ML093340077: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[SVPLTR 09-0055, 10 CFR 72.48 Evaluation Summary Report]]
| number = ML093340077
| issue date = 11/18/2009
| title = 10 CFR 72.48 Evaluation Summary Report
| author name = Hanley T
| author affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/FSME, NRC/NMSS/SFPO
| docket = 05000010, 05000237, 05000249, 07200037
| license number = DPR-002, DPR-019, DPR-025
| contact person =
| case reference number = SVPLTR #09-0055
| document type = Letter
| page count = 2
}}
 
=Text=
{{#Wiki_filter:Exelton Exelon Generation Company, LLC www.exeloncorp.com Nuclear Dresden Nuclear Power Station 6500 North Dresden Road Morris, IL 60450-9765 10 CFR 72.48 November 18, 2009 SVPLTR: #09-0055 ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Dresden Nuclear Power Station, Units 1, 2 & 3 Facility Operating License No. DPR-2 Renewed Facility Operating License Nos. DPR-19 and DPR 25 NRC Docket Nos. 50-10, 50-237, 50-249 and 72-37
 
==Subject:==
10 CFR 72.48 Evaluation Summary Report In accordance with the requirements of 10 CFR 72.48, "Changes, tests, and experiments," paragraph (d)(2), Exelon Generation Company, LLC (EGC) is submitting a report containing a brief description of changes, tests, or experiments, including a summary of the evaluation of each, performed for the Dresden Nuclear Power Station (DNPS), Independent Spent Fuel Storage Installation (ISFSI). This report is being submitted within an interval of 24 months from submittal of the previous DNPS ISFSI report. The enclosed report identifies that no 10 CFR 72.48 evaluations were performed during the period from November 1, 2007 to November 1, 2009.Should you have any questions regarding this report, please contact Ms. Marri Marchionda, Regulatory Assurance Manager, at (815) 416 -2800.Respectfully, Tim Hanley Site Vice President Dresden Nuclear Power Station Enclosures cc: Regional Administrator, NRC Region III NRC Senior Resident Inspector-Dresden Nuclear Power Station Dresden Nuclear Power Station 10 CFR 72.48 Evaluation Summary Report All 10 CFR 72.48 reviews performed from November 1, 2007 to November 1, 2009 were screenings.
There were no 10 CFR 72.48 evaluations performed during this period. Thus, no evaluation summaries are provided.}}

Latest revision as of 16:10, 11 July 2019