications at power reactor sites.1.DefinitionsCalm: Any wind speed below the starting threshold of the wind speed or direction sensor,whichever is greater.Dew Point: The temperature to which a given parcel of air must be cooled at constant pressureand constant water-vapor content in order for saturation to occur.Gaussian Plume Model: A basic atmospheric dispersion model that assumes that the plumespread has a Gaussian distribution in both the horizontal and vertical directions and, therefore, uses the standard deviations of plume concentration distribution in the horizontal ( y) and vertical ( z).Precipitation: Any of the forms of water particles, whether liquid or solid, that fall from theatmosphere and reach the ground.Relative Humidity: The ratio of the vapor pressure to the saturation vapor pressure with respectto water.Pasquill Stability Class: A classification of atmospheric stability, or the amount of turbulentmixing in the atmosphere and its effect on effluent dispersion.Starting Threshold: The minimum wind speed above which the measuring instrument isperforming within its minimum specification.System Accuracy: The amount by which a measured variable deviates from a value accepted astrue or standard. System accuracy encompasses all the components of the system, from sensors through processors, data recorders, and displays.System Calibration: The process of validating the output of an observing system against knownreference observations or standards.Temperature: A measure of the hotness or coldness of the ambient air as measured by a suitableinstrument.Vertical Temperature Difference (T): The measured difference in air temperature between twoelevations on the same tower. It is defined as the upper level temperature measurement minus the lower level temperature measurement.Water Equivalent: The amount of water, in inches, measured at ground level from rain and/ormelted frozen precipitation (e.g., snow, freezing precipitation).

5The 10-meter (33-foot) level is generally accepted throughout the world as a standard meteorological referencemeasurement level. The 60-meter (197-foot) level generally coincides with assumptions regarding releases from light-water reactors. A measurement height other than 60 meters (197 feet) may be appropriate for those plants where themost probable atmospheric release height is other than 60 meters (197 feet).

6Vertical temperature difference is the preferred method for determining Pasquill stability classes at nuclear power plants for licensing purposes because it is an effective indicator for the worst case stability conditions (e.g., Pasquillstability classes E, F, and G), and certain Gaussian plume models endorsed by the NRC (such as the models referenced in Regulatory Guides 1.145 and 1.194) are based on empirically derived plume meander factors from field tr acerstudies that used T to classify atmospheric stability. Alternative methods may be used to classify atmosphericstability if appropriate justification is provided. However, the use of alternative methods to classify atmospheric stability may require modifications of the models described in Regulatory Guides 1.145 and 1.194.DG-1164, Page 7Wet-Bulb Temperature: The lowest temperature an air parcel could achieve if cooled by therelease of latent heat caused by evaporation of all its available moisture. The bigger the difference between the actual temperature (or dry-bulb temperature) and the wet-bulb temperature, the relatively drier the air.Wind Direction: The direction from which the wind is blowing. Wind direction is reported indegrees azimuth, measured clockwise from true north and ranging from 0 to 360 (e.g., north is 0 or 360, east is 90, etc.).Wind Speed: The rate at which air is moving horizontally past a given point.2.Meteorological ParametersThis section discusses the criteria for a basic meteorological monitoring system.Wind speed, wind direction, and vertical temperature difference should be measured on oneopen-lattice tower or mast. Wind speed and wind direction should be measured at heights of approximately 10 meters (33 feet) and 60 meters (197 feet) above ground level and at a representative level for releases significantly greater than 60 meters (197 feet).

5 Vertical temperature difference (T)should be measured between the 10-meter (33-foot) level and 60-meter (197-foot) levels and, if necessary, between the 10-meter (33-foot) level and a higher level that is representative of diffusion conditions from release points significantly greater than 60 meters (197 feet).

6 Table 1 provides adefinition of Pasquill stability classes as a function of T.

7While routine release or design-basis accident assessments of offsite dose consequences do not typically considerprecipitation, the presence or absence of precipitation and its amount are important for severe accident assessments that are included in the applicant's environmental report and the staff's environmental impact assessment pursuant toSubpart A to 10 CFR Part 51. Severe accident dose consequence computer codes, such as Version 2 of the MELCOR Accident Consequence Code System (MACCS2) (see D. Chanin and M.L. Young), account for the efficient removal of particulate radionuclides from the plume by wet deposition.

8For example, trees 15 meters (49 feet) in height should be no closer than 150 meters (492 feet) from the tower or mast.DG-1164, Page 8Table 1. Classification of Atmospheric StabilityStabilityClassificationPasquillStability CategoryTemperature changewith height (C/100m)Extremely unstableAT 1.9Moderately unstableB1.9 < T 1.7Slightly unstableC1.7 < T 1.5NeutralD1.5 < T 0.5Slightly stableE0.5 < T 1.5Moderately stableF1.5 < T 4.0Extremely stableGT > 4.0Ambient temperature should be monitored at approximately 10 meters (33 feet). Precipitationshould be measured at ground level near the base of the mast or tower.

7 At sites where there is apotential for fogging or icing from the release of water vapor caused by plant operations (e.g., because of the operation of a cooling tower or cooling pond), instrumentation should be provided for measuring temperature and humidity (e.g., dew point, wet-bulb temperature, or relative humidity) at heights representative of water-vapor release.3.Siting of Meteorological InstrumentsTo the extent practical, meteorological measurements should be made in locations that canprovide data representative of the atmospheric conditions into which material will be released and transported. The tower or mast should be sited at approximately the same elevation as finished plant grade. Factors to be considered in selecting the appropriate measurement locations and installation of the instruments include the prevailing wind direction, the topography, and the location of manmade and vegetation obstructions.Whenever possible, wind measurements should be made at locations and heights that avoidairflow modifications by obstructions such as large structures, trees, or nearby terrain with heights exceeding one-half the height of the wind measurement. The separation between the wind sensor and such obstructions should be 10 times the obstruction height.

8 Wind sensors should be located on top ofthe measurement tower or mast or extended outward on a boom to reduce airflow modification and turbulence induced by the supporting structure itself.

DG-1164, Page 9Because the tower structure can affect downwind measurements, sensors on the side of a towershould be mounted at a distance equal to at least twice the longest horizontal dimension of the tower (e.g., the side of a triangular tower). The sensors should be on the upwind side of the mounting object in areas with a dominant prevailing wind direction. In areas with two distinct prevailing wind directions(e.g., mountain valleys), the sensors should be mounted in a direction perpendicular to the primary two directions.Air temperature and humidity measurements should be made to avoid air modification by heatand moisture sources (e.g., ventilation sources, cooling towers, water bodies, large parking lots). For this reason, the tower or mast should not be located on or near permanent manmade surfaces, such as concrete or asphalt, or temporary land disturbances, such as coal piles, plowed fields, or storage areas.

Temperature sensors should be mounted in fan-aspirated radiation shields to minimize the adverse influences of thermal radiation and precipitation. The aspirated temperature shields should either be pointed downward or laterally towards the north.Precipitation gauges should be equipped with wind shields to minimize the wind-caused loss ofprecipitation. Where appropriate, precipitation gauges should also be equipped with heaters to measure water equivalent during freezing conditions.4.Instrument Accuracy and RangeThe time-average accuracies for digital systems should meet the criteria listed in Table 2. These accuracies are stated in terms of overall system accuracies and should include, where applicable, the errors introduced by sensors, cables, signal conditioners, temperature environments for signal conditioning and recording equipment, recorders, processors, data displays, and the data reduction process.The instrumentation should be capable of operating over the expected range of climaticconditions based on regional climatology.If the accuracies of the signal conditioning equipment and/or data acquisition system aresensitive to changes in temperature, they should be housed in a climate-controlled environment.

9The use of redundant sensors and/or recorders is an acceptable approach to achieve the 90-percent data recovery goal.DG-1164, Page 10Table 2. Meteorological System Accuracies and ResolutionsMeasurementSystem AccuracyMeasurementResolutionWind Speed+/-0.22 m/s (+/-0.5 mph) for speeds < 2.2 m/s (5 mph)+/-5% for speeds 2.2 m/s (5 mph)starting threshold < 0.45 m/s (1 mph)0.1 m/s or 0.1 mphWind Direction+/-5 degreestarting threshold < 0.45 m/s (1 mph)1.0 degreeTemperature+/-0.5 C (+/-0.9 F)0.1 C or 0.1 FVertical TemperatureDifference+/-0.1 C (+/-0.18 F)0.01 C or 0.01 FDew Point+/-1.5 C (+/-0.27 F)0.1 C or 0.1 FWet-Bulb Temperature+/-0.5 C (+/-0.9 F)0.1 C or 0.1 FRelative Humidity+/-4%0.1%Precipitation(water equivalent)+/-10% for a volume equivalent to 2.54 mm (0.1 in.)of precipitation at a rate < 50 mm/h (<2 in./h)0.25 mm or 0.01 in.Time+/-5 min1 min5.Instrument Maintenance and Servicing SchedulesMeteorological instruments should be inspected and serviced at a frequency that will ensure datarecovery of at least 90 percent on an annual basis.

9 The 90-percent rate applies to the composite of allvariables (e.g., the joint frequency distribution of wind speed, wind direction, stability class) needed to model atmospheric dispersion for each potential release pathway. In addition, the 90-percent rate applies individually to the other meteorological parameters.Channel operability checks should be performed daily and channel calibrations should beperformed semiannually, unless the operating history of the equipment indicates that either more or less frequent calibration is necessary. System calibrations should encompass entire data channels and may be performed by a series of sequential, overlapping, or total channel steps such that each channel from sensors to recorders and displays is calibrated. Where applicable, guyed wires and anchors used to support guyed towers should be inspected annually.6.Data Reduction and CompilationMeteorological monitoring systems should use electronic digital data acquisition systems as theprimary data recording system. Data may be recorded and displayed in either English units (e.g., miles per hour, degrees Fahrenheit, inches) or metric units (e.g., meters per second, degrees Celsius, millimeters) and should meet the resolution criteria listed in Table 2.

10For those sites with a high frequency of low wind speeds, the joint frequency distributions of wind speed, winddirection, and atmospheric stability data should have a larger number of wind speed categories at the lower wind speeds to avoid having all the data listed in the lowest wind speed classes.

11For example, if the comparison of the primary and supplemental meteorological systems indicates convergencein a lake breeze setting, then a "keyhole" protective action recommendation may not be appropriate.DG-1164, Page 11A backup recording system (either analog or digital) may be used to provide a high assurance ofvalid data. Where analog data recording systems are used, wind speed and wind direction should be recorded on continuous trace strip charts. Other variables may be recorded on multipoint charts with a sampling rate of at least once per minute.The basic data should be compiled and archived as hourly values for use in historical climaticand dispersion analyses. Digital hourly values should consist of a sampling of data at intervals no longer than 60 seconds, and the mean values for the accumulated data should be determined using no less than 30 instantaneous values spaced equally over not less than a 15-minute period. The hourly values may be generated by using one 15-minute value per hour (if the same 15-minute period is used each hour) or by averaging all of the 15-minute values recorded during the hour. For precipitation, the hourly value should represent the total amount of precipitation (water equivalent) measured during the hour. Hourly maximum wind speed gust values may also be archived for use in the analysis of wind loading for the design of buildings and other structures. Appendix A shows the format for the electronic copy of the hourly database that should be submitted as a supplement to the application.The basic data should also be compiled into annual joint frequency distributions of wind speedand wind direction by atmospheric stability class. Table 3 gives an example of a suitable format for data compilation and reporting purposes. Similar tables of joint frequency distribution should be prepared for each of the other atmospheric stability classes.

10To aid in assessing the impact of plant operation on the environment, joint frequency distributiontypes of data summaries should be compiled, which will permit the description of the frequency and extent of fogging and icing conditions caused by plant operation.7.Special Considerations for Complex Terrain SitesThe plant's preoperational meteorological monitoring program should provide an adequate basisfor atmospheric transport and diffusion estimates for the exclusion area distance, the outer boundary of the low-population zone, and the hypothetical maximally exposed member of the public (e.g., the site boundary and the nearest resident, vegetable garden, and milk and meat animals within 8 kilometers (5 miles) in each downwind sector).At some sites, because of complex flow patterns in nonuniform terrain, additional wind andtemperature instrumentation and more comprehensive programs may be necessary. For example, the representation of circulation for a hill-valley complex or a site near a large body of water may need additional measuring points to determine airflow patterns and spatial variations of atmospheric stability.

Occasionally the unique diffusion characteristics of a particular site may also warrant the use of special meteorological instrumentation and/or studies.The plant's operational meteorological monitoring program should provide an adequate basis foratmospheric transport and diffusion estimates within the plume exposure emergency planning zone

[i.e., within approximately 16 kilometers (10 miles)].

11 DG-1164, Page 128.Special Considerations to Support Emergency PreparednessIn order to identify rapidly changing meteorological conditions for use in performing emergencyresponse dose consequence assessments, 15-minute average values should be compiled for real-time display in the appropriate emergency response facilities (e.g., control room, technical support center,and emergency operations facility). The 15-minute averaged values should be calculated using at least 30 equally spaced samples. All the meteorological channels required for input to the dose assessment models should be available and presented in a format compatible for input to the models. Regulatory Guide 1.97, "Criteria for Accident Monitoring Instrumentation for Nuclear Power Plants," Revision 4, issued June 2006, provides additional criteria for the display of meteorological data in control rooms.If the basis for any of the emergency action levels includes the monitoring of onsitemeteorological conditions (e.g., the occurrence of measured hurricane-force winds onsite as a basis for declaring an Unusual Event), the tower and its instrumentation should be capable of surviving, monitoring, and displaying the meteorological condition.If the plant computer system collects wind speed, wind direction, and atmospheric stability data,these data should be submitted as inputs to the NRC ERDS as provided for in Section VI of Appendix E to 10 CFR Part 50.The applicant should have provisions in place to obtain representative meteorological data fromalternative sources during an emergency if the site meteorological monitoring system is unavailable.9.DocumentationThe safety analysis report should document the onsite meteorological measurements program,in accordance with 10 CFR 50.34(a)(1) and 50.34(b)(1).

DG-1164, Page 13Table 3. Example Joint Frequency Distribution of Wind Direction,Wind Speed, and Stability ClassSite/Plant Name: Extremely Stable (T exceeds 4.0 C/100 m)Pasquill Stability Class GPeriod of Record: WindDirectionWind Speed (m/s) at Meter Level; T between Meters and Meters<0.50.5-1.01.1-1.51.6-2.02.1-3.03.1-4.04.1-5.05.1-6.06.1-8.08.1-10.0>10.0TOTAL N NNE NEENE EESE SE SSE S SSW SWWSW WWNW NW NNWVARIABLETotalNumber of Calms:Number of Missing Hours:Values in this table can be in counts or percent of total valid hours.

DG-1164, Page 14D. IMPLEMENTATIONThis section provides information to applicants and licensees regarding the NRC staff's plans forusing this draft regulatory guide. No backfitting is intended or approved in connection with its issuance.The NRC has issued this draft guide to encourage public participation in its development. Except in those cases in which an applicant or licensee proposes or has previously established an acceptable alternative method for complying with specified portions of the NRC's regulations, the methods to be described in the active guide will reflect public comments and will be usedin evaluating (1) submittals in connection with applications for construction permits, standard plant design certifications, operating licenses, early site permits, and combined licenses, and (2) submittals from operating reactor licensees who voluntarily propose to initiate system modifications if there is a clear nexus between the proposed modifications and the subject for which guidance is provided herein.

DG-1164, Page 15REGULATORY ANALYSIS1.Statement of the ProblemThe NRC issued the original version of Regulatory Guide 1.23 in February 1972 to describe asuitable onsite meteorological measurements program to collect the basic meteorological data needed to determine the environmental impacts of the plant, perform consequence assessments supporting routine release and design-basis accident evaluations, and support emergency preparedness programs and other applications at power reactor sites. That original issuance is currently the official version of Regulatory Guide 1.23. However, the NRC issued a proposed Revision 1 to Regulatory Guide 1.23 for public comment in September 1980 in response to the accident at Three Mile Island. That first proposed Revision 1 to Regulatory Guide 1.23 contained "special considerations for emergency planning," which included (1) provisions for remote interrogation of the meteorological system by the NRC and other emergency response organizations during emergency situations, and (2) a viable backup system to obtain real-time local meteorological data.Although the NRC never officially adopted its first proposed Revision 1 of Regulatory Guide1.23, the agency issued a second proposed Revision 1 for public comment in April 1986. That secondproposed Revision 1 endorsed, with some minor exceptions, the "Standard for Determining Meteorological Information at Nuclear Power Sites," which the American National Standards Institute/American Nuclear Society (ANSI/ANS) promulgated as ANSI/ANS-2.5-1984. Although ANSI/ANS-2.5-1984 did not contain the "special considerations for emergency planning" included in the first proposed Revision 1 of Regulatory Guide 1.23, it did update other provisions of the earlier revision.

Nonetheless, the NRC never officially adopted the second proposed Revision 1 of Regulatory Guide 1.23, and ANSI/ANS-2.5-1984 has since been withdrawn and is currently inactive.The agency has now drafted a third proposed Revision 1 of Regulatory Guide 1.23 to replacethe original (and still official) version of Regulatory Guide 1.23. As such, Draft Regulatory Guide DG-1164 clarifies regulatory requirements and updates regulatory guidance regarding the criteria for an onsite meteorological measurements program to collect the basic meteorological data needed to support plant licensing and operation. Compared to the original (and still official) version of Regulatory Guide 1.23, this proposed revision better reflects current regulatory requirements and best practices.2.ObjectiveThe objective of this regulatory action is to update the NRC's guidance with respect to the criteriafor an onsite meteorological measurements program for the collection of basic meteorological data needed to support plant licensing and operation. The updated regulatory guide better reflects current regulatory requirements and best practices compared to the original (and official) version of Regulatory Guide 1.23.3.Alternative ApproachesThe NRC staff considered the following three alternative approaches to the problem of outdatedguidance regarding the criteria for a suitable onsite meteorological measurements program:(1)Do not revise Regulatory Guide 1.23.

(2)Endorse ANSI/ANS-3.11-2005, "Determining Meteorological Information at Nuclear Facilities."(3)Update Regulatory Guide 1.23.

DG-1164, Page 163.1Alternative 1: Do Not Revise Regulatory Guide 1.23Under this alternative, the NRC would not revise this guidance, and applicants and licenseeswould continue to use the original version of this regulatory guide. This alternative is considered the baseline or "no action" alternative and, as such, involves no value/impact considerations.3.2Alternative 2: Endorse ANSI/ANS-3.11-2005Under this alternative, the NRC would endorse ANSI/ANS-3.11-2005. Whereas ANSI/ANS-2.5-1984 was primarily intended to support licensing applications of commercial nuclear power plants, ANSI/ANS-3.11-2005 has an expanded scope that includes nuclear installations at Federal sites, ranges, and reservations (e.g., U.S. Department of Energy and Department of Defense facilities). Because the nature and extent of the radiological and hazardous chemical materials present at Federal sites can differ significantly from similar materials present at commercial nuclear power plants, ANSI/ANS-3.11-2005 provides additional guidance beyond what the NRC considers to be basic meteorological monitoring program criteria applicable to commercial nuclear power plants. Consequently, wholesale NRC endorsement of ANSI/ANS-3.11-2005 would place unnecessary regulatory burden on NRC applicantsand licensees. Partial endorsement of ANSI/ANS-3.11-2005 would be confusing.3.3Alternative 3: Update Regulatory Guide 1.23Under this alternative, the NRC would update Regulatory Guide 1.23 to better reflect currentregulatory requirements and best practices. The revision would use guidance provided in ANSI/ANS-3.11-2005, where appropriate, with explicit references to NRC regulatory requirements.The benefit of this action would be the added assurance that the meteorological data collected byapplicants and licensees are adequate to represent onsite meteorological conditions needed to determine environmental impacts of the plants, perform consequence assessments supporting routine release and design-basis accident evaluations, and support emergency preparedness programs and other applications at power reactor sites. Guidance would be specific to commercial nuclear power plants.The cost to the NRC would be relatively small, limited to the one-time cost of issuing the revisedregulatory guide. Applicants and licensees would incur little cost in implementing the updated guidance (compared to the current official version of Regulatory Guide 1.23) because the only additional meteorological channel specified in the third proposed Revision 1 of Regulatory Guide 1.23 is precipitation.4.ConclusionBased on this regulatory analysis, the staff recommends that the NRC revise Regulatory Guide1.23. The staff concludes that the proposed action will add assurance that the meteorological data collected by applicants and licensees are adequate to represent onsite meteorological conditions.BACKFIT ANALYSISThis draft regulatory guide provides licensees and applicants with new guidance that the NRCstaff considers acceptable for use in collecting meteorological data at nuclear power plant sites. The application of this guide is voluntary. Licensees may continue to use the original version of this regulatory guide if they so choose. No backfit, as defined in 10 CFR 50.109, "Backfitting," is eitherintended or implied.

12Copies may be purchased from the American National Standards Institute/American Nuclear Society,555 North Kensington Avenue, La Grange Park, Illinois 60526 [phone: (708)352-6611; fax: (708)352-0499]. Purchase information is available through the ANS Web site at http://www.ans.org/store/vc-stnd

.13NUREG/CR-6613 was developed by Sandia National Laboratories and published by the U.S. Nuclear RegulatoryCommission. Copies are also available for inspection or copying for a fee from the NRC's Public Document Room at 11555 Rockville Pike, Rockville, MD; the PDR's mailing address is USNRC PDR, Washington, DC 20555;telephone (301) 415-4737 or (800) 397-4209; fax (301) 415-3548; email PDR@nrc.gov. In addition, copies areavailable at current rates from the U.S. Government Printing Office, P.O. Box 37082, Washington, DC 20402-9328, telephone (202) 512-1800; or from the National Technical Information Service (NTIS), 5285 Port Royal Road, Springfield, VA 22161, http://www.ntis.gov, telephone (703) 487-4650.

14The National Environmental Policy Act of 1969 is available electronically through the NEPAnet Web site at http://ceq.eh.doe.gov/nepa/regs/nepa/nepaeqia.htm

.15All regulatory guides listed herein were published by the U.S. Nuclear Regulatory Commission. Where an ADAMSaccession number is identified, the specified regulatory guide is available electronically through the NRC'sAgencywide Documents Access and Management System (ADAMS) at http://www.nrc.gov/reading-rm/adams.html. All other regulatory guides are available electronically through the Public Electronic Reading Room on the NRC'spublic Web site, at http://www.nrc.gov/reading-rm/doc-collections/reg-guides/. Single copies of regulatory guides mayalso be obtained free of charge by writing the Reproduction and Distribution Services Section, ADM, USNRC, Washington, DC 20555-0001, or by fax to (301)415-2289, or by email to DISTRIBUTION@nrc.gov. Active guidesmay also be purchased from the National Technical Information Service (NTIS)on a standing order basis. Details on this service may be obtained by contacting NTIS at 5285 Port Royal Road, Springfield, Virginia 22161, online at http://www.ntis.gov, or by telephone at (703) 487-4650. Copies are also available for inspection or copying for a feefrom the NRC's Public Document Room (PDR), which is located at 11555 Rockville Pike, Rockville, Maryland;the PDR's mailing address is USNRC PDR, Washington, DC 20555-0001. The PDR can also be reached by telephoneat (301) 415-4737 or (800) 397-4205, by fax at (301) 415-3548, and by email to PDR@nrc.gov

.DG-1164, Page 17REFERENCESANSI/ANS-2.5-1984, "Standard for Determining Meteorological Information at Nuclear Power Sites,"American National Standards Institute/American Nuclear Society, 1984.

12ANSI/ANS-3.11-2005, "Determining Meteorological Information at Nuclear Facilities," AmericanNational Standards Institute/American Nuclear Society, 2005.

12D. Chanin and M.L. Young, "A Code Manual for MACCS2," NUREG/CR-6613, SAND97-0954, U.S. Nuclear Regulatory Commission, Washington, DC, May 1998.

13National Environmental Policy Act of 1969, Pub. L.91-190, 42 U.S.C. 4321-4347, United States Senate and House of Representatives, Washington, DC, January 1, 1970.

14Regulatory Guide 1.78, "Evaluating the Habitability of a Nuclear Power Plant Control Room Duringa Postulated Hazardous Chemical Release," Revision 1, U.S. Nuclear Regulatory Commission, Washington, DC, December 2001.

15Regulatory Guide 1.97, "Criteria for Accident Monitoring Instrumentation for Nuclear Power Plants,"Revision 4, U.S. Nuclear Regulatory Commission, Washington, DC, June 2006.

16All cited sections of Title 10 of the Code of Federal Regulations are available through the NRC's public Web site at http://www.nrc.gov/reading-rm/doc-collections/cfr/

.DG-1164, Page 18Regulatory Guide 1.111, "Methods for Estimating Atmospheric Transport and Dispersion of GaseousEffluents in Routine Releases from Light-Water-Cooled Reactors," Revision 1, U.S. Nuclear Regulatory Commission, Washington, DC, July 1977.Regulatory Guide 1.145, "Atmospheric Dispersion Models for Potential Accident ConsequenceAssessments at Nuclear Power Plants," Revision 1, U.S. Nuclear Regulatory Commission, Washington, DC, November 1982 (reissued February 1983 to correct page 1.145-7).Regulatory Guide 1.194, "Atmospheric Relative Concentrations for Control Room RadiologicalHabitability Assessments at Nuclear Power Plants," U.S. Nuclear Regulatory Commission, Washington, DC, June 2003.U.S. Code of Federal Regulations

, Title 10, "Energy," Part 20, Standards for Protection AgainstRadiation."

16U.S. Code of Federal Regulations

, Title 10, "Energy," Part 50, "Domestic Licensing of Production andUtilization Facilities."U.S. Code of Federal Regulations

, Title 10, "Energy," Part 50, Appendix A, "General Design Criteriafor Nuclear Power Plants."U.S. Code of Federal Regulations, Title 10, "Energy," Part 50, Appendix E, "Emergency Planning andPreparedness for Production and Utilization Facilities."U.S. Code of Federal Regulations

, Title 10, "Energy," Part 50, Appendix I, "Numerical Guides forDesign Objectives and Limiting Conditions for Operation to Meet the Criterion 'As Low As Is Reasonably Achievable' for Radioactive Material in Light-Water-Cooled Nuclear Power Reactor Effluents."U.S. Code of Federal Regulations

, Title 10, "Energy," Part 51, "Environmental Protection Regulationsfor Domestic Licensing and Related Regulatory Functions."U.S. Code of Federal Regulations

, Title 10, "Energy," Part 100, "Reactor Site Criteria."

Appendix A to DG-1164, Page A-1APPENDIX ARECOMMENDED FORMATFOR HOURLY METEOROLOGICAL DATATO BE PLACED ON ELECTRONIC MEDIAHourly meteorological data should be submitted to the NRC on mutually agreed-upon media. The file is a formatted, sequential access, ASCII text data file. Comma-delimited or binary data files should not be submitted. The data should be in files that are of a size that are convenient for use and storage. Annual data files are acceptable.At the beginning of each file, use the first five records to give a file description. Include plantname, location (latitude, longitude), dates of data, information explaining data contained in the "other" fields if they are used, heights of measurements, and any additional information pertinent to the identification of the file (e.g., type of moisture measurements). Ensure that all five records are included, even if some are blank. Use 160A1 as the format for the first five records. The remaining records, one per hour, contain the meteorological data in the format A4, I4, I3, I4, 25F5.1, F5.2, 3F5.1. Check the file to ensure quality (e.g., compare against the raw data to ensure that the electronic file has been properly formatted, unit conversions are correct, and invalid data are properly identified).Provide all data to the tenth of a unit, except solar radiation, which should be provided to ahundredth of a unit. This does not necessarily indicate the accuracy of the data (e.g., wind direction is usually given to the nearest degree). Use all nines in any field to indicate a lost record (99999). Use all sevens in a wind direction field to indicate calm (77777). If there are only two levels of data, use the upper and lower levels. If there is only one level of data, use the upper level.NOTE: The sigma theta, moisture, solar radiation, and visibility measurements listed in thefollowing pages are not required measurements but should be provided if they are available.

Appendix A to DG-1164, Page A-2METEOROLOGICAL DATA ON ELECTRONIC MEDIALOCATION:DATE OF DATA RECORD:

A4 Identifier (can be anything) I4 Year I3 Julian Day I4 Hour (on 24-hour clock)ACCURACY F5.1 Upper Measurements: Level = _____ meters_____ F5.1 Wind Direction (degrees)_____ F5.1 Wind Speed (meters/second)

_____ F5.1 Sigma Theta (degrees)_____ F5.1 Ambient Temperature (C)_____ F5.1 Moisture: __________ F5.1 Other: __________ F5.1 Intermediate Measurements: Level = _____ meters_____ F5.1 Wind Direction (degrees)_____ F5.1 Wind Speed (meters/second)

_____ F5.1 Sigma Theta (degrees)_____ F5.1 Ambient Temperature (C)_____ F5.1 Moisture: __________ F5.1 Other: __________ F5.1 Lower Measurements: Level = _____ meters_____ F5.1 Wind Direction (degrees)_____

Appendix A to DG-1164, Page A-3METEOROLOGICAL DATA ON ELECTRONIC MEDIA (Continued) F5.1 Wind Speed (meters/second)

_____ F5.1 Sigma Theta (degrees)_____ F5.1 Ambient Temperature (C)_____ F5.1 Moisture: __________ F5.1 Other: __________ F5.1 Temp. Diff. (Upper-Lower) (C/100 meters)_____ F5.1 Temp. Diff. (Upper-Intermediate) (C/100 meters)_____ F5.1 Temp. Diff. (Intermediate-Lower) (C/100 meters)_____ F5.1 Precipitation (millimeters)

_____ F5.1 Solar Radiation (calories/square centimeter/minute)_____ F5.1 Visibility (kilometers)

_____ F5.1 Other: __________ F5.1 Other: __________

Appendix A to DG-1164, Page A-4DESCRIPTION OF CHANGESThe following is a list of changes from the current official version of Regulatory Guide 1.23, issued inFebruary 1972. The amount of substantial changes from the current official version make it impractical to indicate the changes within the document.Proposed ChangeBasis1.Update discussion of applicable regulations.Many of the current applicable regulations did notexist in 1972 (e.g., Appendix A and Appendix I to10 CFR Part 50; 10 CFR Part 51).2.Update references to associated regulatoryguides.Many of the current associated regulatory guides didnot exist in 1972 (e.g., Regulatory Guides 1.111,1.145, 1.194).3.Add a list of definitions for a number of termsused within the regulatory guide.This change clarifies some of the terms used in theregulatory guide.4.Specify the minimum amount of data needed atdocketing for 10 CFR Part 52 early site permitand combined license applications.The minimum amount of data needed at docketing forearly site permit and combined license applicationsunder 10 CFR Part 52 is similar to the minimumamount of data needed at docketing for operatinglicense applications under 10 CFR Part 50.5.Provide additional guidance for sitingmeteorological instruments (e.g., separationdistance between wind sensors andobstructions to airflow such as buildings, trees,and nearby terrain; instrument boom length andorientation; avoidance of nearby heat andmoisture sources such as cooling towers andparking lots; use of aspirated radiation shieldsfor temperature sensors; use of heaters andwind shields for precipitation gauges).The agency adopted much of this enhanced guidancefrom ANSI/ANS-3.11-2005.6.Delete the criterion for using standarddeviation of horizontal wind direction () as abasis for classifying atmospheric stability.Vertical temperature difference is the preferredmethod for determining Pasquill stability classes atnuclear power plants for licensing purposes becauseit is an effective indicator for the worst case stabilityconditions (e.g., Pasquill stability classes E, F, andG), and certain Gaussian plume models endorsed bythe NRC (such as the models referenced inRegulatory Guides 1.145 and 1.194) are based onempirically derived plume meander factors from fieldtracer studies that used T to classify atmosphericstability. Alternative methods may be used to classifyatmospheric stability if appropriate justification isprovided. However, the use of alternative methods toclassify atmospheric stability may requiremodifications of the models described in RegulatoryGuides 1.145 and 1.194.

Proposed ChangeBasisAppendix A to DG-1164, Page A-57.Add a criterion that precipitation should bemeasured at ground level near the base of thetower.Severe accident calculations now included in anapplicant's environmental report and the staff'senvironmental impact statement use precipitation.8.Clarify the definition of system accuracy,update some of the system accuracy criteria(e.g., add wind direction accuracy for time-average values, specify wind direction sensorstarting threshold, decrease wind speedaccuracy criteria for wind speeds 2.2 m/s,decrease dew-point accuracy criteria, addprecipitation accuracy criteria) and specifymeasurement resolutions.The agency adopted much of this enhanced guidancefrom ANSI/ANS-3.11-2005.9.Provide guidance that the tower andinstrumentation should be capable of surviving,monitoring, and displaying any onsitemeteorological conditions used as a basis forany emergency action levels.Where applicable, this change ensures that themeteorological monitoring system can effectivelysupport providing the meteorological data that areused as a basis for any emergency action levels inaccordance with 10 CFR 50.47(b)(4) and SectionIV.B of Appendix E to 10 CFR Part 50.10.Provide guidance on sampling frequencies andeliminate the criterion for redundant recorders.The agency adopted much of this enhanced guidancefrom ANSI/ANS-3.11-2005.11.Update the specified format for wind speed,wind direction, and stability joint frequencydistribution summaries and add a criterion thatan electronic copy of the hourly databaseshould be submitted with the application.This change adds a finer category breakdown for thelower wind speeds, which is an important input to theRegulatory Guide 1.145 atmospheric dispersionmodels. The NRC is moving the criterion to submitan electronic copy of the hourly database, alreadydiscussed in Standard Review Plan Section 2.3.3, intoRegulatory Guide 1.23.12.Clarify that the preoperational monitoringprogram should provide an adequate basis foratmospheric transport and diffusion estimatesfor the exclusion area boundary, the outerboundary of the low-population zone, and thehypothetical maximally exposed member of thepublic.This change ensures that the meteorologicalmonitoring system can effectively support thecollection of meteorological data for use indeveloping site atmospheric dispersion characteristicsas specified in 10 CFR 100.21(c).13.Clarify that the plant's operationalmeteorological monitoring program shouldprovide an adequate basis for atmospherictransport and diffusion estimates within theplume exposure emergency planning zone.This change ensures that the meteorologicalmonitoring system can effectively support thecollection of meteorological data for use indetermining the magnitude of and for continuouslyassessing the impact of the accidental release ofradioactive materials to the environment as specifiedin Appendix E to 10 CFR Part 50.

Proposed ChangeBasisAppendix A to DG-1164, Page A-614.Add a criterion that 15-minute average valuesof all the meteorological channels required forinput to the emergency response dose modelsshould be available for real-time display in theappropriate emergency response facilities.This change ensures that the meteorologicalmonitoring system can effectively support thecollection of meteorological data for use indetermining the magnitude of and for continuouslyassessing the impact of the accidental release ofradioactive materials to the environment as specifiedin Appendix E to 10 CFR Part 50. Most currentlyoperating nuclear power plants use the 15-minuteaverage criterion for meteorological data as specifiedin the first proposed Revision 1 to Regulatory Guide1.23.