ML12192A090: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[0CAN071203, Response to Request for Additional Information Related to Proposed Emergency Action Levels Using NEI 99-01 Revision 5 Scheme]]
| number = ML12192A090
| issue date = 07/09/2012
| title = Arkansas Nuclear One, Units 1 and 2 - Response to Request for Additional Information Related to Proposed Emergency Action Levels Using NEI 99-01 Revision 5 Scheme
| author name = Pyle S L
| author affiliation = Entergy Operations, Inc
| addressee name =
| addressee affiliation = NRC/NRR, NRC/Document Control Desk
| docket = 05000313, 05000368
| license number = DPR-051, NPF-006
| contact person =
| case reference number = 0CAN071203
| document type = Emergency Preparedness-Emergency Plan, Letter
| page count = 247
}}
 
=Text=
{{#Wiki_filter:0CAN071203  
 
July 9, 2012
 
U.S. Nuclear Regulatory Commission
 
Attn: Document Control Desk Washington, DC  20555
 
==SUBJECT:==
Response to Request for Additional Information Related to Proposed Emergency Action Levels Using
 
NEI 99-01 Revision 5 Scheme Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6
 
==References:==
: 1. Entergy letter dated December 1, 2011, Proposed Emergency Action Levels Using NEI 99-01 Revision 5 Scheme, TAC Nos. ME7661 and ME7662 (ML113350317) (0CAN121102)
: 2. Email from Kaly Kalyanam (U.S. Nuclear Regulatory Commission) to David Bice (Entergy Operations, Inc.) - Proposed Emergency Action Levels Using NEI 99-01 Revision 5 Scheme, dated May 10, 2012
 
==Dear Sir or Madam:==
 
In Reference 1, Entergy Operations, Inc. (Entergy) requested NRC review and approval of the Arkansas Nuclear One (ANO) proposed revision to the Emergency Plan (EP) Emergency Action Levels (EALs). The proposed changes involve revisions to ANO's current EP EAL scheme which is based on NUREG 0654, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants" (the current "implemented" version of the EALs at ANO). Entergy is proposing to adopt the EAL scheme based on the guidance provided in NEI 99-01, Revision 5.
 
By Reference 2, the NRC requested additional information to support continued review of the aforementioned EP EAL revisions. Attachment 1 of this submittal provides the requested information and includes a matrix table denoting the Reference 1 pages that are affected.
Replacement pages are included in Attachment 2. The replacement pages contain revision bars next to each line that has been revised compared to the original page as submitted in
 
Reference 1 above.
Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR  72802 Tel  479-858-4704 Stephenie L Pyle Manager, Licensing Arkansas Nuclear One
 
0CAN071203 Page 2 of 2
 
This letter contains no new commitments. If you have any questions or require additional information, please contact me.
 
Sincerely,  ORIGINAL SIGNED BY STEPHENIE L. PYLE SLP/dbb Attachments: 1. Response to Request for Additional Information 2. Replacement Pages cc: Mr. Elmo Collins Regional Administrator U. S. Nuclear Regulatory Commission
 
Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511
 
NRC Senior Resident Inspector
 
Arkansas Nuclear One P.O. Box 310 London, AR 72847
 
U. S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam MS O-8 B1
 
One White Flint North 11555 Rockville Pike Rockville, MD 20852 Attachment 1 to 0CAN071203 Response to Request for Additional Information    to 0CAN071203
 
Page 1 of 13 Response to Request for Additional Information As stated, in part, in the NRC's request for additional information (RAI) dated May 10, 2012:
 
"Attached are the draft requests for additional information (RAIs) to facilitate the technical review being conducted by the Operating Reactor Licensing and Outreach Branch staff.
Timely and accurate response to these draft RAIs is requested. Please note that the staff assumes the licensee has verified that all values and setpoints can be read on the stated instrumentation, i.e., all values are within the calibrated range (0-100% of scale) of the stated instrumentation."
 
Below are the specific questions from the aforementioned RAI with associated responses.
Following the questions/responses is a table matrix describing the pages of the new Emergency Action Level (EAL) scheme that are affected. The changes describe refer to the Entergy Operations, Inc. original EAL scheme submittal dated December 1, 2011 (ML113350317) (0CAN121102). Revised pages and/or sections, with regard to the original submittal, are referred to below and included in Attachment 2 of this submittal.
: 1. EAL Technical Basis Document - Front Section:
: a. The endorsed EAL scheme development guidance document contains information the staff considers to be necessary for EAL decision makers to understand consistently.
Please provide justification for the omission of the following sections from NEI 99-01 Revision 5 into your site specific EAL Basis Document or revise accordingly to include:
: i. Section 3.2 - Definitions of emergency classification level, initiating condition, and emergency action level.
Response  Definitions conforming to NEI 99-01, Revision 5 guidance for emergency classification level, initiating condition, and emergency action level have been added to the ANO EAL Basis Document (Attachment 3 of the original submittal).
Refer to Pages 6 and 7 of revised Attachment 3.
ii. Section 3.7 - Definitions of unusual event, alert, site area emergency, and general emergency.
Response  Definitions conforming to NEI 99-01, Revision 5 guidance for unusual event, alert, site area emergency, and general emergency. have been added to the ANO EAL Basis Document (Attachment 3 of the original submittal). Refer to Pages 5, 6, 8, and 9 of revised Attachment 3.
to 0CAN071203
 
Page 2 of 13 iii. Sections 3.9, 3.10, 3.11, 3.12, and 3.13 - All of the information provided.
Response  Sections 3.9, 3.10, 3.11, 3.12, and 3.13 of NEI 99-01, Revision 5, have been added to the ANO EAL Basis Document (Attachment 3 of the original submittal) immediately following the Definitions section. The NEI information is modified as appropriate for pressurized water reactor (PWR) and/or site-specific applicability. Refer to Pages 10 through 13 of revised Attachment 3.
iv. Section 5.3 - Last paragraph.
Response  The last paragraph of NEI 99-01, Revision 5, Section 5.3 has been added to the ANO EAL Basis Document (Attachment 3 of the original submittal) following the Definitions section. The NEI information is modified as appropriate for site-specific applicability. Refer to Page 13 of revised Attachment 3.
: 2. Definitions - Please provide justification why the site-specific definition of "CONTAINMENT CLOSURE" was not included or revise accordingly.
Response  The definition of "CONTAINMENT CLOSURE" as contained in Attachment 3 of the original submittal has been revised to match the definition presented in ANO procedure OP-1015.008, "Unit 2 SDC Control."  Refer to Page 5 of revised Attachment 3.
: 3. EALs AA1, AS1, AG1:  Please explain how the limits from the table were developed. If this is the top of the calibrated scale, please explain how this will be differentiated from failed instrumentation.
Response  ANO Chemistry Procedure 1604.051, "Eberline Radiation Monitoring System", describes the setup and operation for each of the eleven Super Particulate Iodine Noble Gas (SPING) monitors used for monitoring and assessing radiological releases at the ANO site. Each SPING is associated with a particular ventilation pathway and provides continuous monitoring of air discharged via the respective release pathway. Attachment 2 of the procedure, "SPING Parameter File Values," provides a list of setpoints identifying the radiological value (in µci/cc) that is associated with each of the four emergency classes (Notification of Unusual Event (NUE), Alert, Site Area Emergency (SAE), and General Emergency (GE)). The setpoints are linear in nature based upon the emergency class dose rate criteria that is associated with the SPING. For example, the value for the SPING 6 (Unit 2 Radwaste Area) Alert setpoint is a factor of 10 higher than the SPING 6 NUE setpoint. This factor of 10 can be derived using a ratio between the current 0.05 mR/hr NUE dose rate classification criteria and the 0.5 mR/hr Alert dose rate classification criteria.
to 0CAN071203
 
Page 3 of 13 The new EAL classification setpoints were established with the same logic as stated above using the following example:
New NEI EAL Limit for NUE: 0.1 mR/hrCurrent EAL Limit for NUE: 0.05 mR/hr=2  By multiplying the ratio of 2 as determined above to the current setpoint, the new setpoint value is obtained:
2 x 1.66E-2 µci/cc = 3.32 E-2 µci/cc Each of the SPING setpoint values were determined in the manner described above.
As noted in the AA1 discussion of Differences (Attachment 1 of the original submittal), ANO
 
will not employ the current dose assessm ent model (RDACS) when the new EALs are implemented. A new dose assessment model using RASCAL is under final development and is scheduled to be fully implemented later this year. As part of the RASCAL implementation process, the SPING monitor setpoints will be evaluated for accuracy given the new model.
For the non-SPING monitors included in EAL AA1 below, a 95% of full scale value was selected. A review of release permit setpoint records indicate that these monitors would indicate nearly a full scale value or off-scale, if the monitor setpoint were multiplied by 200 as stated in Section 2 of this EAL. Note that these monitors (except 2RE-4425) will automatically secure the release when the release permit setpoint is reached in addition to alarming the condition. Steam Generator (SG) Blowdown is not normally discharged to the environment, but is processed back into the condensate and feedwater system.
The radiation monitor limits included in EALs AA1, AS1, AG1 have been verified to be within scale. The first table in each of the aforementioned EAL sections contains identical instruments in all three sections. EAL AA1 is included below because it refers to Channel 7 (medium range noble gas) on each SPING. With regard to Channel 9 (high range noble gas) on each SPING, EAL AG1 contains the highest limits; therefore, EAL AS1 limits are not listed below (also associated with Channel 9 of each SPING) because the AS1 EAL limit would be on scale if the (higher) AG1 EAL limit is on scale. EAL AA1 includes a second table of instrumentation which is also included below.
During response development, Entergy Operations, Inc. (Entergy) noted that limits for SPING 11, Channel 9 (high range noble gas) were inadvertently included in EAL AS1 and AG1. SPING 11, associated with the Low Level Radwaste (LLRW) Building does not contain a high range noble gas channel due to the low levels of radioactivity present in the building. Therefore, this channel has been removed from appropriate attachments. Refer to Pages 18 and 21 of revised Attachment 1, Pages 14 and 17 of revised Attachment 2, Pages 26 and 28 of revised Attachment 3, and Page 1 of revised Attachment 4. The revisions will require replacement of Pages 14-31 of Attachment 4 due to page numbers being affected.
to 0CAN071203
 
Page 4 of 13 From EAL AA1:
MONITORS - UNIT 1 EAL VALUE UPPER RANGE OF MONITOR RX-9820 Containment Purge 5.90E0 µCi/cc 1.8E3 - 2.5E4 µCi/cc RX-9825 Radwaste Area 5.36E0 µCi/cc 1.8E3 - 2.5E4 µCi/cc RX-9830 Fuel Handling Area 4.54E0 µCi/cc 1.8E3 - 2.5E4 µCi/cc RX-9835 Emergency Penetration Room 9.56E1 µCi/cc 1.8E3 - 2.5E4 µCi/cc MONITORS - UNIT 2 EAL VALUE UPPER RANGE OF MONITOR 2RX-9820 Containment Purge 4.46E0 µCi/cc 1.8E3 - 2.5E4 µCi/cc 2RX-9825 Radwaste Area 3.32E0 µCi/cc 1.8E3 - 2.5E4 µCi/cc 2RX-9830 Fuel Handling Area 4.46E0 µCi/cc 1.8E3 - 2.5E4 µCi/cc 2RX-9835 Emergency Penetration Room 8.84E1 µCi/cc 1.8E3 - 2.5E4 µCi/cc 2RX-9840 Post Accident Sampling Building 4.42E1 µCi/cc 1.8E3 - 2.5E4 µCi/cc 2RX-9845 Aux. Building Extension 1.26E1 µCi/cc 1.8E3 - 2.5E4 µCi/cc 2RX-9850 Low Level Radwaste Storage Bldg. 1.77E1 µCi/cc 1.8E3 - 2.5E4 µCi/cc MONITORS - UNIT 1 EAL VALUE UPPER RANGE OF MONITOR RX-9820 Containment Purge (Channel 7 or 9) N/A (see other tables) RE-4830 Waste Gas Radiation Monitor 9.5E7 cpm 1E8 cpm RE-4642 Liquid Radwaste Monitor 9.5E7 cpm 1E8 cpm MONITORS - UNIT 2 EAL VALUE UPPER RANGE OF MONITOR 2RX-9820 Containment Purge (Channel 7 or 9) N/A (see other tables) 2RE-2429 Waste Gas Monitoring System 9.5E5 cpm 1E6 cpm 2RE-2330 BMS Liquid Discharge Monitor 9.5E5 cpm 1E6 cpm 2RE--4423 Regenerative Waste Discharge Monitor 9.5E5 cpm 1E6 cpm 2RE-4425 SG Blowdown to Flume Radiation Monitor9.5E5 cpm 1E6 cpm to 0CAN071203
 
Page 5 of 13 From EAL AG1:
MONITORS - UNIT 1 EAL VALUE UPPER RANGE OF MONITOR RX-9820 Containment Purge 5.90E2 Ci/cc 1.4E5 - 5.2E5 Ci/ccRX-9825 Radwaste Area 5.36E2 Ci/cc 1.4E5 - 5.2E5 Ci/ccRX-9830 Fuel Handling Area 4.54E2 Ci/cc 1.4E5 - 5.2E5 Ci/ccRX-9835 Emergency Penetration Room 9.56E3 Ci/cc 1.4E5 - 5.2E5 Ci/ccMONITORS - UNIT 2 EAL VALUE UPPER RANGE OF MONITOR 2RX-9820 Containment Purge 4.46E2 Ci/cc 1.4E5 - 5.2E5 Ci/cc 2RX-9825 Radwaste Area 3.32E2 Ci/cc 1.4E5 - 5.2E5 Ci/cc 2RX-9830 Fuel Handling Area 4.46E2 Ci/cc 1.4E5 - 5.2E5 Ci/cc 2RX-9835 Emergency Penetration Room 8.84E3 Ci/cc 1.4E5 - 5.2E5 Ci/cc 2RX-9840 Post Accident Sampling Building 4.42E3 Ci/cc 1.4E5 - 5.2E5 Ci/cc 2RX-9845 Aux. Building Extension 1.26E3 Ci/cc 1.4E5 - 5.2E5 Ci/cc  Note that the above SPING values designate a range of activity. This is because the vendor technical manual describes the noble gas detector design and setup considering the energy level of two discrete isotopes, Xe 133 and Kr 85. This design provides high confidence that the noble gas detectors are setup and calibrated to detect activity over a broad range of possible isotopes released during normal and abnormal conditions. In any case, the upper bounds of the monitors are sufficient to establish the appropriate EAL declaration during an event.
: 4. EAL CG1:  Please revise the EAL accordingly to reflect that the inability to monitor reactor vessel level for  30 minutes with core uncovery indicated, by any of the bulleted items you provided, is what the EAL is intended to be. This is a known inconsistency with the generic EAL development guidance for CG1 (NEI) and CS1 (NEI).
Response  EAL CG1, part 2.a has been revised consistent with EAL CS1, part 3. Refer to Page 41 of revised Attachment 1, Page 36 of revised Attachment 2, Page 46 of revised Attachment 3, and Page 5 of revised Attachment 4.
to 0CAN071203
 
Page 6 of 13
: 5. EAL E-HU1:  Please clarify, via adding a note or other means, that security events are bounded by the Hazard EALs.
Response  A Note stating that security events are bounded by the Hazards EALs has been added to EAL E-HU1. Refer to Page 43 of revised Attachment 1, Page 39 of revised Attachment 2, Page 49 of revised Attachment 3, and Page 11 of revised Attachment 4.
: 6. FISSION BARRIER MATRIX - CONTAINMENT BARRIER:  Please explain, in more detail, why there is no threshold for a "Ruptured steam generator is also faulted outside containment."
Response  The aforementioned SG threshold was included Attachment 1, Page 59, but was inadvertently shown as deleted in Attachment 2 (EAL Bases Markup) and omitted in Attachments 3 and 4. Attachment 2 has been revised to show this threshold as retained.
In addition, the SG threshold is added to Attachments 3 and 4. Refer to Page 56 of revised  , Page 63 of revised Attachment 3, and Page 14 of revised Attachment 4. The revisions will require replacement of Pages 14-31 of Attachment 4 due to page numbers being affected.
: 7. EAL HU6, HA6:  Please explain whether the 0.01g acceleration alarm is available to Operators in the Control Room.
Response  ANO-1 seismic trigger XSH-8007 provides alarm in the ANO-1 control room at 0.01 g, as described in both unit Technical Requirements Manual bases for seismic monitoring instrumentation. Both ANO units credit this alarm for EAL response.
: 8. EAL HA3:  Please develop a list of areas applicable to this EAL. The intent of this EAL is to declare an Alert when access to an area is impeded due to a gaseous event. The areas of concern are limited to those that must be entered for safe operation, safe shutdown, or safe cooldown. If access to the area is unnecessary to operate said equipment, then the table does not need the area listed. Note that this EAL is to be declared when an area, already pre-identified as an area where access is required, is subject to a gaseous event that impedes access. Note that this EAL would be declared regardless of whether access was required at the present time or not. Also note that this may entail a column on the table for operating mode applicability. In addition, please revise the wording in the initiating condition and EAL from "prohibited" to "impeded" as this error is to be corrected with the next revision of the generic EAL scheme development guidance.
to 0CAN071203
 
Page 7 of 13 Response  Note that NEI 99-01, Revision 5, EAL HA3, is the equivalent of ANO EAL HA5. An assessment of operational areas was performed as part of the original submittal development and the results illustrated in Table H-1 contained in Attachments 1, 2, 3, and 4 of the original submittal. Of these areas, none need be routinely accessed during normal operations to maintain safe operation of the plant.
Station procedures provide defense-in-depth operation by requiring an Operator (or other) to access equipment areas when placing or removing equipment in/from service. However, provided the unit Control Room remains accessible, most of these requirements may be omitted as necessary without a significant impact to safe plant operation and/or shutdown/cooldown. As a result, only those areas requiring local operator manipulations are considered in this follow-up assessment associated with this RAI. As stated above, none of the areas must be accessed to support normal safe operations. In addition, no area is required to be accessed to perform a shutdown where the reactor is tripped from its steady-state power condition. Although procedures may direct local equipment manipulations in support of shutdown involving a power descent, the option of tripping the reactor from any power level remains available. Therefore, this assessment is focused on establishing steady-state conditions following a reactor trip and a subsequent cooldown of the plant.
A review of shutdown and cooldown procedures for both units was performed. Based on these reviews, the following vital areas were identified as requiring access in support of a shutdown or cooldown. The purpose for access is also provided.
Unit 1  AREA MODES PURPOSE REFERENCE A-4 Switchgear Room 3, 4 Core flood tank valves, decay heat removal (DHR) OP-1102.010 Step 8.25, OP-1104.004 Steps 7.2.6 Upper North Electrical Penetration Room 3, 4 DHR alignment OP-1104.004 Step 7.2.4 Lower South Electrical Equipment Room 3, 4 DHR alignment OP-1104.004 Step 7.2.5 Control Room ALL Overall plant control Various to 0CAN071203
 
Page 8 of 13 Unit 2  AREA MODES PURPOSE REFERENCE Aux Building 317' Emergency Core Cooling Rooms 3, 4 Shutdown Cooling (SDC) venting and alignment OP-2104.004 Steps 7.9, 7.10.2, 7.10.3, 7.13.2, Aux Building 317' Tendon Gallery Access 3, 4 SDC alignment OP-2104.004 Step 7.13.2 Aux Building 335' Charging Pumps / Motor Control Center (MCC) 2B-52 3, 4 Charging low pressure operation, T-Hot injection valves, and SDC alignment OP-2102.010 Steps 8.13, 8.20, 9.18.12 and OP-2104.004 Step 7.13.4 Auxiliary Building 354' MCC 2B-62 Area 3, 4 SDC alignment and T-Hot injection valves at MCC 2B-62 OP-2102.010 Steps 8.20, 9.18.12 and OP-2104.004 Step 7.13.4 Emergency Diesel Generator Corridor 3, 4 Close Safety Injection Tank (SIT) valves and SDC / Low Temperature Overpressure (LTOP) valve alignment at MCC 2B-51 OP-2102.010 Steps 8.18, 8.20 Lower South Piping Penetration Room 3, 4 SDC alignment OP-2104.004 Steps 7.10.4, 7.10.5, 7.11.1, 7.12.1, 7.13.2, 8.8, 8.10.1, 8.11.2 Aux Building 386' Containment Hatch 3, 4 Close SIT valves at MCC 2B-61 OP-2102.010 Step 8.18 Control Room ALL Overall plant control Various Mode 3 is included above for DHR- and SDC-related activities because the procedures begin alignment in Mode 3; however, these actions could be delayed until Mode 4, if necessary. In order to ensure adequate guidance to emergency response personnel, the above areas are added to the EAL in order to provide prompt operator guidance for EAL declaration. Refer to Pages 77 and 78 of revised Attachment 1, Page 78 of revised
, Page 84 of revised Attachment 3, and Pages 19-21 of revised Attachment 4.
: 9. EAL HA6:  Please explain how the list of areas can be susceptible to the specific hazards. Please provide a hazard specific list of applicable areas for these EALs (which may need to be operating mode dependent), or provide justification that supports these areas being considered for the particular hazard.
Response  EAL HA6 refers to damage caused by natural or destructive phenomenon in certain vital areas. The original ANO letter considers the following events:  1) earthquake, 2) tornado, 3) flood, 4) main turbine projectiles, 5) loss of Lake Dardanelle, and 6) vehicle crash onsite. NEI 99-01, Revision 5, states the following for EALs #2 - #5:  "These EALs should specify site specific structures or areas that contain safety system, or component and functions    to 0CAN071203
 
Page 9 of 13 required for safe shutdown of the plant."  Entergy provided this list of structures and areas in the original submittal, but did not perform a review to determine the applicability of each specific hazard to the list. Entergy has performed this review and updated the submittal documents accordingly. The review results are provided below as part of this response. No structures or areas are listed for earthquake or loss of Lake Dardanelle events (ANO EALs #1 and #5); therefore, these EALs were not included in the review.
With regard to the other events listed above, the following discussion describes how the listed areas or components (as depicted in the original submittal) are affected by the subject event.
Tornado - All areas were considered susceptible to damage Internal Flooding AREA COMMENTS Intake Structure Structure evaluated for internal flooding. Pump motors are located above flood level. Some indication could be lost. Access may be
 
limited. Ultimate Heat Sink This is a pond and cannot be impacted by internal flooding. This area is removed from the internal flooding list.
Startup Transformers Located in an outside area and not susceptible to internal flooding. Indications are consistently exposed to rain and inadvertent actuation of the fire suppression system will not result in the loss of the transformer or indication. This area is removed from the internal flooding list. Diesel Fuel Vault Structure evaluated for internal flooding. The common fuel oil vault contains independent fuel oil tanks within separate sub-vaults. It is unlikely all sub-vaults would be affected by internal flooding (resulting from tank rupture or fire system actuation). In addition, the tanks "float" (are maintained full) on the above ground fuel oil storage bulk tank; therefore, the inability to access a sub-vault to verify tank level should have no impact on safe operation of the unit. This area is removed from the internal flooding list.
Refueling Water Tank (RWT) Located in an outside area and not susceptible to internal flooding. This area is removed from the internal flooding list. Turbine Building Area of pipe break may be inaccessible. Loss of some indication possible. Possible loss of non-vital auxiliary feedwater pump.
Qualified
 
Condensate Storage
 
Tank (QCST) Located in an outside area and not susceptible to internal flooding. This area is removed from the internal flooding list. Control Room Internal flooding not assu med. Halon system provides fire protection. This area is removed from the internal flooding list. Auxiliary Building Safety equipment evaluated for internal flooding considerations. Loss of indications and control possible. to 0CAN071203
 
Page 10 of 13 AREA COMMENTS Borated Water Storage Tank (BWST) Located in an outside area and not susceptible to internal flooding. This area is removed from the internal flooding list.
 
Main Turbine Projectiles AREA COMMENTS Reactor Building Not in the vicinity of the Main Turbine. This area is removed from the turbine projectile list. Intake Structure Not in the vicinity of the Main Turbine. This area is removed from the turbine projectile list. Ultimate Heat Sink Not in the vicinity of the Main Turbine. This area is removed from the turbine projectile list. Startup Transformers Possible damage, but considered remote due to location outside Turbine Building. EDGs are unaffected by turbine missiles and can provide power if transformers are lost. Diesel Fuel Vault Not in the vicinity of the Main Turbine. This area is removed from the turbine projectile list. RWT Not in the vicinity of the Main Turbine. This area is removed from the turbine projectile list. Turbine Building Susceptible to significant internal damage. However, is not expected to result in a significant impact to safe shutdown
 
capability. QCST Not in the vicinity of the Main Turbine. This area is removed from the turbine projectile list. Control Room External damage only. Some indications can be affected by impacts to CA-2, located next to the Control Room. Auxiliary Building Some internal damage on Elevation 386' which could affect indication or limited safety equipment. BWST Not in the vicinity of the Main Turbine. This area is removed from the turbine projectile list.
Vehicle Crash - The only area not susceptible to damage from a vehicle crash is the Control Room, due to the elevation of this area. Therefore, the Control Room is removed from the vehicle crash list.
Based on the recommendations included in the above tables, the individual lists in the associated EALs are modified accordingly. Refer to Pages 80 and 81 of revised  , Pages 73-76 of revised Attachment 2, Pages 86 and 87 of revised  , and Pages 22-24 of revised Attachment 4. to 0CAN071203
 
Page 11 of 13
: 10. EAL SU6, SA6, SS6:  Please provide a site-specific list of annunciators and indicators, or provide more detail on the specific systems being monitored.
Response  These EALS consider the annunciators and indicators used to effectively monitor safety systems necessary for ensuring safety functions are met. The safety functions are reactivity control, core cooling, maintaining reactor coolant system (RCS) integrity, and maintaining containment integrity. These indicators and annunciators are generally available to the Control Room Operators from a single monitoring location. In addition to indicators installed in Control Room panels, several computer-based displays are also available, again capable of being monitored from the same Control Room location as the annunciators and panel indicators. Most Control Room indicator and annunciator panels display information necessary for safety function assessment. The following provides a brief description of each panel.
 
ANO-1 Annunciator Panels
 
K-01 Electrical Power Status K-02 Electrical Power Status K-07 Reactivity (Integrated Control System), SG K-08 Reactivity K-09 RCS, DHR K-10 Engineered Safeguards (ES), Radiation
 
K-11 ES K-12 Fire, Emergency Feedwater Initiation and Control
 
ANO-1 Indication/Control Panels
 
C-03 Reactor Power, Reactivity, RCS pressure/temperature, SG pressure/temperature C-04 Pressurizer level/pressure, margin-to-saturation (MTS) C-09 SG pressure/level, Emergency Feedwater (EFW)
C-10 Electrical and Vital Electrical Power C-13 RCS temperature/flow, Reactor Coolant Pumps (RCPs), SG level C-14 Reactor Building (RB) sump level, DHR, RB Spray flow, RCS pressure C-16 ES C-18 ES C-19 Fire, Safety Parameter Display System (SPDS)
C-26 RB hydrogen C-100 Plant Monitoring System (computer and displays)
C-486 RB pressure/level/high range radiation, Acoustic monitors, Main Steam radiation
 
ANO-2 Annunciator Panels
 
2K-01 Electrical Power Status 2K-04 Engineered Safeguards (ESF), Reactor Power 2K-05 ESF
 
2K-06 ESF    to 0CAN071203
 
Page 12 of 13 2K-07 ESF, SDC 2K-08 Vital Electrical Power 2K-09 Vital Electrical Power 2K-10 Reactivity, RCS pressure/temperatur e, Radiation, Containment level/temp/
humidity/ hydrogen 2K-11 RCPs, Fire, SG tube leakage, Radiation
 
ANO-2 Indication/Control Panels 2C-02 SG level/pressure 2C-03 Reactivity, Reactor Power, ES, SPDS 2C-04 RCS pressure/temperature/level, MTS, SDC, Pressurizer heaters 2C-14 RCS pressure/temperature, radiation, RB pressure 2C-16 ES 2C-17 ES 2C-33 Vital Electrical, RB temperature/pressure/humidity/level, SDC, ES 2C-100 Plant Monitoring System (computer and displays) 2C-336 RB high range radiation, MTS, Main Steam radiation, Reactor Power, RCS pressure, Acoustic monitors In light of the above information, there are only 2 to 3 annunciators and 2 to 3 indication /
control panels (in view of the primary monitoring location) on each unit that have minimal or no indications necessary to support safe operation/shutdown/cooldown of the units. As a result, listing the above panels in the EAL offers little beneficial guidance to Operations personnel. The inability to monitor a safety function due to the unavailability of an adequate number of associated annunciators and control panel or computer-based indicators is expected to be quickly recognized and the subject EALs applied as appropriate. Just as the Shift Manager is expected to use his/her judgment in assessing the loss of 75% of safety related annunciation and indication, the Shift Manager is best situated to assess those Control Room panel indicators and annunciation that are associated with safety systems. Based on the above, no changes to the subject EALs are proposed.
: 11. EAL SA3:  Please explain how there can be two required thresholds with competing reactor power values (i.e., SA3.1.a requires reactor power  5% while SA3.1.b requires reactor power < 5%). Please provide further justification for differing reactor power levels or revise accordingly to remove the reactor power value from SA3.1.a or SA3.1.b.
Response  The ALERT classification is based on failure of the reactor trip upon receipt of an automatic trip signal, but successfully tripping the reactor manually. SA3.1.a assumes power should be below 5% immediately following an automatic reactor trip; if not, then the trip has failed.
SA3.1.b assumes a manual trip has taken place due to failure of the automatic trip sequence, which is verified as successful by power indicating below 5%. These values, the EAL wording, and the EAL flow have been verified by Operations and practiced on the simulator. Therefore, Entergy concludes that a change to this EAL is not required.
to 0CAN071203
 
Page 13 of 13
: 12. EAL SG1:  Please explain why the nomenclature used to depict the safety busses of concern (vital 4.16 KV) changed for this EAL to "safety busses" or revise accordingly.
Response  The EAL SG1 nomenclature has been revised in the markup and clean versions of the Basis Document, consistent with other EALs, to read "Vital 4.16 KV". This nomenclature is currently used in Attachments 1 and 4 of the original submittal. Refer to Page 109 of
 
revised Attachment 2 and Page 113 of revised Attachment 3.
During the review of the Reference 1 submittal in response to the Reference 2 NRC request, Entergy noted an editorial error in Attachment 3 (Reference 1), EAL SU9, associated with the RCS sample activity described in Item 2. The numerical value for the activity was shown in the other Reference 1 attachments, but was inadvert ently omitted from Attachment 3. Refer to Page 100 of revised Attachment 3.
 
Based on the above, Entergy requests the NRC replace pages contained in the original submittal dated December 1, 2011 (ML113350317) with the pages included in Attachment 2 of this submittal as follows:
 
Attachment Remove Pages Insert Pages Comments  18, 21, 41, 43, and 77-110 18, 21, 41, 43, 77-110 Pages 82-110 replaced due to page number change only. 14, 17, 36, 39, 56, and 73-112 14, 17, 36, 39, 56, 73-112 With the exception of revised Pages 78 and 109, all pages past Page 73 replaced due to
 
page number change only. Attachment 3 1-110 1-115 Entire section replaced due to change in page numbers. 
 
Actual revised pages
 
impacted are listed in response to above questions. Attachment 4 1-30 1-32 With the exception of revised Pages 5, 11, 14, 19-21 and 22-24, all other pages replaced due to page number
 
change only.
 
Attachment 2 to 0CAN071203 Replacement Pages to 0CAN121102
 
Page 18 of 110 NEI 99-01 Revision 5 EAL Deviation-Differences Document ANO:  AS1 Offsite dose resulting from an actual or imminent release of gaseous radioactivity > 100 mR TEDE or 500 mR child thyroid CDE for the actual or projected duration of the release
 
Operating Mode Applicability: All Emergency Action Level(s): (1 or 2 or 3)
Note: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time. If dose assessment results are available, the classification should be based on EAL #2 instead of EAL #1. Do not delay declaration awaiting dose assessment results.
: 1. VALID reading on Channel 9 on any of the following radiation monitors > the reading shown for  15 minutes:
MONITORS - UNIT 1 LIMIT RX-9820 Containment Purge 5.90E+1 &#xb5;Ci/cc RX-9825 Radwaste Area 5.36E+1 &#xb5;Ci/cc RX-9830 Fuel Handling Area 4.54E+1 &#xb5;Ci/cc RX-9835 Emergency Penetration Room 9.56E+2 &#xb5;Ci/cc MONITORS - UNIT 2 LIMIT 2RX-9820 Containment Purge 4.46E+1 &#xb5;Ci/cc 2RX-9825 Radwaste Area 3.32E+1 &#xb5;Ci/cc 2RX-9830 Fuel Handling Area 4.46E+1 &#xb5;Ci/cc 2RX-9835 Emergency Penetration Room 8.84E+2 &#xb5;Ci/cc 2RX-9840 Post Accident Sampling Building 4.42E+2 &#xb5;Ci/cc 2RX-9845 Aux. Building Extension 1.26E+2 &#xb5;Ci/cc OR 
: 2. Dose assessment using actual meteorology indicates doses > 100 mR TEDE or 500 mR child thyroid CDE at or beyond the site boundary.
OR    to 0CAN121102
 
Page 21 of 110 NEI 99-01 Revision 5 EAL Deviation-Differences Document ANO:  AG1 Offsite dose resulting from an actual or imminent release of gaseous radioactivity > 1000 mR TEDE or 5000 mR child thyroid CDE for the actual or projected duration of the release using actual meteorology
 
Operating Mode Applicability: All  Emergency Action Level(s): (1 or 2 or 3)
Note: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time. If dose assessment results are available, the classification should be based on EAL #2 instead of EAL #1. Do not delay declaration awaiting dose assessment results.
: 1. VALID reading on Channel 9 on any of the following radiation monitors > the reading shown for  15 minutes:
MONITORS - UNIT 1 LIMIT RX-9820 Containment Purge 5.90E+2 (Ci/cc) RX-9825 Radwaste Area 5.36E+2 (Ci/cc) RX-9830 Fuel Handling Area 4.54E+2 (Ci/cc) RX-9835 Emergency Penetration Room 9.56E+3 (Ci/cc)  MONITORS - UNIT 2 LIMIT 2RX-9820 Containment Purge 4.46E+2 (Ci/cc) 2RX-9825 Radwaste Area 3.32E+2 (Ci/cc) 2RX-9830 Fuel Handling Area 4.46E+2 (Ci/cc) 2RX-9835 Emergency Penetration Room 8.84E+3 (Ci/cc) 2RX-9840 Post Accident Sampling Building 4.42E+3 (Ci/cc) 2RX-9845 Aux. Building Extension 1.26E+3 (Ci/cc)  OR  2. Dose assessment using actual meteorology indicates doses > 1000 mR TEDE or 5000 mR child thyroid CDE at or beyond the site boundary.
OR  3. Field survey results indicate closed window dose rates >1000 mR/hr expected to  continue for  60 minutes; or analyses of field survey samples indicate child thyroid CDE > 5000 mR for one hour of inhalation, at or beyond the site boundary.
to 0CAN121102
 
Page 41 of 110 NEI 99-01 Revision 5 EAL Deviation-Differences Document ANO:  CG1  Loss of RCS / reactor vessel inventory affecting fuel clad integrity with containment challenged Operating Mode Applicability:
Cold Shutdown (Mode 5)
Refueling (Mode 6)
 
Emergency Action Level(s):
(1 or 2)  Note: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time.
: 1. a. Core Exit Thermocouples indicate superheat for  30 minutes.
AND  b. Any of the following containment challenge indications:
CONTAINMENT CLOSURE not established  Explosive mixture inside containment  UNPLANNED rise in containment pressure OR 
: 2. a. RCS / reactor vessel level cannot be monitored for  30 minutes with a loss of RCS / reactor vessel inventory as indicated by any of the following:  Containment High Range Radiation Monitor reading > 10 R/hr  Erratic source range monitor indication  Unexplained level rise in Reactor Building Sump, Reactor Drain Tank, Quench Tank, Aux. Building Equipment Drain Tank, or Aux. Building Sump AND  b. Any of the following containment challenge indications:
CONTAINMENT CLOSURE not established  Explosive mixture inside containment  UNPLANNED rise in containment pressure Deviations:
 
None. to 0CAN121102
 
Page 43 of 110 NEI 99-01 Revision 5 EAL Deviation-Differences Document NEI 99-01:  E-HU1 Damage to a loaded cask CONFINEMENT BOUNDARY Operating Mode Applicability: Not applicable Example Emergency Action Level:
: 1. Damage to a loaded cask CONFINEMENT BOUNDARY.
 
ANO:  E-HU1 Note: Security Events are bounded by the Hazards EALs.
Damage to a loaded cask CONFINEMENT BOUNDARY
 
Operating Mode Applicability:
All  Emergency Action Level(s):
: 1. Damage to a loaded cask CONFINEMENT BOUNDARY.
 
Deviations:
None.
Differences:
 
An operating mode applicability of "all" is used vice the NEI designation of "N/A."  The net effect is that this event is applicable regardless of operating mode and therefore, the same as the NEI intent. In addition, a clarifying Note is added to remind users that security related events are
 
bounded by the Hazards EALs.
 
to 0CAN121102
 
Page 77 of 110 NEI 99-01 Revision 5 EAL Deviation-Differences Document NEI 99-01:  HA3 Access to a VITAL AREA is prohibited due to toxic, corrosive, asphyxiant, or flammable gases which jeopardize operation of operable equipment required to maintain safe operations or safely shutdown the reactor.
 
Operating Mode Applicability:
All Example Emergency Action Levels:
Note: If the equipment in the stated area was already inoperable, or out of service, before the event occurred, then this EAL should not be declared as it will have no adverse impact on the ability of the plant to safely operate or safely shutdown beyond that already allowed by Technical Specifications at the time of the event.
: 1. Access to a VITAL AREA is prohibited due to toxic, corrosive, asphyxiant, or flammable gases which jeopardize operation of systems required to maintain safe operations or safely
 
shutdown the reactor.
ANO:  HA5 Access to a VITAL AREA is prohibited due to toxic, corrosive, asphyxiant, or flammable gases which jeopardize operation of operable equipment required to maintain safe operations or safely shutdown the reactor.
 
Operating Mode Applicability: As stated in below tables.
Emergency Action Level(s):
Note: If the equipment in the stated area was already inoperable, or out of service, before the event occurred, then this EAL should not be declared as it will have no adverse impact on the ability of the plant to safely operate or safely shutdown beyond that already allowed by Technical Specifications at the time of the event.
: 1. Access to a VITAL AREA is prohibited due to toxic, corrosive, asphyxiant, or flammable gases which jeopardize operation of systems required to maintain safe operations or safely
 
shutdown the reactor.
Unit 1  VITAL AREA APPLICABLE MODES A-4 Switchgear Room 3, 4 Upper North Electrical Penetration Room 3, 4 Lower South Electrical Equipment Room 3, 4 Control Room ALL    to 0CAN121102
 
Page 78 of 110 Unit 2  VITAL AREA APPLICABLE MODES Auxiliary Building 317' Emergency Core Cooling Rooms 3, 4 Auxiliary Building 317' Tendon Gallery Access 3, 4 Auxiliary Building 335' Charging Pumps / 2B-52 3, 4 Auxiliary Building 354' 2B-62 Area 3, 4 Emergency Diesel Generator Corridor 3, 4 Lower South Piping Penetration Room 3, 4 Auxiliary Building 386' Containment Hatch 3, 4 Control Room ALL Deviations:
None.
Differences:
 
NEI 99-01 HA3 is renumbered to ANO HA5 for formatting purposes based on site preference for order of ICs alone. to 0CAN121102
 
Page 79 of 110 NEI 99-01:  HA1 Natural or Destructive Phenomena Affecting VITAL AREAs
 
Operating Mode Applicability:
All Example Emergency Action Levels:  (1 or 2 or 3 or 4 or 5 or 6)
: 1. a. Seismic event greater than Operating Basis Earthquake (OBE) as indicated by (site-specific seismic instrumentation) reading (site-specific OBE limit).
AND  b. Earthquake confirmed by ANY of the following:
Earthquake felt in plant  National Earthquake Center  Control Room indication of degraded performance of systems required for the safe shutdown of the plant
: 2. Tornado striking or high winds greater than (site-specific mph) resulting in VISIBLE DAMAGE to ANY of the following structures containing safety systems or components OR control room indication of degraded per formance of those safety systems:
(site-specific structure list)
: 3. Internal flooding in ANY of the following areas resulting in an electrical shock hazard that precludes access to operate or monitor safety equipment OR control room indication of degraded performance of those safety systems:
(site-specific area list)
: 4. Turbine failure-generated PROJECTILES resulting in VISIBLE DAMAGE to or penetration of ANY of the following structures containing safety systems or components OR control room indication of degraded perform ance of those safety systems:
(site-specific structure list)
: 5. Vehicle crash resulting in VISIBLE DAMAGE to ANY of the following structures containing safety systems or components OR control room indication of degraded performance of those safety systems:
(site-specific structure list)
: 6. (Site-specific occurrences) resulting in VISIBLE DAMAGE to ANY of the following structures containing safety systems or components OR control room indication of degraded performance of those safety systems:    to 0CAN121102
 
Page 80 of 110 ANO:  HA6 Natural or destructive phenomena affecting VITAL AREAS
 
Operating Mode Applicability:
All Emergency Action Level(s): (1 or 2 or 3 or 4 or 5 or 6)
: 1. a. Seismic event > Operating Basis Earthquake (OBE) as indicated by annunciation of the 0.1g acceleration alarm.
AND  b. Earthquake confirmed by any of the following:
Earthquake felt in plant  National Earthquake Center  Control Room indication of degraded performance of systems required for the safe shutdown of the plant OR  2. Tornado striking or high winds > 67 mph resulting in VISIBLE DAMAGE to any of the following structures/equipment containing safety systems or components or Control Room indication of degraded performance of those safety systems:
Reactor Building Turbine Building Intake Structure Q Condensate Storage Tank (QCST)
Ultimate Heat Sink Control Room Startup Transformers Auxiliary Building Diesel Fuel Vault Borated Water Storage Tank (BWST)
Refueling Water Tank (RWT)
OR  3. Internal flooding in any of the following areas resulting in an electrical shock hazard that precludes access to operate or monitor safety equipment or Control Room indication of degraded performance of those safety systems:
Intake Structure Turbine Building Auxiliary Building OR    to 0CAN121102
 
Page 81 of 110 ANO:  HA6 (Cont'd)
Emergency Action Level(s) (Cont'd)
: 4. Turbine failure-generated PROJECTILES resulting in VISIBLE DAMAGE to or penetration of any of the structures/equipment containing safety systems or components or Control Room indication of degraded performance of those safety systems.
Control Room Turbine Building Startup Transformers Auxiliary Building OR  5. Lake Dardanelle level < 335 feet and Emergency Cooling Pond inoperable.
OR  6. Vehicle crash resulting in VISIBLE DAMAGE to any of the structures/equipment containing safety systems or components or Control Room indication of degraded performance of those safety systems.
Reactor Building Turbine Building Intake Structure QCST Ultimate Heat Sink RWT Startup Transformers Auxiliary Building Diesel Fuel Vault BWST Deviations:
None.
 
Differences:
NEI 99-01 HA1 is renumbered to ANO HA6 for formatting purposes based on site preference for order of ICs alone.
 
Site-specific information is added on SAR design basis in the bases for EAL #2.
 
Site-specific areas for EALs #4 and #6 are presented in a table and the table is referenced causing a minor difference in EAL language from that in NEI 99-01.
 
An evaluation was performed to determine if any other site-specific occurrences were applicable to ANO. Lake Dardanelle low level with the Emergency Cooling Pond inoperable was determined to be the only other site-specific occurrence that warrants declaration of an Alert.
EAL #5 was added. The NEI EAL #5 was renumbered as EAL #6 to provide consistency
 
between NUE and Alert EALs for lake level. to 0CAN121102
 
Page 82 of 110 NEI 99-01:  HS4 HOSTILE ACTION within the PROTECTED AREA
 
Operating Mode Applicability:
All  Example Emergency Action Level:
: 1. A HOSTILE ACTION is occurring or has occurred within the PROTECTED AREA as reported by the (site security shift supervision).
 
ANO:  HS1 HOSTILE ACTION within the PROTECTED AREA
 
Operating Mode Applicability:
All  Emergency Action Level(s):
: 1. A HOSTILE ACTION is occurring or has occurred within the PROTECTED AREA as reported by ANO Security Shift Supervision.
Deviations:
None.
Differences:
NEI 99-01 HS4 is renumbered to ANO HS1 for formatting purposes based on site preference for order of ICs alone. to 0CAN121102
 
Page 83 of 110 NEI 99-01:  HS3 Other conditions exist which in the judgment of the Emergency Director warrant declaration of a Site Area Emergency.
Operating Mode Applicability:
All  Example Emergency Action Level:
: 1. Other conditions exist which in the judgment of the Emergency Director indicate that events are in progress or have occurred which involve actual or likely major failures of plant functions needed for protection of the public or HOSTILE ACTION that results in intentional damage or malicious acts; (1) toward site personnel or equipment that could lead to the likely failure of or; (2) that prevent effective access to equipment needed for the protection of the public. Any releases are not expected to result in exposure levels which exceed EPA Protective Action Guideline exposure levels beyond the site boundary.
 
ANO:  HS2 Other conditions exist which in the judgment of the SM / TSC Director / EOF Director warrant declaration of a Site Area Emergency
 
Operating Mode Applicability:
All  Emergency Action Level(s):
: 1. Other conditions exist which in the judgment of the SM / TSC Director / EOF Director indicate that events are in progress or have occurred which involve actual or likely major failures of plant functions needed for protection of the public or HOSTILE ACTION that results in intentional damage or malicious acts; (1) toward site personnel or equipment that could lead to the likely failure of or; (2) that prevent effective access to equipment needed for the protection of the public. Any releases are not expected to result in exposure levels which exceed EPA Protective Action Guideline exposure levels beyond the site boundary.
 
Deviations:
None.
Differences:
 
NEI 99-01 HS3 is renumbered to ANO HS2 for formatting purposes based on site preference for order of ICs alone. to 0CAN121102
 
Page 84 of 110 NEI 99-01:  HS2 Control room evacuation has been initiated and plant control cannot be established.
 
Operating Mode Applicability:
All  Example Emergency Action Level:
: 1. a. Control room evacuation has been initiated.
AND  b. Control of the plant cannot be established within (site-specific minutes).
ANO:  HS3 Control Room evacuation has been initiated and plant control cannot be established
 
Operating Mode Applicability:
All  Emergency Action Level(s):
: 1. a. Control Room evacuation has been initiated AND  b. Control of the plant cannot be established in accordance with the following procedures within 15 minutes:
Unit 1:  1203.002, "Alternate Shutdown" Unit 2:  2203.014, "Alternate Shutdown" Deviations:
 
None. Differences:
NEI 99-01 HS2 is renumbered to ANO HS3 for formatting purposes based on site preference for order of ICs alone.
The procedural reference is included in the EAL for consistency with HA3. to 0CAN121102
 
Page 85 of 110 NEI 99-01:  HG1 HOSTILE ACTION resulting in loss of physical control of the facility.
 
Operating Mode Applicability:
All Example Emergency Action Level:
(1 or 2) 
: 1. A HOSTILE ACTION has occurred such that plant personnel are unable to operate equipment required to maintain safety functions.
: 2. A HOSTILE ACTION has caused failure of Spent Fuel Cooling Systems and IMMINENT fuel damage is likely for a freshly off-loaded reactor core in pool.
ANO:  HG1 HOSTILE ACTION resulting in loss of physical control of the facility
 
Operating Mode Applicability:
All Emergency Action Level(s): (1 or 2)
: 1. A HOSTILE ACTION has occurred such that plant personnel are unable to operate equipment required to maintain safety functions.
OR  2. A HOSTILE ACTION has caused failure of Spent Fuel Cooling Systems and IMMINENT fuel damage is likely for a freshly off-loaded reactor core in pool.
Deviations:
None.
 
Differences:
None. to 0CAN121102
 
Page 86 of 110 NEI 99-01:  HG2 Other conditions exist which in the judgment of the Emergency Director warrant declaration of a General Emergency.
Operating Mode Applicability:
All  Example Emergency Action Level:
: 1. Other conditions exist which in the judgment of the Emergency Director indicate that events are in progress or have occurred which involve actual or IMMINENT substantial core degradation or melting with potential for loss of containment integrity or HOSTILE ACTION that results in an actual loss of physical control of the facility. Releases can be reasonably
 
expected to exceed EPA Protective Action Guideline exposure levels offsite for more than the immediate site area.
 
ANO:  HG2
 
Other conditions exist which in the judgment of the SM / TSC Director / EOF Director warrant declaration of a General Emergency.
 
Operating Mode Applicability:
All Emergency Action Level(s):
: 1. Other conditions exist which in the judgment of the SM / TSC Director / EOF Director indicate that events are in progress or have occurred which involve actual or IMMINENT substantial core degradation or melting with potential for loss of containment integrity or HOSTILE ACTION that results in an actual loss of physical control of the facility. Releases can be reasonably expected to exceed EPA Protective Action Guideline exposure levels offsite for more than the immediate site area.
Deviations:
 
None. Differences:
None. to 0CAN121102
 
Page 87 of 110 NEI 99-01:  SU1 Loss of all Off-site AC power to emergency busses for 15 minutes or longer.
 
Operating Mode Applicability:
Power Operation Startup Hot Standby
 
Hot Shutdown
 
Example Emergency Action Level:
Note: The Emergency Director should not wait until the applicable time has elapsed but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. Loss of all off-site AC power to (site-specific emergency busses) for 15 minutes or longer.
 
ANO:  SU1 Loss of all offsite AC power to Vital 4.16 KV busses  15 minutes
 
Operating Mode Applicability:
Power Operations (Mode 1) Startup (Mode 2)
Hot Standby (Mode 3)
Hot Shutdown (Mode 4)
Emergency Action Level(s):
Note: The SM should not wait until the applicable time has elapsed but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. Loss of all offsite AC power to Vital 4.16 KV busses  15 minutes.
 
Deviations:
None.
Differences:
 
The site-specific term "Vital 4.16 KV" is used in the IC and EAL to define emergency busses. to 0CAN121102
 
Page 88 of 110 NEI 99-01:  SU3 UNPLANNED loss of safety system annunciation or indication in the control room for 15 minutes
 
or longer.
Operating Mode Applicability:
Power Operation Startup Hot Standby
 
Hot Shutdown Example Emergency Action Level:
Note: The Emergency Director should not wait until the applicable time has elapsed but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. UNPLANNED Loss of greater than approximately 75% of the following for 15 minutes or longer:  a. (Site-specific control room safety system annunciation)
OR  b. (Site-specific control room safety system indication) to 0CAN121102
 
Page 89 of 110 ANO:  SU6 UNPLANNED loss of safety system annunciation or indication in the Control Room  15 minutes Operating Mode Applicability: Power Operations (Mode 1) Startup (Mode 2)
 
Hot Standby (Mode 3)
 
Hot Shutdown (Mode 4)
 
Emergency Action Level(s):
Note: The SM should not wait until the applicable time has elapsed but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. UNPLANNED loss of > approximately 75% of the following  15 minutes:
: a. Control Room annunciators associated with safety systems.
OR  b. Control Room safety system indication.
Deviations:
 
None. Differences:
NEI 99-01 SU3 is renumbered to ANO SU6 for formatting purposes based on site preference for order of ICs alone. In an attempt to group "families" of emergency classes together with the same last digit Arabic numeral designation (such as SU1, SA1, SS1, etc.), ICs labeled SU2, SU3, SU4, and SU5 are not provided. All NEI 99-01 NOUE ICs for the System Malfunction category are still addressed in the ANO EALs.
 
Additional information is provided in the bases to define those systems associated with safety system indication. to 0CAN121102
 
Page 90 of 110 NEI 99-01:  SU5 RCS leakage
 
Operating Mode Applicability:
Power Operation Startup Hot Standby
 
Hot Shutdown Example Emergency Action Levels: (1 or 2)
: 1. Unidentified or pressure boundary leakage greater than 10 gpm.
: 2. Identified leakage greater than 25 gpm.
ANO:  SU7 RCS leakage
 
Operating Mode Applicability: Power Operations (Mode 1) Startup (Mode 2)
 
Hot Standby (Mode 3)
 
Hot Shutdown (Mode 4)
Emergency Action Level(s):
(1 or 2) 
: 1. Unidentified or pressure boundary leakage > 10 gpm.
 
OR 
: 2. Identified leakage
> 25 gpm.
Deviations:
None. Differences:
Because prompt, procedurally driven action can be taken to isolate some sources of potential RCS leakage (such as isolating the Letdown system), the ANO basis document further defines this leakage to be a loss of RCS inventory due to a leak in the RCS or a supporting system that is not or cannot be isolated within 10 minutes. This clarification meets the intent of NEI 99-01.
 
NEI 99-01 SU5 is renumbered to ANO SU7 for formatting purposes based on site preference for order of ICs alone.
 
Basis information is added noting that steam generator tube leakage is considered as identified leakage. to 0CAN121102
 
Page 91 of 110 NEI 99-07:  SU6 Loss of All On-site or Off-site communications capabilities
 
Operating Mode Applicability:
Power Operation Startup Hot Standby
 
Hot Shutdown Example Emergency Action Levels: (1 or 2)
: 1. Loss of all of the following on-site communication methods affecting the ability to perform routine operations.
(site-specific list of communications methods)
 
2 Loss of all of the following off-site communication methods affecting the ability to perform offsite notifications.
(site-specific list of communications methods)
 
ANO:  SU8
 
Loss of all onsite or offsite communications capabilities
 
Operating Mode Applicability: Power Operations (Mode 1) Startup (Mode 2)
 
Hot Standby (Mode 3)
 
Hot Shutdown (Mode 4)
Emergency Action Level(s):
(1 or 2) 
: 1. Loss of all Table M1 onsite communications methods affecting the ability to perform routine operations.
OR    to 0CAN121102
 
Page 92 of 110 ANO:  SU8 (Cont'd)
: 2. Loss of all Table M2 offsite communications methods affecting the ability to perform offsite notifications.
Table M1 Onsite Communications Methods  Table M2 Offsite Communications Methods Station radio system  All telephone lines (commercial and microwave) Plant paging system  ENS In-plant telephones  Gaitronics Deviations:
None.
Differences:
NEI 99-01 SU6 is renumbered to ANO SU8 for formatting purposes based on site preference for order of ICs alone.
 
Onsite and offsite communications methods are presented in tables and the tables are
 
referenced causing a minor difference in EAL language from that in NEI 99-01. to 0CAN121102
 
Page 93 of 110 NEI 99-01: SU4 Fuel clad degradation
 
Operating Mode Applicability:
Power Operation Startup Hot Standby
 
Hot Shutdown Example Emergency Action Levels:
(1 or 2) 
: 1. (Site-specific radiation monitor readings indicating fuel clad degradation greater than Technical Specification allowable limits.)
: 2. (Site-specific coolant sample activity value indicating fuel clad degradation greater than Technical Specification allowable limits.)
 
ANO:  SU9 Fuel clad degradation
 
Operating Mode Applicability:
Power Operations (Mode 1) Startup (Mode 2)
Hot Standby (Mode 3)
Hot Shutdown (Mode 4)
Emergency Action Level(s):
: 1. Failed Fuel Iodine radiation monitor reading indicates fuel clad degradation > Technical Specification allowable limits:
Unit 1: RI-1237S reads > 1.3 x 10 5 counts per minute Unit 2: 2RITS-4806B reads > .65 x 10 5 counts per minute OR    to 0CAN121102
 
Page 94 of 110 ANO:  SU9 (Cont'd)
: 2. RCS sample activity value indicating fuel clad degradation > Technical Specification allowable limits:
  > 1.0 uCi/gm Dose Equivalent I-131 (DEI) for more than 48 hours OR  Unit 1:  60 uCi/gm Dose Equivalent I-131 Unit 2: > 60 uCi/gm Dose Equivalent I-131 OR  Unit 1: > 2200 &#xb5;Ci/gm Dose Equivalent Xe-133 for more than 48 hours Unit 2: > 3100 &#xb5;Ci/gm Dose Equivalent Xe-133 for more than 48 hours Deviations:
None. Differences:
NEI 99-01 SU4 is renumbered to ANO SU9 for formatting purposes based on site preference for order of ICs alone.
An EAL value and associated basis information are provided for the nominal operating limit for DEI for RCS activity in addition to the transient iodine spiking limit described in NEI 99-01. This value is also provided for Dose Equivalent Xe-133 in accordance with the station's Technical Specifications. to 0CAN121102
 
Page 95 of 110 NEI 99-01:  SU8 Inadvertent criticality
 
Operating Mode Applicability:
Hot Standby Hot Shutdown
 
Example Emergency Action Level:
(1 or 2)  1. UNPLANNED sustained positive period observed on nuclear instrumentation.
[BWR]
: 1. UNPLANNED sustained positive startup rate observed on nuclear instrumentation.
[PWR]
ANO:  SU10 Inadvertent criticality
 
Operating Mode Applicability: Hot Standby (Mode 3)
Hot Shutdown (Mode 4)
 
Emergency Action Level(s):
: 1. UNPLANNED sustained positive startup rate observed on nuclear instrumentation.
Deviations:
None.
 
Differences:
NEI 99-01 SU8 is renumbered to ANO SU10 for formatting purposes based on site preference for order of ICs alone. to 0CAN121102
 
Page 96 of 110 NEI 99-01:  SU2 Inability to reach required shutdown within Technical Specification limits
 
Operating Mode Applicability:
Power Operation Startup Hot Standby
 
Hot Shutdown
 
Example Emergency Action Level:
: 1. Plant is not brought to required operating mode within Technical Specifications Limiting Condition for Operation (LCO) Action Statement Time.
ANO:  SU11 Inability to reach required operating mode within Technical Specification limits
 
Operating Mode Applicability:
Power Operations (Mode 1) Startup (Mode 2)
 
Hot Standby (Mode 3)
 
Hot Shutdown (Mode 4)
 
Emergency Action Level(s):
: 1. Plant is not brought to required operating mode within Technical Specifications LCO action statement time.
Deviations:
None.
Differences:
 
NEI 99-01 SU2 is renumbered to ANO SU11 for formatting purposes based on site preference for order of ICs alone.
 
The NEI IC is changed to refer to required "operating mode" vice "shutdown" to provide clarity and agreement with the associated NEI EAL and bases. This change does not alter the meaning or intent of the IC. to 0CAN121102
 
Page 97 of 110 NEI 99-01:  SA5 AC power capability to emergency busses reduced to a single power source for 15 minutes or longer such that any additional single failure would result in station blackout Operating Mode Applicability:
Power Operation Startup Hot Standby
 
Hot Shutdown Example Emergency Action Level:
Note: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. a. AC power capability to (site-specific emergency busses) reduced to a single power source for 15 minutes or longer.
AND  b. Any additional single power source failure will result in station blackout.
 
to 0CAN121102
 
Page 98 of 110 ANO:  SA1 AC power capability to Vital 4.16 KV busses reduced to a single power source  15 minutes such that any additional single failure would result in station blackout Operating Mode Applicability:
Power Operations (Mode 1) Startup (Mode 2)
 
Hot Standby (Mode 3)
 
Hot Shutdown (Mode 4)
Emergency Action Level(s):
Note: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. a. AC power capability to Vital 4.16 KV busses reduced to a single power source  15 minutes.
AND  b. Any additional single power source failure will result in station blackout.
Deviations:
 
None. Differences:
NEI 99-01 SA5 is renumbered to ANO SA1 for formatting purposes based on site preference for order of ICs alone.
The site-specific term "Vital 4.16 KV" is used in the IC and EAL to define emergency busses. to 0CAN121102
 
Page 99 of 110 NEI 99-01:  SA2 Automatic Scram (Trip) fails to shutdown the reactor and the manual actions taken from the reactor control console are successful in shutting down the reactor.
Operating Mode Applicability:
Power Operation Startup  Example Emergency Action Level:
: 1. a. An automatic scram (trip) failed to shutdown the reactor.
 
AND  b. Manual actions taken at the reactor control console successfully shutdown the reactor as indicated by (site-specific indications of plant shutdown).
 
ANO:  SA3 Automatic trip fails to shutdown the reactor and the manual actions taken from the reactor control console are successful in shutting down the reactor
 
Operating Mode Applicability:
Power Operations (Mode 1) Startup (Mode 2)
Emergency Action Level(s):
: 1. a. An automatic trip failed to shutdown the reactor as indicated by reactor power  5%. AND  b. Manual actions taken at the reactor control console successfully shutdown the reactor as indicated by reactor power < 5%.
 
Deviations:
None.
Differences:
 
NEI 99-01 SA2 is renumbered to ANO SA3 for formatting purposes based on site preference for order of ICs alone.
 
The site-specific % reactor power is used to indicate both when the automatic reactor trip is not successful and when the manual reactor trip is successful.
Additional information is provided in the bases to define a failure of the manual trip function. to 0CAN121102
 
Page 100 of 110 NEI 99-01:  SA4 UNPLANNED Loss of safety system annunciation or indication in the control room with either (1) a SIGNIFICANT TRANSIENT in progress, or (2) compensatory indicators unavailable.
Operating Mode Applicability:
Power Operation Startup Hot Standby
 
Hot Shutdown Example Emergency Action Level:
Note: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. a. UNPLANNED loss of greater than approximately 75% of the following for 15 minutes or longer:
  (Site-specific control room safety system annunciation)
OR  (Site-specific control room safety system indication)
: b. EITHER of the following:
A SIGNIFICANT TRANSIENT is in progress.
Compensatory indications are unavailable. to 0CAN121102
 
Page 101 of 110 ANO:  SA6 UNPLANNED loss of safety system annunciation or indication in the Control Room with either (1) a SIGNIFICANT TRANSIENT in progress, or (2) compensatory indicators unavailable Operating Mode Applicability: Power Operations (Mode 1) Startup (Mode 2)
 
Hot Standby (Mode 3)
 
Hot Shutdown (Mode 4)
Emergency Action Levels(s):
Note: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. a. UNPLANNED loss of > approximately 75% of the following  15 minutes:
Control Room annunciators associated with safety systems OR  Control Room safety system indication AND  b. Either of the following:
A SIGNIFICANT TRANSIENT is in progress OR  Compensatory indications are unavailable Deviations:
None.
Differences:
 
NEI 99-01 SA4 is renumbered to ANO SA6 for formatting purposes based on site preference for order of ICs alone.
 
An "and" and an additional "or" are used in the EAL for clarity.
 
Additional information is provided in the bases with the term "SPDS" to define computer based information.
 
Additional information is provided in the bases to define those systems associated with safety system indication. to 0CAN121102
 
Page 102 of 110 NEI 99-01:  SS1 Loss of all Off-site and all On-Site AC power to emergency busses for 15 minutes or longer.
Operating Mode Applicability:
Power Operation Startup Hot Standby
 
Hot Shutdown
 
Example Emergency Action Level:
Note: The Emergency Director should not wait until the applicable time has elapsed but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. Loss of all Off-Site and all On-Site AC power to (site-specific emergency busses) for 15 minutes or longer.
 
ANO:  SS1 Loss of all offsite and all onsite AC power to Vital 4.16 KV busses  15 minutes
 
Operating Mode Applicability: Power Operations (Mode 1) Startup (Mode 2)
Hot Standby (Mode 3)
 
Hot Shutdown (Mode 4)
Emergency Action Level(s):
Note: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. Loss of all offsite and all onsite AC power to Vital 4.16 KV busses  15 minutes.
Deviations:
None.
Differences:
The site-specific term "Vital 4.16 KV" is used in the IC and EAL to define emergency busses. to 0CAN121102
 
Page 103 of 110 NEI 99-01:  SS2 Automatic Scram (Trip) fails to shutdown the reactor and manual actions taken from the reactor control console are not successful in shutting down the reactor.
Operating Mode Applicability:
Power Operation Startup  Example Emergency Action Level:
: 1. a. An automatic scram (trip) failed to shutdown the reactor.
 
AND  b. Manual actions taken at the reactor control console do not shutdown the reactor as indicated by (site-specific indications of reactor not shutdown).
 
ANO:  SS3 Automatic trip fails to shutdown the reactor and manual actions taken from the reactor control console are not successful in shutting down the reactor.
 
Operating Mode Applicability:
Power Operations (Mode 1) Startup (Mode 2)
Emergency Action Level(s):
: 1. a. An automatic trip failed to shutdown the reactor.
 
AND  b. Manual actions taken at the reactor control console do not shutdown the reactor as indicated by reactor power  5%.
Deviations:
None.
Differences:
 
NEI 99-01 SS2 is renumbered to ANO SS3 for formatting purposes based on site preference for order of ICs alone.
 
Additional information is provided in the bases to define a failure of the manual trip function. to 0CAN121102
 
Page 104 of 110 NEI 99-01:  SS3 Loss of all vital DC power for 15 minutes or longer.
 
Operating Mode Applicability:
Power Operation Startup Hot Standby
 
Hot Shutdown
 
Example Emergency Action Level:
Note: The Emergency Director should not wait until the applicable time has elapsed but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. Less than (site-specific bus voltage indication) on all (site-specific Vital DC busses) for 15 minutes or longer.
 
ANO:  SS4 Loss of all Vital DC power  15 minutes
 
Operating Mode Applicability:
Power Operations (Mode 1) Startup (Mode 2)
Hot Standby (Mode 3)
 
Hot Shutdown (Mode 4)
Emergency Action Level(s):
Note: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed but should declare the event as soon as it is determined that the condition has exceeded, or will likely, exceed the applicable time.
: 1. < 105 volts on all Vital DC busses  15 minutes.
Deviations:
None.
Differences:
NEI 99-01 SS3 is renumbered to ANO SS4 for formatting purposes based on site preference for order of ICs alone. to 0CAN121102
 
Page 105 of 110 NEI 99-01:  SS6 Inability to Monitor a SIGNIFICANT TRANSIENT in Progress
 
Operating Mode Applicability:
Power Operation Startup Hot Standby
 
Hot Shutdown
 
Example Emergency Action Level:
Note: The Emergency Director should not wait until the applicable time has elapsed but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. a. Loss of greater than approximately 75% of the following for 15 minutes or longer:
 
  (Site-specific control room safety system annunciation)
OR  (Site-specific control room safety system indication)
AND  b. A SIGNIFICANT TRANSIENT is in progress.
AND  c. Compensatory indications are unavailable.
to 0CAN121102
 
Page 106 of 110 ANO:  SS6 Inability to monitor a SIGNIFICANT TRANSIENT in progress
 
Operating Mode Applicability:
Power Operations (Mode 1) Startup (Mode 2)
 
Hot Standby (Mode 3)
 
Hot Shutdown (Mode 4)
 
Emergency Action Level(s):
Note: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. a. Loss of > approximately 75% of the following  15 minutes:
Control Room annunciators associated with safety systems OR  Control Room safety system indication AND  b. A SIGNIFICANT TRANSIENT is in progress.
AND  c. Compensatory indications are unavailable.
Deviations:
None.
 
Differences:
Additional information is provided in the bases with the term "SPDS" to define computer based information.
 
Additional information is provided in the bases to define those systems associated with safety system indication. to 0CAN121102
 
Page 107 of 110 NEI 99-01:  SG1 Prolonged loss of all Off-site and all On-Site AC power to emergency busses
 
Operating Mode Applicability:
Power Operation Startup Hot Standby
 
Hot Shutdown
 
Example Emergency Action Level:
: 1. a. Loss of all off-site and all on-site AC power to (site-specific emergency busses).
 
AND  b. EITHER of the following:
Restoration of at least one emergency bus in less than (site-specific hours) is not likely.  (Site-specific indication of continuing degradation of core cooling based on Fission Product Barrier monitoring.)    to 0CAN121102
 
Page 108 of 110 ANO:  SG1 Prolonged loss of all offsite and all onsite AC power to Vital 4.16 KV busses
 
Operating Mode Applicability: Power Operations (Mode 1) Startup (Mode 2)
 
Hot Standby (Mode 3)
 
Hot Shutdown (Mode 4)
 
Emergency Action Level(s):
: 1. a. Loss of all offsite and all onsite AC power to Vital 4.16 KV busses.
 
AND  b. Either of the following:
Restoration of at least one Vital 4.16 KV bus in < 4 hours is not likely OR  Continuing degradation of core cooling based on Fission Product Barrier monitoring as indicated by CETs  700 &deg;F.
Deviations:
None.
Differences:
The site-specific term "Vital 4.16 KV" is used in the IC and EAL to define emergency busses.
 
An "or" is used in the EAL for clarity. to 0CAN121102
 
Page 109 of 110 NEI 99-01:  SG2 Automatic Scram (Trip) and all manual actions fail to shutdown the reactor and indication of an extreme challenge to the ability to cool the core exists.
Operating Mode Applicability:
Power Operation Startup  Example Emergency Action Level:
: 1. a. An automatic scram (trip) failed to shutdown the reactor.
 
AND  b. All manual actions do not shutdown the reactor as indicated by (site-specific indications of reactor not shutdown).
AND  c. EITHER of the following exist or have occurred due to continued power generation:
  (Site-specific indication that core cooling is extremely challenged.)
  (Site-specific indication that heat removal is extremely challenged.)    to 0CAN121102
 
Page 110 of 110 ANO:  SG3 Automatic trip and all manual actions fail to shutdown the reactor and indication of an extreme challenge to the ability to cool the core exists.
Operating Mode Applicability:
Power Operations (Mode 1) Startup (Mode 2)
Emergency Action Level(s):
: 1. a. An automatic trip failed to shutdown the reactor.
 
AND  b. All manual actions do not shutdown the reactor as indicated by reactor power  5%. AND  c. Either of the following exist or have occurred due to continued power generation:
CET temperatures at or approaching 1200 &deg;F OR  Feedwater flow rate less than:
Unit 1:  430 gpm Unit 2:  485 gpm Deviations:
None.
Differences:
SG2 is renumbered to ANO IC SG3 for formatting purposes based on site preference for order of ICs alone.
 
An "or" is used in the EAL for clarity.
to 0CAN121102
 
Page 14 of 112 ABNORMAL RAD LEVELS / RADIOLOGICAL EFFLUENT AS1  Initiating Condition -- SITE AREA EMERGENCY Offsite dose resulting from an actual or IMMINENT release of gaseous radioactivity
> greater than 100 m R rem TEDE or 500 m Rrem child t Thyroid CDE for the actual or projected duration of the release
 
Operating Mode Applicability:
All  Example Emergency Action Level (s): (1 or 2 or 3 or 4)  Note: The SM/TSC Director/EOF Director Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time. If dose assessment results are available, the classification decl aration should be based on EAL #2 dose assessment instead of EAL #1radiation monitor values. Do not delay declaration awaiting dose assessment results. 1. VALID reading on Channel 9 on anyANY of the following radiation monitors
> greater than the reading shown for
> 15 minutes or longer
:  (site specific monitor list and threshold values)
MONITORS - UNIT 1 LIMIT RX-9820 Containment Purge 5.90E+1 &#xb5;Ci/cc RX-9825 Radwaste Area 5.36E+1 &#xb5;Ci/cc RX-9830 Fuel Handling Area 4.54E+1 &#xb5;Ci/cc RX-9835 Emergency Penetration Room 9.56E+2 &#xb5;Ci/cc MONITORS - UNIT 2 LIMIT 2RX-9820 Containment Purge 4.46E+1 &#xb5;Ci/cc 2RX-9825 Radwaste Area 3.32E+1 &#xb5;Ci/cc 2RX-9830 Fuel Handling Area 4.46E+1 &#xb5;Ci/cc 2RX-9835 Emergency Penetration Room 8.84E+2 &#xb5;Ci/cc 2RX-9840 Post Accident Sampling Building 4.42E+2 &#xb5;Ci/cc 2RX-9845 Aux. Building Extension 1.26E+2 &#xb5;Ci/cc OR  2. Dose assessment using actual meteorology indicates doses
> greater than 100 m R rem TEDE or 500 m Rrem child thyroid CDE at or beyond the site boundary. 
: 3. VALID perimeter radiation monitoring system reading greater than 100 mR/hr for 15 minutes or longer. [for sites having telemetered perimeter monitors]
to 0CAN121102
 
Page 17 of 112 ABNORMAL RAD LEVELS / RADIOLOGICAL EFFLUENT AG1  Initiating Condition -- GENERAL EMERGENCY Offsite dose resulting from an actual or IMMINENT release of gaseous radioactivity
> greater than 1000 m R rem TEDE or 5000 m R rem child t Thyroid CDE for the actual or projected duration of the release using actual meteorology  Operating Mode Applicability:
All  Example Emergency Action Level (s): (1 or 2 or 3 or 4)  Note: The SM/TSC Director/EOF Director Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time. If dose assessment results are available, the classification declaration should be based on EAL #2 dose assessment instead of EAL #1 radiation monitor values. Do not delay declaration awaiting dose assessment results. 1. VALID reading on Channel 9 on anyANY of the following radiation monitors
> greater than the reading shown for
> 15 minutes or longer
:  (site specific monitor list and threshold values)
MONITORS - UNIT 1 LIMIT RX-9820 Containment Purge 5.90E+2 (Ci/cc) RX-9825 Radwaste Area 5.36E+2 (Ci/cc) RX-9830 Fuel Handling Area 4.54E+2 (Ci/cc) RX-9835 Emergency Penetration Room 9.56E+3 (Ci/cc)  MONITORS - UNIT 2 LIMIT 2RX-9820 Containment Purge 4.46E+2 (Ci/cc) 2RX-9825 Radwaste Area 3.32E+2 (Ci/cc) 2RX-9830 Fuel Handling Area 4.46E+2 (Ci/cc) 2RX-9835 Emergency Penetration Room 8.84E+3 (Ci/cc) 2RX-9840 Post Accident Sampling Building 4.42E+3 (Ci/cc) 2RX-9845 Aux. Building Extension 1.26E+3 (Ci/cc)  OR  2. Dose assessment using actual meteorology indicates doses
> greater than 1000 m Rrem TEDE or 5000 m Rrem child thyroid CDE at or beyond the site boundary. 3. VALID perimeter radiation monitoring system reading greater than 1000 mR/hr for 15 minutes or longer. [for sites having tel emetered perimeter monitors]
OR    to 0CAN121102
 
Page 36 of 112 COLD SHUTDOWN/REFUELING SYSTEM MALFUNCTION CG1  Initiating Condition - GENERAL EMERGENCY Loss of RCS/
reactor vessel RPV inventory affecting fuel clad integrity with containment challenged  Operating Mode Applicability:
Cold Shutdown (Mode 5)            Refueling (Mode 6)  Example Emergency Action Level (s): (1 or 2)  Note:  The SM/TSC Director/EOF DirectorEmergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time. 1. a. Core exit thermocouples indicate superheat RCS/RPV level less than (site specific level for TOAF) for > 30 minutes or longer
. AND b. Any of the following containment challenge indications:
ANY containment challenge indication (see Table):
CONTAINMENT CLOSURE not established Explosive mixture inside containment UNPLANNED rise in containment pressure OR  2. a. RCS/
reactor vessel RPV level cannot be monitored for  30 minutes with a loss of RCS /
reactor vessel inventory aswith core uncovery indicated by any ANY of the following for 30 minutes:  Containment High Range Radiation Monitor reading > 10R/hr (Site specific radiation monitor) reading greater than (site specific setpoint).
Erratic source range monitor indication  UNexplained PLANNED level rise in Reactor Building Sump, Reactor Drain Tank, Quench Tank, Aux. Building Equipment Drain Tank, or Aux. Building Sump (site specific sump or tank).
      [Other site specific indications]
AND      to 0CAN121102
 
Page 39 of 112 ISFSI MALFUNCTION E-HU1  Initiating Condition - NOTIFICATION OF UNUSUAL EVENT Note: Security Events are bounded by the Hazards EALs.
Damage to a loaded cask CONFINEMENT BOUNDARY  Operating Mode Applicability:
All Not applicable Example Emergency Action Level (s):  1. Damage to a loaded cask CONFINEMENT BOUNDARY
. Basis:  An NUE A NOUE in this IC is categorized on the basis of the occurrence of an event of sufficient magnitude that a loaded cask CONFINEMENT BOUNDARY is damaged or violated. This includes classification based on a loaded fuel storage cask CONFINEMENT BOUNDARY loss leading to the degradation of the fuel during storage or posing an operational safety problem with respect to its removal from storage.
  [The results of the ISFSI Safety Analysis Report (SAR) per NUREG 1536 or SAR referenced in the cask('s) Certificate of Compliance and the related NRC Safety Evaluation Report identify natural phenomena events and accident conditions that could potentially effect the CONFINEMENT BOUNDARY
]This EAL addresses a dropped cask, a tipped over cask, EXPLOSION, PROJECTILE damage, FIRE damage or natural phenomena affecting a cask (e.g., seismic event, tornado, etc.)
. to 0CAN121102
 
Page 56 of 112 FISSION PRODUCT BARRIERS PWR TABLE 5
-F-3 CONTAINMENT 1 A. RUPTURED steam generator SG is also FAULTED outside of containment OR 2 B. a. Primary-to-s S econdary leakrate
>greater than 10 gpm  AND b. UNISOLABLE steam release from affected steam generator SG to the environment Potential Loss:
NoneNot Applicable Basis:  Th is e loss EAL threshold recognizes that SG tube leakage can represent a bypass of the c Containment barrier as well as a loss of the RCS barrier.
Users should realize that the two loss thresholds could be considered redundant. This was recognized during the development process. The inclusion of an threshold that uses Emergency Procedure commonly used terms like "RUPTURED and FAULTED" adds to the ease of the classification process and has been included based on this human factor concern.
 
This EAL threshold results in a NUE NOUE for smaller breaks that; (1) do not exceed the Normal Makeup Capacity for Unit 1 or the capacity of one charging pump in the normal charging lineup for Unit 2 the normal charging capacity EAL thre shold in RCS leak rate barrier Potential Loss threshold, or (2) do not result in ECCS actuation in RCS SG tube rupture barrier Loss threshold. For larger breaks, RCS barrier threshold criteria would result in an Alert. For SG tube ruptures which may involve multiple steam generators or UNISOLABLE unisolable secondary line breaks, this condition threshold would exist in conjunction with RCS barrier condition threshold s and would result in a Site Area Emergency.
Escalation to General Emergency would be based on "Potential Loss" of the Fuel Clad Barrier.
Loss 1.Threshold A This EAL threshold addresses the condition in which a RUPTURED steam generator is also FAULTED. This condition represents a bypass of the RCS and containment barriers and is a subset of the second threshold.
In conjunction with RCS leak rate barrier loss EAL RCB2threshold, this would always result in the declaration of a Site Area Emergency.
Loss 2.Threshold B  This EAL threshold addresses SG tube leaks that exceed 10 gpm in conjunction with an UNISOLABLE release path to the environment from the affected steam generator. The threshold for establishing the UNISOLABLE secondary side release is intended to be a prolonged release of radioactivity from the RUPTURED steam generat or directly to the environment. This could be expected to occur when the main condenser is unavailable to accept the contaminated steam (i.e., SG tube rupture with concurrent loss of off-site power and the RUPTURED steam generator is required for plant cooldown or a stuck open relief valve). The time it takes to isolate a SG with to 0CAN121102
 
Page 73 of 112 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HA 6 1  3. Internal flooding in anyANY of the following areas resulting in an electrical shock hazard that precludes access to operate or monitor safety equipment or OR C c ontrol R r oom indication of degraded performance of those safety systems: 
(site specific area list)
Intake Structure Auxiliary Building Turbine Building OR  4. Turbine failure-generated PROJECTILES resulting in VISIBLE DAMAGE to or  penetration of anyANY of the following structures/equipment containing safety systems or components or OR C control R room indication of degraded performance of those safety systems:
(site specific structure list)
Control Room Turbine Building Startup Transformers Auxiliary Building OR  1. Lake Dardanelle level < 335 feet and Emergency Cooling Pond inoperable.
OR  6 5. Vehicle crash resulting in VISIBLE DAMAGE to any ANY of thefollowing structures
/equipment containing safety systems or components or OR C c ontrol R room indication of degraded performance of those safety systems: 
(site specific structure list)
Reactor Building Turbine Building Intake Structure QCST Ultimate Heat Sink RWT Startup Transformers Auxiliary Building Diesel Fuel Vault BWST
: 6. (Site specific occurrences) resulting in VISIBLE DAMAGE to ANY of the following structures containing safety systems or components OR control room indication of degraded performance of those safety systems:
(site specific structure list)
Basis:  These EALs escalate from HU 6 1 in that the occurrence of the event has resulted in VISIBLE DAMAGE to plant structures or areas containing equipment necessary for a safe shutdown, or has caused damage to the safety systems in those structures evidenced by C c ontrol R r oom    to 0CAN121102
 
Page 74 of 112 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HA 6 1  indications of degraded system response or performance. The occurrence of VISIBLE DAMAGE and/or degraded system response is intended to discriminate against lesser events. The initial report should not be interpreted as mandating a lengthy damage assessment prior to classification. No attempt is made in this EAL to assess the actual magnitude of the damage. The significance here is not that a particular system or structure was damaged, but rather, that the event was of sufficient magnitude to cause this degradation. Escalation of this emergency classification level, if appropriate, would be based on System Malfunction (S) ICs. EALs #2 - #5  [These EALs should specify site specific structures or areas that contain safety system, or component and functions required for safe shutdown of the plant. Site specific Safe Shutdown Analysis should be consulted for equipment and plant areas required to establish or maintain safe shutdown.
]  EAL #1  Seismic events of this magnitude can result in a VITAL AREA being subjected to forces beyond design limits, and thus damage may be assumed to have occurred to plant safety systems. 
[This threshold should be based on site specific FSAR design basis. See EPRI
-sponsored "Guidelines for Nuclear Plant Response to an Earthquake", dated October 1989, for information on seismic event categories.
]  The National Earthquake Center can confirm if an earthquake has occurred in the area of the plant. EAL #2  This EAL is based on a tornado striking (touching down) or high winds that have caused VISIBLE DAMAGE to structures containing functions or systems required for safe shutdown of the plant.
The high wind value in EAL #2 is conservatively based on the SAR design basis for Unit 1 of 67 mph. Unit 2 Design basis is 80 mph.
The high wind value should be based on site specific FSAR design basis as long as it is within the range of the instrumentation available for wind speed.]  EAL #3  This EAL addresses the effect of internal flooding caused by events such as component failures, equipment misalignment, or outage activity mishaps. It is based on the degraded performance of systems, or has created industrial safety hazards (e.g., electrical shock) that preclude necessary access to operate or monitor safety equipment. The inability to access, operate or monitor safety equipment represents an actual or substantial potential degradation of the level of safety of the plant.      to 0CAN121102
 
Page 75 of 112 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HA 6 1  Flooding as used in this EAL describes a condition where water is entering the room faster than installed equipment is capable of removal, resulting in a rise of water level within the room. Classification of this EAL should not be delayed while corrective actions are being taken to isolate the water source. 
[The site specific areas include those areas that contain systems required for safe shutdown of the plant, which are not designed to be partially or fully submerged. The plant's IPEEE may provide insight into areas to be considered when developing this EAL.
]  EAL #4  This EAL addresses the threat to safety related equipment imposed by PROJECTILEs generated by main turbine rotating component failures. Therefore, this EAL is consistent with the definition of an ALERT in that the potential exists for actual or substantial potential degradation of the level
 
of safety of the plant. 
[The site specific list of areas should include all areas containing safety structure, system, or component, their controls, and their power supplies.
]  EAL #5  This EAL addresses vehicle crashes within the PROTECTED AREA that result s in VISIBLE DAMAGE to VITAL AREAS or indication of damage to safety structures, systems, or components containing functions and systems required for safe shutdown of the plant.
EAL #6  This EAL addresses other site specific phenomena that result in VISIBLE DAMAGE to VITAL AREAS or results in indication of damage to safety structures, systems, or components containing functions and systems required for safe shutdown of the plant (such as hurricane, flood, or seiche) that can also be precursors of more serious events.
[Sites subject to severe weather as defined in the NUMARC station blackout initiatives should include an EAL based on activation of the severe weather mitigation procedures (e.g., precautionary shutdowns, diesel testing, staff call
-outs, etc.).
] EAL #6 addresses site specific phenomena which has the potential for the loss of primary and secondary heat sink.
Reference Documents:
: 1. OP-1203.025, "Natural Emergencies"
: 2. OP-2203.008, "Natural Emergencies"
: 3. Unit 1 FSAR
: 4. Unit 2 FSAR to 0CAN121102
 
Page 76 of 112 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HA 4 2  Initiating Condition - ALERT FIRE or EXPLOSION affecting the operability of plant safety systems required to establish or maintain safe shutdown  Operating Mode Applicability:
All  Example Emergency Action Level (s):  1. FIRE or EXPLOSION resulting in VISIBLE DAMAGE to anyANY Table H1 of the following structure s or area containing safety systems or components or OR C control R r oom indication of degraded performance of those safety systems
.  (site specific structure list)
Table H1 Unit 1 Unit 2 CA-1 & HP Office Area Condensate Demineralizer Room Corridor 98 Fire Area C Lower North Electrical Penetration Room (LNEPR) Lower South Electrical Equipment Room (LSEER) / Air Compressor Room Lower South Electrical Penetration Room (LSEPR) Lower South Piping Penetration Room (LSPPR)
Main Steam Isolation Violation (MSIV) Room North Engineered Safeguards (ES) SWGR Room (A4) South ES SWGR Room Turbine Building A1, A2, H1, H2 SWGR area 354' Bowling Alley north end west of Breathing Air compressor room 368' West Heater Deck from LSEER (orange door) along east wall of ES SWGR Rooms to Corridor 98 door.
Upper North Electrical Penetration Room (UNEPR) / Hot Tool Room / Decon Room Upper South Electrical Penetration Room (USEPR) Upper South Piping Penetration Room (USPPR) 2A3 Room 2A4, 2D02, & East Battery Room 2B53 Room 2B63 Room 2B9/2B10 Room 2Y11/13 Equipment Room Auxiliary Building 317' General Access Auxiliary Building 335' Auxiliary Building 354'
'B' Engineered Safeguards Features (ESF)
Room Corridor Behind Door 340 Turbine Building 2A1, 2A2, 2H1, 2H2 Area 354' West wall of Demineralizer area 368' West Heater Deck north of north Switchgear (SWGR) Room (2A3) and East of LNEPR Intake Structure  354' or 366' LNEPR LSEPR Motor-Generator (MG) Set Room Steam Pipe Area Hot Machine Shop UNEPR, UNPPR, LNPPR, USPPR to 0CAN121102
 
Page 77 of 112 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HA 4 2  Basis:  VISIBLE DAMAGE is used to identify the magnitude of the FIRE or EXPLOSION and to discriminate against minor FIRES and EXPLOSIONS. The reference to structures or areas containing safety systems or components is included to discriminate against FIRES or EXPLOSIONS in areas having a low probability of affecting safe operation. The significance here is not that a safety system was degraded but the fact that the FIRE or EXPLOSION was large enough to cause damage to these systems. The use of VISIBLE DAMAGE should not be interpreted as mandating a lengthy damage assessment prior to classification. The declaration of an Alert and the activation of the Technical Support Center will provide the SM/TSC Director/EOF DirectorEmergency Director with the resources needed to perform detailed damage assessments.
The SM/TSC Director/EOF Director Emergency Director also needs to consider any security aspects of the EXPLOSION. 
[This EAL should specify site specific structures or areas that contain safety system, or component and functions required for safe shutdown of the plant. Site specific Safe Shutdown Analysis should be consulted for equipment and plant areas required to establish or maintain safe shutdown.]  Escalation of this emergency classification level, if appropriate, will be based on System Malfunction (S)s, Fission Product Barrier Degradation (F) or Abnormal Rad iation Levels /
Radiological Effluent (A) ICs. to 0CAN121102
 
Page 78 of 112 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HA 5 3  Initiating Condition - ALERT Access to a VITAL AREA is prohibited due to toxic, corrosive, asphyxiant or flammable gases which jeopardize operation of operable equipment required to maintain safe operations or safely
 
shutdown the reactor.
 
Unit 1    VITAL AREA APPLICABLE MODES A-4 Switchgear Room 3, 4  Upper North Electrical Penetration Room 3, 4  Lower South Electrical Equipment Room 3, 4  Control Room ALL    Unit 2  VITAL AREA APPLICABLE MODES Auxiliary Building 317' Emer gency Core Cooling Rooms 3, 4  Auxiliary Building 317' Tendon Gallery Access 3, 4  Auxiliary Building 335' Charging Pumps / 2B-52 3, 4  Auxiliary Building 354' 2B-62 Area 3, 4  Emergency Diesel Generator Corridor 3, 4  Lower South Piping Penetration Room 3, 4  Auxiliary Building 386' Containment Hatch 3, 4  Control Room ALL    Operating Mode Applicability:
AllAs stated in above tables.
Example Emergency Action Level (s):  Note:  If the equipment in the stated area was already inoperable, or out of service, before the event occurred, then this EAL should not be declared as it will have no adverse impact on the ability of the plant to safely operate or safely shutdown beyond that already allowed by Technical Specifications at the time of the event. 1. Access to a VITAL AREA is prohibited due to toxic, corrosive, asphyxiant or flammable gases which jeopardize operation of systems required to maintain safe operations or safely shutdown the reactor. to 0CAN121102
 
Page 79 of 112 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HA 5 3  Basis:  Gases in a VITAL AREA can affect the ability to safely operate or safely shutdown the reactor.
The fact that SCBA s may be worn does not eliminate the need to declare the event. Declaration should not be delayed for confirmation from atmospheric testing if the atmosphere poses an immediate threat to life and health or an immediate threat of severe exposure to gases.
This could be based upon documented analysis, indication of personal ill effects from exposure, or operating experience with the hazards. If the equipment in the stated area was already inoperable, or out of service, before the event occurred, then this EAL should not be declared as it will have no adverse impact on the ability of the plant to safely operate or safely shut down beyond that already allowed by Technical Specifications at the time of the event. An asphyxiant is a gas capable of reducing the level of oxygen in the body to dangerous levels. Most commonly, asphyxiants work by merely displacing air in an enclosed environment. This reduces the concentration of oxygen below the normal level of around 19%, which can lead to breathing difficulties, unconsciousness or even death. An uncontrolled release of flammable gasses within a facility structure has the potential to affect safe operation of the plant by limiting either operator or equipment operations due to the potential for ignition and resulting equipment damage/personnel injury. Flammable gasses, such as hydrogen and acetylene, are routinely used to maintain plant systems (hydrogen) or to repair equipment/components (acetylene - used in welding). This EAL assumes concentrations of flammable gasses which can ignite/support combustion. Escalation of this emergency classification level, if appropriate, will be based on System Malfunction (S)s, Fission Product Barrier Degradation (F) or Abnormal Rad iation Levels /
Radioactive Effluent (A) ICs. to 0CAN121102
 
Page 80 of 112 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HA 1 4  Initiating Condition - ALERT HOSTILE ACTION within the OWNER CONTROLLED AREA or airborne attack threat Operating Mode Applicability:
All  Example Emergency Action Level (s):  (1 or 2)  1. A HOSTILE ACTION is occurring or has occurred within the OWNER CONTROL LED AREA as reported by ANO the  Security Shift Supervision(site specific security shift supervision). OR 2. A validated notification from NRC of an airliner attack threat within 30 minutes of the site. 
 
Basis:  NOTE Note: Timely and accurate communication between Security Shift Supervision and the Control Room is crucial for the implem entation of effective Security EALs. These EALs address the contingency for a very rapid progression of events, such as that experienced on September 11, 2001. They are not premised solely on the potential for a radiological release. Rather the issue includes the need for rapid assistance due to the possibility for significant and indeterminate damage from additional air, land or water attack elements. The fact that the site is under serious attack or is an identified attack target with minimal time available for further preparation or additional assistance to arrive requires a heightened state of readiness and implementation of protective measures that can be effective (such as on-site evacuation, dispersal or sheltering).
EAL #1  This EAL addresses the potential for a very rapid progression of events due to a HOSTILE ACTION. It is not intended to address incidents that are accidental events or acts of civil disobedience, such as small aircraft impact, hunters, or physical disputes between employees within the O WNER C ONTROLLED A REA. Those events are adequately addressed by other EALs. Note that this EAL is applicable for any HOSTILE ACTION occurring, or that has occurred, in the OWNER CONTROLLED AREA. This includes I ndependent S pent F uel S torage I nstallation
's that may be outside the PROTECTED AREA but still within the OWNER CONTROLLED AREA. 
[Although nuclear plant security officers are well trained and prepared to protect against HOSTILE ACTION, it is appropriate for OROs to be notified and encouraged to begin activation (if they do not normally) to be better prepared should it be necessary to consider further actions
.]  [If not previously notified by the NRC that the airborne HOSTILE ACTION was intentional, then it would be expected, although not certain, that notification by an appropriate Federal agency would    to 0CAN121102
 
Page 81 of 112 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HA 1 4  follow. In this case, appropriate federal agency is intended to be NORAD, FBI, FAA or NRC. However, the declaration should not be unduly delayed awaiting Federal notification.
]  EAL #2  This EAL addresses the immediacy of an expected threat arrival or impact on the site within a relatively short time. The intent of this EAL is to ensure that notifications for the airliner attack threat are made in a timely manner and that O ffsite R esponse O rganizations and plant personnel are at a state of heightened awareness regarding the credible threat. Airliner is meant to be a large aircraft with the potential for causing significant damage to the plant. This EAL is met when a plant receives information regarding an airliner attack threat from NRC and the airliner is within 30 minutes of the plant. Only the plant to which the specific threat is made need declare the Alert.
The NRC Headquarters Operations Officer (HOO) will communicate to the licensee if the threat involves an airliner (airliner is meant to be a large aircraft with the potential for causing significant damage to the plant). The status and size of the plane may be provided by NORAD through the
 
NRC. to 0CAN121102
 
Page 82 of 112 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HA 3 5  Initiating Condition - ALERT Control room evacuation has been initiated Operating Mode Applicability:
All  Example Emergency Action Level (s):  1.      Alternate Shutdown procedure (Site-specific procedure) requires C c ontrol R r oom evacuation
:  Unit 1:
1203.002, "Alternate Shutdown" Unit 2:
2203.014, "Alternate Shutdown" Basis:  With the C c ontrol R room evacuated, additional support, monitoring and direction through the Technical Support Center and/or other emergency response facilities may be necessary. Inability to establish plant control from outside the C c ontrol R room will escalate this event to a Site Area Emergency. to 0CAN121102
 
Page 83 of 112 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HA 2 6  Initiating Condition - ALERT Other conditions exist which in the judgment of the SM/TSC Director/EOF Director Emergency Director warrant declaration of an Alert  Operating Mode Applicability:
All  Example Emergency Action Level (s):  1. Other conditions exist which in the judgment of the SM/TSC Director/EOF Director Emergency Director indicate that events are in progress or have occurred which involve an actual or potential substantial degradation of the level of safety of the plant or a security event that involves probable life threatening risk to site personnel or damage to site equipment because of HOSTILE ACTION. Any releases are expect ed to be limited to small fractions of the EPA Protective Action Guideline exposure levels.
Basis:  This EAL addresses unanticipated conditions not addressed explicitly elsewhere but that warrant declaration of an emergency because conditions exist which are believed by the SM/TSC Director/EOF Director Emergency Di rector to fall under the Alert emergency classification level. to 0CAN121102
 
Page 84 of 112 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HS 3 2  Initiating Condition - SITE AREA EMERGENCY Control R room evacuation has been initiated and plant control cannot be established  Operating Mode Applicability:
All  Example Emergency Action Level (s):  1. a. Control room evacuation has been initiated  AND  b. Control of the plant cannot be established in accordance with the following procedures within 15(site specific minutes):  Unit 1:  1203.002, "Alternate Shutdown" Unit 2:  2203.014, "Alternate Shutdown" Basis:  The intent of this IC is to capture those events where control of the plant cannot be reestablished in a timely manner. In this case, expeditious transfer of control of safety systems has not occurred (although fission product barrier damage may not yet be indicated). The intent of the EAL is to establish control of important plant equipment and knowledge of important plant parameters in a timely manner. Primary emphasis should be placed on those components and instruments that supply protection for and information about safety functions such as reactivity control (ability to shutdown the reactor and maintain it shutdown), RCS inventory (ability to cool the core), and decay heat removal (ability to maintain a heat sink).Typically, these safety functions are reactivity control (ability to shutdown the reactor and maintain it shutdown), reactor water level (ability to cool the core), and de cay heat removal (ability to maintain a heat sink) for a BWR. The equivalent functions for a PWR are reactivity control, RCS inventory, and secondary heat removal.
The determination of whether or not control is established at the remote shutdown panel is based on SM/TSC Director/EOF Director Emergency Director (ED) judgment. The SM/TSC Director/EOF DirectorEmerge ncy Director is expected to make a reasonable, informed judgment within 15 minutesthe site specific time for transfer that the plant staff licensee has control of the plant from the remote shutdown panel. 
[The site specific time for transfer is based on analysis or assessments as to how quickly control must be reestablished without core uncovering and/or core damage. This time should not exceed 15 mi nutes without additional justification
.]  Escalation of this emergency classification level, if appropriate, would be by Fission Product Barrier Degradation (F) or Abnormal Rad iation Levels/Radiological Effluent (A) EALs. to 0CAN121102
 
Page 85 of 112 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HS 2 3  Initiating Condition - SITE AREA EMERGENCY Other conditions exist which in the judgment of the SM/TSC Director/EOF Director Emergency Director warrant declaration of a Site Area Emergency  Operating Mode Applicability:
All  Example Emergency Action Level (s):  1. Other conditions exist which in the judgment of the SM/TSC Director/EOF Director Emergency Director indicate that events are in progress or have occurred which involve actual or likely major failures of plant functions needed for protection of the public or HOSTILE ACTION that results in intentional damage or malicious acts; (1) toward site personnel or equipment that could lead to the likely failure of or; (2) that prevent effective access to equipment needed for the protection of the public. Any releases are not expected to result in exposure levels which exceed EPA Protective Action Guideline exposure levels beyond the site boundary.
Basis:  This EAL addresses unanticipated conditions not addressed explicitly elsewhere but that warrant declaration of an emergency because conditions exist which are believed by the SM/TSC Director/EOF Director Emergency Director to fall under the emergency classification level description for Site Area Emergency. to 0CAN121102
 
Page 86 of 112 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HS 1 4  Initiating Condition - SITE AREA EMERGENCY HOSTILE ACTION within the PROTECTED AREA Operating Mode Applicability:
All  Example Emergency Action Level (s):  1. A HOSTILE ACTION is occurring or has occurred within the PROTECTED AREA as reported by ANO the  Security Shift Supervision(site security shift supervision). Basis:  This condition represents an escalated threat to plant safety above that contained in the Alert in that a HOSTILE FORCE has progressed fr om the OWNER CONTROLLED AREA to the PROTECTED AREA. This EAL addresses the contingency for a very rapid progression of events, such as that experienced on September 11, 2001. It is not premised solely on the potential for a radiological release. Rather the issue includes the need for rapid assistance due to the possibility for significant and indeterminate damage from additional air, land or water attack elements. The fact that the site is under serious attack with minimal time available for further preparation or additional assistance to arrive requires O ffsite R esponse O rganization readiness and preparation for the implementation of protective measures. This EAL addresses the potential for a very rapid progression of events due to a HOSTILE ACTION. It is not intended to address incidents that are accidental events or acts of civil disobedience, such as small aircraft impact, hunters, or physical disputes between employees within the PROTECTED AREA. Those event s are adequately addressed by other EALs. 
[Although nuclear plant security officers are well trained and prepared to protect against HOSTILE ACTION, it is appropriate for OROs to be notified and encouraged to begin preparations for public protective actions (if they do not normally) to be better prepared should it be necessary to consider further actions.
]  [If not previously notified by NRC that the airborne HOSTILE ACTION was intentional, then it would be expected, although not certain, that notification by an appropriate Federal agency would follow. In this case, appropriate federal agency is intended to be NORAD, FBI, FAA or NRC. However, the declaration should not be unduly delayed awaiting Federal notification.
]  Escalation of this emergency classification level, if appropriate, would be based on actual plant status after impact or progression of attack. to 0CAN121102
 
Page 87 of 112 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HG1  Initiating Condition - GENERAL EMERGENCY HOSTILE ACTION resulting in loss of physical control of the facility  Operating Mode Applicability:
All  Example Emergency Action Level (s):  (1 or 2)  1. A HOSTILE ACTION has occurred such that plant personnel are unable to operate equipment required to maintain safety functions.
OR  2. A HOSTILE ACTION has caused failure of Spent Fuel Cooling Systems and IMMINENT fuel damage is likely for a freshly off-loaded reactor core in pool. 
 
Basis:  EAL #1  This EAL encompasses conditions under which a HOSTILE ACTION has resulted in a loss of physical control of VITAL AREAS (containing vital equipment or controls of vital equipment) required to maintain safety functions and control of that equipment cannot be transferred to and operated from another location. These safety functions are reactivity control (ability to shut down the reactor and keep it shutdown) RCS inventory (ability to cool the core), and secondary heat removal (ability to maintain a heat sink). 
  [Typically, these safety functions are reactivity control (ability to shut down the reacto r and keep it shutdown) reactor water level (ability to cool the core), and decay heat removal (ability to maintain a heat sink) for a BWR. The equivalent functions for a PWR are reactivity control, RCS inventory, and secondary heat removal.
]  [Loss of physical control of the Control Room or remote shutdown/alternate shutdown capability alone may not prevent the ability to maintain safety functions per se. Design of the remote shutdown/alternate shutdown capability and the location of the transfer switches should be taken into account. Primary emphasis should be placed on those components and instruments that supply protection for and information about safety functions
.]  If control of the plant equipment necessary to maintain safety functions can be transferred to another location, then the threshold is not met.
EAL #2  This EAL addresses failure of spent fuel cooling systems as a result of HOSTILE ACTION if IMMINENT fuel damage is likely, such as when a freshly off-loaded reactor core is in the spent fuel pool. At ANO, the term "freshly off-loaded reactor core" refers to fuel that has been discharged from the core and stored in the spent fuel pool for a period of LESS THAN one year.
[A f reshly off
-loaded reactor core is defined by site specific criteria. to 0CAN121102
 
Page 88 of 112 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HG2  Initiating Condition - GENERAL EMERGENCY Other conditions exist which in the judgment of the SM/TSC Director/EOF Director Emergency Director warrant declaration of a General Emergency  Operating Mode Applicability:
All  Example Emergency Action Level (s):  1. Other conditions exist which in the judgment of the SM/TSC Director/EOF Director Emergency Director indicate that events are in progress or have occurred which involve actual or IMMINENT substantial core degradation or melting with potential for loss of containment integrity or HOSTILE ACTION that results in an actual loss of physical control of the facility.
 
Releases can be reasonably expected to exceed EPA Protective Action Guideline exposure levels offsite for more than the immediate site area.
Basis:  This EAL addresses unanticipated conditions not addressed explicitly elsewhere but that warrant declaration of an emergency because conditions exist which are believed by the SM/TSC Director/EOF Director Emergency Director to fall under the emergency classification level description for General Emergency. to 0CAN121102
 
Page 89 of 112 SYSTEM MALFUNCTION SU1  Initiating Condition - NOTIFICATION OF UNUSUAL EVENT Loss of all o O ffsite AC power to Vital 4.16 KV emergency busses > for 15 minutes or longer Operating Mode Applicability: Power Operation s (Mode 1)
Startup (Mode 2)            Hot Standby (Mode 3)            Hot Shutdown (Mode 4)  Example Emergency Action Level (s):  Note: The SM Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time. 1. Loss of all offsite AC power to Vital 4.16 KV (site specific emergency busses) for > 15 minutes or longe r. Basis:  Prolonged loss of offsite AC power reduces required redundancy and potentially degrades the level of safety of the plant by rendering the plant more vulnerable to a complete loss of AC power
 
to emergency busses. Fifteen minutes was selected as a threshold to exclude transient or momentary losses of off-site power.        Reference Documents:
: 1. 1202.007, "
Degraded Powe r" 2. 1202.008, "
Blackout" 3. 2202.007, "
Loss of Off-Site Power"
: 4. 2202.008, "Station Blackout"
  [At multi-unit stations, the EALs should allow credit for operation of installed design feat ures, such as cross
-ties or swing diesels, provided that abnormal or emergency operating procedures address their use. However, these stations must also consider the impact of this condition on other shared safety functions in developing the site specific EAL.]  [Plants that have a proceduralized capability to cross
-tie AC power from an off
-site power supply of a companion unit may take credit for the redundant power source in the associated EAL for this IC.]    to 0CAN121102
 
Page 90 of 112 SYSTEM MALFUNCTION SU 11 2  Initiating Condition - NOTIFICATION OF UNUSUAL EVENT Inability to reach required operating mode shutdown within Technical Specification limits Operating Mode Applicability: Power Operation s (Mode 1)
Startup (Mode 2)            Hot Standby (Mode 3)            Hot Shutdown (Mode 4)  Example Emergency Action Level (s):  1. Plant is not brought to required operating mode within Technical Specifications LCO Action Statement t T ime. Basis:  Limiting Conditions of Operation (LCOs) require the plant to be brought to a required operating mode when the Technical Specification required configuration cannot be restored. Depending on the circumstances, this may or may not be an emergency or precursor to a more severe condition. In any case, the initiation of plant shutdown required by the site Technical Specifications requires a four hour report under 10 CFR 50.72 (b) Non-emergency events. The plant is within its safety envelope when being shut down within the allowable action statement time in the Technical Specifications. An immediate N O UE is required when the plant is not brought to the required operating mode within the allowable action statement time in the Technical Specifications. Declaration of a n  N OUE is based on the time at which the LCO-specified action statement time period elapses under the site Technical Specifications and is not related to how long a condition may have existed.  [Other required Technical Specification shutdowns that involve precursors to more serious events are addressed by other System Malfunction, Hazards, or Fission Product Barrier Degradation ICs.]  Reference Documents:
: 1. ANO2 Technical Specifications
: 2. ANO1 Technical Specifications to 0CAN121102
 
Page 91 of 112 SYSTEM MALFUNCTION SU 6 3  Initiating Condition - NOTIFICATION OF UNUSUAL EVENT UNPLANNED loss of safety system annunciation or indication in the C c ontrol R r oom > for 15 minutes or longer Operating Mode Applicability: Power Operation s (Mode 1)
Startup (Mode 2)            Hot Standby (Mode 3)            Hot Shutdown (Mode 4)  Example Emergency Action Level (s):  Note: The SM Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. UNPLANNED Loss of
>greater than approximately 75% of the following for > 15 minutes or longer:  (Site specific control room safety system annunciation)
: a. Control Room annunciators associated with safety systems.
OR  b. C(Site specific c ontrol R room safety system indication
.)  Basis:  This IC and its associated EAL are intended to recognize the difficulty associated with monitoring changing plant conditions without the use of a major portion of the annunciation or indication equipment. Recognition of the availability of computer based indication equipment is considered
[e.g., SPDS, plant computer, etc.
]  "Planned" loss of annunciators or indicators includes scheduled maintenance and testing activities. Quantification is arbitrary, however, it is estimated that if approximately 75% of the safety system annunciators or indicators are lost, there is an increased risk that a degraded plant condition could go undetected. It is not intended that plant personnel perform a detailed count of the instrumentation lost but use the value as a judgment threshold for determining the severity of the plant conditions. to 0CAN121102
 
Page 92 of 112 SYSTEM MALFUNCTION SU 6 3  It is further recognized that most plant designs provide redundant safety system indication powered from separate uninterruptible power supplies. While failure of a large portion of annunciators is more likely than a failure of a large portion of indications, the concern is included in this EAL due to difficulty associated with assessment of plant conditions. The loss of specific, or several, safety system indicators should remain a function of that specific system or component operability status. This will be addressed by the specific Technical Specification. The initiation of a Technical Specification imposed plant shutdown related to the instrument loss will be reported via 10 CFR 50.72. If the shutdown is not in compliance with the Technical Specification action, the N O UE is based on SU 11 2 "Inability to r R each r R equired operating mode Shutdown w Within Technical Specification l Limits."  Indicators associated with safety systems are those indicators for reactivity control, core cooling, maintaining reactor coolant system integrity or maintaining containment integrity.
  [Site specific annunciators or indicators for this EAL must include those identified in the Abnormal Operating Procedures, in the Emergency Operating Procedures, and in other EALs (e.g., area, process, and/or effluent rad monitors, etc.).
]  Fifteen minutes was selected as a threshold to exclude transient or momentary power losses. 
[Due to the limited number of safety systems in operation during cold shutdown, refueling, and defueled modes, no IC is indicated during these modes of operation.
]  This N OUE will be escalated to an Alert based on a concurrent loss of compensatory indications or if a SIGNIFICANT TRANSIENT is in progress during the loss of annunciation or indication (SA6). Reference Documents:
: 1. 1203.043, "Loss Control Room Annunciators"
: 2. 2203.042, "Loss of Control Room Annunciators" to 0CAN121102
 
Page 93 of 112 SYSTEM MALFUNCTION SU9  Initiating Condition - NOTIFICATION OF UNUSUAL EVENT Fuel c Clad degradation Operating Mode Applicability: Power Operation s (Mode 1)
Startup (Mode 2)            Hot Standby (Mode 3)            Hot Shutdown (Mode 4)  Example Emergency Action Level (s):  (1 or 2)  1. (Site specific radiation monitor readings indicating fuel clad degradation greater than Technical Specification allowable limits.)
: 2. (Site specific coolant sample activity value indicating fuel clad degradation greater than Technical Specification allowable limits.)
: 1. Failed Fuel Iodine radiation monitor reading indicates fuel clad degradation > Technical Specification allowable limits:
Unit 1: RI-1237S reads > 1.3 x 10 5 counts per minute Unit 2:  2RITS-4806B reads > .65 x 10 5 counts per minute OR 2. RCS sample activity value indicating fuel clad degradation > Technical Specification allowable limits:
  > 1.0 uCi/gm Dose Equivalent I-131 for more than 48 hours OR  Unit 1: > 60 uCi/gm Dose Equivalent I-131 Unit 2: > 60 uCi/gm Dose Equivalent I-131 OR  Unit 1: > 2200 &#xb5;Ci/gm Dose Equivalent Xe-133 for more than 48 hours Unit 2: > 3100 &#xb5;Ci/gm Dose Equivalent Xe-133 for more than 48 hours to 0CAN121102
 
Page 94 of 112 SYSTEM MALFUNCTION SU9  Basis:  This IC EAL is included because it is a precursor of more serious conditions and, as result, is considered to be a potential degradation of the level of safety of the plant.
EAL #1  This threshold addresses the Letdown site-specific R radiation M monitor readings that provide indication of a degradation of fuel clad integrity. 
[Such as BWR air ejector monitors, PWR failed fuel monitors, etc.
]  EAL #2  This EAL threshold addresses coolant samples exceeding coolant technical specifications for transient iodine spiking limits and coolant samples exceeding coolant Technical Specifications for nominal operating limits for the time period specified in the Technical Specifications
. Escalation of this IC EAL to the Alert level is via the Fission Product Barriers (F). Reference Documents:
: 1. ANO1 Technical Specifications
: 2. ANO2 Technical Specifications  to 0CAN121102
 
Page 95 of 112 SYSTEM MALFUNCTION SU 7 5  Initiating Condition - NOTIFICATION OF UNUSUAL EVENT RCS leakage Operating Mode Applicability: Power Operation s (Mode 1)
Startup (Mode 2)            Hot Standby (Mode 3)            Hot Shutdown (Mode 4)  Example Emergency Action Level (s):  (1 or 2)  1. Unidentified or pressure boundary leakage
>greater than 10 gpm.      OR  2. Identified leakage
> great er than 25 gpm. Basis:  With respect to this IC, RCS leakage is defined as a loss of RCS inventory due to a leak in the RCS or a supporting system that is not or cannot be isolated within 10 minutes. For example, isolation of the RCS Letdown (purification) system is a standard abnormal operating procedure action and may prevent unnecessary classifications when a non-RCS leakage path leak exists.
However, the intent of this condition is met if attempts to isolate the RCS leak are NOT successful.
This IC is included as a n N OUE because it may be a precursor of more serious conditions and, as result, is considered to be a potential degradation of the level of safety of the plant. The 10 gpm value for the unidentified or pressure boundary leakage was selected as it is observable with normal C c ontrol R room indications. Lesser values must generally be determined through time-consuming surveillance tests (e.g., mass balances). Relief valve normal operation should be excluded from this IC. However, a relief valve that operates and fails to close per design should be considered applicable to this IC if the relief valve
 
cannot be isolated. The EAL for identified leakage is set at a higher value due to the lesser significance of identified leakage in comparison to unidentified or pressure boundary leakage. Steam generator tube leakage is identified leakage. In either case, escalation of this IC to the Alert level is via Fission Product Barrier Degradation (F) ICs. to 0CAN121102
 
Page 96 of 112 SYSTEM MALFUNCTION SU 8 6  Initiating Condition - NOTIFICATION OF UNUSUAL EVENT Loss of all o O nsite or o Offsite communications capabilities Operating Mode Applicability: Power Operation s (Mode 1)
Startup (Mode 2)            Hot Standby (Mode 3)            Hot Shutdown (Mode 4)  Example Emergency Action Level (s):  (1 or 2) 
: 1. Loss of all Table M1 of the following onsite communication s methods affecting the ability to perform routine operations.  (site specific list of communications methods)
OR  2. Loss of all Table M2 of the following offsite communication s methods affecting the ability to perform offsite notifications. (site specific list of communications methods)
Table M1 Onsite Communications Methods  Table M2 Offsite Communications Methods Station radio system All telephone lines (commercial and microwave)
Plant paging system ENS In-plant telephones Gaitronics Basis:
The purpose of this IC and its associated EALs is to recognize a loss of communications capability that either defeats the plant operations staff ability to perform routine tasks necessary for plant operations or the ability to communicate issues with offsite authorities. 
[The loss of off
-site communications ability is expected to be significantly more comprehensive than the condition addressed by 10 CFR 50.72.
]  The availability of one method of ordinary offsite communications is sufficient to inform federal, state, and local authorities of plant problems. This EAL is intended to be used only when extraordinary means (e.g., relaying of information from non-routine radio transmissions, individuals being sent to off-site locations, etc.) are being used to make communications possible. to 0CAN121102
 
Page 97 of 112 SYSTEM MALFUNCTION SU 8 6  Reference Documents:
: 1. 1903.062, "Communications System Operating Procedure"
  [Site specific list for on
-site communications loss must encompass the loss of all means of communications (e.g., commercial telephones, sound powered phone systems, page party system (Gaitronics) and radios / walkie talkies) routinely used for operations.
]  [Site specific list for off
-site communications loss must encompass the loss of all means of communications with off
-site authorities. This should include the ENS, commercial telephone lines, telecopy transmissions, and dedicated phone systems that are routinely used for offsite emergency notifications.
]    to 0CAN121102
 
Page 98 of 112 SYSTEM MALFUNCTION SU 10 8  Initiating Condition - NOTIFICATION OF UNUSUAL EVENT Inadvertent criticality Operating Mode Applicability: Hot Standby (Mode 3)            Hot Shutdown (Mode 4)
Example Emergency Action Level (s):  1. UNPLANNED sustained positive period observed on nuclear ins trumentation. [
BWR]  1. UNPLANNED sustained positive startup rate observed on nuclear instrumentation.
[PWR]  Basis:  This IC addresses inadvertent criticality events. This IC indicates a potential degradation of the level of safety of the plant, warranting a n N OUE classification. This IC excludes inadvertent criticalities that occur during planned reactivity changes associated with reactor startups (e.g., criticality earlier than estimated). 
[This condition can be identified using the startup rate meter. The term "sustained" is used in order to allow exclusion of expected short term positive startup rates from planned control rod movements for (such as shutdown bank withdrawal). These short term positive startup rates are the result of the rise in neutron population due to subcritical multiplication
.]  Escalation would be by the Fission Product Barrier Table (F), as appropriate to the operating mode at the time of the event.
Reference Documents:
: 1. 1203.012G, "Annunciator K08 Corrective Action"
: 2. 2203.012D, "Annunciator 2K04 Corrective Action" to 0CAN121102
 
Page 99 of 112 SYSTEM MALFUNCTION SA 3 2  Initiating Condition - ALERT Automatic t Scram (T rip) fails to shutdown the reactor and the manual actions taken from the reactor control console are successful in shutting down the reactor  Operating Mode Applicability: Power Operation s (Mode 1)
Startup (Mode 2)  Example Emergency Action Level (s):  1. a. An automatic scram (trip) failed to shutdown the reactor as indicated by reactor power >
5%. AND  b. Manual actions taken at the reactor control console successfully shutdown the reactor as indicated by reactor power < 5%
(site specific indications of plant shutdown). Basis:  [The reactor should be considered shutdown when it producing less heat than the maximum decay heat load for which the safety systems are designed (typically 3 to 5% power). For plants using CSFSTs, this EAL equates to the criteria used to determine a valid Subcriticality Red Path. For BWRs this EAL should be the APRM downscale trip setpoint.
]  Manual scram (trip) actions taken at the reactor control console are any set of actions by the R r eactor O operator(s) which causes or should cause control rods to be rapidly inserted into the core and shuts down the reactor. Any action taken to trip the reactor from any location other than panel C03 (Unit 1) or panels 2C03/2C14 (Unit 2) constitutes a failure of the manual trip function.
Failure of manual trip would escalate the event to a Site Area Emergency (SS3).  [If the manual scram (trip) switches/pushbuttons on the control room console panels are considered an automatic input into the Reactor Protection System, a failure to scram (trip) without any other automatic input would make this threshold applicable.
]  This condition indicates failure of the automatic protection system to scram (trip) the reactor. This condition is more than a potential degradation of a safety system in that a front line automatic protection system did not function in response to a plant transient. Thus the plant safety has been compromised because design limits of the fuel may have been exceeded. An Alert is indicated because conditions may exist that lead to potential loss of fuel clad or RCS and because of the failure of the Reactor Protection System to automatically shutdown the plant.
If manual actions taken at the reactor control console fail to shutdown the reactor, the event would escalate to a Site Area Emergency. to 0CAN121102
 
Page 100 of 112 SYSTEM MALFUNCTION SA 6 4  Initiating Condition - ALERT UNPLANNED l Loss of safety system annunciation or indication in the C c ontrol R r oom with either EITHER (1) a SIGNIFICANT TRANSIENT in progress, or (2) compensatory indicators unavailable  Operating Mode Applicability: Power Operation s (Mode 1)
Startup (Mode 2)            Hot Standby (Mode 3)            Hot Shutdown (Mode 4)  Example Emergency Action Level (s):  Note: The SM/TSC Director/EOF DirectorEmergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition  has exceeded, or will likely exceed, the applicable time. 1. a. UNPLANNED loss of
>greater than approximately 75% of the following
> for 15 minutes or longer:  (Site specific control room safety system annunciation)
Control Room annunciators associated with safety systems OR    C (Site specific c ontrol R room safety system indication
)  AND    b. Either EITHER of the following:  A SIGNIFICANT TRANSIENT is in progress OR. Compensatory indications are unavailable.
Basis:  This IC is intended to recognize the difficulty associated with monitoring changing plant conditions without the use of a major portion of the annunciation or indication equipment during a SIGNIFICANT TRANSIENT. 
[Recognition of the availability of computer based indication equipment is considered (e.g., SPDS, plant computer, etc.).
]  "Planned" loss of annunciators or indicators includes scheduled maintenance and testing activities.
to 0CAN121102
 
Page 101 of 112 SYSTEM MALFUNCTION SA 6 4  Quantification is arbitrary, however, it is estimated that if approximately 75% of the safety system annunciators or indicators are lost, there is an increased risk that a degraded plant condition could go undetected. It is not intended that plant personnel perform a detailed count of the instrumentation lost but use the value as a judgment threshold for determining the severity of the plant conditions. It is also not intended that the Shift Manager Supervisor be tasked with making a judgment decision as to whether additional personnel are required to provide increased monitoring of system operation. It is further recognized that most plant designs provide redundant safety system indication powered from separate uninterruptible power supplies. While failure of a large portion of annunciators is more likely than a failure of a large portion of indications, the concern is included in this EAL due to difficulty associated with assessment of plant conditions. The loss of specific, or several, safety system indicators should remain a function of that specific system or component operability status. This will be addressed by the specific Technical Specification. The initiation of a Technical Specification imposed plant shutdown related to the instrument loss will be reported via 10 CFR 50.72. If the shutdown is not in compliance with the Technical Specification action, the N O UE is based on SU 11 2 "Inability to r R each r R equired operating modeShutdown w Within Technical Specification l L imits."  [Site-specific annunciators or indicators for this EAL must include those identified in the Abnormal Operating Procedures, in the Emergency Operating Procedures, and in other EALs (e.g., area, process, and/or effluent rad monitors, etc.).]
Indicators associated with safety systems are those indicators for reactivity control, core cooling, maintaining reactor coolant system integrity or maintaining containment integrity.
  "Compensatory indications" in this context includes computer based information such as SPDS , QSPDS, COLSS, etc. [This should include all computer systems available for this use depending on specific plant design and subsequent retrofits.
] If both a major portion of the annunciation system and all computer monitoring are unavailable, the Alert is required. 
[Due to the limited number of safety systems in operation during cold shutdown, refueling and defueled modes, no IC is indicated during these modes of operation.
]  Fifteen minutes was selected as a threshold to exclude transient or momentary power losses.
This Alert will be escalated to a Site Area Emergency if the operating crew cannot monitor the transient in progress due to a concurrent loss of compensatory indications with a SIGNIFICANT TRANSIENT in progress during the loss of annunciation or indication.
Reference Documents:
: 1. 1015.037, "
Post Transient Review"
: 2. 1203.043, "Loss of Control Room Annunciators"
: 3. 2203.042, "Loss of Control Room Annunciators" to 0CAN121102
 
Page 102 of 112 SYSTEM MALFUNCTION SA 1 5  Initiating Condition - ALERT AC power capability to Vital 4.16 KV emergency busses reduced to a single power source
> for 15 minutes or longer such that any additional single failure would result in station blackout  Operating Mode Applicability: Power Operation s (Mode 1)
Startup (Mode 2)            Hot Standby (Mode 3)            Hot Shutdown (Mode 4)  Example Emergency Action Level (s):  Note: The SM/TSC Director/EOF DirectorEmergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time. 
: 1. a. AC power capability to Vital 4.16 KV (site-specific emergency busses) reduced to a single power source
>for 15 minutes or longer. AND  b. Any additional single power source failure will result in station blackout.
Basis:  [This IC and the associated EALs are intended to provide an escalation from IC SU1, "Loss of All Off-site AC Power To Emergency Busses for Greater Than 15 Minutes."]  The condition indicated by this IC is the degradation of the offsite and onsite AC power systems such that any additional single failure would result in a station blackout. This condition could occur due to a loss of offsite power with a concurrent failure of all but one emergency generator to supply power to its emergency busses. Another related condition could be the loss of all offsite power and loss of onsite emergency generators with only one train of emergency busses being backfed from the unit main generator, or the loss of onsite emergency generators with only one train of emergency busses being backfed from offsite power. The subsequent loss of this single power source would escalate the event to a Site Area Emergency in accordance with SS1. Fifteen minutes was selected as a threshold to exclude transient or momentary losses of power.
The EAL allows credit for operation of the Alternate AC Diesel Generator.
Reference Documents:
: 1. 1202.007, "
Degraded Powe r" 2. 1202.008, "
Blackout" 3. 2202.007, "
Loss of Off-Site Power"
: 4. 2202.008, "Station Blackout"
: 5. 2104.037, "
Alternate AC Diesel Generator Operations" to 0CAN121102
 
Page 103 of 112 SYSTEM MALFUNCTION SA 1 5    [At multi-unit stations, the EALs should allow credit for operation of installed design features, such as cross
-ties or swing diesels, provided that abnormal or emergency operating procedures address their use. However, these stations must also consider the impact of this condition on other shared safety functions in developing the site specific EAL.
]  [Plants that have a proceduralized capability to c ross-tie AC power from an off
-site power supply of a companion unit may take credit for the redundant power source in the associated EAL for this IC.] 
. to 0CAN121102
 
Page 104 of 112 SYSTEM MALFUNCTION SS1  Initiating Condition - SITE AREA EMERGENCY Loss of all o Offsite and all o O n s Site AC power to Vital 4.16 KVemergency busses >for 15 minutes or longer
. Operating Mode Applicability: Power Operation s (Mode 1)
Startup (Mode 2)            Hot Standby (Mode 3)            Hot Shutdown (Mode 4)  Example Emergency Action Level (s):  Note: The SM/TSC Director/EOF DirectorEmergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. Loss of all o O ff s-Site and all o O n s-S ite AC power to Vital 4.16 KV (site specific emergency busses) > for 15 minutes or longer. Basis:  Loss of all AC power to emergency busses comp romises all plant safety systems requiring electric power including Shutdown Cooling RHR, ECCS, Containment Heat Removal and the Ultimate Heat Sink. Prolonged loss of all AC power to emergency busses will lead to loss of Fuel Clad, RCS, and Containment, thus this event can escalate to a General Emergency. Fifteen minutes was selected as a threshold to exclude transient or momentary losses of offsite power.  [At multi-unit stations, the EALs should allow credit for operation of installed design features, such as cross-ties or swing diesels, provided that abnormal or emergency operating procedures address their use. However, these stations must also consider the impact of this condition on other shared safety functions in developing the site specific EAL.
]  [Plants that have a proceduralized capability to cross
-tie AC power from an off
-site power supply of a companion unit may take credit for the redundant power source in the associated EAL for this IC.]  Escalation to General Emergency is via Fission Product Barrier Degradation (F) or IC SG1, "Prolonged l L oss of a A ll o O ffsite Power and a Prolonged Loss of A ll o O nsite AC p P ower to Vital 4.16 KV busses
."  Reference Documents:
: 1. 1202.007, "
Degraded Power"
: 2. 1202.008, "
Blackout" 3. 2202.007, "
Loss of Off-Site Power"
: 4. 2202.008, "Station Blackout"
: 5. 2104.037, "
Alternate AC Diesel Generator Operations" to 0CAN121102
 
Page 105 of 112 SYSTEM MALFUNCTION SS 3 2  Initiating Condition - SITE AREA EMERGENCY Automatic t Scram (T rip) fails to shutdown the reactor and manual actions taken from the reactor control console are not successful in shutting down the reactor Operating Mode Applicability: Power Operation s (Mode 1)
Startup (Mode 2)                        Example Emergency Action Level (s):  1. a. An automatic scram (trip) failed to shutdown the reactor.
AND  b. Manual actions taken at the reactor control console do not shutdown the reactor as indicated by reactor power > 5%. (site specific indications of reactor not shutdown). Basis:  Under these conditions, the reactor is producing more heat than the maximum decay heat load for which the safety systems are designed and efforts to bring the reactor subcritical are unsuccessful. A Site Area Emergency is warranted because conditions exist that lead to IMMINENT loss or potential loss of both fuel clad and RCS. 
[The reactor should be considered shutdown when it producing less heat than the maximum decay heat load for which the safety systems are designed (typically 3 to 5% power). For plants using CSFSTs, this EAL equates to the criteria used to determine a valid Subcriticality Red Path. For BWRs this EAL should be the APRM downscale trip setpoint.
]  Manual scram (trip) actions taken at the reactor control console are any set of actions by the R r eactor O o perator(s) at which causes or should cause control rods to be rapidly inserted into the core and shuts down the reactor.
Manual scram (trip) actions are not considered successful if action away from panel C03 (Unit 1) or panels 2C03/2C14 (Unit 2) the reactor control console is required to scram (trip) the reactor. This EAL is still applicable even if actions taken away from panel C03 (Unit 1) or panels 2C03/2C14 (Unit 2) the reactor control console are successful in shutting the reactor down because the design limits of the fuel may have been exceeded or because of the gross failure of the Reactor Protection System to shutdown the plant. 
[Although this IC may be viewed as redundant to the Fission Product Barrier Degradation IC, its inclusion is necessary to better assure timely recognition and emergency response.
]  Escalation of this event to a General Emergency would be due to a prolonged condition leading to an extreme challenge to either core-cooling or heat removal. to 0CAN121102
 
Page 106 of 112 SYSTEM MALFUNCTION SS 4 3  Initiating Condition - SITE AREA EMERGENCY Loss of all vital DC power
> for 15 minutes or longer. Operating Mode Applicability: Power Operation s (Mode 1)
Startup (Mode 2)            Hot Standby (Mode 3)            Hot Shutdown (Mode 4)  Example Emergency Action Level (s):  Note: The SM/TSC Director/EOF DirectorEmergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1.  < Less than 105 volts (site specific bus voltage indication) on all (site specific V v ital DC busses) > for 15 minutes or longer. Basis:  Loss of all DC power compromises ability to monitor and control plant safety functions. Prolonged loss of all DC power will cause core uncovering and loss of containment integrity when there is significant decay heat and sensible heat in the reactor system. 
[Site specific bus voltage should be based on the minimum bus voltage necessary for the operation of safety related equipment. This voltage value should incorporate a margin of at least 15 minutes of operation before the onset of inability to operate those loads. This voltage is usually near the minimum voltage selected when battery sizing is performed. Typically the value for the entire battery set is approximately 105 VDC. For a 60 cell string of batteries the cell voltage is typically 1.75 Volts per cell. For a 58 string battery set the minimum voltage is typically 1.81 Volts per cell.]  Fifteen minutes was selected as a threshold to exclude transient or momentary power losses.
Escalation to a General Emergency would occur by Abnormal Rad iation Levels/Radiological Effluent (A), Fission Product Barrier Degradation (F). to 0CAN121102
 
Page 107 of 112 SYSTEM MALFUNCTION SS6  Initiating Condition - SITE AREA EMERGENCY Inability to monitor a SIGNIFICANT TRANSIENT in progress Operating Mode Applicability: Power Operation s (Mode 1)
Startup (Mode 2)            Hot Standby (Mode 3)            Hot Shutdown (Mode 4)  Example Emergency Action Level (s):  Note: The SM/TSC Director/EOF DirectorEmergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time. 1. a. Loss of
> greater than approximately 75% of the following
> for 15 minutes or longer:  (Site specific control room safety system annunciation)
Control Room annunciators associated with safety systems OR  C (Site specific c ontrol R room safety system indication
)  AND  b. A SIGNIFICANT TRANSIENT is in progress.
AND c. Compensatory indications are unavailable.
Basis:  This IC is intended to recognize the threat to plant safety associated with the complete loss of capability of the control room staff to monitor plant response to a SIGNIFICANT TRANSIENT.  "Planned" and "UNPLANNED" actions are not differentiated since the loss of instrumentation of this magnitude is of such significance during a transient that the cause of the loss is not an
 
ameliorating factor. Quantification is arbitrary, however, it is estimated that if approximately 75% of the safety system annunciators or indicators are lost, there is an increased risk that a degraded plant condition could go undetected. It is not intended that plant personnel perform a detailed count of the instrumentation lost but use the value as a judgment threshold for determining the severity of the plant conditions. It is also not intended that the Shift Manager Supervisor be tasked with making a    to 0CAN121102
 
Page 108 of 112 SYSTEM MALFUNCTION SS6  judgment decision as to whether additional personnel are required to provide increased monitoring of system operation. It is further recognized that most plant designs provide redundant safety system indication powered from separate uninterruptible power supplies. While failure of a large portion of annunciators is more likely than a failure of a large portion of indications, the concern is included in this EAL due to difficulty associated with assessment of plant conditions. The loss of specific, or several, safety system indicators should remain a function of that specific system or component operability status. This will be addressed by the specific Technical Specification. The initiation of a Technical Specification imposed plant shutdown related to the instrument loss will be reported via 10 CFR 50.72. If the shutdown is not in compliance with the Technical Specification action, the N O UE is based on SU 11 2 "Inability to r R each r R equired operating modeShutdown w Within Technical Specification l L imits."  A Site Area Emergency is considered to exist if the C c ontrol R r oom staff cannot monitor safety functions needed for protection of the public while a significant transient is in progress. 
[Site specific annunciators for this EAL should be limited to include those identified in the Abnormal Operating Procedures, in the Emergency Operating Procedures, and in other EALs (.g., area, process, and/or effluent rad monitors, etc.)
]  Site specific indications needed to monitor safety functions necessary for protection of the public must include C c ontrol R room indications, computer generated indications and dedicated annunciation capability. Indicators associated with safety systems are those indicators for reactivity control, core cooling, maintaining reactor coolant system integrity or maintaining containment integrity.
  [The specific indications should be those used to determine such functions as the ability to shut down the reactor, maintain the core cooled, to maintain the reactor coolant system intact, maintain the spent fuel cooled, and to maintain containment intact.
]  "Compensatory indications" in this context includes computer based information such as SPDS , QSPDS, COLSS, etc. This should include all computer systems available for this use depending on specific plant design and subsequent retrofits. Fifteen minutes was selected as a threshold to exclude transient or momentary power losses.
Reference Documents:
: 1. 1015.037, "Post Transient Review"
: 2. 1203.043, "Loss of Control Room Annunciators"
: 3. 2203.042, "Loss of Control Room Annunciators"
  [Due to the limited number of safety systems in operation during cold shutdown, refueling and defueled modes, no IC is indicated during these modes of operation.
]    to 0CAN121102
 
Page 109 of 112 SYSTEM MALFUNCTION SG1  Initiating Condition - GENERAL EMERGENCY Prolonged loss of all o O ffsite and all o O n s-Site AC power to Vital 4.16 KV emergency busses  Operating Mode Applicability: Power Operation s (Mode 1)
Startup (Mode 2)            Hot Standby (Mode 3)            Hot Shutdown (Mode 4)  Example Emergency Action Level (s):  1. a. Loss of all offsite and all onsite AC power to Vital 4.16 KV(site specific emergency busses). AND    b. Either EITHER of the following:  Restoration of at least one Vital 4.16 KVemergency bus in < less than (site specific 4 hours) is not likely.
OR  Continuing degradation of core cooling based on Fission Product Barrier monitoring as indicated by CETs > 700&deg;F.(Site specific indication of continuing degradation of core cooling based on Fission Product Barrier monitoring.)
Basis:  Loss of all AC power to Vital 4.16 KV emergency busses compromises all plant safety systems requiring electric power including Shutdown Cooling RHR, ECCS, Containment Heat Removal and the Ultimate Heat Sink. Prolonged loss of all AC power to Vital 4.16 KVemergency busses will lead to loss of fuel clad, RCS, and containment, thus warranting declaration of a General Emergency. 
[The (site-specific hours) to restore AC power can be based on a site blackout coping analysis performed in conformance with 10 CFR 50.63 and Regulatory Guide 1.155, "Station Blackout," as available. Appropriate allowance for off
-site emergency response including evacuation of surrounding areas should be considered. Although this IC may be viewed as redundant to the Fission Product Barrier Degradation IC, its inclusion is necessary to better assure timely recognition and emergency response.
]  This IC is specified to assure that in the unlikely event of a prolonged station blackout, timely recognition of the seriousness of the event occurs and that declaration of a General Emergency occurs as early as is appropriate, based on a reasonable assessment of the event trajectory. The likelihood of restoring at least one Vital 4.16 KVemergency bus should be based on a realistic appraisal of the situation since a delay in an upgrade decision based on only a chance of mitigating the event could result in a loss of valuable time in preparing and implementing public protective actions. to 0CAN121102
 
Page 110 of 112 SYSTEM MALFUNCTION SG1    In addition, under these conditions, fission product barrier monitoring capability may be degraded. 
[Although it may be difficult to predict when power can be restored, it is necessary to give the SM/TSC Director/EOF Director Emergency Director a reasonable idea of how quickly (s)he may need to declare a General Emergency based on two major considerations:
: 1. Are there any present indications that core cooling is already degraded to the point that loss or potential loss of Fission Product Barriers is IMMINENT? 
: 2. If there are no present indications of such core cooling degradation, how likely is it that power can be restored in time to assure that a loss of two barriers with a potential loss of the third barrier can be prevented?  Thus, indication of continuing core cooling degradation must be based on Fission Product Barrier monitoring with particular emphasis on SM/TSC Director/EOF Director Emergency Director judgment as it relates to IMMINENT loss or potential loss of fission product barriers and degraded ability to monitor fission product barriers
.] Reference Documents:
: 1. Unit 1 Calculation 85-E-0072-02, "Time from Loss of All AC Power to Loss of Subcooling"
: 2. Unit 2 Calculation 85-E-0072-01, "Time from Loss of All AC Power to Loss of Subcooling" to 0CAN121102
 
Page 111 of 112 FISSION PRODUCT BARRIERS PWR TABLE 5
-F-3 CONTAINMENT Initiating Condition - GENERAL EMERGENCY Automatic t Scram (T rip) and all manual actions fail to shutdown the reactor and indication of an extreme challenge to the ability to cool the core exists  Operating Mode Applicability: Power Operation s (Mode 1)
Startup (Mode 2)  Example Emergency Action Level (s):  1. a. An automatic scram (trip) failed to shutdown the reactor AND  b. All manual actions do not shutdown the reactor as indicated by reactor  power > 5% (site specific indications of reactor not shutdown)
. AND  c. Either EITHER of the following exist or have occurred due to continued power generation: 
(Site specific indication that core cooling is extremely challenged.)
CET temperatures at or approaching 1200&deg; F OR    (Site specific indication that heat removal is extremely challenged.)
Feedwater flow rate less than:
Unit 1:  430 gpm Unit 2:  485 gpm  Basis:
Under these conditions, the reactor is producing more heat than the maximum decay heat load for which the safety systems are designed and efforts to bring the reactor subcritical are unsuccessful. 
[The reactor should be considered shutdown when it producing less heat than the maximum decay heat load for which the safety systems are designed (typically 3 to 5% power). For plants using CSFSTs, this EAL equates to the criteria used to determine a valid Subcriticality Red Path. For BWRs this EAL should be the APRM downscale trip setpoint.
]  [For PWRs, the extreme challenge to the ability to cool the core is intended to mean that the core exit temperatures are at or approaching 1200 degrees F or that the reactor vessel water level is below the top of active fuel. For plants using CSFSTs, this EAL equates to a Core Cooling RED condition combined with a Subcriticality RED condition.
]    to 0CAN121102
 
Page 112 of 112 SYSTEM MALFUNCTION SG1  [For BWRs, the extreme challenge to the ability to cool the core is intended to mean that the reactor vessel water level cannot be restored and maintained above Minimum Steam Cooling RPV Water Level as described in the EOP bases.
]  [Another consideration is the inability to initially remove heat during the early stages of this sequence. For PWRs, if emergency feedwater flow is insufficient to remove the amount of heat required by design from at least one steam generator, an extreme challenge should be considered to exist. For plants using CSFSTs, this EAL equates to a Heat Sink RED condition combined with a Subcriticality RED condition.
]  [For BWRs, considerations include inability to remove heat via the main condenser, or via the suppression pool or torus (e.g., due to high pool water temperature)
.]  In the event either of these challenges exists at a time that the reactor has not been brought below the power associated with the safety syst em design a core melt sequence exists. In this situation, core degradation can occur rapidly. For this reason, the General Emergency declaration is intended to be anticipatory of the fission product barrier table declaration to permit maximum off-site intervention time.
 
ANO EAL BASIS DOCUMENT to 0CAN121102
 
Page 2 of 115 ANO EAL BASIS DOCUMENT TABLE OF CONTENTS SECTION PAGE General Notes on Basis Document Use............................................................................ 4 Definitions.......................................................................................................................... 5 Overview............................................................................................................................ 10 Abnormal Radiation Levels / Radiological Effluents.......................................................... 14 AU1................................................................................................................................ 15 AU2................................................................................................................................ 18 AA1................................................................................................................................ 20 AA2................................................................................................................................ 23 AA3................................................................................................................................ 25 AS1................................................................................................................................ 26 AG1............................................................................................................................... 28 Cold Shutdown / Refueling System Malfunction................................................................ 30 CU1............................................................................................................................... 31 CU2............................................................................................................................... 32 CU3............................................................................................................................... 34 CU5............................................................................................................................... 35 CU6............................................................................................................................... 36 CU7............................................................................................................................... 37 CU8............................................................................................................................... 38 CA1................................................................................................................................ 39 CA3................................................................................................................................ 41 CA5................................................................................................................................ 43 CS1................................................................................................................................ 44 CG1............................................................................................................................... 45 Independent Spent Fuel Storage Installation (ISFSI) Malfunction..................................... 48 E-HU1............................................................................................................................ 49 Fission Product Barrier Degradation.................................................................................. 50 General Bases............................................................................................................... 51 Fuel Clad Barrier EALs (FCB)....................................................................................... 52 RCS Barrier EALs (RCB)............................................................................................... 57 Containment Barrier EALS (CNB)................................................................................. 60    to 0CAN121102
 
Page 3 of 115 ANO EAL BASIS DOCUMENT TABLE OF CONTENTS SECTION PAGE Hazards and Other Conditions Affecting Plant Safety....................................................... 67 HU1............................................................................................................................... 68 HU2............................................................................................................................... 69 HU4............................................................................................................................... 71 HU5............................................................................................................................... 73 HU6............................................................................................................................... 74 HA1................................................................................................................................ 78 HA2................................................................................................................................ 80 HA3................................................................................................................................ 81 HA4................................................................................................................................ 82 HA5................................................................................................................................ 84 HA6................................................................................................................................ 85 HS1................................................................................................................................ 89 HS2................................................................................................................................ 90 HS3................................................................................................................................ 91 HG1............................................................................................................................... 92 HG2............................................................................................................................... 93 System Malfunction............................................................................................................
94 SU1................................................................................................................................ 95 SU6................................................................................................................................ 96 SU7................................................................................................................................ 98 SU8................................................................................................................................ 99 SU9................................................................................................................................ 100 SU10.............................................................................................................................. 102 SU11.............................................................................................................................. 103 SA1................................................................................................................................ 104 SA3................................................................................................................................ 105 SA6................................................................................................................................ 106 SS1................................................................................................................................ 108 SS3................................................................................................................................ 109 SS4................................................................................................................................ 110 SS6................................................................................................................................ 111 SG1............................................................................................................................... 113 SG3............................................................................................................................... 115    to 0CAN121102
 
Page 4 of 115 ANO EAL BASIS DOCUMENT GENERAL NOTES ON BASIS DOCUMENT USE Plant Operating Mode Usage for ANO EALs:
UNIT 1: Mode 1 = Power Operation - Keff  0.99, Reactor Power > 5% Mode 2 = Startup - Keff  .99, Reactor Power  5% Mode 3 = Hot Standby - Keff < .99, RCS  280 &deg;F Mode 4 = Hot Shutdown - Keff < .99, 280 &deg;F > RCS >200 &deg;F
 
Mode 5 = Cold Shutdown - Keff < .99, RCS  200 &deg;F Mode 6 = Refueling - One or more reactor vessel head closure bolts less than fully tensioned Defueled (D) - All reactor fuel removed from reactor pressure vessel (full core offload during refueling or extended outage). This is not an operating mode designation by Technical Specifications.
 
UNIT 2: Mode 1 = Power Operation - Keff  0.99, Reactor Power > 5%, RCS  300 &deg;F Mode 2 = Startup - Keff  .99, Reactor Power  5%, RCS  300 &deg;F Mode 3 = Hot Standby - Keff < .99, Reactor Power 0, RCS  300 &deg;F Mode 4 = Hot Shutdown - Keff < .99, Reactor Power 0, 300 &deg;F > RCS > 200 &deg;F
 
Mode 5 = Cold Shutdown - Keff < .99, Reactor Power 0, RCS  200 &deg;F  Mode 6 = Refueling - Keff  .95, Reactor Power 0, RCS  140 &deg;F Reactor vessel head unbolted or removed and fuel in the vessel Defueled (D) - All reactor fuel removed from reactor pressure vessel (full core offload during refueling or extended outage). This is not an operating mode designation by Technical Specifications.
This basis document serves two basic functions:
It provides background and explanatory information based on NEI 99-01 to present a basis for the origination of the ANO EALs for reviewers and users. The second function this basis document may provide is an aid to decision makers when making a determination to classify an emergency event. It is intended that decision makers have all the information in Attachment 7.1 of this procedure that they need to make a sound classification decision. Information that may be useful to a decision maker in classifying emergency events is also contained in the Basis section for each IC in the Basis Document.
The expectation is that emergency classifications are to be made as soon as conditions are present and recognizable for the classification, but within 15 minutes or less in all cases of conditions present. A decision maker's use of this Basis Document for assistance is not intended to delay the classification. to 0CAN121102
 
Page 5 of 115 ANO EAL BASIS DOCUMENT DEFINITIONS
 
The following definitions are taken from NEI 99-01 are applicable to the ANO emergency classification system:
AFFECTING SAFE SHUTDOWN:
Event in progress has adversely affected functions that are necessary to bring the plant to and maintain it in the applicable HOT or COLD SHUTDOWN condition. Plant condition applicability is determined by Technical Specification LCOs in effect.
 
Example 1: Event causes damage that results in entry into an LCO that requires the plant to be placed in HOT SHUTDOWN. HOT SHUTDOWN is achievable, but COLD SHUTDOWN is not. This event is not "AFFECTING SAFE SHUTDOWN."
Example 2: Event causes damage that results in entry into an LCO that requires the plant to be placed in COLD SHUTDOWN. HOT SHUTDOWN is achievable, but COLD SHUTDOWN is not. This event is "AFFECTING SAFE SHUTDOWN."
ALERT:  Events are in progress or have occurred which involve an actual or potential substantial degradation of the level of safety of the plant or a security event that involves probable life threatening risk to site personnel or damage to site equipment because of HOSTILE ACTION.
Any releases are expected to be limited to small fractions of the EPA Protective Action Guideline (PAG) exposure levels.
 
BOMB:
Refers to an explosive device suspected of having sufficient force to damage plant systems or structures.
 
CIVIL DISTURBANCE:
 
A group of persons violently protesting station operations or activities at the site.
CONFINEMENT BOUNDARY:
The barrier(s) between areas containing radioactive substances and the environment.
 
CONTAINMENT CLOSURE:
The action to secure primary containment and its associated structures, systems, and components as a functional barrier to fission product release under existing plant conditions.
Containment closure must be capable of being set within 30 minutes. Containment Closure is Set when the penetrations are isolated by manual or automatic isolation valve, blind flange, or equivalent. to 0CAN121102
 
Page 6 of 115 ANO EAL BASIS DOCUMENT EMERGENCY ACTION LEVEL (EAL):
A pre-determined, site specific, observable threshold for a plant IC that places the plant in a given emergency classification level. An EAL can be: an instrument reading; an equipment status indicator; a measurable parameter (on-site or off-site); a discrete, observable event; results of analyses; entry into specific emergency operating procedures; or another phenomenon which, if it occurs, indicates entry into a particular emergency classification level.
EMERGENCY CLASSIFICATION LEVEL:
One of a minimum set of names or titles established by the NRC for grouping off normal nuclear power plant conditions according to (1) their relative radiological seriousness, and (2) the time-sensitive on-site and off-site radiological emergency preparedness actions necessary to respond to such conditions. The existing radiological emergency classification levels, in ascending order of seriousness, are called:
Notification of Unusual Event (NUE)
Alert Site Area Emergency (SAE)
General Emergency (GE)
EXPLOSION:
A rapid, violent, unconfined combustion, or catastrophic failure of pressurized/energized equipment that imparts energy of sufficient force to potentially damage permanent structures, systems, or components.
 
EXTORTION:
An attempt to cause an action at the station by threat of force.
FAULTED:  In a steam generator, the existence of secondary side leakage that results in an uncontrolled drop in steam generator pressure or the steam generator being completely depressurized.
FIRE:  Combustion characterized by heat and light. Sources of smoke such as slipping drive belts or overheated electrical equipment do not constitute FIREs.
Observation of flame is preferred but is NOT required if large quantities of smoke and heat are observed.
GENERAL EMERGENCY (GE):
Events are in progress or have occurred which involve actual or IMMINENT substantial core degradation or melting with potential for loss of containment integrity or HOSTILE ACTION that results in an actual loss of physical control of the facility. Releases can be reasonably expected to exceed EPA PAG exposure levels off-site for more than the immediate site area. to 0CAN121102
 
Page 7 of 115 ANO EAL BASIS DOCUMENT HOSTAGE:  A person(s) held as leverage against the station to ensure that demands will be met by the station. HOSTILE ACTION:
An act toward a Nuclear Power Plant or its personnel that includes the use of violent force to destroy equipment, take hostages, and/or intimidate the  licensee to achieve an end. This includes attack by air, land, or water using guns, explosives, projectiles, vehicles, or other devices used to deliver destructive force. Other acts that satisfy the overall intent may be included. HOSTILE ACTION should not be construed to include acts of civil disobedience or felonious acts that are not part of a concerted attack on the NPP. Non-terrorism-based EALs should be used to address such activities (i.e., this may include violent acts between individuals in the OWNER CONTROLLED AREA).
 
HOSTILE FORCE:
One or more individuals who are engaged in a determined assault, overtly or by stealth and deception, equipped with suitable weapons capable of killing, maiming, or causing destruction.
IMMINENT:
Mitigation actions have been ineffective, additional actions are not expected to be successful, and trended information indicates that the event or condition will occur. Where IMMINENT timeframes are specified, they shall apply.
 
INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI):
A complex that is designed and constructed for the interim storage of spent nuclear fuel and other radioactive materials associated with spent fuel storage.
INITIATING CONDITION (IC):
One of a predetermined subset of nuclear power plant conditions where either the potential exists for a radiological emergency, or such an emergency has occurred.
INTRUSION:
A person(s) present in a specified area without authorization. Discovery of a BOMB in a specified area is indication of INTRUSION into that area by a HOSTILE FORCE.
NORMAL PLANT OPERATIONS:
Activities at the plant site associated with routine testing, maintenance, or equipment operations, in accordance with normal operating or administrative procedures. Entry into off-normal or emergency operating procedures, or deviation from normal security or radiological controls posture, is a departure from NORMAL PLANT OPERATIONS.
 
to 0CAN121102
 
Page 8 of 115 ANO EAL BASIS DOCUMENT NOTIFICATION OF UNUSUAL EVENT (NUE):
Events are in progress or have occurred which indicate a potential degradation of the level of safety of the plant or indicate a security threat to facility protection has been initiated. No releases of radioactive material requiring off-site response or monitoring are expected unless
 
further degradation of safety systems occurs.
 
OWNER CONTROLLED AREA (OCA):
The external area contiguous to the designated reactor site Protected Area over which site Security exercises control. The OCA extends outward to the Entergy site property lines.
 
PROJECTILE:
An object directed toward a Nuclear Power Plant that could cause concern for its continued operability, reliability, or personnel safety.
 
PROTECTED AREA:
 
An area encompassed by physical barriers (i.e., the security fence) and to which access is controlled.
 
RUPTURED:
 
In a steam generator, existence of primary-to-secondary leakage of a magnitude sufficient to require or cause a reactor trip and safety injection. 
 
SABOTAGE:
Deliberate damage, mis-alignment, or mis-operation of plant equipment with the intent to render the equipment inoperable. Equipment found tampered with or damaged due to malicious mischief may not meet the definition of SABOTAGE until this determination is made by security supervision.
 
SECURITY CONDITION:
Any Security Event as listed in the approved security  contingency plan that constitutes a threat/compromise to site security, threat/risk to site personnel, or a potential degradation to the level of safety of the plant. A SECURITY CONDITION does not involve a HOSTILE ACTION.
SIGNIFICANT TRANSIENT:
An UNPLANNED event involving one or more of the following: (1) automatic turbine runback
> 25% thermal reactor power, (2) electrical load rejection > 25% full electrical load, (3) Reactor Trip, (4) Safety Injection Activation, or (5) thermal power oscillations > 10%.
 
to 0CAN121102
 
Page 9 of 115 ANO EAL BASIS DOCUMENT SITE AREA EMERGENCY (SAE):
Events are in progress or have occurred which involve actual or likely major failures of plant functions needed for protection of the public or HOSTILE ACTION that results in intentional damage or malicious acts; 1) toward site personnel or equipment that could lead to the likely failure of or; 2) that prevent effective access to, equipment needed for the protection of the
 
public. Any releases are not expected to result in exposure levels which exceed EPA PAG exposure levels beyond the site boundary.
STRIKE ACTION:
A work stoppage within the PROTECTED AREA by a body of workers to enforce compliance with demands made on Entergy or its affiliates. The STRIKE ACTION must threaten to interrupt NORMAL PLANT OPERATIONS.
UNISOLABLE:
A breach or leak that cannot be promptly isolated.
 
UNPLANNED:
A parameter change or an event that is not the result of an intended evolution and requires
 
corrective or mitigative actions.
 
VALID:  An indication, report, or condition, is considered to be VALID when it is verified by (1) an instrument channel check, (2) indications on related or redundant indicators, or (3) by direct observation by plant personnel, such that doubt related to the indicator's operability, the condition's existence, or the report's accuracy is removed. Implicit in this definition is the need for timely assessment.
VISIBLE DAMAGE:
Damage to equipment or structure that is readily observable without measurements, testing, or analysis. Damage is sufficient to cause concern regarding the continued operability or reliability of the affected structure, system, or component. Example damage includes: deformation due to heat or impact, denting, penetration, rupture, cracking, paint blistering. Surface blemishes (e.g.,
paint chipping, scratches) should not be included.
 
VITAL AREAS:
Any area within a protected area containing any equipment, system or device which, by result of failure, destruction or associated release, could directly or indirectly endanger the health and
 
safety of the public.
 
to 0CAN121102
 
Page 10 of 115 ANO EAL BASIS DOCUMENT OVERVIEW 
 
Emergency Action Levels Planned evolutions involve preplanning to address the limitations imposed by the condition, the performance of required surveillance testing, and the implementation of specific controls prior to knowingly entering the condition in accordance with the specific requirements of the ANO Technical Specifications (TSs). Activities which cause the site to operate beyond that allowed by the TSs, planned or unplanned, may result in an EAL threshold being met or exceeded.
Planned evolutions to test, manipulate, repair, perform maintenance or modifications to systems and equipment that result in an EAL value being met or exceeded are not subject to classification and activation requirements as long as the evolution proceeds as planned and is within the operational limitations imposed by the ANO operating license. However, these conditions may be subject to the reporting requirements of 10 CFR 50.72.
 
Classifications are based on evaluation of each Unit. All classifications are to be based upon valid indications, reports or conditions. Indications, reports or conditions are considered valid when they are verified by (1) an instrument channel check, or (2) indications on related or redundant indications, or (3) by direct observation by plant personnel, such that doubt related to the indication's operability, the condition's existence, or the report's accuracy is removed.
Implicit in this definition is the need for timely assessment.
 
With the emergency classification levels defined, the thresholds that must be met for each EAL to be placed under the EAL can be determined. There are two basic approaches to determining these EALs. EALs and emergency classification level boundaries coincide for those continuously measurable, instrumented ICs, such as radioactivity, core temperature, coolant levels, etc. For these ICs, the EAL will be the threshold reading that most closely corresponds to the EAL description using the best available information.
 
For discrete (discontinuous) events, the approach will have to be somewhat different. Typically, in this category are internal and external hazards such as fire or earthquake. The purpose for including hazards in EALs is to assure that station personnel and off-site emergency response organizations are prepared to deal with consequential damage these hazards may cause. If, indeed, hazards have caused damage to safety functions or fission product barriers, this should be confirmed by symptoms or by observation of such failures. Therefore, it may be appropriate to enter an Alert status for events approaching or exceeding design basis limits such as Operating Basis Earthquake (OBE), design basis wind loads, Fire within Vital Areas, etc. This would give the operating staff additional support and improved ability to determine the extent of plant damage. If damage to barriers or challenges to Safety Functions (SFs) have occurred or are identified, then the additional support can be used to escalate or terminate the emergency classification level based on what has been found. Of course, security events must reflect potential for increasing security threat levels.
 
Plant emergency operating procedures (EOPs) are designed to maintain and/or restore a set of SFs which are listed in the order of priority for restoration efforts during accident conditions.      to 0CAN121102
 
Page 11 of 115 ANO EAL BASIS DOCUMENT The PWR CSF set includes: Subcriticality Core cooling Heat sink Pressure-temperature-stress (RCS integrity)
Containment
 
RCS inventory There are diverse and redundant plant systems to support each SF. By monitoring the SFs instead of the individual system component status, the impact of multiple events is inherently addressed, e.g., the number of operable components available to maintain the SF.
 
The EOPs contain detailed instructions regarding the monitoring of these functions and provides a scheme for classifying the significance of the challenge to the functions. In providing EALs based on these schemes, the emergency classification level can flow from the EOP assessment rather than being based on a separate EAL asse ssment. This is desir able as it reduces ambiguity and the time necessary to classify the event.
 
Although the majority of the EALs provide very specific thresholds, the Emergency Director must remain alert to events or conditions that lead to the conclusion that exceeding the EAL is imminent. If, in the judgment of the Emergency Director, an imminent situation is at hand, the classification should be made as if the threshold has been exceeded. While this is particularly prudent at the higher emergency classification levels (as the early classification may provide for more effective implementation of protective measures), it is nonetheless applicable to all emergency classification levels.
 
Treatment of Multiple Events and Classification Level Upgrading The above discussion deals primarily with simpler emergencies and events that may not escalate rapidly. However, usable EAL guidance must also consider rapidly evolving and complex events. Hence, emergency classification level upgrading and consideration of multiple events must be addressed.
 
When multiple simultaneous events occur, the emergency classification level is based on the highest EAL reached. For example, two Alerts remain in the Alert category. Or, an Alert and a SAE is a SAE. Further guidance is provided in RIS 2007-02, Clarification of NRC Guidance for Emergency Notifications During Quickly Changing Events.
 
Emergency classification level upgrading must also consider the effects of a loss of a common system on more than one unit (e.g. potential for radioactive release from more than one core at the same site). This must be considered in the emergency classification level declaration and in the development of appropriate site specific ICs and EALs based on the generic EAL guidance.
 
to 0CAN121102
 
Page 12 of 115 ANO EAL BASIS DOCUMENT Although the majority of the EALs provide very specific thresholds, the Emergency Director must remain alert to events or conditions that lead to the conclusion that exceeding the EAL is imminent. If, in the judgment of the Emergency Director, an imminent situation is at hand, the classification should be made as if the threshold has been exceeded. While this is particularly prudent at the higher emergency classification levels (as the early classification may provide for more effective implementation of protective measures), it is nonetheless applicable to all emergency classification levels.
 
Emergency Classification Level Downgrading Another important aspect of usable EAL guidance is the consideration of what to do when the risk posed by an emergency is clearly decreasing. A combination approach involving recovery from GEs and some SAEs, and termination from NUEs, Alerts, and certain SAEs causing no long term plant damage appears to be the best choice. Downgrading to lower emergency classification levels adds notifications, but may have merit under certain circumstances.
 
Classifying Transient Events For some events, the condition may be corrected before a declaration has been made. The key consideration in this situation is to determine whether or not further plant damage occurred while the corrective actions were being taken. In some situations, this can be readily determined, in other situations, further analyses (e.g., coolant radiochemistry sampling, may be necessary). Classify the event as indicated and terminate the emergency once assessment shows that there were no consequences from the event and other termination criteria are met.
Existing guidance for classifying transient events addresses the period of time of event recognition and classification (15 minutes). However, in cases when EAL declaration criteria may be met momentarily during the normal expected response of the plant, declaration requirements should not be considered to be met when the conditions are a part of the designed plant response, or result from appropriate Operator actions.
There may be cases in which a plant condition that exceeded an EAL was not recognized at the time of occurrence but is identified well after the condition has occurred (e.g., as a result of routine log or record review), and the condition no longer exists. In these cases, an emergency should not be declared.
Reporting requirements of 10 CFR 50.72 are applicable and the guidance of NUREG-1022, Event Reporting Guidelines 10 CFR 50.72 and 50.73, should be applied.
 
Operating Mode Applicability
 
The plant operating mode that existed at the time that the event occurred, prior to any protective system or operator action initiated in response to the condition, is compared to the mode applicability of the EALs. If an event occurs, and a lower or higher plant operating mode is reached before the emergency classification level can be declared, the emergency classification level shall be based on the mode that existed at the time the event occurred.
to 0CAN121102
 
Page 13 of 115 ANO EAL BASIS DOCUMENT For events that occur in Cold Shutdown or Refueling, escalation is via EALs that have Cold Shutdown or Refueling for mode applicability, even if Hot Shutdown (or a higher mode) is entered during any subsequent heat-up. In particular, the fission product barrier EALs are applicable only to events that initiate in Hot Shutdown or higher.
 
Summary ANO has established an EAL Basis Document including basis information with the IC/EALs.
This information may assist the Emergency Director in making classifications, particularly those involving judgment or multiple events. The basis information may also be useful in training, for explaining event classifications to off-site officials, and for facilitating regulatory review and approval of the classification scheme.
to 0CAN121102
 
Page 14 of 115 ABNORMAL RADIATION LEVELS / RADIOLOGICAL EFFLUENTS to 0CAN121102
 
Page 15 of 115 ABNORMAL RAD LEVELS / RADIOLOGICAL EFFLUENT AU1  Initiating Condition - NOTIFICATION OF UNUSUAL EVENT
 
Any release of gaseous or liquid radioactivity to the environment > 2 times the ODCM limits for  60 minutes
 
Operating Mode Applicability:
All  Example Emergency Action Level(s): 
(1 or 2 or 3)
Note: The SM should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the release duration has exceeded, or will likely exceed, the applicable time. In the absence of data to the contrary, assume that the release duration has exceeded the applicable time if an ongoing release is detected and the release start time is unknown.
: 1. VALID reading on Channel 7 on any of the following radiation monitors > the reading shown for  60 minutes:
MONITORS - UNIT 1 LIMIT RX-9820 Containment Purge 5.90E-2 &#xb5;Ci/cc RX-9825 Radwaste Area 5.36E-2 &#xb5;Ci/cc RX-9830 Fuel Handling Area 4.54E-2 &#xb5;Ci/cc RX-9835 Emergency Penetration Room 9.56E-1 &#xb5;Ci/cc MONITORS - UNIT 2 LIMIT 2RX-9820 Containment Purge 4.46E-2 &#xb5;Ci/cc 2RX-9825 Radwaste Area 3.32E-2 &#xb5;Ci/cc 2RX-9830 Fuel Handling Area 4.46E-2 &#xb5;Ci/cc 2RX-9835 Emergency Penetration Room 8.84E-1 &#xb5;Ci/cc 2RX-9840 Post Accident Sampling Building 4.42E-1 &#xb5;Ci/cc 2RX-9845 Aux. Building Extension 1.26E-1 &#xb5;Ci/cc 2RX-9850 Low Level Radwaste Storage Bldg. 1.77E-1 &#xb5;Ci/cc OR    to 0CAN121102
 
Page 16 of 115 ABNORMAL RAD LEVELS / RADIOLOGICAL EFFLUENT AU1  2. VALID reading on any of the following radiation monitors > 2 times the alarm setpoint established by a current release permit for  60 minutes.
EFFLUENT MONITORS - Unit 1 RX-9820 Containment Purge (Channel 7 or 9) RE-4830 Waste Gas Radiation Monitor RE-4642 Liquid Radwaste Monitor EFFLUENT MONITORS - Unit 2 2RX-9820 Containment Purge (Channel 7 or 9) 2RE-2429 Waste Gas Decay Tank Vent Line Radiation Monitor 2RE-2330 BMS Liquid Discharge Monitor 2RE-4423 Regenerative Waste Discharge Monitor 2RE-4425 SG Blowdown to Flume Radiation Monitor OR 
: 3. Confirmed grab sample analyses for gaseous or liquid releases indicates concentrations or release rates > 2 times the applicable values of the ODCM for  60 minutes.
Basis:  The SM should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time.
 
This IC addresses a potential reduction in the level of safety of the plant as indicated by a radiological release that exceeds regulator y commitments for an extended period of time.
ANO incorporates features intended to control the release of radioactive effluents to the environment. Further, there are administrative controls established to prevent unintentional releases, or control and monitor intentional releases. The occurrence of extended, uncontrolled radioactive releases to the environment is indicative of a degradation in these features and/or
 
controls.
The ODCM multiples are specified in AU1 and AA1 only to distinguish between non-emergency conditions, and from each other. While these multiples obviously correspond to an offsite dose or dose rate, the emphasis in classifying these events is the degradation in the level of safety of the plant, NOT the magnitude of the associated dose or dose rate.
 
Releases should not be prorated or averaged over 60 minutes. For example, a release exceeding 4 times ODCM limits for 30 minutes does not meet the threshold for this IC.
 
to 0CAN121102
 
Page 17 of 115 ABNORMAL RAD LEVELS / RADIOLOGICAL EFFLUENT AU1  This Initiating Condition includes any release for which a radioactivity discharge permit was not prepared, or a release that exceeds the conditions (e.g., minimum dilution flow, maximum discharge flow, alarm setpoints, etc.) on the applicable permit.
 
EAL #1 This EAL addresses radioactivity releases, that for whatever reason, cause effluent radiation monitor readings to exceed the threshold identified in the EAL.
 
This EAL is intended for sites that have established effluent monitoring on non-routine release pathways for which a discharge permit would not normally be prepared.
 
EAL #2 This EAL addresses radioactivity releases, that for whatever reason, cause effluent radiation monitor readings to exceed the threshold identified in this Initiating Condition established by the release permit. This value may be associated with a planned batch release, or a continuous release path.
EAL #3 This EAL addresses uncontrolled releases that are detected by sample analyses, particularly on unmonitored pathways, e.g., spills of radioactive liquids into storm drains, heat exchanger leakage in river water systems, lake, etc.
 
EAL #1 and #2 directly correlate with the IC since annual average meteorology is required to be used in showing compliance with the ODCM and is used in calculating the alarm setpoints.
 
Reference Documents
:  1. 1604.051, "Eberline Radiation Monitor System"
: 2. Offsite Dose Calculation Manual to 0CAN121102
 
Page 18 of 115 ABNORMAL RAD LEVELS / RADIOLOGICAL EFFLUENT AU2  Initiating Condition - NOTIFICATION OF UNUSUAL EVENT UNPLANNED rise in plant radiation levels Operating Mode Applicability:
All Example Emergency Action Level(s): 
(1 or 2)  1. a. UNPLANNED lowering of water level in the refueling canal or spent fuel pool as indicated by:
Personnel observation, refueling crew report, indication on area security camera, borated water source (BWST or RWT) level drop due to makeup demands.
AND  b. VALID Area Radiation Monitor reading rise on any of the following:
Unit 1 RE-8009 Spent Fuel Area RE-8017 Fuel Handling Area Unit 2 2RE-8914 Spent Fuel Area 2RE-8915 Spent Fuel Area 2RE-8916 Spent Fuel Area 2RE-8912 Containment Incore Instrumentation OR  2. UNPLANNED VALID Area Radiation Monitor readings or survey results indicate a rise by a factor of 1000 over normal* levels.
Note: For area radiation monitors with ranges incapable of measuring 1000 times normal* levels, classification shall be based on VALID full scale indication unless surveys confirm that area radiation levels are below 1000 times normal* within 15 minutes of the Area Radiation Monitor indications going to full scale indication.
* Normal can be considered as the highest reading in the past twenty-four hours excluding the current peak value.
to 0CAN121102
 
Page 19 of 115 ABNORMAL RAD LEVELS / RADIOLOGICAL EFFLUENT AU2  Basis:  This IC addresses elevated radiation levels as a result of lowered water level above irradiated fuel or events that have resulted, or may result, in UNPLANNED rises in radiation dose rates within plant buildings. These radiation rises represent a loss of control over radioactive material and represent a potential degradation in the level of safety of the plant.
 
EAL #1  The refueling pathway is a site specific combination of cavities, tubes, canals and pools. While a radiation monitor could detect a rise in dose rate due to a drop in the water level, it might not be a reliable indication of whether or not the fuel is covered. For example, a refueling bridge ARM reading may rise due to planned evolutions such as head lift, or even a fuel assembly being raised in the manipulator mast. Also, a monitor could in fact be properly responding to a known event involving transfer or relocation of a source, stored in or near the fuel pool or responding to a planned evolution such as removal of the reactor head. Generally, elevated radiation monitor indications will need to be combined with another indicator (or personnel
 
report) of water loss
. For refueling events where the water level drops below the RPV flange classification would be via CU2. This event escalates to an Alert per AA2 if irradiated fuel outside the reactor vessel is uncovered. For events involving irradiated fuel in the reactor vessel, escalation would be via the Fission Product Barrier Matrix for events in operating Modes 1-4.
 
EAL #2 This EAL addresses rises in plant radiation levels that represent a loss of control of radioactive material resulting in a potential degradation in the level of safety of the plant.
 
This EAL excludes radiation level rises that result from planned activities such as use of radiographic sources and movement of radioactive waste materials. A specific list of ARMs is not required as it would restrict the applicability of the Threshold. The intent is to identify loss of control of radioactive material in any monitored area.
 
to 0CAN121102
 
Page 20 of 115 ABNORMAL RAD LEVELS / RADIOLOGICAL EFFLUENT AA1  Initiating Condition - ALERT Any release of gaseous or liquid radioactivity to the environment > 200 times the ODCM limits for  15 minutes 
 
Operating Mode Applicability:
All Example Emergency Action Level(s): 
(1 or 2 or 3)
Note: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the release duration has exceeded, or will likely exceed, the applicable time. In the absence of data to the contrary, assume that the release duration has exceeded the applicable time if an ongoing release is detected and the release start time is unknown. 1. VALID reading on Channel 7 on any of the following radiation monitors > the reading shown for  15 minutes:
MONITORS - UNIT 1 LIMIT RX-9820 Containment Purge 5.90E0 &#xb5;Ci/cc RX-9825 Radwaste Area 5.36E0 &#xb5;Ci/cc RX-9830 Fuel Handling Area 4.54E0 &#xb5;Ci/cc RX-9835 Emergency Penetration Room 9.56E+1 &#xb5;Ci/cc MONITORS - UNIT 2 LIMIT 2RX-9820 Containment Purge 4.46E0 &#xb5;Ci/cc 2RX-9825 Radwaste Area 3.32E0 &#xb5;Ci/cc 2RX-9830 Fuel Handling Area 4.46E0 &#xb5;Ci/cc 2RX-9835 Emergency Penetration Room 8.84E+1 &#xb5;Ci/cc 2RX-9840 Post Accident Sampling Building 4.42E+1 &#xb5;Ci/cc 2RX-9845 Aux. Building Extension 1.26E+1 &#xb5;Ci/cc 2RX-9850 Low Level Radwaste Storage Bldg. 1.77E+1 &#xb5;Ci/cc OR    to 0CAN121102
 
Page 21 of 115 ABNORMAL RAD LEVELS / RADIOLOGICAL EFFLUENT AA1  2. EITHER VALID reading on any of the following radiation monitors > 200 times the alarm setpoint established by a current release  permit for  15 minutes OR VALID reading greater than the value listed for  15 minutes.
MONITORS - UNIT 1 LIMIT RX-9820 Containment Purge (Channel 7 or 9) N/A RE-4830 Waste Gas Radiation Monitor 9.5E7 cpm RE-4642 Liquid Radwaste Monitor 9.5E7 cpm MONITORS - UNIT 2 LIMIT 2RX-9820 Containment Purge (Channel 7 or 9) N/A 2RE-2429 Waste Gas Monitoring System 9.5E5 cpm 2RE-2330 BMS Liquid Discharge Monitor 9.5E5 cpm 2RE-4423 Regenerative Waste Discharge Monitor 9.5E5 cpm 2RE-4425 SG Blowdown to Flume Radiation Monitor 9.5E5 cpm OR  3. Confirmed grab sample analyses for gaseous or liquid releases indicates concentrations or release rates > 200 times the applicable values of the ODCM for  15 minutes.
Basis:  The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but
 
should declare the event as soon as it is determined that the condition will likely exceed the applicable time.
 
This IC addresses an actual or substantial potential reduction in the level of safety of the plant as indicated by a radiological release that exceeds regulatory commitments for an extended period of time. ANO incorporates features intended to control the release of radioactive effluents to the environment. Further, there are administrative controls established to prevent unintentional releases, or control and monitor intentional releases. The occurrence of extended, uncontrolled radioactive releases to the environment is indicative of a degradation in these features and/or controls.
 
The ODCM multiples are specified in AU1 and AA1 only to distinguish between non-emergency conditions, and from each other. While these multiples obviously correspond to an offsite dose or dose rate, the emphasis in classifying these events is the degradation in the level of safety of the plant, NOT the magnitude of the associated dose or dose rate.
 
to 0CAN121102
 
Page 22 of 115 ABNORMAL RAD LEVELS / RADIOLOGICAL EFFLUENT AA1  Releases should not be prorated or averaged. For example, a release exceeding 600 times ODCM limits for 5 minutes does not meet the threshold for this IC.
 
This Initiating Condition includes any release for which a release permit was not prepared, or a release that exceeds the conditions (e.g., minimum dilution flow, maximum discharge flow, alarm setpoints, etc.) on the applicable permit.
 
EAL #1  This EAL addresses radioactivity releases, that for whatever reason, cause effluent radiation monitor readings to exceed the threshold identified in the Initiating Condition.
 
This EAL is intended for sites that have established effluent monitoring on non-routine release pathways for which a discharge permit would not normally be prepared.
 
EAL #2 This EAL addresses radioactivity releases, that for whatever reason, cause effluent radiation monitor readings to exceed the threshold identified in this Initiating Condition established by the radioactivity discharge permit. This value may be associated with a planned batch release, or a continuous release path. The limit values provided are for those cases in which the maximum monitor range is less than the release permit value multiplied by 200.
 
EAL #3  This EAL addresses uncontrolled releases that are detected by sample analyses, particularly on unmonitored pathways, e.g., spills of radioactive liquids into storm drains, heat exchanger leakage in river water systems, lake, etc.
 
EAL #1 and #2 directly correlate with the IC since annual average meteorology is required to be used in showing compliance with the ODCM and is used in calculating the alarm setpoints.
 
Reference Documents
:  1. 1604.051, "Eberline Radiation Monitor System"
: 2. Offsite Dose Calculation Manual to 0CAN121102
 
Page 23 of 115 ABNORMAL RAD LEVELS / RADIOLOGICAL EFFLUENT AA2  Initiating Condition - ALERT Damage to irradiated fuel or loss of water level that has resulted or will result in the uncovering of irradiated fuel outside the reactor vessel
 
Operating Mode Applicability:
All Example Emergency Action Level(s): 
(1 or 2)  1. A water level drop in the refueling canal or spent fuel pool that will result in irradiated fuel becoming uncovered.
OR  2. VALID alarm on any of the following radiation monitors due to damage to irradiated fuel or loss of water level.
Unit 1 RX-9820 Containment Purge (Channel 7 or 9) RX-9825 Radwaste Area (Channel 7 or 9) RX-9830 Fuel Handling Area (Channel 7 or 9) RE-8060 Containment High Range Radiation Monitors RE-8061 Containment High Range Radiation Monitors RE-8009 Spent Fuel Area RE-8017 Fuel Handling Unit 2 2RX-9820 Containment Purge (Channel 7 or 9) 2RX-9825 Radwaste Area (Channel 7 or 9) 2RX-9830 Fuel Handling Area (Channel 7 or 9) 2RE-8905 Containment Equipment Hatch Area 2RE-8909 Containment Personnel Access Area 2RE-8925-1 Containment High Range Radiation Monitors 2RE-8925-2 Containment High Range Radiation Monitors 2RE-8914 Spent Fuel Area 2RE-8915 Spent Fuel Area 2RE-8916 Spent Fuel Area  2RE-8912 Containment Incore Inst.
to 0CAN121102
 
Page 24 of 115 ABNORMAL RAD LEVELS / RADIOLOGICAL EFFLUENT AA2  Basis:  This IC addresses rises in radiation dose rates within plant buildings, and may be a precursor to a radioactivity release to the environment. These events represent a loss of control over radioactive material and represent an actual or substantial potential degradation in the level of
 
safety of the plant.
 
These events escalate from AU2 in that fuel activity has been released, or is anticipated due to fuel heatup. This IC applies to spent fuel requiring water coverage and is not intended to address spent fuel which is licensed for dry storage.
 
EAL #1  Indications may include instrumentation such as water level and local area radiation monitors, and personnel (e.g., refueling crew) reports. Depending on available level indication, the declaration may be based on indications of water makeup rate or drop in applicable borated water storage tank level. Video cameras (Security or outage-related) may allow remote
 
observation of level.
 
EAL #2 This EAL addresses radiation monitor indications of fuel uncovery and/or fuel damage.
 
Elevated ventilation monitor readings may be indication of a radioactivity release from the fuel, confirming that damage has occurred. Elevated background at the ventilation monitor due to water level drop may mask elevated ventilation exhaust airborne activity and needs to be considered.
 
While a radiation monitor could detect a rise in dose rate due to a drop in the water level, it
 
might not be a reliable indication of whether or not the fuel is covered.
For example, a refueling bridge ARM reading may rise due to planned evolutions such as head lift, or even a fuel assembly being raised in the manipulator mast. Also, a monitor could in fact be properly responding to a known event involving transfer or relocation of a source, stored in or near the fuel pool or responding to a planned evolution such as removal of the reactor head. Generally, elevated radiation monitor indications will need to be combined with another indicator (or personnel report) of water loss.
 
Escalation of this emergency classification level, if appropriate, would be based on AS1 or AG1.
 
to 0CAN121102
 
Page 25 of 115 ABNORMAL RAD LEVELS / RADIOLOGICAL EFFLUENT AA3  Initiating Condition - ALERT Rise in radiation levels within the facility that impedes operation of systems required to maintain plant safety functions
 
Operating Mode Applicability:
All  Example Emergency Action Level(s):
Dose rate > 15 mR/hr in any of the following areas requiring continuous occupancy to maintain plant safety functions:
 
Unit 1 Control Room  Unit 2 Control Room  Central Alarm Station Basis:  This IC addresses elevated radiation levels that impact continued operation in areas requiring continuous occupancy to maintain safe operation or to perform a safe shutdown.
 
The cause and/or magnitude of the rise in radiation levels is not a concern of this IC. The SM/TSC Director/EOF Director must consider the source or cause of the elevated radiation levels and determine if any other IC may be involved.
 
This IC is not meant to apply to rises in the containment dome radiation monitors as these are events which are addressed in the fission product barrier matrix EALs.
 
Areas requiring continuous occupancy include the Control Rooms and the Central Alarm
 
Station.      to 0CAN121102
 
Page 26 of 115 ABNORMAL RAD LEVELS / RADIOLOGICAL EFFLUENT AS1  Initiating Condition -- SITE AREA EMERGENCY Offsite dose resulting from an actual or IMMINENT release of gaseous radioactivity > 100 mR TEDE or 500 mR child thyroid CDE for the actual or projected duration of the release
 
Operating Mode Applicability:
All Example Emergency Action Level(s): 
(1 or 2 or 3)
Note: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time. If dose assessment results are available, the classification should be based on EAL #2 instead of EAL #1. Do not delay declaration awaiting dose assessment results.
: 1. VALID reading on Channel 9 on any of the following radiation monitors > the reading shown for  15 minutes:
MONITORS - UNIT 1 LIMIT RX-9820 Containment Purge 5.90E+1 &#xb5;Ci/cc RX-9825 Radwaste Area 5.36E+1 &#xb5;Ci/cc RX-9830 Fuel Handling Area 4.54E+1 &#xb5;Ci/cc RX-9835 Emergency Penetration Room 9.56E+2 &#xb5;Ci/cc MONITORS - UNIT 2 LIMIT 2RX-9820 Containment Purge 4.46E+1 &#xb5;Ci/cc 2RX-9825 Radwaste Area 3.32E+1 &#xb5;Ci/cc 2RX-9830 Fuel Handling Area 4.46E+1 &#xb5;Ci/cc 2RX-9835 Emergency Penetration Room 8.84E+2 &#xb5;Ci/cc 2RX-9840 Post Accident Sampling Building 4.42E+2 &#xb5;Ci/cc 2RX-9845 Aux. Building Extension 1.26E+2 &#xb5;Ci/cc OR 
: 2. Dose assessment using actual meteorology indicates doses > 100 mR TEDE or 500 mR child thyroid CDE at or beyond the site boundary.
OR    to 0CAN121102
 
Page 27 of 115 ABNORMAL RAD LEVELS / RADIOLOGICAL EFFLUENT AS1  3. Field survey results indicate closed window dose rates > 100 mR/hr expected to continue for  60 minutes; or analyses of field survey samples indicate child thyroid CDE > 500 mR for one hour of inhalation, at or beyond the site boundary.
Basis:  This IC addresses radioactivity releases that result in doses at or beyond the site boundary that exceed 10% of the EPA Protective Action Guides (PAGs). Releases of this magnitude are associated with the failure of plant systems needed for the protection of the public.
 
EAL #1  The monitor list in EAL #1 includes monitors on all potential release pathways (plant stack, primary-secondary leak, fuel handling accident).
 
EAL #2 Since dose assessment in EAL #2 is based on actual meteorology, whereas the monitor readings in EAL #1 are not, the results from these assessments may indicate that the classification is not warranted, or may indicate that a higher classification is warranted. For this reason, emergency implementing procedures should call for the timely performance of dose assessments using actual meteorology and release information. If the results of these dose assessments are available when the classification is made (e.g., initiated at a lower classification level), the dose assessment results override the monitor reading EALs.
 
EAL #3 Field team surveys in EAL #3 should be perfo rmed at or beyond the SITE BOUNDARY and at the most accurate indicator of the condition. Field data are independent of release elevation and meteorology. The assumed release duration is one hour. Expected post accident source terms would be dominated by noble gases providing the dose rate value. Sampling of radioiodine by adsorption on a charcoal cartridge should determine the iodine value.
 
Reference Documents:
: 1. 1604.051, "Eberline Radiation Monitor System"
: 2. Offsite Dose Calculation Manual to 0CAN121102
 
Page 28 of 115 ABNORMAL RAD LEVELS / RADIOLOGICAL EFFLUENT AG1  Initiating Condition -- GENERAL EMERGENCY Offsite dose resulting from an actual or IMMINENT release of gaseous radioactivity > 1000 mR TEDE or 5000 mR child thyroid CDE for the actual or projected duration of the release using actual meteorology
 
Operating Mode Applicability:
All  Example Emergency Action Level(s): 
(1 or 2 or 3)
Note: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time. If dose assessment results are available, the classification should be based on EAL #2 instead of EAL #1. Do not delay declaration awaiting dose assessment results.
: 1. VALID reading on Channel 9 on any of the following radiation monitors > the reading shown for  15 minutes:
MONITORS - UNIT 1 LIMIT RX-9820 Containment Purge 5.90E+2 (Ci/cc) RX-9825 Radwaste Area 5.36E+2 (Ci/cc) RX-9830 Fuel Handling Area 4.54E+2 (Ci/cc) RX-9835 Emergency Penetration Room 9.56E+3 (Ci/cc) MONITORS - UNIT 2 LIMIT 2RX-9820 Containment Purge 4.46E+2 (Ci/cc) 2RX-9825 Radwaste Area 3.32E+2 (Ci/cc) 2RX-9830 Fuel Handling Area 4.46E+2 (Ci/cc) 2RX-9835 Emergency Penetration Room 8.84E+3 (Ci/cc) 2RX-9840 Post Accident Sampling Building 4.42E+3 (Ci/cc) 2RX-9845 Aux. Building Extension 1.26E+3 (Ci/cc)  OR  2. Dose assessment using actual meteorology indicates doses > 1000 mR TEDE or 5000 mR child thyroid CDE at or beyond the site boundary.
OR    to 0CAN121102
 
Page 29 of 115 ABNORMAL RAD LEVELS / RADIOLOGICAL EFFLUENT AG1  3. Field survey results indicate closed window dose rates > 1000 mR/hr expected to continue for  60 minutes; or analyses of field survey samples indicate child thyroid CDE > 5000 mR for one hour of inhalation, at or beyond the site boundary.
Basis:  This IC addresses radioactivity releases that result in doses at or beyond the site boundary that exceed the EPA Protective Action Guides (PAGs). Public protective actions will be necessary. Releases of this magnitude are associated with the failure of plant systems needed for the protection of the public and likely involve fuel damage.
 
EAL #1  The monitor list in EAL #1 includes monitors on all potential release pathways (plant stack, primary-secondary leak, fuel handling accident).
 
EAL #2 Since dose assessment in EAL #2 is based on actual meteorology, whereas the monitor readings in EAL #1 are not, the results from these assessments may indicate that the classification is not warranted. For this reason, emergency implementing procedures should call for the timely performance of dose assessments using actual meteorology and release information. If the results of these dose asse ssments are available w hen the classification is made (e.g., initiated at a lower classification level), the dose assessment results override the monitor reading EALs.
 
EAL #3 Field team surveys in EAL #3 should be perfo rmed at or beyond the SITE BOUNDARY and at the most accurate indicator of the condition. Field data are independent of release elevation and meteorology. The assumed release duration is one hour. Expected post accident source terms would be dominated by noble gases providing the dose rate value. Sampling of radioiodine by adsorption on a charcoal cartridge should determine the iodine value.
 
Reference Documents
:  1. 1604.051, "Eberline Radiation Monitor System"
: 2. Offsite Dose Calculation Manual
 
to 0CAN121102
 
Page 30 of 115
 
Cold Shutdown / Refueling System Malfunction    to 0CAN121102
 
Page 31 of 115 COLD SHUTDOWN/REFUELING SYSTEM MALFUNCTION CU1  Initiating Condition -- NOTIFICATION OF UNUSUAL EVENT RCS leakage Operating Mode Applicability:
Cold Shutdown (Mode 5)
Example Emergency Action Level(s):
Note: The SM should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the
 
applicable time.
: 1. RCS leakage results in the inability to maintain or restore level within Pressurizer or RCS level target band for  15 minutes.
Basis:  This IC is considered to be a potential degradation of the level of safety of the plant. The inability to maintain or restore level is indicative of loss of RCS inventory.
Relief valve normal operation should be excluded from this IC. However, a relief valve that operates and fails to close per design should be considered applicable to this IC if the relief valve cannot be isolated.
 
Prolonged loss of RCS Inventory may result in escalation to the Alert emergency classification level via either CA1 or CA3.
 
. to 0CAN121102
 
Page 32 of 115 COLD SHUTDOWN/REFUELING SYSTEM MALFUNCTION CU2  Initiating Condition -- NOTIFICATION OF UNUSUAL EVENT UNPLANNED loss of RCS / reactor vessel inventory Operating Mode Applicability:
Refueling (Mode 6)
 
Example Emergency Action Level(s): 
(1 or 2)
Note: The SM should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the
 
applicable time.
: 1. UNPLANNED RCS / reactor vessel level drop as indicated by either of the following:
: a. RCS / reactor vessel water level drop below the reactor vessel flange for  15 minutes when the RCS / reactor vessel level band is established above the reactor vessel
 
flange  OR  b. RCS / reactor vessel water level drop below the RCS / reactor vessel level band for  15 minutes or longer when the RCS / reactor vessel level band is established below the reactor vessel flange.
OR  2. RCS / reactor vessel  level cannot be monitored with a loss of RCS / reactor vessel  inventory as indicated by an unexplained level rise in (as applicable) the Reactor Building Sump, Reactor Drain Tank, Aux. Building Equipment Drain Tank, Aux. Building Sump, or
 
Quench Tank.
Basis:  This IC is a precursor of more serious conditions and considered to be a potential degradation
 
of the level of safety of the plant.
Refueling evolutions that lower RCS water level below the reactor vessel flange are carefully planned and procedurally controlled. An UNPLANNED event that results in water level dropping below the reactor vessel  flange, or below the planned RCS water level for the given evolution (if the planned RCS water level is already below the reactor vessel  flange), warrants declaration of an NUE due to the reduced RCS inventory that is available to keep the core covered.
The allowance of 15 minutes was chosen because it is reasonable to assume that level can be restored within this time frame using one or more of the redundant means of refill that should be available. If level cannot be restored in this time frame then it may indicate a more serious
 
condition exists.
Continued loss of RCS Inventory will result in escalation to the Alert emergency classification
 
level via either CA1 or CA3. to 0CAN121102
 
Page 33 of 115 COLD SHUTDOWN/REFUELING SYSTEM MALFUNCTION CU2  EAL #1 This EAL involves a drop in RCS level below the top of the reactor vessel flange that continues for 15 minutes due to an UNPLANNED event. This EAL is not applicable to drops in flooded reactor cavity level, which is addressed by AU2 EAL1, until such time as the level drops to the level of the vessel flange.
 
If reactor vessel level continues to drop and reaches the Bottom ID of the RCS Loop then escalation to CA1 would be appropriate.
 
EAL #2 This EAL addresses conditions in the refueling mode when normal means of core temperature indication and RCS level indication may not be available. Redundant means of reactor vessel level indication will normally be installed (including the ability to monitor level visually) to assure that the ability to monitor level will not be interrupted. However, if all level indication were to be lost during a loss of RCS inventory event, the operators would need to determine that reactor vessel inventory loss was occurring by observing sump and tank level changes. Sump and tank level rises must be evaluated against other potential sources of leakage such as cooling water sources inside the containment to ensure they are indicative of RCS leakage.
 
Escalation to the Alert emergency classification level would be via either CA1 or CA3.
 
to 0CAN121102
 
Page 34 of 115 COLD SHUTDOWN/REFUELING SYSTEM MALFUNCTION CU3  Initiating Condition -- NOTIFICATION OF UNUSUAL EVENT UNPLANNED loss of decay heat removal capability with irradiated fuel in the reactor vessel Operating Mode Applicability:
Cold Shutdown (Mode 5)  Refueling (Mode 6)
 
Example Emergency Action Level(s): 
(1 or 2)  Note: The SM should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the
 
applicable time.
: 1. UNPLANNED event results in RCS temperature exceeding 200 &deg;F.
OR  2. Loss of all RCS temperature and RCS/reactor vessel level indication for  15 minutes.
 
Basis:  This IC is a precursor of more serious conditions and, as a result, is considered to be a potential degradation of the level of safety of the plant. In cold shutdown the ability to remove decay heat relies primarily on forced cooling flow. Operation of the systems that provide this forced cooling may be jeopardized due to the unlikely loss of electrical power or RCS inventory. Since the RCS usually remains intact in the cold shutdown mode a large inventory of water is available to keep the core covered.
 
During refueling the level in the reactor vessel will normally be maintained above the reactor vessel flange. Refueling evolutions that lower water level below the reactor vessel flange are carefully planned and procedurally controlled. Loss of forced decay heat removal at reduced inventory may result in more rapid rises in RCS/reactor vessel temperatures depending on the
 
time since shutdown.
 
Normal means of core temperature indication and RCS level indication may not be available in the refueling mode. Redundant means of reactor vessel level indication are therefore procedurally installed to assure that the ability to monitor level will not be interrupted. However, if all level and temperature indication were to be lost in either the cold shutdown of refueling modes, EAL 2 would result in declaration of an NUE if both temperature and level indication cannot be restored within 15 minutes from the loss of both means of indication.
 
Escalation to Alert would be via CA1 based on an inventory loss or CA3 based on exceeding its temperature criteria.
 
to 0CAN121102
 
Page 35 of 115 COLD SHUTDOWN/REFUELING SYSTEM MALFUNCTION CU5  Initiating Condition -- NOTIFICATION OF UNUSUAL EVENT AC power capability to Vital 4.16 KV busses reduced to a single power source  15 minutes such that any additional single failure would result in station blackout
 
Operating Mode Applicability:
Cold Shutdown (Mode 5)  Refueling (Mode 6)
 
Example Emergency Action Level(s):
Note: The SM should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the
 
applicable time.
: 1. a. AC power capability to Vital 4.16 KV busses reduced to a single power source  15 minutes.
AND  b. Any additional single power source failure will result in station blackout.
Basis:  The condition indicated by this IC is the degradation of the offsite and onsite AC power systems such that any additional single failure would result in a station blackout. This condition could occur due to a loss of offsite power with a concurrent failure of all but one emergency generator to supply power to its emergency busses. The subsequent loss of this single power source would escalate the event to an Alert in accordance with CA5.
 
Fifteen minutes was selected as a threshold to exclude transient or momentary losses of power.
The EAL allows credit for operation of the Alternate AC Diesel Generator.
 
Reference Documents
:  1. 1202.007, "
Degraded Powe r"  2. 1202.008, "
Blackout"  3. 2202.007, "
Loss of Off-Site Power"
: 4. 2202.008, "Station Blackout"
: 5. 2104.037, "
Alternate AC Diesel Generator Operations" to 0CAN121102
 
Page 36 of 115 COLD SHUTDOWN/REFUELING SYSTEM MALFUNCTION CU6  Initiating Condition -- NOTIFICATION OF UNUSUAL EVENT Loss of required DC power  15 minutes Operating Mode Applicability:
Cold Shutdown (Mode 5)  Refueling (Mode 6)
 
Example Emergency Action Level(s):
Note: The SM should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the
 
applicable time.
: 1. < 105 volts on required Vital DC bus  15 minutes.
Basis:  The purpose of this IC and its associated EALs is to recognize a loss of DC power compromising the ability to monitor and control the removal of decay heat during Cold Shutdown or Refueling operations.
 
It is intended that the loss of the operating (operable) train is to be considered. If this loss results in the inability to maintain cold shutdown, the escalation to an Alert will be per CA3.
 
Fifteen minutes was selected as a threshold to exclude transient or momentary power losses.
 
to 0CAN121102
 
Page 37 of 115 COLD SHUTDOWN/REFUELING SYSTEM MALFUNCTION CU7  Initiating Condition -- NOTIFICATION OF UNUSUAL EVENT Inadvertent criticality Operating Mode Applicability:
Cold Shutdown (Mode 5)  Refueling (Mode 6)
 
Example Emergency Action Level(s):
: 1. UNPLANNED sustained positive startup rate observed on nuclear instrumentation.
 
Basis:
This IC addresses criticality events that occur in Cold Shutdown or Refueling modes such as fuel mis-loading events and inadvertent dilution events. This IC indicates a potential degradation of the level of safety of the plant, warranting an NUE classification.
 
This condition can be identified using the startup rate meter. The term "sustained" is used in order to allow exclusion of expected short term positive startup rates from planned fuel bundle or control rod movements during core alteration. These short term positive startup rates are the result of the rise in neutron population due to subcritical multiplication.
 
Escalation would be by SM judgment.
 
to 0CAN121102
 
Page 38 of 115 COLD SHUTDOWN/REFUELING SYSTEM MALFUNCTION CU8  Initiating Condition -- NOTIFICATION OF UNUSUAL EVENT Loss of all onsite or offsite communications capabilities Operating Mode Applicability:
Cold Shutdown (Mode 5)  Refueling (Mode 6)
Defueled
 
Example Emergency Action Level(s): 
(1 or 2) 
: 1. Loss of all Table C2 onsite communication methods affecting the ability to perform routine operations.
OR  2. Loss of all Table C3 offsite communication methods affecting the ability to perform offsite notifications.
Table C2 Onsite Communications Methods  Table C3 Offsite Communications Methods Station radio system  All telephone lines (commercial and microwave) Plant paging system  ENS In-plant telephones  Gaitronics Basis:  The purpose of this IC and its associated EALs is to recognize a loss of communications capability that either defeats the plant operations staff ability to perform routine tasks necessary for plant operations or the ability to communicate issues with offsite authorities. The loss of off-site communications ability is expected to be significantly more comprehensive than the condition addressed by 10 CFR 50.72.
 
The availability of one method of ordinary offsite communications is sufficient to inform federal, state, and local authorities of plant issues. This EAL is intended to be used only when extraordinary means (e.g., relaying of information from radio transmissions, individuals being sent to offsite locations, etc.) are being utilized to make communications possible.
 
to 0CAN121102
 
Page 39 of 115 COLD SHUTDOWN/REFUELING SYSTEM MALFUNCTION CA1  Initiating Condition - ALERT Loss of RCS / reactor vessel inventory Operating Mode Applicability:
Cold Shutdown (Mode 5)  Refueling (Mode 6)
 
Example Emergency Action Level(s): 
(1 or 2)  Note: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time.
: 1. Loss of RCS / reactor vessel inventory as indicated by:
Unit 1: RVLMS Levels 1 through 8 indicate DRY Unit 2: RVLMS Levels 1 through 5 indicate DRY OR  Unit 1: Reactor vessel level < 368 ft., 0 in. (bottom of the hot leg)
Unit 2: Reactor vessel level < 369 ft., 1.5 in. (bottom of the hot leg)
OR  2. RCS / reactor vessel level cannot be monitored for  15 minutes with a loss of RCS / reactor vessel inventory as indicated by an unexplained level rise in (as applicable) the Reactor Building Sump, Reactor Drain Tank, Aux. Building Equipment Drain Tank, Aux.
Building Sump, or Quench Tank.
 
Basis:  These EALs serve as precursors to a loss of ability to adequately cool the fuel. The magnitude of this loss of water indicates that makeup systems have not been effective and may not be capable of preventing further reactor vessel level lowering and potential core uncovery. This condition will result in a minimum emergency classification level of an Alert.
 
EAL #1 The bottom of the RCS hot leg penetration into the reactor vessel is approximately RLVMS Level 8 (Unit 1) or RVLMS Level 5 (Unit 2). However, RVLMS may not be available in mode 6. Redundant means level indication is provided in this mode and included in EAL #1. The bottom of the RCS hot leg penetration into the reactor vessel is 368 ft., 0 in. (Unit 1) or 369 ft., 1.5 in.
(Unit 2). Below this level, reactor vessel level indication will be lost and loss of suction to decay heat removal systems will occur. The inability to restore and maintain level after reaching this setpoint would be indicative of a failure of the RCS barrier. to 0CAN121102
 
Page 40 of 115 COLD SHUTDOWN/REFUELING SYSTEM MALFUNCTION CA1  EAL #2 In the cold shutdown mode, normal RCS level and reactor vessel level instrumentation systems will usually be available. In the refueling mode, normal means of reactor vessel level indication may not be available. Redundant means of reactor vessel level indication will usually be installed (including the ability to monitor level visually) to assure that the ability to monitor level will not be interrupted. However, if all level indication were to be lost during a loss of RCS inventory event, the operators would need to determine that reactor vessel inventory loss was occurring by observing sump and tank level changes. Sump and tank level rises must be evaluated against other potential sources of leakage such as cooling water sources inside the containment to ensure they are indicative of RCS leakage.
 
If reactor vessel level continues to lower then escalation to Site Area Emergency will be via CS1.
to 0CAN121102
 
Page 41 of 115 COLD SHUTDOWN/REFUELING SYSTEM MALFUNCTION CA3  Initiating Condition - ALERT Inability to maintain plant in Cold Shutdown Operating Mode Applicability:
Cold Shutdown (Mode 5)  Refueling (Mode 6)
 
Example Emergency Action Level(s): 
(1 or 2)  1. An UNPLANNED event results in RCS temperature > 200 &deg;F > the specified duration in Table C1.
Table C1 RCS Reheat Duration Thresholds RCS Containment Closure Duration Intact (but not RCS Lowered Inventory) N/A 60 minutes* Established 20 minutes* Not intact or RCS Lowered Inventory Not Established 0 minutes
* If an RCS heat removal system is in operation within this time frame and RCS temperature is being reduced, the EAL is not applicable.
OR  Note: EAL #2 does not apply in solid plant conditions.
: 2. An UNPLANNED event results in RCS pressure rise > 10 psi due to a loss of RCS cooling.
 
Basis:
EAL #1 The RCS Reheat Duration Threshold table addresses complete loss of functions required for core cooling for greater than 60 minutes during refueling and cold shutdown modes when RCS integrity is established. RCS integrity should be considered to be in place when the RCS pressure boundary is in its normal condition for the cold shutdown mode of operation (e.g., no freeze seals or nozzle dams). The 60 minute time frame should allow sufficient time to restore cooling without there being a substantial degradation in plant safety.
 
The RCS Reheat Duration Threshold table also addresses the complete loss of functions required for core cooling for greater than 20 minutes during refueling and cold shutdown modes when CONTAINMENT CLOSURE is established but RCS integrity is not established or RCS inventory is reduced (e.g., mid-loop operation ). As discussed above, RCS integrity should be    to 0CAN121102
 
Page 42 of 115 COLD SHUTDOWN/REFUELING SYSTEM MALFUNCTION CA3  assumed to be in place when the RCS pressure boundary is in its normal condition for the cold shutdown mode of operation (e.g., no freeze seals or nozzle dams). The allowed 20 minute time frame was included to allow operator action to restore the heat removal function, if possible.
 
Finally, the EAL addresses complete loss of functions required for core cooling during refueling and cold shutdown modes when neither CONTAINMENT CLOSURE nor RCS integrity are established.
The (*) indicates that this EAL is not applicable if actions are successful in restoring an RCS heat removal system to operation and RCS temperature is being reduced within the specified
 
time frame.
 
EAL #2 The 10 psi pressure rise addresses situations where, due to high decay heat loads, the time provided to restore temperature control, should be less than 60 minutes. The RCS pressure setpoint chosen should be 10 psi or the lowest pressure that the site can read on installed Control Board instrumentation that is equal to or greater than 10 psi.
Escalation to Site Area Emergency would be via CS1 should boiling result in significant reactor vessel level loss leading to core uncovery.
 
A loss of Technical Specification components alone is not intended to constitute an Alert. The same is true of a momentary UNPLANNED excursion above the Technical Specification cold shutdown temperature limit when the heat removal function is available.
 
The SM / TSC Director / EOF Director must remain alert to events or conditions that lead to the conclusion that exceeding the EAL is IMMINENT. If, in the judgment of the SM / TSC Director /
EOF Director, an IMMINENT situation is at hand, the classification should be made as if the threshold has been exceeded.
 
to 0CAN121102
 
Page 43 of 115 COLD SHUTDOWN/REFUELING SYSTEM MALFUNCTION CA5  Initiating Condition - ALERT Loss of all offsite and all onsite AC power to Vital 4.16KV busses  15 minutes Operating Mode Applicability:
Cold Shutdown (Mode 5)  Refueling (Mode 6)
Defueled
 
Example Emergency Action Level(s):
Note: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time.
: 1. Loss of all offsite and all on-site AC power to Vital 4.16KV busses  15 minutes.
Basis:  Loss of all AC power compromises all plant safety systems requiring electric power including DHR/shutdown cooling, emergency core cooling, containment cooling, spent fuel pool cooling and the ultimate heat sink.
 
The event can be classified as an Alert when in cold shutdown, refueling, or defueled mode because of the significantly reduced decay heat and lower temperature and pressure, which allow raising the time to restore one of the emergency busses, relative to that specified for the Site Area Emergency EAL.
 
Escalating to Site Area Emergency, if appropriate, is by Abnormal Radiation Levels/
 
Radiological Effluent (TAB A) ICs.
 
Fifteen minutes was selected as a threshold to exclude transient or momentary power losses.
 
to 0CAN121102
 
Page 44 of 115 COLD SHUTDOWN/REFUELING SYSTEM MALFUNCTION CS1  Initiating Condition - SITE AREA EMERGENCY Loss of RCS / reactor vessel inventory affecting core decay heat removal capability Operating Mode Applicability:
Cold Shutdown (Mode 5)  Refueling (Mode 6)
 
Example Emergency Action Level(s): 
(1 or 2)  Note: The SM / TSC Director / EOF Director  should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time.
: 1. With CONTAINMENT CLOSURE not established:
Unit 1: RVLMS Levels 1 through 9 indicate DRY Unit 2: RVLMS Levels 1 through 6 indicate DRY OR  2. With CONTAINMENT CLOSURE established, core exit thermocouples indicate superheat.
 
OR 
: 3. RCS / reactor vessel level cannot be monitored for  30 minutes with a loss of RCS / reactor vessel inventory as indicated by any of the following:  Containment High Range Radiation Monitor reading > 10 R/hr  Erratic source range monitor indication  Unexplained level rise in Reactor Building Sump, Reactor Drain Tank, Quench Tank, Aux. Building Equipment Drain Tank, or Aux. Building Sump.
Basis:  Under the conditions specified by this IC, continued lowering in RCS / reactor vessel level is indicative of a loss of inventory control. Inventory loss may be due to an RCS breach, pressure boundary leakage, or continued boiling in the RPV. Thus, declaration of a Site Area Emergency is warranted.
 
Escalation to a General Emergency is via CG1 or AG1.
 
to 0CAN121102
 
Page 45 of 115 COLD SHUTDOWN/REFUELING SYSTEM MALFUNCTION CS1  EAL #3 In the cold shutdown mode, normal RCS level and reactor vessel level instrumentation systems will usually be available. In the refueling mode, normal means of reactor vessel level indication may not be available. Redundant means of reactor vessel level indication will usually be installed (including the ability to monitor level visually) to assure that the ability to monitor level will not be interrupted. However, if all level indication were to be lost during a loss of RCS inventory event, the operators would need to determine that reactor vessel inventory loss was occurring by observing sump and tank level changes. Sump and tank level rises must be evaluated against other potential sources of leakage such as cooling water sources inside the containment to ensure they are indicative of RCS leakage.
 
The 30-minute duration allows sufficient time for actions to be performed to recover inventory control equipment.
 
As water level in the reactor vessel lowers, the dose rate above the core will rise. The dose rate due to this core shine should result in site specific monitor indication and possible alarm.
 
to 0CAN121102
 
Page 46 of 115 COLD SHUTDOWN/REFUELING SYSTEM MALFUNCTION CG1  Initiating Condition - GENERAL EMERGENCY Loss of RCS / reactor vessel inventory affecting fuel clad integrity with containment challenged Operating Mode Applicability:
Cold Shutdown (Mode 5)  Refueling (Mode 6)
 
Example Emergency Action Level(s):
Note: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time.
: 1. a. Core exit thermocouples indicate superheat for  30 minutes.
AND  b. Any of the following containment challenge indications:  CONTAINMENT CLOSURE not established  Explosive mixture inside containment  UNPLANNED rise in containment pressure OR  2. a. RCS / reactor vessel level cannot be monitored for  30 minutes with a loss of RCS / reactor vessel inventory as indicated by any of the following:  Containment High Range Radiation Monitor reading > 10 R/hr  Erratic source range monitor indication  Unexplained level rise in Reactor Building Sump, Reactor Drain Tank, Quench Tank, Aux. Building Equipment Drain Tank, or Aux. Building Sump AND  b. Any of the following containment challenge indications:  CONTAINMENT CLOSURE not established  Explosive mixture inside containment  UNPLANNED rise in containment pressure to 0CAN121102
 
Page 47 of 115 COLD SHUTDOWN/REFUELING SYSTEM MALFUNCTION CG1  Basis:  This IC represents the inability to restore and maintain reactor vessel level to above the top of active fuel with containment challenged. Fuel damage is probable if reactor vessel level cannot be restored, as available decay heat will cause boiling, further reducing the reactor vessel level.
With the CONTAINMENT breached or challenged then the potential for unmonitored fission product release to the environment is high. This represents a direct path for radioactive inventory to be released to the environment. This is consistent with the definition of a GE. The GE is declared on the occurrence of the loss or IMMINENT loss of function of all three barriers.
 
A number of variables can have a significant impact on heat removal capability challenging the fuel clad barrier. Examples include mid-loop, reduced level / flange level, head in place, cavity flooded, RCS venting strategy, decay heat removal system design, vortexing pre-disposition, and steam generator U-tube draining.
 
Analysis indicates that core damage may occur within an hour following continued core uncovery therefore, 30 minutes was conservatively chosen.
 
If CONTAINMENT CLOSURE is re-established prior to exceeding the 30 minute core uncovery time limit then escalation to GE would not occur.
 
In the early stages of a core uncovery event, it is unlikely that hydrogen buildup due to a core uncovery could result in an explosive mixture of dissolved gasses in Containment. However, Containment monitoring and/or sampling should be performed to verify this assumption and a General Emergency declared if it is determined that an explosive mixture exists.
 
Sump and tank level rises must be evaluated against other potential sources of leakage such as cooling water sources inside the containment to ensure they are indicative of RCS leakage.
 
In the cold shutdown mode, normal RCS level and reactor vessel level instrumentation systems will usually be available. In the refueling mode, normal means of reactor vessel level indication may not be available. Redundant means of reactor vessel level indication will usually be installed (including the ability to monitor level visually) to assure that the ability to monitor level will not be interrupted. However, if all level indication were to be lost during a loss of RCS inventory event, the operators would need to determine that reactor vessel inventory loss was occurring by observing sump and tank level changes. Sump and tank level rises must be evaluated against other potential sources of leakage such as cooling water sources inside the containment to ensure they are indicative of RCS leakage.
 
As water level in the reactor vessel lowers, the dose rate above the core will rise. The dose rate due to this core shine should result in site specific monitor indication and possible alarm.
Reference Documents
:  1. ULD-1-SYS-24, "Unit 1 Inadequate Core Cooling"
: 2. ULD-2-SYS-24, "Unit 2 Inadequate Core Cooling" to 0CAN121102
 
Page 48 of 115
 
INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI) MALFUNCTION to 0CAN121102
 
Page 49 of 115 ISFSI MALFUNCTION E-HU1    Initiating Condition - NOTIFICATION OF UNUSUAL EVENT Note: Security Events are bounded by the Hazards EALs.
Damage to a loaded cask CONFINEMENT BOUNDARY
 
Operating Mode Applicability:
All  Example Emergency Action Level(s):
: 1. Damage to a loaded cask CONFINEMENT BOUNDARY.
Basis:  An NUE in this IC is categorized on the basis of the occurrence of an event of sufficient magnitude that a loaded cask CONFINEMENT BOUNDARY is damaged or violated. This includes classification based on a loaded fuel storage cask CONFINEMENT BOUNDARY loss leading to the degradation of the fuel during storage or posing an operational safety problem with respect to its removal from storage.
 
This EAL addresses a dropped cask, a tipped over cask, EXPLOSION, PROJECTILE damage, FIRE damage or natural phenomena affecting a cask (e.g., seismic event, tornado, etc.).
to 0CAN121102
 
Page 50 of 115
 
FISSION PRODUCT BARRIER DEGRADATION    to 0CAN121102
 
Page 51 of 115 FISSION PRODUCT BARRIERS General Bases The logic used for these initiating conditions reflects the following considerations:
The Fuel Clad Barrier and the RCS Barrier are weighted more heavily than the Containment Barrier (See Sections 3.4 and 3.8). NUE ICs associated with RCS and Fuel Clad Barriers are addressed under System Malfunction (S) ICs.
At the Site Area Emergency level, there must be some ability to dynamically assess how far present conditions are from the threshold for a General Emergency. For example, if Fuel Clad and RCS Barrier "Loss" EALs existed, that, in addition to off-site dose assessments, would require continual assessments of radioactive inventory and containment integrity. Alternatively, if both Fuel Clad and RCS Barrier "Potential Loss" EALs existed, the SM / TSC Director / EOF Director would have more assurance that there was no immediate need to escalate to a General Emergency.
The ability to escalate to higher emergency classes as an event deteriorates must be maintained. For example, RCS leakage steadily increasing would represent an increasing risk to public health and safety.
The Containment Barrier should not be declared lost or potentially lost based on exceeding Technical Specification action statement criteria, unless there is an event in progress requiring mitigation by the Containment barrier. When no event is in progress (Loss or Potential Loss of either Fuel Clad and/or RCS) the Containment Barrier status is addressed by Technical Specifications.
 
to 0CAN121102
 
Page 52 of 115 FISSION PRODUCT BARRIERS FUEL CLAD Fuel Clad Barrier Emergency Action Levels: FCB1 OR FCB2 OR FCB3 OR FCB4 OR FCB5 OR FCB6  The Fuel Clad barrier consists of the zircalloy or stainless steel fuel bundle tubes that contain
 
the fuel pellets.
: 1. Primary Coolant Activity Level (FCB1)
Loss:  1. Coolant activity > 300 &#xb5;Ci/gm dose equivalent I-131 activity by Chemistry sample
 
OR  2. Radiation levels > 1000 MR/hr
 
Unit 1: at SA-229 Unit 2: at 2TCD-19
 
Potential Loss:
None  Basis:  Loss The site specific value corresponds to 300 Ci/gm I-131 equivalent. Assessment by the EAL Task Force indicates that this amount of coolant activity is well above that expected for iodine spikes and corresponds to less than 5% fuel clad damage. This amount of radioactivity indicates significant clad damage and thus the Fuel Clad Barrier is considered lost.
 
A reading of greater than 1000 mR/hr within at one foot from the RCS sample lines (SA-229 for Unit 1, 2TCD-19 for Unit 2) has been determined to correspond to fuel clad failure of approximately 2-5%, and thus the fuel clad barrier is considered lost. This reading is well above that expected for iodine spikes and thus indicates significant clad damage and thus the fuel clad barrier is considered lost.
 
Potential Loss
 
There is no Potential Loss EAL associated with this item.
Reference Documents
: 1. ANO Calculation 03-E-0002-01, "Radiation Monitor EAL Setpoints for Fission Product Barrier Degradation" to 0CAN121102
 
Page 53 of 115 FISSION PRODUCT BARRIERS FUEL CLAD
: 2. Core Exit Thermocouple Readings (FCB2)
 
Loss: > 1200 &deg;F CET temperature.
Potential Loss:
Unit 1: ICC exists as evidenced by CETs indicating superheated conditions Unit 2: Average CETs indicate superheat for current RCS pressure Basis:
Loss The Loss EAL of > 1200 &deg;F is consistent with NEI 99-01 and corresponds to significant superheating of the coolant.
 
Potential Loss The Potential Loss EAL corresponds to a loss of subcooling margin.
 
Note that the loss or potential loss EAL for this category will occur after a loss of adequate sub-cooling margin, which represents a loss of the RCS barrier in EAL RCB1, and therefore represents the loss of two barriers, resulting in a Site Area Emergency per FS1. Any loss or potential loss of the containment barrier at that point would escalate to a General Emergency.
 
Reference Documents
: 1. Unit 1 EOP 1202.005, "Inadequate Core Cooling"
: 2. Unit 1 EOP 1202.013, "EOP Figures"
: 3. Unit 2 OP 2202.009, "Functional Recovery"
: 4. ANO Procedure OP 1302.022, "Core Damage Assessment"
: 5. CE-NPSD-241, "Development of the Comprehensive Procedure Guideline for Core Damage Assessment," Task 467
: 6. BWOG EOP Technical Bases Document, Vol. 3, Chapter III.F to 0CAN121102
 
Page 54 of 115 FISSION PRODUCT BARRIERS FUEL CLAD
: 3. Reactor Vessel Water Level (FCB3)
 
Loss: None  Potential Loss:
Unit 1: RVLMS Levels 1 through 9 indicate DRY Unit 2: RVLMS Levels 1 through 7 indicate DRY
 
Basis:  Loss There is no Loss EAL associated with this item.
Potential Loss
 
The Reactor Vessel Level Monitoring Systems at ANO do not provide positive indication of core uncovery. The above core level indication provided is used to monitor the approach to and recovery from ICC conditions, but the CETs are used to identify core uncovery, and are the only positive indication of core uncovery.
 
Per reference document #1, the reactor vessel level indicators installed in Unit 1 extend from the top of the reactor vessel to the fuel alignment plate, and information in reference document
#2 indicates that the lowest sensor is greater than 2 feet above the top of active fuel. If any of the 4 RCPs are running, flow induced turbulence produced by the pumps renders the reactor vessel level indicator readings invalid.
 
Per reference document #3, only the reactor vessel level indicators above the core are considered part of the ICC monitoring system. Per reference document #4, the lowest sensor above the core, RVLMS LVL 6 on the ICC monitoring panel 2C388, is 47 inches above the top of the core. If any of the 4 RCPs are running, flow induced turbulence produced by the pumps renders the reactor vessel level indicator readings invalid.
 
For either unit then, should CET indication be unavailable and reactor vessel level indication be unavailable due to RCP operation or any other cause, a degraded ability to monitor the barrier would exist.
 
Reference Documents
:  1. ULD-1-SYS-24, "Unit 1 Inadequate Core Cooling System"
: 2. Calculation 84-EQ-0080-02, "Loop Error Analysis for Reactor Vessel Level Monitoring System"  3. ULD-2-SYS-24, "Unit 2 Inadequate Core Cooling Monitoring System"
: 4. Calculation 90-E-0116-01, "Unit 2 EOP Setpoint Document," Setpoint R.3    to 0CAN121102
 
Page 55 of 115 FISSION PRODUCT BARRIERS FUEL CLAD
: 4. Containment Radiation Monitoring (FCB4)
 
Loss: Containment high range radiation monitor reading > 1000 R/hr
 
Potential Loss:
None  Basis:  Loss The 1000 R/hr reading on the containment high range radiation monitors (RE-8060 or RE-8061 for Unit 1, 2RE-8925-1 or 2RE-8925-2 for Unit 2) is a value which indicates the release of reactor coolant, with elevated activity indicative of fuel damage, into the containment.
 
Reactor coolant concentrations of this magnitude are several times larger than the maximum concentrations (including iodine spiking) allowed within technical specifications and are therefore indicative of fuel damage.
 
This radiation monitor value is higher than that specified for RCS barrier Loss EAL RCB3. Thus, this EAL indicates a loss of both the Fuel Clad barrier and RCS barrier that appropriately escalates the emergency classification to a Site Area Emergency per FS1.
 
Potential Loss There is no Potential Loss EAL associated with this item.
 
Reference Documents
:  1. NUREG 1228, "Source Term Estimation During Incident Response to Severe Nuclear Power Plant Accidents"
: 2. ANO Calculation 03-E-0002-01, "Radiation Monitor EAL Setpoints for Fission Product Barrier Degradation"
: 5. Core Damage Assessment (FCB5)
Loss: At least 5% fuel clad damage as determined from core damage assessment
 
Potential Loss:
None Basis:  Loss This level is consistent with other fuel clad barrier loss EALs indicative of significant fuel clad damage, but uses core damage assessment evaluations by Technical Support personnel. The fuel clad barrier is considered lost.
 
to 0CAN121102
 
Page 56 of 115 FISSION PRODUCT BARRIERS FUEL CLAD If this determination is made from the high range containment radiation monitor readings, or if accompanied by other indications of a loss or potential loss of the RCS barrier, this EAL condition represents a Site Area Emergency per FS1.
 
Potential Loss
 
There is no potential loss EAL associated with this item.
Reference Documents
:  1. ANO Procedure OP-1302.022, "Core Damage Assessment"
: 6. Emergency Director Judgment (FCB6)
Any condition in the opinion of the SM / TSC Director / EOF Director that indicates Loss or Potential Loss of the Fuel Clad barrier.
Basis:  This EAL addresses any other factors that are to be used by the SM / TSC Director / EOF Director in determining whether the Fuel Clad barrier is lost or potentially lost. In addition, the inability to monitor the barrier should also be incorporated in this EAL as a factor in SM / TSC Director / EOF Director judgment that the barrier may be considered lost or potentially lost.
 
to 0CAN121102
 
Page 57 of 115 FISSION PRODUCT BARRIERS RCS  RCS Barrier EALs:
RCB1 OR RCB2 OR RCB3 OR RCB4  The RCS Barrier includes the RCS primary side and its connections up to and including the pressurizer safety and relief valves, and other connections up to and including the primary
 
isolation valves.
: 1. RCS Leak Rate (RCB1)
Loss: RCS leak rate > available makeup capacity as indicated by:
 
Unit 1: Loss of adequate subcooling margin Unit 2: RCS subcooling (MTS) can NOT be maintained at least 30 &deg;F Potential Loss:
Unit 1: UNISOLABLE RCS leak > 50 gpm with Letdown isolated Unit 2: UNISOLABLE RCS leak > 44 gpm with Letdown isolated Basis:  Loss  This EAL addresses conditions where leakage from the RCS is greater than available inventory control capacity such that a loss of subcooling has occurred. The loss of subcooling is the fundamental indication that the inventory control systems are inadequate in maintaining RCS pressure and inventory against the mass loss through the leak.
 
Potential Loss This EAL is based on the apparent inability to maintain normal liquid inventory within the Reactor Coolant System (RCS) by normal operation of the Makeup and Purification System (Unit 1) or the Chemical and Volume Control System (Unit 2).
For Unit 1 this is based on indications that leakage is greater than normal makeup capacity.
The operator could not batch in water and boric acid to the makeup system fast enough to maintain the makeup tank level during a 50 gpm RCS leak. It is not necessary to perform a detailed assessment of the RCS leakrate to implement this EAL. Any event or condition which, in the judgment of the SM / TSC Director / EOF Director, could result in RCS leakage in excess of Unit 1 normal makeup capacity would meet the intent of this EAL; for example:  Need to open the BWST suction for the operating makeup pump due to lowering makeup tank level  Full or partial HPI is needed to maintain the RCS pressure or pressurizer level  Two out of three seal stages failed on any RCP  RCS pressure lowering due to failure of a primary relief valve to reseat    to 0CAN121102
 
Page 58 of 115 FISSION PRODUCT BARRIERS RCS  For Unit 2, this is considered as the capacity of one charging pump discharging to the charging header (44 gpm). Any event or condition which, in the judgment of the SM / TSC Director / EOF Director, could result in RCS leakage in excess of Unit 2 normal makeup capacity would meet the intent of this EAL; for example:  A second charging pump being required is indicative of a substantial RCS leak  Three out of four seal stages failed on any RCP  RCS pressure lowering due to failure of a primary relief valve to reseat Isolating letdown is a standard abnormal operating procedure action and may prevent unnecessary classifications when a non-RCS leakage path such as a Makeup and Purification System or CVCS leak exists. The intent of this condition is met if attempts to isolate Letdown are NOT successful. Additional charging pumps being required is indicative of a substantial
 
RCS leak.
Reference Documents
:  1. Unit 1 EOP 1202.013, Figure 1, "Saturation and Adequate SCM"
: 2. Unit 1 EOP Setpoint Document, Calculation  90-E-0116-07, Setpoint B.19
: 3. Unit 2 EOP 2202.009, "Functional Recovery"
: 4. Unit 2 EOP Setpoint Document, Calculation 90-E-0116-01
: 5. Unit 2 SAR Table 9.3-14, Charging Pumps Design Data
: 2. SG Tube Rupture (RCB2)
 
Loss: SGTR  that results in an ECCS (SI) actuation
 
Potential Loss:  None  Basis:  Loss This EAL addresses the full spectrum of Steam Generator (SG) tube rupture events in conjunction with Containment barrier Loss EALs. It addresses RUPTURED SG(s) for which the leakage is large enough to cause actuation (either automatic or manual) of ECCS (SI). This is consistent to the RCS leak rate barrier Potential Loss EAL.
 
By itself, this EAL will result in the declaration of an Alert. However, if the SG is also FAULTED (i.e., two barriers failed), the declaration escalates to a Site Area Emergency per Containment barrier Loss EAL CNB3. to 0CAN121102
 
Page 59 of 115 FISSION PRODUCT BARRIERS RCS  Potential Loss There is no Potential Loss EAL associated with this item.
: 3. Containment Radiation Monitoring (RCB3)
Loss: Containment high range radiation monitor reading > 100 R/hr.
Potential Loss:
None  Basis  Loss  The 100 R/hr reading on the containment high range radiation monitors (RE-8060 or RE-8061 for Unit 1, 2RE-8925-1 or 2RE-8925-2 for Unit 2) is a value which indicates the release of reactor coolant to the containment.
This reading is less than that specified for Fuel Clad barrier EAL FCB4. Thus, this EAL is indicative of a RCS leak only. If the radiation monitor reading rose to that specified by Fuel Clad barrier EAL, fuel damage would also be indicated.
During the initial fifteen minutes after a thermal event inside containment, the high range radiation monitor readings are considered invalid due to possibility of a transient thermally-induced current.
 
Potential Loss There is no Potential Loss EAL associated with this item.
 
Reference Documents
:  1. ANO Calculation 03-E-0002-01 , "Radiation Monitor EAL Setpoints for Fission Product Barrier Degradation"
: 4. Emergency Director Judgment (RCB4)
Any condition in the opinion of the SM / TSC Director / EOF Director that indicates Loss or Potential Loss of the RCS Barrier.
 
Basis:  This EAL addresses any other factors that are to be used by the SM / TSC Director / EOF Director in determining whether the RCS barrier is lost or potentially lost. In addition, the inability to monitor the barrier should also be incorporated in this EAL as a factor in SM / TSC Director / EOF Director judgment that the barrier may be considered lost or potentially lost. to 0CAN121102
 
Page 60 of 115 FISSION PRODUCT BARRIERS CONTAINMENT Containment Barrier EALs:
CNB1 OR CNB2 OR CNB3 OR CNB4 OR CNB5 OR CNB6 OR CNB7  The Containment Barrier includes the containment building and connections up to and including the outermost containment isolation valves. This barrier also includes the main steam, feedwater, and blowdown line extensions outside the containment building up to and including the outermost secondary side isolation valve.
: 1. Containment Pressure (CNB1)
Loss:  1. Rapid unexplained drop in containment pressure following an initial rise in containment pressure OR 
: 2. Containment pressure or sump level response not consistent with LOCA conditions Potential Loss:
: 1. Unit 1: Containment pressure > 73.7 PSIA (59 PSIG) and rising Unit 2: Containment pressure > 73.7 PSIA (59 PSIG) and rising OR  2. Explosive mixture exists inside containment.
 
OR  3. a. Containment Pressure > containment spray actuation setpoint
 
UNIT 1: 44.7 PSIA (30 PSIG)
UNIT 2: 23.3 PSIA (8.6 PSIG)
AND  b. LESS THAN one full train of spray operating Basis:  Loss  Rapid unexplained loss of pressure (i.e., not attributable to containment spray or condensation effects) following an initial pressure rise from a primary or secondary high energy line break indicates a loss of containment integrity. Containment pressure and sump levels should rise as a result of mass and energy release into containment from a LOCA. Thus, sump level or pressure not rising indicates containment bypass and a loss of containment integrity. to 0CAN121102
 
Page 61 of 115 FISSION PRODUCT BARRIERS CONTAINMENT This indicator relies on operator recognition of an unexpected response for the condition and therefore, does not have a specific value associated with it. The unexpected response is important because it is the indicator for a containment bypass condition.
 
Potential Loss 1.
 
The site specific pressure is based on the containment design pressure.
Potential Loss 2.
 
Existence of an explosive mixture means a hydrogen and oxygen concentration of at least the lower deflagration limit curve exists. The hydrogen concentration of 4% has been recognized by the NRC staff as a well-established lower flammability limit in air or steam-air atmospheres that is adequately conservative for protecting against an H2 explosion. Hydrogen control systems at ANO are designed and operated as to maintain the containment hydrogen concentration below this level, so that indications of hydrogen concentrations above this are considered a potential challenge to the containment integrity.
 
Potential Loss 3.
 
This EAL represents a potential loss of containment in that the containment heat removal/depressurization system (e.g., containment sprays, ice condenser fans, etc., but not including containment venting strategies) are either lost or performing in a degraded manner, as indicated by containment pressure greater than the setpoint at which the equipment was supposed to have actuated.
 
Reference Documents
:  1. Unit 1 OP-1105.003, "Engineering Safeguards Actuation System"
: 2. Unit 1 SAR Sections 1.4.43, 5.2.1.2.1, 14.2.2.5.5.1 (reactor building design pressure)
: 3. Unit 1 SAR Section 6.6 (Post-Loss of Coolant Accident Hydrogen Control)
: 4. Unit 1 TS Table 3.3.5-1
: 5. Unit 2 SAR Section 6.2.5 (Combustible Gas Control In Containment)
: 6. Unit 2 SAR Section 3.8.1.3.1.D (Containment Design Pressure)
: 7. Unit 2 TS Table 3.3-4
: 8. Regulatory Guide 1.7, "Control of Combustible Gas Concentrations in Containment Following a Loss-of-Coolant Accident, Rev. 2 1978" to 0CAN121102
 
Page 62 of 115 FISSION PRODUCT BARRIERS CONTAINMENT
: 2. Core Exit Thermocouple Readings (CNB2)
 
Loss: None  Potential Loss:
: 1. a. CETs indicate > 1200 &deg;F AND  b. Restoration procedures not effective within 15 minutes.
OR  2. a. CETs indicate > 700 &deg;F AND  b. RVLMS indicates:
Unit 1: Levels 1 through 9 DRY Unit 2: Levels 1 through 7 DRY AND  c. Restoration procedures not effective within 15 minutes.
Basis:  Loss  There is no Loss EAL associated with this item.
 
Potential Loss
 
The conditions in these EALs represent an IMMINENT core melt sequence which, if not corrected, could lead to vessel failure and a higher potential for containment failure. In conjunction with the Core Cooling and RCS Leakage criteria in the Fuel and RCS barrier columns, this threshold would result in the declaration of a General Emergency, i.e., loss of two barriers and the potential loss of a third. If the function restoration procedures are ineffective, there is no "success" path.
 
The function restoration procedures are those emergency operating procedures that address the recovery of the core cooling critical safety functions. The procedure is considered effective if the temperature is dropping or if the vessel water level is rising.
 
Whether or not the procedures will be effective should be apparent within 15 minutes. The SM / TSC Director / EOF Director should make the declaration as soon as it is determined that the procedures have been, or will be ineffective. to 0CAN121102
 
Page 63 of 115 FISSION PRODUCT BARRIERS CONTAINMENT
: 3. SG Secondary Side Release With Primary-to-Secondary Leakage (CNB3)
Loss:  1. RUPTURED steam generator is also FAULTED outside of containment OR  2. a. Primary-to-secondary leakrate > 10 gpm AND  b. UNISOLABLE steam release from affected steam generator to the environment Potential Loss:
None  Basis:  This loss EAL recognizes that SG tube leakage can represent a bypass of the containment barrier as well as a loss of the RCS barrier.
This EAL results in a NUE for smaller breaks that; (1) do not exceed the Normal Makeup Capacity for Unit 1 or the capacity of one charging pump in the normal charging lineup for Unit 2 EAL in RCS leak rate barrier Potential Loss , or (2) do not result in ECCS actuation in RCS SG tube rupture barrier Loss. For larger breaks, RCS barrier threshold criteria would result in an Alert. For SG tube ruptures which may involve multiple steam generators or UNISOLABLE secondary line breaks, this condition would exist in conjunction with RCS barrier conditions and would result in a Site Area Emergency. E scalation to General Emergency would be based on "Potential Loss" of the Fuel Clad Barrier.
 
Loss 1. This EAL addresses the condition in which a RUPTURED steam generator is also FAULTED.
This condition represents a bypass of the RCS and containment barriers and is a subset of the second threshold. In conjunction with RCS leak rate barrier loss EAL RCB2, this would always result in the declaration of a Site Area Emergency.
 
Loss 2. This EAL addresses SG tube leaks that exceed 10 gpm in conjunction with an UNISOLABLE release path to the environment from the affected steam generator. The threshold for establishing the UNISOLABLE secondary side release is intended to be a prolonged release of
 
radioactivity from the RUPTURED steam generator directly to the environment. This could be expected to occur when the main condenser is unavailable to accept the contaminated steam (i.e., SG tube rupture with concurrent loss of off-site power and the RUPTURED steam generator is required for plant cooldown or a stuck open relief valve). The time it takes to isolate a SG with tube leakage > 10 gpm in accordance with plant specific EOPs is not considered a prolonged release. In this case the SG with tube leakage > 10 gpm with a concurrent loss of offsite power is normally steamed to the environment in a controlled manner to achieve and maintain a RCS Hot Leg temperature below that which corresponds to the Main    to 0CAN121102
 
Page 64 of 115 FISSION PRODUCT BARRIERS CONTAINMENT Steam Safety Valve relief settings. However, if the SG cannot be isolated or if both SGs have tube leakage > 10 gpm, a prolonged release will likely be necessary to support plant cooldown. If the main condenser is available, there may be releases via air ejectors, gland seal exhausters, and other similar controlled, and often monitored, pathways. These pathways do not meet the intent of an UNISOLABLE release path to the environment. These minor releases are assessed using Abnormal Radiation Levels / Radiological Effluent ICs (TAB A).
 
Potential Loss There is no Potential Loss EAL associated with this item.
: 4. Containment Isolation Failure or Bypass (CNB4)
Loss:  1. UNISOLABLE breach of containment AND  2. Direct downstream pathway to the environment exists after containment isolation signal Potential Loss:
None  Basis:  Loss  This EAL addresses incomplete containment isolation that allows a direct release to the environment. A breach of containment has also occurred if an inboard and outboard pair of isolation valves fails to close on an automatic actuation signal or from a manual action in the Control Room and opens a release path to the environment.
The breach is not isolable from the Control Room if an attempt for isolation from the Control Room has been made and was unsuccessful. An attempt for isolation should be made prior to the accident classification. If isolable upon identification, then this Initiating Condition is not
 
applicable.
The use of the modifier "direct" in defining the release path discriminates against release paths through interfacing liquid systems. The existence of an in-line charcoal filter does not make a release path indirect since the filter is not effective at removing fission product noble gases.
Typical filters have an efficiency of 95-99% removal of iodine. Given the magnitude of the core inventory of iodine, significant releases could still occur.
In addition, since the fission product release would be driven by boiling in the reactor vessel, the
 
high humidity in the release stream can be expected to render the filters ineffective in a short period.
 
Potential Loss There is no Potential Loss EAL associated with this item. to 0CAN121102
 
Page 65 of 115 FISSION PRODUCT BARRIERS CONTAINMENT
: 5. Containment Radiation Monitoring (CNB5)
 
Loss: None  Potential Loss:
Containment high range radiation monitor reading > 4000 R/hr Basis:  Loss  There is no Loss EAL associated with this item.
 
Potential Loss
 
The 4000 R/hr reading on the containment high range radiation monitors (RE-8060 or RE-8061 for Unit 1, 2RE-8925-1 or 2RE-8925-2 for Unit 2) is a value which indicates significant fuel damage well in excess of the EALs associated with both loss of Fuel Clad and loss of RCS barriers. A major release of radioactivity requiring off-site protective actions from core damage is not possible unless a major failure of fuel cladding allows radioactive material to be released from the core into the reactor coolant.
 
Regardless of whether containment is challenged, this amount of activity in containment, if released, could have such severe consequences that it is prudent to treat this as a potential loss of containment, such that a General Emergency declaration is warranted.
 
Because the monitor reading exceeds the readings for Fuel Clad Barrier loss in FCB4 and RCS Barrier loss in RCB3, the SM/TSC Director/EOF Director should declare a General Emergency when this value on the Containment High Range Rad Monitor is exceeded as a loss of two barriers (fuel clad and RCS) and potential loss of the third (containment).
 
Reference Documents
:  1. ANO Calculation 03-E-0002-01, "Radiation Monitor EAL Setpoints for Fission Product Barrier Degradation"
: 2. NUREG 1228, "Source Term Estimation During Incident Response to Severe Nuclear Power Plant Accidents" to 0CAN121102
 
Page 66 of 115 FISSION PRODUCT BARRIERS CONTAINMENT
: 6. Other Indications (CNB6)
Elevated readings on the following radiation monitors that indicate loss or potential loss of the Containment barrier:
MONITORS - UNIT 1 RX-9820 Containment Purge RX-9825 Radwaste Area RX-9830 Fuel Handling Area RX-9835 Emergency Penetration Room MONITORS - UNIT 2 2RX-9820 Containment Purge 2RX-9825 Radwaste Area 2RX-9830 Fuel Handling Area 2RX-9835 Emergency Penetration Room 2RX-9840 Post Accident Sampling Building 2RX-9845 Aux. Building Extension Basis:  This EAL covers other indications that may unambiguously indicate the loss or potential loss of the containment barrier.
: 7. Emergency Director Judgment (CNB7)
Any condition in the opinion of the SM / TSC Director / EOF Director that indicates Loss or Potential Loss of the Containment Barrier.
 
Basis:  This EAL addresses any other factors that are to be used by the SM / TSC Director / EOF Director in determining whether the Containment barrier is lost or potentially lost. In addition, the inability to monitor the barrier should also be incorporated in this EAL as a factor in SM /
TSC Director / EOF Director judgment that the barrier may be considered lost or potentially lost.
The Containment barrier should not be declared lost or potentially lost based on exceeding Technical Specification action statement criteria, unless there is an event in progress requiring mitigation by the Containment barrier. When no event is in progress (Loss or Potential Loss of either Fuel Clad and/or RCS) the Containment barrier status is addressed by Technical Specifications. to 0CAN121102
 
Page 67 of 115
 
HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY    to 0CAN121102
 
Page 68 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HU1  Initiating Condition - NOTIFICATION OF UNUSUAL EVENT
 
Confirmed SECURITY CONDITION or threat which indicates a potential degradation in the level of safety of the plant
 
Operating Mode Applicability:
All  Example Emergency Action Level(s): 
(1 or 2 or 3)
: 1. A SECURITY CONDITION that does not involve a HOSTILE ACTION as reported by ANO Security Shift Supervision.
OR  2. A credible site specific security threat notification.
 
OR 
: 3. A validated notification from NRC providing information of an aircraft threat.
Basis:  NOTE: Timely and accurate communication between Security Shift Supervision and the Control Room is crucial for the implementation of effective Security EALs.
 
Security events which do not represent a potential degradation in the level of safety of the plant are reported under 10 CFR 73.71 or in some cases under 10 CFR 50.72. Security events assessed as HOSTILE ACTIONS are classifiable under HA1, HS1 and HG1.
 
A higher initial classification could be made based upon the nature and timing of the security threat and potential consequences. Consideration shall be given to upgrading the emergency response status and emergency classification in accordance with the Safeguards Contingency Plan and Emergency Plan.
 
EAL #1 The Security Shift Supervisor is the designated individual on-site qualified and trained to confirm that a security event is occurring or has occurred. Training on security event classification confirmation is closely controlled due to the strict secrecy controls placed on the plant
 
Safeguards Contingency Plan.
This EAL is based on the Safeguards Contingency Plan. The Safeguards Contingency Plan is based on guidance provided in NEI 03-12. to 0CAN121102
 
Page 69 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HU1  EAL #2  This EAL is included to ensure that appropriate notifications for the security threat are made in a timely manner. This includes information of a credible threat. Only the plant to which the specific threat is made need declare the NUE.
 
The determination of "credible" is made through use of information found in the Safeguards Contingency Plan.
 
EAL #3 The intent of this EAL is to ensure that notifications for the aircraft threat are made in a timely manner and that Offsite Response Organizations and plant personnel are at a state of heightened awareness regarding the credible threat. It is not the intent of this EAL to replace existing non-hostile related EALs involving aircraft.
 
This EAL is met when a plant receives information regarding an aircraft threat from NRC. 
 
Validation is performed by calling the NRC or by other approved methods of authentication. Only the plant to which the specific threat is made need declare the NUE.
 
The NRC Headquarters Operations Officer (HOO) will communicate to the licensee if the threat involves an airliner (airliner is meant to be a large aircraft with the potential for causing significant damage to the plant). The status and size of the plane may be provided by NORAD through the NRC.
 
Escalation to Alert via HA1 would be appropriate if the threat involves an airliner within 30 minutes of the plant.
 
to 0CAN121102
 
Page 70 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HU2  Initiating Condition - NOTIFICATION OF UNUSUAL EVENT
 
Other conditions exist which in the judgment of the SM warrant declaration of an NUE
 
Operating Mode Applicability:
All  Example Emergency Action Level(s):
: 1. Other conditions exist which in the judgment of the SM indicate that events are in progress or have occurred which indicate a potential degradation of the level of safety of the plant or indicate a security threat to facility protection has been initiated. No releases of radioactive material requiring offsite response or monitoring are expected unless further degradation of safety systems occurs.
Basis:  This EAL addresses unanticipated conditions not addressed explicitly elsewhere but that warrant declaration of an emergency because conditions exist which are believed by the SM to fall under the NUE emergency classification level.
 
to 0CAN121102
 
Page 71 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HU4  Initiating Condition - NOTIFICATION OF UNUSUAL EVENT FIRE within the PROTECTED AREA not extinguished within 15 minutes of detection or EXPLOSION within the PROTECTED AREA Operating Mode Applicability:
All  Example Emergency Action Level(s):
(1 or 2)  Note: The SM should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the duration has exceeded, or will likely exceed, the applicable time.
: 1. FIRE in any Table H1 structure or area not extinguished 1) within 15 minutes of Control Room notification or 2) within 15 minutes of verification of a Control Room FIRE alarm.
Table H1 Unit 1 Unit 2 CA-1 & HP Office Area Condensate Demineralizer Room Corridor 98 Fire Area C Lower North Electrical Penetration Room (LNEPR) Lower South Electrical Equipment Room (LSEER) / Air Compressor Room Lower South Electrical Penetration Room (LSEPR) Lower South Piping Penetration Room (LSPPR)
 
Main Steam Isolation Violation (MSIV) Room North Engineered Safeguards (ES) SWGR Room (A4) South ES SWGR Room
 
Turbine Building  A1, A2, H1, H2 SWGR area  354' Bowling Alley north end west of Breathing Air compressor room  368' West Heater Deck from LSEER (orange door) along east wall of ES SWGR Rooms to Corridor 98 door. Upper North Electrical Penetration Room (UNEPR) / Hot Tool Room / Decon Room Upper South Electrical Penetration Room (USEPR) Upper South Piping Penetration Room (USPPR) 2A3 Room 2A4, 2D02, & East Battery Room 2B53 Room 2B63 Room
 
2B9/2B10 Room
 
2Y11/13 Equipment Room Auxiliary Building 317' General Access Auxiliary Building 335' Auxiliary Building 354'
'B' Engineered Safeguards Features (ESF)
Room Corridor Behind Door 340
 
Turbine Building  2A1, 2A2, 2H1, 2H2 Area  354' West wall of Demineralizer area  368' West Heater Deck north of north Switchgear (SWGR) Room (2A3) and East of LNEPR Intake Structure  354' or 366' LNEPR LSEPR Motor-Generator (MG) Set Room Steam Pipe Area
 
Hot Machine Shop UNEPR, UNPPR, LNPPR, USPPR    to 0CAN121102
 
Page 72 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HU4    OR  2. EXPLOSION within the PROTECTED AREA.
 
Basis:  This IC addresses the magnitude and extent of FIRES or EXPLOSIONS that may be potentially significant precursors of damage to safety systems. It addresses the FIRE / EXPLOSION, and not the degradation in performance of affected systems that may result.
 
As used here, detection is visual observation and report by plant personnel or sensor alarm indication.
 
EAL #1 The 15-minute time period begins with a credible notification that a FIRE is occurring or indication of a fire detection system alarm/actuation. Verification of a fire detection system alarm/actuation includes actions that can be taken within the Control Room or other nearby site specific location to ensure that it is not spurious. An alarm is assumed to be an indication of a FIRE unless it is disproved within the 15-minute period by personnel dispatched to the scene.
In other words, a personnel report from the scene may be used to disprove a sensor alarm if received within 15 minutes of the alarm, but shall not be required to verify the alarm.
 
The intent of this 15-minute duration is to size the FIRE and to discriminate against small FIRES that are readily extinguished (e.g., smoldering waste paper basket).
 
EAL #2  This EAL addresses only those EXPLOSIONS of sufficient force to damage permanent structures or equipment within the PROTECTED AREA.
 
No attempt is made to assess the actual magnitude of the damage. The occurrence of the EXPLOSION is sufficient for declaration.
 
The SM also needs to consider any security aspects of the EXPLOSION, if applicable.
 
Escalation of this emergency classification level, if appropriate, would be based on HA4.
 
to 0CAN121102
 
Page 73 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HU5  Initiating Condition - NOTIFICATION OF UNUSUAL EVENT
 
Release of toxic, corrosive, asphyxiant, or flammable gases deemed detrimental to NORMAL PLANT OPERATIONS.
 
Operating Mode Applicability:
All  Example Emergency Action Level(s):
(1 or 2) 
: 1. Toxic, corrosive, asphyxiant or flammable gas es in amounts that have or could adversely affect NORMAL PLANT OPERATIONS.
OR  2. Report by Local, County or State officials for evacuation or sheltering of site personnel based on an offsite event.
Basis:  This IC is based on the release of toxic, corrosive, asphyxiant or flammable gases of sufficient quantity to affect NORMAL PLANT OPERATIONS.
 
The fact that SCBAs may be worn does not eliminate the need to declare the event.
This IC is not intended to require significant assessment or quantification. It assumes an uncontrolled process that has the potential to affect plant operations. This would preclude small or incidental releases, or releases that do not impact structures needed for plant operation.
 
An asphyxiant is a gas capable of reducing the level of oxygen in the body to dangerous levels. Most commonly, asphyxiants work by merely displacing air in an enclosed environment. This reduces the concentration of oxygen below the normal level of around 19%, which can lead to breathing difficulties, unconsciousness or even death.
 
Escalation of this emergency classification level, if appropriate, would be based on HA5.
to 0CAN121102
 
Page 74 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HU6  Initiating Condition - NOTIFICATION OF UNUSUAL EVENT
 
Natural or destructive phenomena affecting the PROTECTED AREA
 
Operating Mode Applicability:
All Example Emergency Action Level: 
(1 or 2 or 3 or 4 or 5 or 6)
: 1. Seismic event identified by any 2 of the following:  Seismic event confirmed by annunciation of the 0.01g acceleration alarm  Earthquake felt in plant  National Earthquake Center OR  2. Tornado striking within PROTECTED AREA boundary or high winds > 67 mph.
 
OR  3. Internal flooding that has the potential to affect safety related equipment required by Technical Specifications for the current operating mode in any of the structures or areas in Table H1.
to 0CAN121102
 
Page 75 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HU6    Table H1 Unit 1 Unit 2 CA-1 & HP Office Area Condensate Demineralizer Room Corridor 98
 
Fire Area C Lower North Electrical Penetration Room (LNEPR) Lower South Electrical Equipment Room (LSEER) / Air Compressor Room Lower South Electrical Penetration Room (LSEPR) Lower South Piping Penetration Room (LSPPR)
Main Steam Isolation Violation (MSIV) Room North Engineered Safeguards (ES) SWGR Room (A4) South ES SWGR Room
 
Turbine Building  A1, A2, H1, H2 SWGR area  354' Bowling Alley north end west of Breathing Air compressor room  368' West Heater Deck from LSEER (orange door) along east wall of ES SWGR Rooms to Corridor 98 door. Upper North Electrical Penetration Room (UNEPR) / Hot Tool Room / Decon Room Upper South Electrical Penetration Room (USEPR) Upper South Piping Penetration Room (USPPR) 2A3 Room 2A4, 2D02, & East Battery Room 2B53 Room
 
2B63 Room
 
2B9/2B10 Room
 
2Y11/13 Equipment Room Auxiliary Building 317' General Access Auxiliary Building 335' Auxiliary Building 354'
'B' Engineered Safeguards Features (ESF)
Room Corridor Behind Door 340 Turbine Building  2A1, 2A2, 2H1, 2H2 Area  354' West wall of Demineralizer area  368' West Heater Deck north of north Switchgear (SWGR) Room (2A3) and East of LNEPR Intake Structure  354' or 366'
 
LNEPR LSEPR Motor-Generator (MG) Set Room Steam Pipe Area Hot Machine Shop UNEPR, UNPPR, LNPPR, USPPR OR  4. Turbine failure resulting in casing penetration or damage to turbine or generator seals.
 
OR  5. Lake Dardanelle level < 335 feet.
 
OR  6. Lake Dardanelle level > 345 feet. to 0CAN121102
 
Page 76 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HU6  Basis:
These EALs are categorized on the basis of the occurrence of an event of sufficient magnitude to be of concern to plant operators.
 
EAL #1  Damage may be caused to some portions of the site, but should not affect ability of safety functions to operate.
 
As defined in the EPRI-sponsored Guidelines for Nuclear Plant Response to an Earthquake, dated October 1989, a "felt earthquake" is An earthquake of sufficient intensity such that: (a) the vibratory ground motion is felt at the nuclear plant site and recognized as an earthquake based on a consensus of control room operators on duty at the time, and (b) for plants with operable seismic instrumentation, the seismic switches of the plant are activated.
The National Earthquake Center can confirm if an earthquake has occurred in the area of the
 
plant. EAL #2 This EAL is based on a tornado striking (touching down) or high winds within the PROTECTED
 
AREA. The high wind value in EAL #2 is conservatively based on the SAR design basis for Unit 1 of 67 mph. Unit 2 Design basis is 80 mph.
 
Escalation of this emergency classification level, if appropriate, would be based on VISIBLE DAMAGE, or by other in plant conditions, via HA6.
EAL #3 This EAL addresses the effect of internal flooding caused by events such as component failures, equipment misalignment, or outage activity mishaps.
Escalation of this emergency classification level, if appropriate, would be via HA6, or by other plant conditions.
 
EAL #4  This EAL addresses main turbine rotating component failures of sufficient magnitude to cause observable damage to the turbine casing or to the seals of the turbine generator. Generator seal damage observed after generator purge does not meet the intent of this EAL because it did
 
not impact normal operation of the plant.
 
Of major concern is the potential for leakage of combustible fluids (lubricating oils) and gases (hydrogen cooling) to the plant environs. Actual FIRES and flammable gas build up are appropriately classified via HU4 and HU5. to 0CAN121102
 
Page 77 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HU6  This EAL is consistent with the definition of an NUE while maintaining the anticipatory nature desired and recognizing the risk to non-safety related equipment.
Escalation of this emergency classification level, if appropriate, would be to HA6 based on damage done by PROJECTILES generated by the failure or in conjunction with a steam generator tube rupture. These latter events would be classified by the radiological (A) ICs or Fission Product Barrier (F) ICs.
EALs #5 and #6
 
EALs #5 and #6 are based on the levels of Lake Dardanelle at which the site will take specific action to reduce the impact of the lake level on plant safety by initiating plant shutdown.
Reference Documents
:  1. OP-1203.025, "Natural Emergencies"
: 2. OP-2203.008, "Natural Emergencies"
: 3. Unit 1 FSAR
: 4. Unit 2 FSAR to 0CAN121102
 
Page 78 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HA1  Initiating Condition - ALERT
 
HOSTILE ACTION within the OWNER CONTROLLED AREA or airborne attack threat
 
Operating Mode Applicability:
All Example Emergency Action Level(s): 
(1 or 2)  1. A HOSTILE ACTION is occurring or has occurred within the OWNER CONTROLLED AREA as reported by ANO Security Shift Supervision.
OR  2. A validated notification from NRC of an airliner attack threat within 30 minutes of the site.
 
Basis:  NOTE: Timely and accurate communication between Security Shift Supervision and the Control Room is crucial for the implem entation of effective Security EALs.
 
These EALs address the contingency for a very rapid progression of events, such as that experienced on September 11, 2001. They are not premised solely on the potential for a radiological release. Rather the issue includes the need for rapid assistance due to the possibility for significant and indeterminate damage from additional air, land or water attack elements.
 
The fact that the site is under serious attack or is an identified attack target with minimal time available for further preparation or additional assistance to arrive requires a heightened state of readiness and implementation of protective measures that can be effective (such as on-site evacuation, dispersal or sheltering).
 
EAL #1 This EAL addresses the potential for a very rapid progression of events due to a HOSTILE ACTION. It is not intended to address incidents that are accidental events or acts of civil disobedience, such as small aircraft impact, hunters, or physical disputes between employees within the OWNER CONTROLLED AREA. Those events are adequately addressed by other
 
EALs.
 
Note that this EAL is applicable for any HOSTILE ACTION occurring, or that has occurred, in the OWNER CONTROLLED AREA. This includes Independent Spent Fuel Storage Installations that may be outside the PROTECTED AREA but still in the OWNER CONTROLLED AREA. to 0CAN121102
 
Page 79 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HA1  EAL #2  This EAL addresses the immediacy of an expected threat arrival or impact on the site within a relatively short time.
 
The intent of this EAL is to ensure that notifications for the airliner attack threat are made in a timely manner and that Offsite Response Organizations and plant personnel are at a state of heightened awareness regarding the credible threat. Airliner is meant to be a large aircraft with the potential for causing significant damage to the plant.
 
This EAL is met when a plant receives information regarding an airliner attack threat from NRC and the airliner is within 30 minutes of the plant. Only the plant to which the specific threat is made need declare the Alert.
 
The NRC Headquarters Operations Officer (HOO) will communicate to the licensee if the threat involves an airliner (airliner is meant to be a large aircraft with the potential for causing significant damage to the plant). The status and size of the plane may be provided by NORAD through the NRC.
to 0CAN121102
 
Page 80 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HA2  Initiating Condition - ALERT
 
Other conditions exist which in the judgment of the SM / TSC Director / EOF Director warrant declaration of an Alert
 
Operating Mode Applicability:
All Example Emergency Action Level(s):
: 1. Other conditions exist which in the judgment of the SM / TSC Director / EOF Director indicate that events are in progress or have occurred which involve an actual or potential substantial degradation of the level of safety of the plant or a security event that involves probable life threatening risk to site personnel or damage to site equipment because of HOSTILE ACTION. Any releases are expected to be limited to small fractions of the EPA Protective Action Guideline exposure levels.
Basis:
This EAL addresses unanticipated conditions not addressed explicitly elsewhere, but that warrant declaration of an emergency because conditions exist which are believed by the SM / TSC Director / EOF Director to fall under the Alert emergency classification level.
 
to 0CAN121102
 
Page 81 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HA3  Initiating Condition - ALERT
 
Control room evacuation has been initiated
 
Operating Mode Applicability:
All  Example Emergency Action Level(s):
: 1. Alternate Shutdown procedure requires Control Room evacuation:
 
Unit 1: 1203.002, "Alternate Shutdown" Unit 2: 2203.014, "Alternate Shutdown" Basis:  With the Control Room evacuated, additional support, monitoring and direction through the Technical Support Center and/or other emergency response facilities may be necessary.
Inability to establish plant control from outside the Control Room will escalate this event to a Site Area Emergency.
 
to 0CAN121102
 
Page 82 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HA4  Initiating Condition - ALERT
 
FIRE or EXPLOSION affecting the operability of plant safety systems required to establish or maintain safe shutdown
 
Operating Mode Applicability:
All Example Emergency Action Level(s):
: 1. FIRE or EXPLOSION resulting in VISIBLE DAMAGE to any Table H1 structure or area containing safety systems or components or Control Room indication of degraded
 
performance of those safety systems.
Table H1 Unit 1 Unit 2 CA-1 & HP Office Area Condensate Demineralizer Room
 
Corridor 98
 
Fire Area C Lower North Electrical Penetration Room (LNEPR) Lower South Electrical Equipment Room (LSEER) / Air Compressor Room Lower South Electrical Penetration Room (LSEPR) Lower South Piping Penetration Room (LSPPR)
Main Steam Isolation Violation (MSIV) Room North Engineered Safeguards (ES) SWGR Room (A4) South ES SWGR Room
 
Turbine Building  A1, A2, H1, H2 SWGR area  354' Bowling Alley north end west of Breathing Air compressor room  368' West Heater Deck from LSEER (orange door) along east wall of ES SWGR Rooms to
 
Corridor 98 door. Upper North Electrical Penetration Room (UNEPR) / Hot Tool Room / Decon Room Upper South Electrical Penetration Room (USEPR) Upper South Piping Penetration Room (USPPR) 2A3 Room 2A4, 2D02, & East Battery Room
 
2B53 Room
 
2B63 Room
 
2B9/2B10 Room 2Y11/13 Equipment Room Auxiliary Building 317' General Access Auxiliary Building 335' Auxiliary Building 354'
'B' Engineered Safeguards Features (ESF)
Room Corridor Behind Door 340
 
Turbine Building  2A1, 2A2, 2H1, 2H2 Area  354' West wall of Demineralizer area  368' West Heater Deck north of north Switchgear (SWGR) Room (2A3) and East of LNEPR Intake Structure  354' or 366'
 
LNEPR LSEPR Motor-Generator (MG) Set Room Steam Pipe Area
 
Hot Machine Shop UNEPR, UNPPR, LNPPR, USPPR to 0CAN121102
 
Page 83 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HA4  Basis:
VISIBLE DAMAGE is used to identify the magnitude of the FIRE or EXPLOSION and to discriminate against minor FIRES and EXPLOSIONS.
 
The reference to structures or areas containing safety systems or components is included to discriminate against FIRES or EXPLOSIONS in areas having a low probability of affecting safe operation. The significance here is not that a safety system was degraded but the fact that the FIRE or EXPLOSION was large enough to cause damage to these systems.
 
The use of VISIBLE DAMAGE should not be interpreted as mandating a lengthy damage assessment prior to classification. The declaration of an Alert and the activation of the Technical Support Center will provide the SM/TSC Director/EOF Director with the resources needed to perform detailed damage assessments.
 
The SM / TSC Director / EOF Director also needs to consider any security aspects of the EXPLOSION.
 
Escalation of this emergency classification level, if appropriate, will be based on System Malfunction (S), Fission Product Barrier Degradation (F) or Abnormal Radiation Levels /
 
Radiological Effluent (A) ICs.
 
to 0CAN121102
 
Page 84 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HA5  Initiating Condition - ALERT
 
Access to a VITAL AREA is prohibited due to toxic, corrosive, asphyxiant or flammable gases which jeopardize operation of operable equipment required to maintain safe operations or safely
 
shutdown the reactor.
 
Unit 1  VITAL AREA APPLICABLE MODES A-4 Switchgear Room 3, 4 Upper North Electrical Penetration Room 3, 4 Lower South Electrical Equipment Room 3, 4 Control Room ALL Unit 2  VITAL AREA APPLICABLE MODES Auxiliary Building 317' Emergency Core Cooling Rooms 3, 4 Auxiliary Building 317' Tendon Gallery Access 3, 4 Auxiliary Building 335' Charging Pumps / 2B-52 3, 4 Auxiliary Building 354' 2B-62 Area 3, 4 Emergency Diesel Generator Corridor 3, 4 Lower South Piping Penetration Room 3, 4 Auxiliary Building 386' Containment Hatch 3, 4 Control Room ALL Operating Mode Applicability:  As stated in above tables.
Example Emergency Action Level(s):
Note: If the equipment in the stated area was already inoperable, or out of service, before the event occurred, then this EAL should not be declared as it will have no adverse impact on the ability of the plant to safely operate or safely shutdown beyond that already allowed by Technical Specifications at the time of the event.
: 1. Access to a VITAL AREA is prohibited due to toxic, corrosive, asphyxiant or flammable gases which jeopardize operation of systems required to maintain safe operations or safely
 
shutdown the reactor.
to 0CAN121102
 
Page 85 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HA5  Basis:
Gases in a VITAL AREA can affect the ability to safely operate or safely shutdown the reactor. The fact that SCBAs may be worn does not eliminate the need to declare the event.
 
Declaration should not be delayed for confirmation from atmospheric testing if the atmosphere poses an immediate threat to life and health or an immediate threat of severe exposure to gases. This could be based upon documented analysis, indication of personal ill effects from exposure, or operating experience with the hazards.
 
If the equipment in the stated area was already inoperable, or out of service, before the event occurred, then this EAL should not be declared as it will have no adverse impact on the ability of the plant to safely operate or safely shut down beyond that already allowed by Technical Specifications at the time of the event.
 
An asphyxiant is a gas capable of reducing the level of oxygen in the body to dangerous levels.
Most commonly, asphyxiants work by merely displacing air in an enclosed environment. This reduces the concentration of oxygen below the normal level of around 19%, which can lead to breathing difficulties, unconsciousness or even death.
 
An uncontrolled release of flammable gasses within a facility structure has the potential to affect safe operation of the plant by limiting either operator or equipment operations due to the potential for ignition and resulting equipment damage/personnel injury. Flammable gasses, such as hydrogen and acetylene, are routinely used to maintain plant systems (hydrogen) or to repair equipment/components (acetylene - used in welding). This EAL assumes concentrations of flammable gasses which can ignite/support combustion.
 
Escalation of this emergency classification level, if appropriate, will be based on System Malfunction (S), Fission Product Barrier Degradation (F) or Abnormal Radiation Levels /
Radioactive Effluent (A) ICs.
. to 0CAN121102
 
Page 86 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HA6  Initiating Condition - ALERT
 
Natural or destructive phenomena affecting VITAL AREAS
 
Operating Mode Applicability:
All Example Emergency Action Level(s):
  (1 or 2 or 3 or 4 or 5 or 6)
: 1. a. Seismic event > Operating Basis Earthquake (OBE) as indicated by annunciation of the 0.1g acceleration alarm.
AND  b. Earthquake confirmed by any of the following:
Earthquake felt in plant  National Earthquake Center  Control Room indication of degraded performance of systems required for the safe shutdown of the plant OR  2. Tornado striking or high winds > 67 mph resulting in VISIBLE DAMAGE to any of the following structures/equipment containing safety systems or components or Control Room indication of degraded performance of those safety systems:
Reactor Building Turbine Building Intake Structure Q Condensate Storage Tank (QCST)
Ultimate Heat Sink Control Room Startup Transformers Auxiliary Building Diesel Fuel Vault Borated Water Storage Tank (BWST)
 
Refueling Water Tank (RWT)
OR  3. Internal flooding in any of the following areas resulting in an electrical shock hazard that precludes access to operate or monitor safety equipment or Control Room indication of degraded performance of those safety systems:
Intake Structure Turbine Building Auxiliary Building OR    to 0CAN121102
 
Page 87 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HA6  4. Turbine failure-generated PROJECTILES resulting in VISIBLE DAMAGE to or penetration of any of the structures/equipment containing safety systems or components or Control Room indication of degraded perform ance of those safety systems:
Control Room Turbine Building Startup Transformers Auxiliary Building OR  5. Lake Dardanelle level < 335 feet and Emergency Cooling Pond inoperable.
 
OR  6. Vehicle crash resulting in VISIBLE DAMAGE to any of the structures/equipment containing safety systems or components or Control Room indication of degraded performance of those safety systems:
Reactor Building Turbine Building Intake Structure QCST Ultimate Heat Sink RWT Startup Transformers Auxiliary Building Diesel Fuel Vault BWST Basis:  These EALs escalate from HU6 in that the occurrence of the event has resulted in VISIBLE DAMAGE to plant structures or areas containing equipment necessary for a safe shutdown, or has caused damage to the safety systems in those structures evidenced by Control Room indications of degraded system response or performance. The occurrence of VISIBLE DAMAGE and/or degraded system response is intended to discriminate against lesser events. The initial report should not be interpreted as mandating a lengthy damage assessment prior to classification. No attempt is made in this EAL to assess the actual magnitude of the damage. The significance here is not that a particular s ystem or structure was damaged, but rather, that the event was of sufficient magnitude to cause this degradation.
 
Escalation of this emergency classification level, if appropriate, would be based on System Malfunction (S) ICs.
 
EAL #1 Seismic events of this magnitude can result in a VITAL AREA being subjected to forces beyond design limits, and thus damage may be assumed to have occurred to plant safety systems.
The National Earthquake Center can confirm if an earthquake has occurred in the area of the
 
plant. to 0CAN121102
 
Page 88 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HA6    EAL #2  This EAL is based on a tornado striking (touching down) or high winds that have caused VISIBLE DAMAGE to structures containing functions or systems required for safe shutdown of the plant. The high wind value in EAL #2 is conservatively based on the SAR design basis for Unit 1 of 67 mph. Unit 2 Design basis is 80 mph.
EAL #3 This EAL addresses the effect of internal flooding caused by events such as component failures, equipment misalignment, or outage activity mishaps. It is based on the degraded performance of systems, or has created industrial safety hazards (e.g., electrical shock) that preclude necessary access to operate or monitor safety equipment. The inability to access, operate or monitor safety equipment represents an actual or substantial potential degradation of
 
the level of safety of the plant.
 
Flooding as used in this EAL describes a condition where water is entering the room faster than installed equipment is capable of removal, resulting in a rise of water level within the room. Classification of this EAL should not be delayed while corrective actions are being taken to isolate the water source.
 
EAL #4  This EAL addresses the threat to safety related equipment imposed by PROJECTILEs generated by main turbine rotating component failures. Therefore, this EAL is consistent with the definition of an ALERT in that the potential exists for actual or substantial potential degradation of the level of safety of the plant.
 
EAL #5 This EAL addresses vehicle crashes within the PROTECTED AREA that result in VISIBLE DAMAGE to VITAL AREAS or indication of damage to safety structures, systems, or components containing functions and systems required for safe shutdown of the plant.
EAL #6 EAL #6 addresses site specific phenomena which has the potential for the loss of primary and
 
secondary heat sink.
 
Reference Documents
:  1. OP-1203.025, "Natural Emergencies"
: 2. OP-2203.008, "Natural Emergencies"
: 3. Unit 1 FSAR
: 4. Unit 2 FSAR    to 0CAN121102
 
Page 89 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HS1  Initiating Condition - SITE AREA EMERGENCY
 
HOSTILE ACTION within the PROTECTED AREA
 
Operating Mode Applicability:
All  Example Emergency Action Level(s):
: 1. A HOSTILE ACTION is occurring or has occurred within the PROTECTED AREA as reported by ANO Security Shift Supervision.
Basis:  This condition represents an escalated threat to plant safety above that contained in the Alert in that a HOSTILE FORCE has progressed fr om the OWNER CONTROLLED AREA to the PROTECTED AREA.
 
This EAL addresses the contingency for a very rapid progression of events, such as that experienced on September 11, 2001. It is not premised solely on the potential for a radiological release. Rather the issue includes the need for rapid assistance due to the possibility for significant and indeterminate damage from additional air, land or water attack elements.
 
The fact that the site is under serious attack with minimal time available for further preparation or additional assistance to arrive requires Offsite Response Organization readiness and preparation for the implementation of protective measures.
 
This EAL addresses the potential for a very rapid progression of events due to a HOSTILE ACTION. It is not intended to address incidents that are accidental events or acts of civil disobedience, such as small aircraft impact, hunters, or physical disputes between employees within the PROTECTED AREA. Those ev ents are adequately addressed by other EALs.
 
Escalation of this emergency classification level, if appropriate, would be based on actual plant status after impact or progression of attack.
 
to 0CAN121102
 
Page 90 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HS2  Initiating Condition - SITE AREA EMERGENCY
 
Other conditions exist which in the judgment of the SM / TSC Director / EOF Director warrant declaration of a Site Area Emergency
 
Operating Mode Applicability:
All Example Emergency Action Level(s):
: 1. Other conditions exist which in the judgment of the SM / TSC Director / EOF Director indicate that events are in progress or have occurred which involve actual or likely major failures of plant functions needed for protection of the public or HOSTILE ACTION that results in intentional damage or malicious acts; (1) toward site personnel or equipment that could lead to the likely failure of or; (2) that prevent effective access to equipment needed for the protection of the public. Any releases are not expected to result in exposure levels which exceed EPA Protective Action Guideline exposure levels beyond the site boundary.
Basis:  This EAL addresses unanticipated conditions not addressed explicitly elsewhere but that warrant declaration of an emergency because conditions exist which are believed by the SM / TSC Director / EOF Director to fall under the emergency classification level description for Site Area Emergency.
to 0CAN121102
 
Page 91 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HS3  Initiating Condition - SITE AREA EMERGENCY
 
Control Room evacuation has been initiated and plant control cannot be established
 
Operating Mode Applicability:
All  Example Emergency Action Level(s):
: 1. a. Control room evacuation has been initiated
 
AND  b. Control of the plant cannot be established in accordance with the following procedures within 15 minutes:
Unit 1: 1203.002, "Alternate Shutdown" Unit 2: 2203.014, "Alternate Shutdown" Basis:  The intent of this IC is to capture those events where control of the plant cannot be reestablished in a timely manner. In this case, expeditious transfer of control of safety systems has not occurred (although fission product barrier damage may not yet be indicated).
 
The intent of the EAL is to establish control of important plant equipment and knowledge of important plant parameters in a timely manner. Primary emphasis should be placed on those components and instruments that supply protection for and information about safety functions such as reactivity control (ability to shutdown the reactor and maintain it shutdown), RCS inventory (ability to cool the core), and decay heat removal (ability to maintain a heat sink).
 
The determination of whether or not control is established at the remote shutdown panel is based on SM / TSC Director / EOF Director judgment. The SM / TSC Director / EOF Director is expected to make a reasonable, informed judgment within 15 minutes that the plant staff has control of the plant from the remote shutdown panel.
 
Escalation of this emergency classification level, if appropriate, would be by Fission Product Barrier Degradation (F) or Abnormal Radiation Levels/Radiological Effluent (A) EALs.
 
to 0CAN121102
 
Page 92 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HG1  Initiating Condition - GENERAL EMERGENCY
 
HOSTILE ACTION resulting in loss of physical control of the facility
 
Operating Mode Applicability:
All Example Emergency Action Level(s):
  (1 or 2)
: 1. A HOSTILE ACTION has occurred such that plant personnel are unable to operate equipment required to maintain safety functions.
OR  2. A HOSTILE ACTION has caused failure of Spent Fuel Cooling Systems and IMMINENT fuel damage is likely for a freshly off-loaded reactor core in pool.
Basis:
EAL #1 This EAL encompasses conditions under which a HOSTILE ACTION has resulted in a loss of physical control of VITAL AREAS (containing vital equipment or controls of vital equipment) required to maintain safety functions and control of that equipment cannot be transferred to and operated from another location. These safety functions are reactivity control (ability to shut down the reactor and keep it shutdown) RCS inventory (ability to cool the core), and secondary heat removal (ability to maintain a heat sink).
 
Loss of physical control of the Control Room or remote shutdown/alternate shutdown capability alone may not prevent the ability to maintain safety functions per se. Design of the remote shutdown/alternate shutdown capability and the location of the transfer switches should be taken into account. Primary emphasis should be placed on those components and instruments that supply protection for and information about safety functions.
 
If control of the plant equipment necessary to maintain safety functions can be transferred to another location, then the threshold is not met.
 
EAL #2 This EAL addresses failure of spent fuel cooling systems as a result of HOSTILE ACTION if IMMINENT fuel damage is likely, such as when a freshly off-loaded reactor core is in the spent fuel pool. At ANO, the term "freshly off-loaded reactor core" refers to fuel that has been discharged from the core and stored in the spent fuel pool for a period of LESS THAN one year.
 
to 0CAN121102
 
Page 93 of 115 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY HG2  Initiating Condition - GENERAL EMERGENCY
 
Other conditions exist which in the judgment of the SM / TSC Director / EOF Director warrant declaration of a General Emergency
 
Operating Mode Applicability:
All Example Emergency Action Level(s):
: 1. Other conditions exist which in the judgment of the SM / TSC Director / EOF Director indicate that events are in progress or have occurred which involve actual or IMMINENT substantial core degradation or melting with potential for loss of containment integrity or HOSTILE ACTION that results in an actual loss of physical control of the facility. Releases can be reasonably expected to exceed EPA Protective Action Guideline exposure levels offsite for more than the immediate site area.
Basis:
This EAL addresses unanticipated conditions not addressed explicitly elsewhere but that warrant declaration of an emergency because conditions exist which are believed by the SM / TSC Director / EOF Director to fall under the emergency classification level description for
 
General Emergency.
 
to 0CAN121102
 
Page 94 of 115
 
SYSTEM MALFUNCTION    to 0CAN121102
 
Page 95 of 115 SYSTEM MALFUNCTION SU1  Initiating Condition - NOTIFICATION OF UNUSUAL EVENT
 
Loss of all offsite AC power to Vital 4.16 KV busses  15 minutes
 
Operating Mode Applicability: Power Operations (Mode 1)  Startup (Mode 2)
Hot Standby (Mode 3)  Hot Shutdown (Mode 4)
Example Emergency Action Level(s):
Note: The SM should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. Loss of all offsite AC power to Vital 4.16 KV busses  15 minutes.
Basis:  Prolonged loss of offsite AC power reduces required redundancy and potentially degrades the level of safety of the plant by rendering the plant more vulnerable to a complete loss of AC
 
power to emergency busses.
 
Fifteen minutes was selected as a threshold to exclude transient or momentary losses of off-site power.
 
Reference Documents
:  1. 1202.007, "Degraded Power"
: 2. 1202.008, "Blackout"
: 3. 2202.007, "Loss of Off-Site Power"
: 4. 2202.008, "Station Blackout"
 
to 0CAN121102
 
Page 96 of 115 SYSTEM MALFUNCTION SU6  Initiating Condition - NOTIFICATION OF UNUSUAL EVENT
 
UNPLANNED loss of safety system annunciation or indication in the Control Room  15 minutes
 
Operating Mode Applicability: Power Operations (Mode 1)  Startup (Mode 2)
Hot Standby (Mode 3)  Hot Shutdown (Mode 4)
Example Emergency Action Level(s):
Note: The SM should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. UNPLANNED Loss of > approximately 75% of the following > 15 minutes:
: a. Control Room annunciators associated with safety systems.
OR  b. Control Room safety system indication.
 
Basis:  This IC and its associated EAL are intended to recognize the difficulty associated with monitoring changing plant conditions without the use of a major portion of the annunciation or indication equipment.
 
Recognition of the availability of computer based indication equipment is considered e.g., SPDS, plant computer, etc.
 
"Planned" loss of annunciators or indicators includes scheduled maintenance and testing
 
activities.
Quantification is arbitrary, however, it is estimated that if approximately 75% of the safety system annunciators or indicators are lost, there is an increased risk that a degraded plant condition could go undetected. It is not intended that plant personnel perform a detailed count of the instrumentation lost but use the value as a judgment threshold for determining the severity of the plant conditions.
It is further recognized that most plant designs provide redundant safety system indication powered from separate uninterruptible power supplies. While failure of a large portion of annunciators is more likely than a failure of a large portion of indications, the concern is included in this EAL due to difficulty associated with assessment of plant conditions. The loss of specific, or several, safety system indicators should remain a function of that specific system or component operability status. This will be addressed by the specific Technical Specification. to 0CAN121102
 
Page 97 of 115 SYSTEM MALFUNCTION SU6  The initiation of a Technical Specification imposed plant shutdown related to the instrument loss will be reported via 10 CFR 50.72. If the shutdown is not in compliance with the Technical Specification action, the NUE is based on SU11 "Inability to reach required operating mode within Technical Specification limits."
 
Indicators associated with safety systems are those indicators for reactivity control, core cooling, maintaining reactor coolant system integrity or maintaining containment integrity.
Fifteen minutes was selected as a threshold to exclude transient or momentary power losses.
 
This NUE will be escalated to an Alert based on a concurrent loss of compensatory indications or if a SIGNIFICANT TRANSIENT is in progress during the loss of annunciation or indication (SA6).
Reference Documents
:  1. 1203.043, "Loss Control Room Annunciators"
: 2. 2203.042, "Loss of Control Room Annunciators"
 
to 0CAN121102
 
Page 98 of 115 SYSTEM MALFUNCTION SU7  Initiating Condition - NOTIFICATION OF UNUSUAL EVENT
 
RCS leakage
 
Operating Mode Applicability: Power Operations (Mode 1)  Startup (Mode 2)
Hot Standby (Mode 3)  Hot Shutdown (Mode 4)
 
Example Emergency Action Level(s):
  (1 or 2)
: 1. Unidentified or pressure boundary leakage > 10 gpm.
OR  2. Identified leakage > 25 gpm.
 
Basis:  With respect to this IC, RCS leakage is defined as a loss of RCS inventory due to a leak in the RCS or a supporting system that is not or cannot be isolated within 10 minutes. For example, isolation of the RCS Letdown (purification) system is a standard abnormal operating procedure action and may prevent unnecessary classifications when a non-RCS leakage path leak exists. However, the intent of this condition is met if attempts to isolate the RCS leak are NOT successful.
 
This IC is included as an NUE because it may be a precursor of more serious conditions and, as result, is considered to be a potential degradation of the level of safety of the plant. The 10 gpm value for the unidentified or pressure boundary leakage was selected as it is observable with normal Control Room indications. Lesser values must generally be determined through time-consuming surveillance tests (e.g., mass balances).
 
Relief valve normal operation should be excluded from this IC. However, a relief valve that operates and fails to close per design should be considered applicable to this IC if the relief valve cannot be isolated.
 
The EAL for identified leakage is set at a higher value due to the lesser significance of identified leakage in comparison to unidentified or pressure boundary leakage. Steam generator tube leakage is identified leakage. In either case, escalation of this IC to the Alert level is via Fission Product Barrier Degradation (F) ICs.
to 0CAN121102
 
Page 99 of 115 SYSTEM MALFUNCTION SU8  Initiating Condition - NOTIFICATION OF UNUSUAL EVENT
 
Loss of all onsite or offsite communications capabilities
 
Operating Mode Applicability: Power Operations (Mode 1)  Startup (Mode 2)
Hot Standby (Mode 3)  Hot Shutdown (Mode 4)
 
Example Emergency Action Level(s):
  (1 or 2)
: 1. Loss of all Table M1 onsite communications methods affecting the ability to perform routine operations.
OR  2. Loss of all Table M2 offsite communications methods affecting the ability to perform offsite notifications.
Table M1 Onsite Communications Methods  Table M2 Offsite Communications Methods Station radio system  All telephone lines (commercial and microwave) Plant paging system  ENS In-plant telephones  Gaitronics Basis:
The purpose of this IC and its associated EALs is to recognize a loss of communications capability that either defeats the plant operations staff ability to perform routine tasks necessary for plant operations or the ability to communicate issues with offsite authorities.
 
The availability of one method of ordinary offsite communications is sufficient to inform federal, state, and local authorities of plant problems. This EAL is intended to be used only when extraordinary means (e.g., relaying of information from non-routine radio transmissions, individuals being sent to off-site locations, etc.) are being used to make communications
 
possible.
 
Reference Documents
:  1. 1903.062, "Communications System Operating Procedure"
 
to 0CAN121102
 
Page 100 of 115 SYSTEM MALFUNCTION SU9  Initiating Condition - NOTIFICATION OF UNUSUAL EVENT
 
Fuel clad degradation
 
Operating Mode Applicability: Power Operations (Mode 1)  Startup (Mode 2)
Hot Standby (Mode 3)  Hot Shutdown (Mode 4)
 
Example Emergency Action Level(s):
  (1 or 2)
: 1. Failed Fuel Iodine radiation monitor reading indicates fuel clad degradation > Technical Specification allowable limits:
Unit 1: RI-1237S reads > 1.3 x 10 5 counts per minute Unit 2: 2RITS-4806B reads > .65 x 10 5 counts per minute OR  2. RCS sample activity value indicating fuel clad degradation > Technical Specification allowable limits:
  > 1.0 uCi/gm Dose Equivalent I-131 for more than 48 hours OR  Unit 1:  60 uCi/gm Dose Equivalent I-131 Unit 2: > 60 uCi/gm Dose Equivalent I-131 OR  Unit 1: > 2200 &#xb5;Ci/gm Dose Equivalent Xe-133 for more than 48 hours Unit 2: > 3100 &#xb5;Ci/gm Dose Equivalent Xe-133 for more than 48 hours    to 0CAN121102
 
Page 101 of 115 SYSTEM MALFUNCTION SU9  Basis:
This IC is included because it is a precursor of more serious conditions and, as result, is considered to be a potential degradation of the level of safety of the plant.
 
EAL #1  This threshold addresses the Letdown Radiation Monitor readings that provide indication of a degradation of fuel clad integrity.
 
EAL #2  This EAL addresses coolant samples exceeding coolant technical specifications for transient iodine spiking limits and coolant samples exceeding coolant Technical Specifications for nominal operating limits for the time period specified in the Technical Specifications.
 
Escalation of this IC to the Alert level is via the Fission Product Barriers (F).
 
Reference Documents
:  1. ANO1 Technical Specifications
: 2. ANO2 Technical Specifications to 0CAN121102
 
Page 102 of 115 SYSTEM MALFUNCTION SU10  Initiating Condition - NOTIFICATION OF UNUSUAL EVENT
 
Inadvertent criticality
 
Operating Mode Applicability: Hot Standby (Mode 3)  Hot Shutdown (Mode 4)
 
Example Emergency Action Level(s):
: 1. UNPLANNED sustained positive startup rate observed on nuclear instrumentation.
 
Basis:  This IC addresses inadvertent criticality events. This IC indicates a potential degradation of the level of safety of the plant, warranting an NUE classification. This IC excludes inadvertent criticalities that occur during planned reactivity changes associated with reactor startups (e.g.,
criticality earlier than estimated).
 
This condition can be identified using the startup rate meter. The term "sustained" is used in order to allow exclusion of expected short term positive startup rates from planned control rod movements for (such as shutdown bank withdrawal). These short term positive startup rates are the result of the rise in neutron population due to subcritical multiplication.
 
Escalation would be by the Fission Product Barrier Table (F), as appropriate to the operating mode at the time of the event.
 
Reference Documents
:  1. 1203.012G, "Annunciator K08 Corrective Action"
: 2. 2203.012D, "Annunciator 2K04 Corrective Action" to 0CAN121102
 
Page 103 of 115 SYSTEM MALFUNCTION SU11  Initiating Condition - NOTIFICATION OF UNUSUAL EVENT
 
Inability to reach required operating mode within Technical Specification limits
 
Operating Mode Applicability: Power Operations (Mode 1)  Startup (Mode 2)
Hot Standby (Mode 3)  Hot Shutdown (Mode 4)
Example Emergency Action Level(s):
: 1. Plant is not brought to required operating mode within Technical Specifications LCO Action Statement time.
Basis:  Limiting Conditions of Operation (LCOs) require the plant to be brought to a required operating mode when the Technical Specification required configuration cannot be restored. Depending on the circumstances, this may or may not be an emergency or precursor to a more severe condition. In any case, the initiation of plant shutdown required by the site Technical Specifications requires a four hour report under 10 CFR 50.72 (b) Non-emergency events. The plant is within its safety envelope when being shut down within the allowable action statement time in the Technical Specifications. An immediate NUE is required when the plant is not brought to the required operating mode within the allowable action statement time in the Technical Specifications. Declaration of an NUE is based on the time at which the LCO-specified action statement time period elapses under the site Technical Specifications and is not related to how long a condition may have existed.
 
Reference Documents
:  1. ANO2 Technical Specifications
: 2. ANO1 Technical Specifications to 0CAN121102
 
Page 104 of 115 SYSTEM MALFUNCTION SA1  Initiating Condition - ALERT
 
AC power capability to Vital 4.16 KV busses reduced to a single power source  15 minutes such that any additional single failure would result in station blackout
 
Operating Mode Applicability: Power Operations (Mode 1)  Startup (Mode 2)  Hot Standby (Mode 3)  Hot Shutdown (Mode 4)
 
Example Emergency Action Level(s):
Note: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. a. AC power capability to Vital 4.16 KV busses reduced to a single power source  15 minutes.
AND  b. Any additional single power source failure will result in station blackout.
Basis:  The condition indicated by this IC is the degradation of the offsite and onsite AC power systems such that any additional single failure would result in a station blackout. This condition could occur due to a loss of offsite power with a concurrent failure of all but one emergency generator to supply power to its emergency busses. Another related condition could be the loss of all offsite power and loss of onsite emergency generators with only one train of emergency busses being backfed from the unit main generator, or the loss of onsite emergency generators with only one train of emergency busses being backfed from offsite power. The subsequent loss of this single power source would escalate the event to a Site Area Emergency in accordance with SS1.
Fifteen minutes was selected as a threshold to exclude transient or momentary losses of power.
 
The EAL allows credit for operation of the Alternate AC Diesel Generator.
Reference Documents
:  1. 1202.007, "Degraded Power"
: 2. 1202.008, "Blackout"
: 3. 2202.007, "Loss of Off-Site Power"
: 4. 2202.008, "Station Blackout"
: 5. 2104.037, "Alternate AC Diesel Generator Operations" to 0CAN121102
 
Page 105 of 115 SYSTEM MALFUNCTION SA3  Initiating Condition - ALERT
 
Automatic trip fails to shutdown the reactor and the manual actions taken from the reactor control console are successful in shutting down the reactor
 
Operating Mode Applicability: Power Operations (Mode 1)  Startup (Mode 2)
Example Emergency Action Level(s):
: 1. a. An automatic trip failed to shutdown the reactor as indicated by reactor power  5%. AND  b. Manual actions taken at the reactor control console successfully shutdown the reactor as indicated by reactor power < 5%.
Basis:  Manual trip actions taken at the reactor control console are any set of actions by the Reactor Operator(s) which causes or should cause control rods to be rapidly inserted into the core and shuts down the reactor. Any action taken to trip the reactor from any location other than panel C03 (Unit 1) or 2C03/2C14 (Unit 2) constitutes a failure of the manual trip function. Failure of manual trip would escalate the event to a Site Area Emergency (SS3).
This condition indicates failure of the automatic protection system to trip the reactor. This condition is more than a potential degradation of a safety system in that a front line automatic protection system did not function in response to a plant transient. Thus the plant safety has been compromised because design limits of the fuel may have been exceeded. An Alert is indicated because conditions may exist that lead to potential loss of fuel clad or RCS and because of the failure of the Reactor Protection System to automatically shutdown the plant.
 
If manual actions taken at the reactor control console fail to shutdown the reactor, the event would escalate to a Site Area Emergency.
to 0CAN121102
 
Page 106 of 115 SYSTEM MALFUNCTION SA6  Initiating Condition - ALERT
 
UNPLANNED loss of safety system annunciation or indication in the Control Room with either (1) a SIGNIFICANT TRANSIENT in progress, or (2) compensatory indicators unavailable
 
Operating Mode Applicability: Power Operations (Mode 1)  Startup (Mode 2)  Hot Standby (Mode 3)  Hot Shutdown (Mode 4)
 
Example Emergency Action Level(s):
Note: The SM/TSC Director/EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. a. UNPLANNED loss of > approximately 75% of the following  15 minutes:
Control Room annunciators associated with safety systems OR  Control Room safety system indication AND  b. Either of the following:
A SIGNIFICANT TRANSIENT is in progress OR  Compensatory indications are unavailable.
Basis:
This IC is intended to recognize the difficulty associated with monitoring changing plant conditions without the use of a major portion of the annunciation or indication equipment during a SIGNIFICANT TRANSIENT.
 
Recognition of the availability of computer based indication equipment is considered (e.g.,
SPDS, plant computer, etc.).
"Planned" loss of annunciators or indicators includes scheduled maintenance and testing
 
activities. to 0CAN121102
 
Page 107 of 115 SYSTEM MALFUNCTION SA6  Quantification is arbitrary, however, it is estimated that if approximately 75% of the safety system annunciators or indicators are lost, there is an increased risk that a degraded plant condition could go undetected. It is not intended that plant personnel perform a detailed count of the instrumentation lost but use the value as a judgment threshold for determining the severity of the plant conditions. It is also not intended that the Shift Manager be tasked with making a judgment decision as to whether additional personnel are required to provide increased monitoring of system operation.
It is further recognized that most plant designs provide redundant safety system indication powered from separate uninterruptible power supplies. While failure of a large portion of annunciators is more likely than a failure of a large portion of indications, the concern is included in this EAL due to difficulty associated with assessment of plant conditions. The loss of specific, or several, safety system indicators should remain a function of that specific system or component operability status. This will be addressed by the specific Technical Specification.
The initiation of a Technical Specification imposed plant shutdown related to the instrument loss will be reported via 10 CFR 50.72. If the shutdown is not in compliance with the Technical Specification action, the NUE is based on SU11 "Inability to reach required operating mode within Technical Specification limits."  Indicators associated with safety systems are those indicators for reactivity control, core cooling, maintaining reactor coolant system integrity or maintaining containment integrity.
 
"Compensatory indications" in this context includes computer based information such as SPDS, QSPDS, COLSS, etc. If both a major portion of the annunciation system and all computer monitoring are unavailable, the Alert is required.
 
Fifteen minutes was selected as a threshold to exclude transient or momentary power losses.
 
This Alert will be escalated to a Site Area Emergency if the operating crew cannot monitor the transient in progress due to a concurrent loss of compensatory indications with a SIGNIFICANT TRANSIENT in progress during the loss of annunciation or indication.
 
Reference Documents
:  1. 1015.037, "Post Transient Review"
: 2. 1203.043, "Loss of Control Room Annunciators"
: 3. 2203.042, "Loss of Control Room Annunciators" to 0CAN121102
 
Page 108 of 115 SYSTEM MALFUNCTION SS1  Initiating Condition - SITE AREA EMERGENCY
 
Loss of all offsite and all onsite AC power to Vital 4.16 KV busses  15 minutes
 
Operating Mode Applicability: Power Operations (Mode 1)  Startup (Mode 2)
Hot Standby (Mode 3)  Hot Shutdown (Mode 4)
Example Emergency Action Level(s):
Note: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. Loss of all offsite and all onsite AC power to Vital 4.16 KV busses  15 minutes.
Basis:  Loss of all AC power to emergency busses comp romises all plant safety systems requiring electric power including Shutdown Cooling, ECCS, Containment Heat Removal and the Ultimate Heat Sink. Prolonged loss of all AC power to emergency busses will lead to loss of Fuel Clad, RCS, and Containment, thus this event can escalate to a General Emergency.
Fifteen minutes was selected as a threshold to exclude transient or momentary losses of offsite
 
power.
 
Escalation to General Emergency is via Fission Product Barrier Degradation (F) or IC SG1, "Prolonged loss of all offsite and all onsite AC power to Vital 4.16 KV busses."  Reference Documents
:  1. 1202.007, "Degraded Power"
: 2. 1202.008, "Blackout"
: 3. 2202.007, "Loss of Off-Site Power"
: 4. 2202.008, "Station Blackout"
: 5. 2104.037, "Alternate AC Diesel Generator Operations"
 
to 0CAN121102
 
Page 109 of 115 SYSTEM MALFUNCTION SS3  Initiating Condition - SITE AREA EMERGENCY
 
Automatic trip fails to shutdown the reactor and manual actions taken from the reactor control console are not successful in shutting down the reactor
 
Operating Mode Applicability: Power Operations (Mode 1)  Startup (Mode 2)
Example Emergency Action Level(s):
: 1. a. An automatic trip failed to shutdown the reactor.
 
AND  b. Manual actions taken at the reactor control console do not shutdown the reactor as indicated by reactor power  5%. Basis:  Under these conditions, the reactor is producing more heat than the maximum decay heat load for which the safety systems are designed and efforts to bring the reactor subcritical are unsuccessful. A Site Area Emergency is warranted because conditions exist that lead to IMMINENT loss or potential loss of both fuel clad and RCS.
Manual trip actions taken at the reactor control console are any set of actions by the Reactor Operator(s) which causes or should cause control rods to be rapidly inserted into the core and shuts down the reactor.
 
Manual trip actions are not considered successful if action away from panel C03 (Unit 1) or panels 2C03/2C14 (Unit 2) is required to trip the reactor. This EAL is still applicable even if actions taken away from panel C03 (Unit 1) or panels 2C03/2C14 (Unit 2) are successful in shutting the reactor down because the design limits of the fuel may have been exceeded or because of the gross failure of the Reactor Protection System to shutdown the plant.
 
Escalation of this event to a General Emergency would be due to a prolonged condition leading to an extreme challenge to either core-cooling or heat removal.
 
to 0CAN121102
 
Page 110 of 115 SYSTEM MALFUNCTION SS4  Initiating Condition - SITE AREA EMERGENCY
 
Loss of all vital DC power  15 minutes
 
Operating Mode Applicability: Power Operations (Mode 1)  Startup (Mode 2)
Hot Standby (Mode 3)  Hot Shutdown (Mode 4)
Example Emergency Action Level(s):
Note: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. < 105 volts on all Vital DC busses  15 minutes.
Basis:  Loss of all DC power compromises ability to monitor and control plant safety functions.
Prolonged loss of all DC power will cause core uncovering and loss of containment integrity when there is significant decay heat and sensible heat in the reactor system.
 
Fifteen minutes was selected as a threshold to exclude transient or momentary power losses.
 
Escalation to a General Emergency would occur by Abnormal Radiation Levels/Radiological Effluent (A), Fission Product Barrier Degradation (F).
 
to 0CAN121102
 
Page 111 of 115 SYSTEM MALFUNCTION SS6  Initiating Condition - SITE AREA EMERGENCY
 
Inability to monitor a SIGNIFICANT TRANSIENT in progress
 
Operating Mode Applicability: Power Operations (Mode 1)  Startup (Mode 2)
Hot Standby (Mode 3)  Hot Shutdown (Mode 4)
Example Emergency Action Level(s):
Note: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. a. Loss of > approximately 75% of the following  15 minutes:
Control Room annunciators associated with safety systems OR  Control Room safety system indication AND  b. A SIGNIFICANT TRANSIENT is in progress.
AND  c. Compensatory indications are unavailable.
Basis:
This IC is intended to recognize the threat to plant safety associated with the complete loss of capability of the control room staff to monitor plant response to a SIGNIFICANT TRANSIENT.
 
"Planned" and "UNPLANNED" actions are not differentiated since the loss of instrumentation of this magnitude is of such significance during a transient that the cause of the loss is not an ameliorating factor.
 
Quantification is arbitrary, however, it is estimated that if approximately 75% of the safety system annunciators or indicators are lost, there is an increased risk that a degraded plant condition could go undetected. It is not intended that plant personnel perform a detailed count of the instrumentation lost but use the value as a judgment threshold for determining the severity of the plant conditions. It is also not intended that the Shift Manager be tasked with making a judgment decision as to whether additional personnel are required to provide increased monitoring of system operation. to 0CAN121102
 
Page 112 of 115 SYSTEM MALFUNCTION SS6  It is further recognized that most plant designs provide redundant safety system indication powered from separate uninterruptible power supplies. While failure of a large portion of annunciators is more likely than a failure of a large portion of indications, the concern is included in this EAL due to difficulty associated with assessment of plant conditions. The loss of specific, or several, safety system indicators should remain a function of that specific system or component operability status. This will be addressed by the specific Technical Specification.
The initiation of a Technical Specification imposed plant shutdown related to the instrument loss will be reported via 10 CFR 50.72. If the shutdown is not in compliance with the Technical Specification action, the NUE is based on SU11 "Inability to reach required operating mode within Technical Specification limits."
 
A Site Area Emergency is considered to exist if the Control Room staff cannot monitor safety functions needed for protection of the public while a significant transient is in progress.
 
Site specific indications needed to monitor safety functions necessary for protection of the public must include Control Room indications, computer generated indications and dedicated annunciation capability.
 
Indicators associated with safety systems are those indicators for reactivity control, core cooling, maintaining reactor coolant system integrity or maintaining containment integrity.
 
"Compensatory indications" in this context includes computer based information such as SPDS, QSPDS, COLSS, etc. This should include all computer systems available for this use depending on specific plant design and subsequent retrofits.
 
Fifteen minutes was selected as a threshold to exclude transient or momentary power losses.
 
Reference Documents
:  1. 015.037, "Post Transient Review"
: 2. 1203.043, "Loss of Control Room Annunciators"
: 3. 2203.042, "Loss of Control Room Annunciators" to 0CAN121102
 
Page 113 of 115 SYSTEM MALFUNCTION SG1  Initiating Condition - GENERAL EMERGENCY
 
Prolonged loss of all offsite and all onsite AC power to Vital 4.16 KV busses
 
Operating Mode Applicability: Power Operations (Mode 1)  Startup (Mode 2)
Hot Standby (Mode 3)  Hot Shutdown (Mode 4)
Example Emergency Action Level(s):
: 1. a. Loss of all offsite and all onsite AC power to Vital 4.16 KV busses.
AND  b. Either of the following:
Restoration of at least one Vital 4.16 KV bus in < 4 hours is not likely.
OR  Continuing degradation of core cooling based on Fission Product Barrier monitoring as indicated by CETs  700 &deg;F. Basis:  Loss of all AC power to Vital 4.16 KV busses compromises all plant safety systems requiring electric power including Shutdown Cooling, ECCS, Containment Heat Removal and the Ultimate Heat Sink. Prolonged loss of all AC power to Vital 4.16 KV busses will lead to loss of fuel clad, RCS, and containment, thus warranting declaration of a General Emergency.
 
This IC is specified to assure that in the unlikely event of a prolonged station blackout, timely recognition of the seriousness of the event occurs and that declaration of a General Emergency occurs as early as is appropriate, based on a reasonable assessment of the event trajectory.
 
The likelihood of restoring at least one Vital 4.16 KV bus should be based on a realistic appraisal of the situation since a delay in an upgrade decision based on only a chance of mitigating the event could result in a loss of valuable time in preparing and implementing public protective actions.
 
In addition, under these conditions, fission product barrier monitoring capability may be
 
degraded.
 
to 0CAN121102
 
Page 114 of 115 SYSTEM MALFUNCTION SG1  Although it may be difficult to predict when power can be restored, it is necessary to give the SM / TSC Director / EOF Director a reasonable idea of how quickly (s)he may need to declare a General Emergency based on two major considerations:
: 1. Are there any present indications that core cooling is already degraded to the point that loss or potential loss of Fission Product Barriers is IMMINENT?
: 2. If there are no present indications of such core cooling degradation, how likely is it that power can be restored in time to assure that a loss of two barriers with a potential loss of the third barrier can be prevented?
 
Thus, indication of continuing core cooling degradation must be based on Fission Product Barrier monitoring with particular emphasis on SM / TSC Director / EOF Director judgment as it relates to IMMINENT loss or potential loss of fission product barriers and degraded ability to monitor fission product barriers.
 
Reference Documents
:  1. Unit 1 Calculation 85-E-0072-02, "Time from Loss of All AC Power to Loss of Subcooling"
: 2. Unit 2 Calculation 85-E-0072-01, "Time from Loss of All AC Power to Loss of Subcooling" to 0CAN121102
 
Page 115 of 115 SYSTEM MALFUNCTION SG3  Initiating Condition - GENERAL EMERGENCY
 
Automatic trip and all manual actions fail to shutdown the reactor and indication of an extreme challenge to the ability to cool the core exists
 
Operating Mode Applicability: Power Operations (Mode 1)  Startup (Mode 2)
Example Emergency Action Level(s):
: 1. a. An automatic trip failed to shutdown the reactor
 
AND  b. All manual actions do not shutdown the reactor as indicated by reactor power  5%. AND  c. Either of the following exist or have occurred due to continued power generation:
CET temperatures at or approaching 1200 &deg;F OR  Feedwater flow rate less than:
Unit 1: 430 gpm Unit 2: 485 gpm  Basis:  Under these conditions, the reactor is producing more heat than the maximum decay heat load for which the safety systems are designed and efforts to bring the reactor subcritical are unsuccessful.
 
In the event either of these challenges exists at a time that the reactor has not been brought
 
below the power associated with the safety system design a core melt sequence exists. In this situation, core degradation can occur rapidly. For this reason, the General Emergency declaration is intended to be anticipatory of the fission product barrier table declaration to permit maximum off-site intervention time.
 
to 0CAN121102
 
Page 1 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT ABNORMAL RADIOLOGICAL EFFLUENTS AG1 Offsite dose resulting from an actual or IMMINENT release of gaseous radioactivity > 1000 mR TEDE or 5000 mR child thyroid CDE for the actual or projected duration of the release using actual meteorology Emergency Action Level(s):
NOTE: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the ev ent as soon as it is determined that the condition will likely exceed the applicable time. If dose assessment results are available, the classification should be based on EAL #2 instead of EAL #1. Do not delay declaration awaiting dose assessment results.
: 1. VALID reading on Channel 9 on any of the following radiation monitors > the reading shown for  15 minutes: MONITORS - Unit 1 LIMIT RX-9820 Containment Purge 5.90E+2 &#xb5;Ci/cc RX-9825 Radwaste Area 5.36E+2 &#xb5;Ci/cc RX-9830 Fuel Handling Area 4.54E+2 &#xb5;Ci/cc RX-9835 Emerg. Penetration Room 9.56E+3 &#xb5;Ci/cc MONITORS - Unit 2 LIMIT 2RX-9820 Containment Purge 4.46E+2 &#xb5;Ci/cc 2RX-9825 Radwaste Area 3.32E+2 &#xb5;Ci/cc 2RX-9830 Fuel Handling Area 4.46E+2 &#xb5;Ci/cc 2RX-9835 Emerg. Penetration Room 8.84E+3 &#xb5;Ci/cc 2RX-9840 PASS Building 4.42E+3 &#xb5;Ci/cc 2RX-9845 Aux. Building Extension 1.26E+3 &#xb5;Ci/cc OR AS1 Offsite dose resulting from an actual or IMMINENT release of gaseous radioactivity > 100 mR TEDE or 500 mR child thyroid CDE for the actual or projected duration of the release Emergency Action Level(s):
NOTE: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time. If dose assessment results are available, the classification should be based on EAL #2 instead of EAL #1. Do not delay declaration awaiting dose assessment results.
: 1. VALID reading on Channel 9 on any of the following radiation monitors > the reading shown for  15 minutes: MONITORS - Unit 1 LIMIT RX-9820 Containment Purge 5.90E+1 &#xb5;Ci/cc RX-9825 Radwaste Area 5.36E+1 &#xb5;Ci/cc RX-9830 Fuel Handling Area 4.54E+1 &#xb5;Ci/cc RX-9835 Emerg. Penetration Room9.56E+2 &#xb5;Ci/cc MONITORS - Unit 2 LIMIT 2RX-9820 Containment Purge 4.46E+1 &#xb5;Ci/cc 2RX-9825 Radwaste Area 3.32E+1 &#xb5;Ci/cc 2RX-9830 Fuel Handling Area 4.46E+1 &#xb5;Ci/cc 2RX-9835 Emerg. Penetration Room8.84E+2 &#xb5;Ci/cc 2RX-9840 PASS Building 4.42E+2 &#xb5;Ci/cc 2RX-9845 Aux. Building Extension 1.26E+2 &#xb5;Ci/cc OR AA1 Any release of gaseous or liquid radioactivity to the environment > 200 times the ODCM limits for  15 minutes Emergency Action Level(s):
NOTE: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the release duration has exceeded, or will likely exceed, the applicable time. In the absence of data to the contrary, assume that the release duration has exceeded the applicable time if an ongoing release is detected and the release start time is unknown.
: 1. VALID reading on Channel 7 on any of the following radiation monitors > the reading shown for  15 minutes: MONITORS - Unit 1 LIMIT RX-9820 Containment Purge 5.90E0 &#xb5;Ci/cc RX-9825 Radwaste Area 5.36E0 &#xb5;Ci/cc RX-9830 Fuel Handling Area 4.54E0 &#xb5;Ci/cc RX-9835 Emerg. Penetration Room9.56E+1 &#xb5;Ci/cc MONITORS - Unit 2 LIMIT 2RX-9820 Containment Purge 4.46E0 &#xb5;Ci/cc 2RX-9825 Radwaste Area 3.32E0 &#xb5;Ci/cc 2RX-9830 Fuel Handling Area 4.46E0 &#xb5;Ci/cc 2RX-9835 Emerg. Penetration Room8.84E+1 &#xb5;Ci/cc 2RX-9840 PASS Building 4.42E+1 &#xb5;Ci/cc 2RX-9845 Aux. Building Extension 1.26E+1 &#xb5;Ci/cc 2RX-9850 LLRW Storage Building 1.77E+1 &#xb5;Ci/cc OR AU1 Any release of gaseous or liquid radioactivity to the environment > 2 times the ODCM limits for  60 minutes Emergency Action Level(s):
NOTE: The SM should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the release duration has exceeded, or will likely exceed, the applicable time. In the absence of data to the contrary, assume that the release duration has exceeded the applicable time if an ongoing release is detected and the release start time is unknown. 1. VALID reading on Channel 7 on any of the following radiation monitors > the reading shown for  60 minutes: MONITORS - Unit 1 LIMIT RX-9820 Containment Purge 5.90E-2 &#xb5;Ci/cc RX-9825 Radwaste Area 5.36E-2 &#xb5;Ci/cc RX-9830 Fuel Handling Area 4.54E-2 &#xb5;Ci/cc RX-9835 Emerg. Penetration Room9.56E-1 &#xb5;Ci/cc MONITORS - Unit 2 LIMIT 2RX-9820 Containment Purge 4.46E-2 &#xb5;Ci/cc 2RX-9825 Radwaste Area 3.32E-2 &#xb5;Ci/cc 2RX-9830 Fuel Handling Area 4.46E-2 &#xb5;Ci/cc 2RX-9835 Emerg. Penetration Room8.84E-1 &#xb5;Ci/cc 2RX-9840 PASS Building 4.42E-1 &#xb5;Ci/cc 2RX-9845 Aux. Building Extension 1.26E-1 &#xb5;Ci/cc 2RX-9850 LLRW Storage Building 1.77E-1 &#xb5;Ci/cc OR 1  2  3  4  5  6  D 1  2  3  4  5  6  D 1  2  3  4  5  6  D 1  2  3  4  5  6  D    to 0CAN121102
 
Page 2 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT ABNORMAL RADIOLOGICAL EFFLUENTS AG1 (continued)
: 2. Dose assessment using actual meteorology indicates doses > 1000 mR TEDE or 5000 mR child thyroid CDE at or beyond the site boundary.
OR 3. Field survey results indicate closed window dose rates
> 1000 mR/hr expected to continue for  60 minutes; or analyses of field survey samples indicate child thyroid CDE > 5000 mR for one hour of inhalation, at or beyond the site boundary.
AS1 (continued)
: 2. Dose assessment using actual meteorology indicates doses > 100 mR TEDE or 500 mR child thyroid CDE at or beyond the site boundary.
OR 3. Field survey results indicate closed window dose rates
> 100 mR/hr expected to continue for  60 minutes; or analyses of field survey samples indicate child thyroid CDE > 500 mR for one hour of inhalation, at or beyond the site boundary. AA1 (continued)
: 2. EITHER VALID reading on any of the following radiation monitors > 200 times the alarm setpoint established by a current release permit for  15 minutes OR VALID reading greater than the value listed for 15 minutes: MONITORS - Unit 1 LIMIT RX-9820 Cont. Purge (Ch. 7 or 9) N/A RX-4830 Waste Gas Monitor 9.5E7 cpm RX-4642 Liquid Radwaste Monitor 9.5E7 cpm RX-9835 Emerg. Penetration RoomN/A MONITORS - Unit 2 LIMIT 2RX-9820 Cont. Purge (Ch. 7 or 9) N/A 2RX-2429 Waste Gas Monitor 9.5E5 cpm 2RX-2330 BMS Discharge Monitor 9.5E5 cpm 2RX-4423 LRW Discharge Monitor 9.5E5 cpm 2RX-4425 SG BD to Flume Monitor 9.5E5 cpm OR 3. Confirmed grab sample analyses for gaseous or liquid releases indicates concentrations or release rates > 200 times the applicable values of the ODCM for  15 minutes. AU1 (continued)
: 2. VALID reading on any of the following radiation monitors > 2 times the alarm setpoint established by a current release permit for  60 minutes: MONITORS - Unit 1 RX-9820 Cont. Purge (Ch. 7 or 9) RX-4830 Waste Gas Monitor RX-4642 Liquid Radwaste Monitor RX-9835 Emerg. Penetration Room MONITORS - Unit 2 2RX-9820 Cont. Purge (Ch. 7 or 9) 2RX-2429 Waste Gas Monitor 2RX-2330 BMS Discharge Monitor 2RX-4423 LRW Discharge Monitor 2RX-4425 SG BD to Flume Monitor OR 3. Confirmed grab sample analyses for gaseous or liquid releases indicates concentrations or release rates > 2 times the applicable values of the ODCM for  60 minutes.
to 0CAN121102
 
Page 3 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT ABNORMAL RADIATION LEVELS AA2  Damage to irradiated fuel or loss of
 
water level that has resulted or will result in the uncovering of irradiated fuel outside the reactor vessel Emergency Action Level(s):
: 1. A water level drop in the refueling canal or spent fuel pool that will result in irradiated fuel becoming uncovered.
OR 2. VALID alarm on any of the following radiation monitors due to damage to irradiated fuel or loss of water level: MONITORS - Unit 1 RX-9820 Containment Purge (Channel 7 or 9) RX-9825 Radwaste Area (Channel 7 or 9) RX-9830 Fuel Handling Area (Channel 7 or 9) RE-8060 Containment High Range Monitor RE-8061 Containment High Range Monitor RE-8009 Spent Fuel Area RE-8017 Fuel Handling MONITORS - Unit 2 2RX-9820 Containment Purge (Channel 7 or 9) 2RX-9825 Radwaste Area (Channel 7 or 9) 2RX-9830 Fuel Handling Area (Channel 7 or 9) 2RE-8905 Containment Equipment Hatch Area 2RE-8909 Containment Personnel Hatch Area 2RE-8925-1/2 Containment High Range Monitors 2RE-8914/15/16Spent Fuel Area Monitors 2RE-8912 Containment Incore Instruments AU2  Unexpected rise in plant radiation
 
levels Emergency Action Level(s):
: 1. a. UNPLANNED lowering of water level in the refueling canal or spent fuel pool as indicated by:  Personnel observation, refueling crew report, indication on area security camera, borated water source (BWST or RWT) level drop due to makeup demands. AND b. VALID Area Radiation Monitor reading rise on any of the following: MONITORS - Unit 1 RE-8009 Spent Fuel Area RE-8017 Fuel Handling Area MONITORS - Unit 2 2RE-8914 Spent Fuel Area 2RE-8915 Spent Fuel Area 2RE-8916 Spent Fuel Area 2RE-8912 Containment Incore Instrumentation OR  1  2  3  4  5  6  D 1  2  3  4  5  6  D    to 0CAN121102
 
Page 4 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT ABNORMAL RADIATION LEVELS AA3  Rise in radiation levels within the facility that impedes operation of systems required to maintain plant safety functions. Emergency Action Level(s):
: 1. Dose rate > 15 mR/hr in any of the following areas requiring continuous occupancy to maintain plant safety functions:  Unit 1 Control Room  Unit 2 Control Room  Central Alarm Station AU2 (continued)
: 2. UNPLANNED VALID Area Radiation Monitor readings or survey results indicate a rise by a factor of 1000 over normal*
 
levels. NOTE: For area radiation monitors with ranges incapable of measuring 1000 times normal*
levels, classification shall be based on VALID full scale indication unless surveys confirm that area radiation levels are below 1000 times normal* within 15 minutes of the Area Radiation Monitor indications going to full scale indication.
* Normal can be considered as the highest reading in the past twenty-four hours excluding the current peak value.
1  2  3  4  5  6  D    to 0CAN121102
 
Page 5 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT COLD SHUTDOWN / REFUELING SYSTEM MALFUNCTION - Loss of RCS / Reactor Vessel Inventory CG1  Loss of RCS / reactor vessel inventory affecting fuel clad integrity with containment challenged Emergency Action Level(s):
NOTE: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the ev ent as soon as it is determined that the condition will likely exceed the applicable time.
: 1. a. Core exit thermocouples indicate superheat for > 30 minutes. AND b. Any of the following containment challenge indications:  CONTAINMENT CLOSURE not established  Explosive mixture inside containment  UNPLANNED rise in containment pressure OR 2. a. RCS / reactor vessel level cannot be monitored for  30 minutes with a loss of RCS / reactor vessel inventory as indicated by any of the following:
CS1  Loss of RCS / reactor vessel inventory affecting core decay heat removal capability Emergency Action Level(s):
NOTE: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time.
: 1. With CONTAINMENT CLOSURE not established: Loss of RCS / reactor vessel level as indicated by:
Unit 1: RVLMS Levels 1 through 9 indicate DRY Unit 2: RVLMS Levels 1 through 6 indicate DRY OR 2. With CONTAINMENT CLOSURE established, core exit thermocouples indicate superheat.
OR CA1  Loss of RCS / reactor vessel
 
inventory Emergency Action Level(s):
NOTE: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time.
: 1. Loss of RCS / reactor vessel inventory as indicated by:
Unit 1: RVLMS Levels 1 through 8 indicate DRY Unit 2: RVLMS Levels 1 through 5 indicate DRY OR Unit 1: Reactor vessel level
< 368 ft., 0 in. (bottom of the hot leg)
Unit 2: Reactor vessel level < 369 ft., 1.5 in. (bottom of the hot leg)
OR 
 
CU1  RCS leakage Emergency Action Level(s):
NOTE: The SM should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time. 1. RCS leakage results in the inability to maintain or restore level within Pressurizer or RCS level target band for  15 minutes.
 
CU2  UNPLANNED loss of RCS / reactor vessel Inventory Emergency Action Level(s):
NOTE: The SM should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time. 1. UNPLANNED RCS / reactor vessel level drop as indicated by either of the following:
5  6 5  6 5  6 5 6    to 0CAN121102
 
Page 6 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT COLD SHUTDOWN / REFUELING SYSTEM MALFUNCTION - Loss of RCS / Reactor Vessel Inventory CG1 (continued)
Containment High Range Radiation Monitor reading
>10 R/hr  Erratic source range monitor indication  Unexplained level rise in Reactor Building Sump, Reactor Drain Tank, Quench Tank, Aux. Building Equipment Drain Tank, or
 
Aux. Building Sump AND b. Any of the following containment challenge indications:  CONTAINMENT CLOSURE not established  Explosive mixture inside containment  UNPLANNED rise in containment pressure CS1 (continued)
: 3. RCS / reactor vessel level cannot be monitored for  30 minutes with a loss of RCS / reactor vessel inventory as indicated by any of the following:  Containment High Range Radiation Monitor reading > 10 R/hr  Erratic source range monitor indication  Unexplained level rise in Reactor Building Sump, Reactor Drain Tank, Quench Tank, Aux. Building Equipment Drain Tank, or Aux. Building Sump  CA1 (continued)
: 2. RCS / reactor vessel level cannot be monitored for  15 minutes with a loss of RCS / reactor vessel inventory as indicated by an unexplained level rise in the Reactor Building Sump, Reactor Drain Tank, Aux. Building Equipment Drain Tank, Aux. Building Sump, or Quench Tank. CU2 (continued)
: a. RCS / reactor vessel water level drop below the reactor vessel flange for 15 minutes when the RCS / reactor vessel level band is established above the reactor vessel flange.
OR b. RCS / reactor vessel water level drop below the RCS / reactor vessel level band for 15 minutes when the RCS / reactor vessel level band is established below the reactor vessel flange. 2. RCS / reactor vessel level cannot be monitored with a loss of RCS / reactor vessel inventory as indicated by an unexplained level rise in (as applicable) the Reactor Building Sump, Reactor Drain Tank, Aux. Building Equipment Drain Tank, Aux.
Building Sump, or Quench Tank.
to 0CAN121102
 
Page 7 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT COLD SHUTDOWN / REFUELING SYSTEM MALFUNCTION - Loss of Decay Heat Removal CA3  Inability to maintain plant in Cold
 
Shutdown Emergency Action Level(s):
: 1. An UNPLANNED event results in RCS temperature > 200 &deg;F > the specified duration in Table C1. Table C1 RCS Reheat Duration Thresholds RCS Containment Closure Duration Intact (but not RCS reduced inventory) N/A  60 minutes*Established  20 minutes*Not intact or RCS reduced inventory Not Established  0 minutes
* If an RCS heat removal system is in operation within this time frame and RCS temperature is being reduced, the EAL is not applicable.
OR NOTE: EAL #2 does not apply in solid plant conditions. 2. An UNPLANNED event results in RCS pressure rise > 10 psi due to a loss of RCS cooling. CU3  UNPLANNED loss of decay heat removal capability with irradiated fuel in the reactor vessel Emergency Action Level(s):
NOTE: The SM should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time. 1. UNPLANNED event results in RCS temperature exceeding 200 &deg;F. OR 2. Loss of all RCS temperature and RCS / reactor vessel level indication for  15 minutes
. 5  6 5  6    to 0CAN121102
 
Page 8 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT COLD SHUTDOWN / REFUELING SYSTEM MALFUNCTION - Loss of AC Power CA5  Loss of all offsite and all onsite AC power to Vital 4.16 KV busses  15 minutes Emergency Action Level(s):
NOTE: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time.
: 1. Loss of all offsite and all onsite AC power to Vital 4.16KV busses  15 minutes.
CU5  AC power capability to Vital 4.16 KV busses reduced to a single power source  15 minutes such that any additional single failure would result in station blackout Emergency Action Level(s):
NOTE: The SM should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time. 1. a. AC power capability to Vital 4.16 KV busses reduced to a single power source 15 minutes. AND b. Any additional single power source failure will result in station blackout.
5  6 5  6  D    to 0CAN121102
 
Page 9 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT COLD SHUTDOWN / REFUELING SYSTEM MALFUNCTION - Loss of DC Power CU6  Loss of required DC power 15 minutes Emergency Action Level(s):
NOTE: The SM should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time. 1. < 105 volts on required Vital DC bus  15 minutes.
GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT COLD SHUTDOWN / REFUELING SYSTEM MALFUNCTION - Inadvertant Criticality CU7  Inadvertent criticality Emergency Action Level(s):
: 1. UNPLANNED sustained positive startup rate observed on nuclear instrumentation.
5  6 5  6    to 0CAN121102
 
Page 10 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT COLD SHUTDOWN / REFUELING SYSTEM MALFUNCTION - Loss of Communications CU8  Loss of all onsite or offsite communications capabilities Emergency Action Level(s):
: 1. Loss of all Table C2 onsite communication methods affecting the ability to perform routine operations.
Table C2 Onsite Communications Equipment Station radio system Plant paging system In-plant telephones Gaitronics OR 2. Loss of all Table C3 offsite communication methods affecting the ability to perform offsite notifications.
Table C3 Offsite Communications Equipment All telephone lines (commercial and microwave)
ENS    5  6  D    to 0CAN121102
 
Page 11 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT ISFSI MALFUNCTION - Cask Damage E-HU1  Note: Security Events are bounded by the Hazards EALs. Damage to a loaded cask CONFINEMENT BOUNDARY Emergency Action Level(s):
: 1. Damage to a loaded cask CONFINEMENT BOUNDARY.
 
GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT FISSION PRODUCT BARRIER MALFUNCTION - Barriers FG1  Loss of ANY two barriers AND loss or potential loss of third barrier FS1  Loss or potential loss of ANY two barriers FA1  ANY loss or ANY potential loss of EITHER fuel clad or RCS FU1  ANY loss or ANY potential loss of containment Note: Determine which combination of the three barriers are lost or have a potential loss and use the above key to classify the event. Also, multiple events could occur which result in the conclusion that exceeding the loss or potential loss EALs is IMMINENT. In this IMMINENT loss situation use judgment and classify as if the EALs are exceeded. 1  2  3  4  5  6  D 1  2  3  4 1  2  3  4 1  2  3  4 1  2  3  4    to 0CAN121102
 
Page 12 of 32 Fuel Clad Barrier EALs RCS Barrier EALs Containment Barrier EALs LOSS POTENTIAL LOSS LOSS POTENTIAL LOSS LOSS POTENTIAL LOSS
: 1. Primary Coolant Activity Level (FCB1)
: 1. RCS Leak Rate (RCB1)
: 1. Containment Pressure (CNB1)
: 1. Coolant activity > 300 &#xb5;Ci/gm dose equivalent I-131 activity by Chemistry sample OR 2. Radiation levels
> 1000 MR/hr Unit 1: at SA-229 Unit 2: at 2TCD-19 None RCS leak rate > available makeup capacity as indicated by: Unit 1: Loss of adequate subcooling margin Unit 2: RCS subcooling (MTS) can NOT be maintained at least
 
30 &deg;F Unit 1: UNISOLABLE RCS leak > 50 gpm with Letdown isolated Unit 2: UNISOLABLE RCS leak > 44 gpm with Letdown isolated 1. Rapid unexplained drop in containment pressure following an initial rise in containment pressure OR 2. Containment pressure or sump level response not consistent with LOCA conditions
: 1. Unit 1: Containment pressure 73.7 PSIA (59 PSIG) and
 
rising Unit 2: Containment pressure 73.7 PSIA and
 
rising OR 2. Explosive mixture exists inside Containment OR 3. a. Containment Pressure > containment spray actuation setpoint Unit 1: 44.7 PSIA (30 PSIG) Unit 2: 23.3 PSIA AND b. LESS THAN one full train of spray operating to 0CAN121102
 
Page 13 of 32 Fuel Clad Barrier EALs RCS Barrier EALs Containment Barrier EALs LOSS POTENTIAL LOSS LOSS POTENTIAL LOSS LOSS POTENTIAL LOSS
: 2. Core Exit Thermocouple Readings (FCB2)
: 2. SG Tube Rupture (RCB2)
: 2. Core Exit Thermocouple Readings (CNB2)> 1200 &deg;F CET temperature Unit 1: ICC exists as evidenced by CETs indicating superheated
 
conditions Unit 2: Average CETs indicate superheat for current RCS pressure SGTR that results in an ECCS (SI) actuation None None 1. a. CETs indicate >
1200 &deg;F AND b. Restoration procedures not effective within 15 minutes OR 2. a. CETs indicate >
700 &deg;F AND b. RVLMS indicates Unit 1: Levels 1 through 9 DRY Unit 2: Levels 1 through 7 DRY AND c. Restoration procedures not effective within 15 minutes to 0CAN121102
 
Page 14 of 32
: 3. Reactor Vessel Water Level (FCB3)
: 3. Containment Radiation Monitoring (RCB3)3. SG Secondary Side Release With Primary-to-Secondary Leakage (CNB3)
None Unit 1: RVLMS Levels 1 through 9 indicate DRY Unit 2: RVLMS Levels 1 through 7 indicate DRY Containment high range radiation monitor reading >
 
100 R/hr None 1. RUPTURED steam generator is also FAULTED outside of containment OR 2. a. Primary-to- secondary leakrate >
10 gpm AND b. UNISOLABLE steam release from
 
affected steam generator to the environment None 4. Containment Radiation Monitoring (FCB4)
: 4. Emergency Director Judgment (RCB4)
: 4. Containment Isolation Failure or Bypass (CNB4) Containment high range radiation monitor reading > 1000 R/hr None Any condition in the opinion of the SM / TSC Director / EOF Director that indicates Loss or Potential Loss of the RCS barrier 1. UNISOLABLE breach of containment AND 2. Direct downstream pathway to the environment exists after containment isolation
 
signal None 5. Core Damage Assessment (FCB5)
: 5. Containment Radiation Monitoring (CNB5)
At least 5% fuel clad damage as determined from core damage assessment None  None Containment high range radiation monitor reading > 4000 R/hr to 0CAN121102
 
Page 15 of 32 Fuel Clad Barrier EALs RCS Barrier EALs Containment Barrier EALs LOSS POTENTIAL LOSS LOSS POTENTIAL LOSS LOSS POTENTIAL LOSS
: 6. Emergency Director Judgment (FCB6)
: 6. Other Indications (CNB6)
Any condition in the opinion of the SM/TSC Director/EOF Director that indicates Loss or Potential Loss of the fuel clad barrier  Elevated readings on the following radiation monitors that indicate loss or potential loss of the Containment barrier:
MONITORS - Unit 1 RX-9820 Containment Purge RX-9825 Radwaste Area RX-9830 Fuel Handling Area RX-9835 Emergency Penetration Room MONITORS - Unit 2 2RX-9820 Containment Purge 2RX-9825 Radwaste Area 2RX-9830 Fuel Handling Area 2RX-9835 Emergency Penetration Room 2RX-9840 Post Accident Sampling Building 2RX-9845 Auxiliary Building Extension Fuel Clad Barrier EALs RCS Barrier EALs Containment Barrier EALs LOSS POTENTIAL LOSS LOSS POTENTIAL LOSS LOSS POTENTIAL LOSS
: 7. Emergency Director Judgment (CNB7)
Any condition in the opinion of the SM / TSC Director / EOF Director that indicates Loss or Potential Loss of the containment barrier to 0CAN121102
 
Page 16 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY - Security HG1  HOSTILE ACTION resulting in loss of physical control of the facility Emergency Action Level(s):
: 1. A HOSTILE ACTION has occurred such that plant personnel are unable to operate equipment required to maintain safety
 
functions.
OR 2. A HOSTILE ACTION has caused failure of Spent Fuel Cooling Systems and IMMINENT fuel damage is likely for a freshly off-loaded reactor core in pool.
HS1  HOSTILE ACTION within the PROTECTED AREA Emergency Action Level(s):
: 1. A HOSTILE ACTION is occurring or has occurred within the PROTECTED AREA as reported by ANO Security Shift Supervision.
HA1  HOSTILE ACTION within the OWNER CONTROLLED AREA or airborne attack threat Emergency Action Level(s):
: 1. A HOSTILE ACTION is occurring or has occurred within the OWNER CONTROLLED AREA as reported by ANO Security Shift Supervision.
OR 2. A validated notification from NRC of an airliner attack threat within 30 minutes of the site. HU1  Confirmed SECURITY CONDITION or threat which indicates a potential degradation in the level of safety of the plant Emergency Action Level(s):
: 1. A SECURITY CONDITION that does not involve a HOSTILE ACTION as reported by ANO Security Shift Supervision.
OR 2. A credible site specific security threat notification.
OR 3. A validated notification from NRC providing information of an aircraft
 
threat. 1  2  3  4  5  6  D 1  2  3  4  5  6  D 1  2  3  4  5  6  D 1  2  3  4  5  6  D    to 0CAN121102
 
Page 17 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY - Discretionary HG2  Other conditions exist which in the judgment of the SM / TSC Director / EOF Director warrant declaration of General Emergency Emergency Action Level(s):
: 1. Other conditions exist which in the judgment of the SM / TSC Director / EOF Director indicate that events are in progress or have occurred which involve actual or IMMINENT substantial core degradation or melting with potential for loss of containment integrity or HOSTILE ACTION that results in an actual loss of physical control of the facility. Releases can be reasonably expected to exceed EPA Protective Action Guideline exposure levels offsite for more than the immediate site area.
HS2  Other conditions exist which in the judgment of the SM / TSC Director / EOF Director warrant declaration of a Site Area Emergency Emergency Action Level(s):
: 1. Other conditions exist which in the judgment of the SM / TSC Director / EOF Director indicate that events are in progress or have occurred which involve actual or likely major failures of plant functions needed for protection of the public or HOSTILE ACTION that results in intentional damage or malicious acts; (1) toward site personnel or equipment that could lead to the likely failure of or; (2) that prevent effective access to equipment needed for the protection of the public. Any releases are not expected to result in exposure levels which exceed EPA Protective Action Guideline exposure levels beyond the site boundary.
HA2  Other conditions exist which in the judgment of the SM / TSC Director / EOF Director warrant declaration of an Alert Emergency Action Level(s):
: 1. Other conditions exist which in the judgment of the SM / TSC Director / EOF Director indicate that events are in progress or have occurred which involve an actual or potential substantial degradation of the level of safety of the plant or a security event that involves probable life threatening risk to site personnel or damage to site equipment because of HOSTILE ACTION. Any releases are expected to be limited to small fractions of the EPA Protective Action Guideline exposure levels. HU2  Other conditions exist which in the judgment of the SM warrant declaration of an NUE Emergency Action Level(s):
: 1. Other conditions exist which in the judgment of the SM indicate that events are in progress or have occurred which indicate a potential degradation of the level of safety of the plant or indicate a security threat to facility protection has been initiated. No releases of radioactive material requiring offsite response or monitoring are expected unless further degradation of safety systems occurs.
1  2  3  4  5  6  D 1  2  3  4  5  6  D 1  2  3  4  5  6  D 1  2  3  4  5  6  D    to 0CAN121102
 
Page 18 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY - Control Room Evacuation HS3  Control Room evacuation has been initiated and plant control cannot be established Emergency Action Level(s):
: 1. a. Control Room evacuation has been initiated. AND b. Control of the plant cannot be established in  accordance with the following procedures within 15 minutes:
Unit 1: 1203.002, "Alternate Shutdown" Unit 2: 2203.014, "Alternate Shutdown" HA3  Control Room evacuation has been
 
initiated Emergency Action Level(s):
: 1. Alternate Shutdown procedure requires Control Room evacuation:
Unit 1: 1203.002, "Alternate Shutdown" Unit 2: 2203.014, "Alternate Shutdown" 1  2  3  4  5  6  D 1  2  3  4  5  6  D    to 0CAN121102
 
Page 19 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY Fire HA4  FIRE or EXPLOSION affecting the operability of plant safety systems required to establish or maintain safe shutdown Emergency Action Level(s):
: 1. FIRE or EXPLOSION resulting in VISIBLE DAMAGE to any Table H1 structure or area containing safety systems or components or Control Room indication of degraded performance of those safety systems.
Toxic Gas  Table H1 Unit 1 Unit 2 CA-1 & HP Office Area Condensate Demineralizer Room Corridor 98 Fire Area C Lower North Electrical Penetration Room (LNEPR) Lower South Electrical Equipment Room (LSEER) / Air Compressor Room Lower South Electrical Penetration Room (LSEPR) Lower South Piping Penetration Room (LSPPR) Main Steam Isolation Violation (MSIV) Room North Engineered Safeguards (ES) SWGR Room (A4) South ES SWGR Room Turbine Building  A1, A2, H1, H2 SWGR area  354' Bowling Alley north end west of Breathing Air compressor room  368' West Heater Deck from LSEER (orange door) along east wall of ES SWGR Rooms to Corridor 98 door Upper North Electrical Penetration Room (UNEPR) / Hot Tool Room / Decon Room Upper South Electrical Penetration Room (USEPR) Upper South Piping Penetration Room (USPPR) 2A3 Room 2A4, 2D02, & East Battery Room 2B53 Room 2B63 Room 2B9/2B10 Room 2Y11/13 Equipment Room Auxiliary Building 317' General Access Auxiliary Building 335' Auxiliary Building 354'
'B' Engineered Safeguards Features (ESF) Room Corridor Behind Door 340 Turbine Building  2A1, 2A2, 2H1, 2H2 Area  354' West wall of Demineralizer area  368' West Heater Deck north of north Switchgear (SWGR) Room (2A3) and East of
 
LNEPR Intake Structure  354' or 366' LNEPR LSEPR Motor-Generator (MG) Set Room Steam Pipe Area Hot Machine Shop UNEPR, UNPPR, LNPPR, USPPR HA5    Access to a VITAL AREA is Access to a VITAL AREA is prohibited due to toxic, corrosive, asphyxiant, or flammable gases which jeopardize operation of operable equipment required to maintain safe operations or safely shutdown the reactor HU4  FIRE within the PROTECTED AREA not extinguished within 15 minutes of detection or EXPLOSION within the PROTECTED AREA Emergency Action Level(s):
NOTE: The SM should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. FIRE in any Table H1 structure or area not extinguished 1) within 15 minutes of Control Room notification or 2) within 15 minutes of verification of a Control Room FIRE alarm.
OR 2. EXPLOSION within the PROTECTED AREA.
1  2  3  4  5  6  D 1  2  3  4  5  6  D 1  2  3  4  5  6  D Control Room Other Areas 3  4  to 0CAN121102
 
Page 20 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY Toxic Gas    HA5 (continued) Emergency Action Level(s):
NOTE: If the equipment in the stated area was already inoperable, or out of service, before the event occurred, then this EAL should not be declared as it will have no adverse impact on the ability of the plant to safely operate or safely shutdown beyond that already allowed by Technical Specifications at the time of the event. 1. Access to a VITAL AREA is prohibited due to toxic, corrosive, asphyxiant, or flammable gases which jeopardize operation of systems required to maintain safe operations or safely shutdown the reactor.
Unit 1  VITAL AREA APPLICABLE MODES A-4 Switchgear Room 3, 4 Upper North Electrical Penetration Room 3, 4 Lower South Electrical Equipment Room 3, 4 Control Room ALL HU5  Release of toxic, corrosive, asphyxiant, or flammable gases deemed detrimental to NORMAL PLANT OPERATIONS Emergency Action Level(s):
: 1. Toxic, corrosive, asphyxiant, or flammable gases in amounts that have or could adversely affect NORMAL PLANT OPERATIONS.
OR 2. Report by Local, County or State officials for evacuation or sheltering of site personnel based on an offsite event.
1  2  3  4  5  6  D    to 0CAN121102
 
Page 21 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY Toxic Gas Natural or Destructive Phenomena  Table H1 Unit 1 Unit 2 CA-1 & HP Office Area Condensate Demineralizer Room Corridor 98 Fire Area C Lower North Electrical Penetration Room (LNEPR) Lower South Electrical Equipment Room (LSEER) / Air Compressor Room Lower South Electrical Penetration Room (LSEPR) Lower South Piping Penetration Room (LSPPR) Main Steam Isolation Violation (MSIV) Room North Engineered Safeguards (ES) SWGR Room (A4) South ES SWGR Room Turbine Building  A1, A2, H1, H2 SWGR area  354' Bowling Alley north end west of Breathing Air compressor room  368' West Heater Deck from LSEER (orange door) along east wall of ES SWGR Rooms to Corridor 98 door Upper North Electrical Penetration Room (UNEPR) / Hot Tool Room / Decon Room Upper South Electrical Penetration Room (USEPR) Upper South Piping Penetration Room (USPPR) 2A3 Room 2A4, 2D02, & East Battery Room
 
2B53 Room
 
2B63 Room 2B9/2B10 Room 2Y11/13 Equipment Room Auxiliary Building 317' General Access Auxiliary Building 335' Auxiliary Building 354' 'B' Engineered Safeguards Features (ESF) Room Corridor Behind Door 340 Turbine Building  2A1, 2A2, 2H1, 2H2 Area  354' West wall of Demineralizer area  368' West Heater Deck north of north Switchgear (SWGR) Room (2A3) and East of LNEPR Intake Structure  354' or 366' LNEPR LSEPR Motor-Generator (MG) Set Room Steam Pipe Area Hot Machine Shop UNEPR, UNPPR, LNPPR, USPPR HA5 (continued)
Unit 2  VITAL AREA APPLICABLE MODES Auxiliary Building 317' Emergency Core Cooling Rooms 3, 4 Auxiliary Building 317' Tendon Gallery Access 3, 4 Auxiliary Building 335' Charging Pumps / 2B-52 3, 4 Auxiliary Building 354' 2B-62 Area 3, 4 Emergency Diesel Generator Corridor 3, 4 Lower South Piping Penetration Room 3, 4 Auxiliary Building 386' Containment Hatch 3, 4 Control Room ALL HU6  Natural or destructive phenomena affecting the PROTECTED AREA Emergency Action Level(s):
: 1. Seismic event identified by any 2 of the following:  Seismic event confirmed by annunciation of the 0.01g acceleration alarm  Earthquake felt in plant  National Earthquake Center OR 2. Tornado striking within PROTECTED AREA boundary or high winds > 67 mph.
OR 3. Internal flooding that has the potential to affect safety related equipment required by Technical Specifications for the current operating mode in any of the structures or areas in Table H1. OR  1  2  3  4  5  6  D    to 0CAN121102
 
Page 22 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY Natural or Destructive Phenomena HA6  Natural or destructive phenomena affecting VITAL AREAS Emergency Action Level(s):
: 1. a. Seismic event > Operating Basis Earthquake (OBE) as indicated by annunciation of the 0.1g acceleration alarm. AND b. Earthquake confirmed by ANY of the following:  Earthquake felt in plant  National Earthquake Center  Control Room indication of degraded performance of systems required for the safe shutdown of the plant OR 2. Tornado striking or high winds > 67 mph resulting in VISIBLE DAMAGE to any of the following structures/equipment containing safety systems or components or Control Room indication of degraded performance of those safety systems:  Reactor Building  Intake Structure  Ultimate Heat Sink HU6  (continued)
: 4. Turbine failure resulting in casing penetration or damage to turbine or generator seals.
OR 5. Lake Dardanelle level < 335 feet.
OR 6. Lake Dardanelle level > 345 feet.
1  2  3  4  5  6  D    to 0CAN121102
 
Page 23 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY Natural or Destructive Phenomena  HA6 (continued)
BWST/RWT  Auxiliary Building  Turbine Building  QCST  Control Room  Startup Transformers  Diesel Fuel Vault OR 3. Internal flooding in any of the following areas resulting in an electrical shock hazard that precludes access to operate or monitor safety equipment or Control Room indication of degraded performance of those safety systems:  Intake Structure  Auxiliary Building  Turbine Building OR 4. Turbine failure-generated PROJECTILES resulting in
 
VISIBLE DAMAGE to or penetration of any of the structures/equipment containing safety systems or components or Control Room indication of degraded performance of those safety systems.
to 0CAN121102
 
Page 24 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY Natural or Destructive Phenomena  HA6 (continued)
Auxiliary Building  Turbine Building  Control Room  Startup Transformers OR 5. Lake Dardanelle level < 335 feet and Emergency Cooling Pond inoperable.
OR 6. Vehicle crash resulting in VISIBLE DAMAGE to any of the structures/equipment containing safety systems or components o r Control Room indication of degraded performance of those safety systems. Reactor Building  Intake Structure  Ultimate Heat Sink BWST/RWT  Auxiliary Building  Turbine Building  QCST  Startup Transformers  Diesel Fuel Vault to 0CAN121102
 
Page 25 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT SYSTEM MALFUNCTION - Loss of AC Power SG1  Prolonged loss of all offsite and all onsite AC power to Vital 4.16 KV busses Emergency Action Level(s):
: 1. a. Loss of all offsite and all onsite AC power to Vital 4.16 KV busses. AND b. Either of the following:  Restoration of at least one Vital 4.16 KV bus in < 4 hours is not likely.
OR  Continuing degradation of core cooling based on Fission Product Barrier monitoring as indicated by CETs  700 &deg;F. SS1  Loss of all offsite and all onsite AC power to Vital 4.16 KV busses  15 minutes Emergency Action Level(s):
NOTE: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. Loss of all offsite and all onsite AC power to Vital 4.16 KV busses  15 minutes.
SA1  AC power capability to Vital 4.16 KV busses reduced to a single power source  15 minutes such that any additional single failure would result in station blackout Emergency Action Level(s):
NOTE: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. a. AC power capability to Vital 4.16 KV busses reduced to a single power source  15 minutes. AND b. Any additional single power source failure will result in station blackout.
SU1  Loss of all offsite AC power to Vital
 
4.16 KV busses  15 minutes Emergency Action Level(s):
NOTE: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. Loss of all offsite AC power to Vital 4.16 KV busses 15 minutes.
1  2  3  4 1  2  3  4 1  2  3  4 1  2  3  4    to 0CAN121102
 
Page 26 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT SYSTEM MALFUNCTION - Failure of Reactor Protection System SG3  Automatic trip and all manual actions fail to shutdown the reactor and indication of an extreme challenge to the ability to cool the core exists Emergency Action Level(s):
: 1. a. An automatic trip failed to shutdown the reactor. AND b. All manual actions do not shutdown the reactor as indicated by reactor power  5%. AND c. Either of the following exist or have occurred due to continued power generation:  CET temperatures at or approaching 1200 &deg;F.
OR  Feedwater flow rate less than: Unit 1: 430 gpm Unit 2: 485 gpm SS3  Automatic trip fails to shutdown the reactor and manual actions taken from the reactor control console are not successful in shutting down the reactor Emergency Action Level(s):
: 1. a. An automatic trip failed to shutdown the reactor. AND b. Manual actions taken at panel C03 (Unit 1) or panels 2C03/2C14 (Unit 2) do not shutdown the reactor as indicated by reactor power  5%. SA3  Automatic trip fails to shutdown the reactor and the manual actions taken from the reactor control console are successful in shutting down the reactor Emergency Action Level(s):
: 1. a. An automatic trip failed to shutdown the reactor as indicated by reactor power  5%. AND b. Manual actions taken at panel C03 (Unit 1) or panels 2C03/2C14 (Unit 2) successfully shutdown the reactor as indicated by reactor power < 5%.
1  2 1  2 1  2    to 0CAN121102
 
Page 27 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT SYSTEM MALFUNCTION - Loss of DC Power SS4  Loss of all Vital DC power 15 minutes Emergency Action Level(s):
NOTE: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. < 105 volts on all Vital DC busses  15 minutes.
1  2  3  4    to 0CAN121102
 
Page 28 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT SYSTEM MALFUNCTION - Loss of Annunciators SS6  Inability to monitor a SIGNIFICANT TRANSIENT in progress Emergency Action Level(s):
NOTE: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. a. UNPLANNED loss of > approximately 75% of the 
 
following  15 minutes:  Control Room annunciators associated with safety systems. OR  Control Room safety system indication. AND b. A SIGNIFICANT TRANSIENT in progress. AND c. Compensatory indications are unavailable.
SA6  UNPLANNED loss of safety system annunciation or indication in the Control Room with either (1) a SIGNIFICANT TRANSIENT in progress, or (2) compensatory indicators unavailable Emergency Action Level(s):
NOTE: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the ev ent as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. a. UNPLANNED loss of > approximately 75% of the following  15 minutes:  Control Room annunciators associated with safety systems. OR  Control Room safety system indication. AND b. Either of the following:  A SIGNIFICANT TRANSIENT is in progress OR  Compensatory indications are unavailable SU6  UNPLANNED loss of safety system annunciation or indication in the Control Room for  15 minutes Emergency Action Level(s):
NOTE: The SM / TSC Director / EOF Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.
: 1. UNPLANNED loss of > approximately 75% of the following  15 minutes: a. Control Room annunciators associated with safety systems. OR b. Control Room safety system indication.
1  2  3  4 1  2  3  4 1  2  3  4    to 0CAN121102
 
Page 29 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT SYSTEM MALFUNCTION - RCS Leakage SU7  RCS leakage Emergency Action Level(s):
: 1. Unidentified or pressure boundary leakage > 10 gpm.
OR 2. Identified leakage > 25 gpm.
1  2  3  4    to 0CAN121102
 
Page 30 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT SYSTEM MALFUNCTION - Loss of Communications SU8  Loss of all onsite or offsite communications capabilities Emergency Action Level(s):
: 1. Loss of all Table M1 onsite communications methods affecting the ability to perform routine operations.
Table M1 Onsite Communications Methods Station radio system Plant paging system In-plant telephones Gaitronics OR 2. Loss of all Table M2 offsite communications methods affecting the ability to perform offsite notifications.
Table M2 Offsite Communications Methods All telephone lines (commercial and microwave)
ENS    1  2  3  4    to 0CAN121102
 
Page 31 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT SYSTEM MALFUNCTION - Fuel Clad Degradation SU9  Fuel clad degradation Emergency Action Level(s):
: 1. Failed Fuel Iodine radiation monitor reading indicates fuel clad degradation > Technical Specification allowable limits:
Unit 1: RI-1237S reads
> 1.3 x 10 5 cpm Unit 2: 2RITS-4806B reads
> .65 x 10 5 cpm OR 2. RCS sample activity value indicating fuel clad degradation > Technical Specification allowable limits:  > 1.0 uCi/gm Dose Equivalent I-131 for more than 48 hours OR  Unit 1:  60 uCi/gm Dose Equivalent I-131 Unit 2: > 60 uCi/gm Dose Equivalent I-131 OR  1  2  3  4    to 0CAN121102
 
Page 32 of 32 GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT SYSTEM MALFUNCTION - Fuel Clad Degradation SU9 (continued)
Unit 1: > 2200 &#xb5;Ci/gm Dose Equivalent Xe-133
 
for more than 48 hours Unit 2: > 3100 &#xb5;Ci/gm Dose Equivalent Xe-133 for more than 48 hours SYSTEM MALFUNCTION - Inadvertant Criticality SU10 Inadvertent criticality Emergency Action Level(s):
: 1. An UNPLANNED sustained positive startup rate observed on nuclear instrumentation.
SYSTEM MALFUNCTION - Failure to Shutdown SU11  Inability to reach required operating mode within Technical Specification limits Emergency Action Level(s):
: 1. A Plant is not brought to required operating mode within Technical Specifications LCO action statement time.
3  4 1  2  3  4}}

Latest revision as of 15:55, 28 June 2019