{{Adams
{{Adams
| number = ML13350A289
| number = ML12216A010
| issue date = 11/30/1975
| issue date = 10/31/1976
| title = Post-Tensioned Prestressing Systems for Concrete Reactor Vessels and Containments.
| title = Post-Tensioned Prestressing Systems for Concrete Reactor Vessels and Containments
| author name =  
| author name =  
| author affiliation = NRC/OSD
| author affiliation = NRC/RES, NRC/OSD
| addressee name =  
| addressee name =  
| addressee affiliation =  
| addressee affiliation =  
Line 10: Line 10:
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = RG-1.103
| document report number = RG-1.103, Rev 1
| document type = Regulatory Guide
| document type = Regulatory Guide
| page count = 4
| page count = 4
}}
}}
{{#Wiki_filter:U.S. NUCLEAR REGULATO COMMISSION.
{{#Wiki_filter:U.S. NUCLEAR REGULATORY
 
COMMISSION
REGULkizORY
REGULATORY
GUIDE OFFICE OF STANDARDS  
GUIDE OFFICE OF STANDARDS  
DEVELOPMENT
DEVELOPMENT
Line 23: Line 23:
PRESTRESSING  
PRESTRESSING  
SYSTEMS FOR CONCRETE REACTOR VESSELS AND CONTAINMENTS
SYSTEMS FOR CONCRETE REACTOR VESSELS AND CONTAINMENTS
November 1975
Revision 1 October 1976


==A. INTRODUCTION==
==A. INTRODUCTION==
(;General Design C(riteriun I. "Quality Standards and Records" of Appendix A. "'General Design Criteria for Nuclear I(oiver PlanIs." to 10 C(FR Part 50. *'Licensing if Prodlucion.
General Design Criterion
1, "Quality Standards and Records," of Appendix A, "General Design Criteria for Nuclear Power Plants," to 10 CFR Part 50, "Licensing of Production and Utilization Facilities," requires that structures, systems, and components important to safety be designed, fabricated, and erected to quality standards commensurate with the importance of the safety func-tions to be performed.


and Utilization Facilities.'- ,equires.
This guide identifies the post-tensioned prestressing systems that have been reviewed and approved by the NRC staff for use in concrete reactor vessels and containments.


in part. that structures.
It also describes qualifications acceptable to the NRC staff for new post-tensioned prestressing systems.
 
systems. and components im-lporlani to safety be designed.
 
fabricated, and erected to (tllality standards commensurate with the importance of Ihe saflcy luncliotins to be performed.
 
This guide identi-ties Ithe post-tensioned pcstressing systems Iltat hiave been reviewed and ai.rovcd by the NRC staff for use in concrete reactor vessels and containmnents and also describes qualifications acceptable to the NRC slafr for new post-tcnsioned prestressing systems.


==B. DISCUSSION==
==B. DISCUSSION==
A oims-tensioned prestressing system is composed ofa'prestressing tendon combined with a method of sira.sing and anchoring the tendon to thie hatrdened coz.crete.Th.e word "symeste is commonly associated ith the. dif-" fercn i proprietary post-tensioned prestrcssing.systenl oil Ihe market and is understood to include .the. type of tendon, anchorage device, and stressing equlipment associated with a given systemi.-.
A post-tensioned prestressing system is composed of a prestressing tendon combined with a method of stressing and anchoring the tendon to the hardened concrete.
It is not practical ito discussthe details or all of the many post-tensioned:.irestressilng sysiems available in the United States. Nlore)ver.'"inw pidit-tensioned prestressing systems are being: devclopod, and existing ones are being modified.


F-6r "te nsreas. the descriptions in this guide are to -systnis listed in Table A. all of which havbeel used or proposed for use.Some examples of use are presented in order to identify iiore specifically thie system being discussed and to provide a rel'erctice io some plants for %,'hich tile sysvetns in Table A have been proposed o, approved.
The word "system" is commonly associated with the differ-ent proprietary post-tensioned prestressing systems on the market and is understood to include the type of tendon, anchorage device, and stressing equipment asso-ciated with a given system.It is not practical to discuss the details of all of the many post-tensioned prestressing systems available in the United States. Moreover, new post-tensioned prestressing systems are being developed, and existing ones are being modified.


The ex:amples cited are not intended to *indicote any testriction or prel'evence in size of the tendot for a given system. Nor is this -uide intended 'to discourage the developmtent of refinements of curr.ent systems or the development of new prestressing systems or concep)ts."hte quatliflcat ions dhat a post-tensioied piestnessitig s'.stem should meet in order td ibe acceptable to tie NRC st-a Tare iden~ified in tlicaiegulatowv positioti.
For these reasons, the descriptions in this guide are limited to systems listed in Table A, all of which have been used or proposed for use.Some examples of use are presented in order to identify more :specifically, the system being discussed and provide a reference to some plants for which the systems in Table A have been proposed or approved.


Rock anchorage systems are..not covered by this guide.Types of Systems STlhie type tof tendon selected usually diclates the choice of stressing eqluipment and also affects the choice ,of end .atchorages.
The examples cited are not intended to indicate any restric-USNRC REGULATORY
GUIDES tion or preference in size of the tendon for a given system. Nor is this guide intended to discourage the development of refinements of current systems or the development of new prestressing systems or concepts.The qualifications that a post-tensioned prestressing system should meet in order to be' acceptable to the NRC staff are identified in the regulatory position.


Basically.
Rock anchorage systems are not covered by this guide.Types of Systems The type of tendon selected usually dictates the choice of stressing equipment and also affects the choice oi end anchorages.


post-tensioued prestressing systenis can be separated into Ihree general categories by Ihe types oh terndon in use: wire, strand. and bar systems. lEtnd anchorages for these tendons are based ott either wedge or direct-bearing p.inciples:
Basically, post-tensioned prestressing systems can be separated into three general categories according to the types of tendon in use: wire, strand, and bar systems.End anchorages for these tendons are based on either wedge or direct-bearing principles;
sometimes a combination of ihe two is used. A description is presented below ot post-tensioned prestressing systems in ternis or types tit tendons and end anchorages.
sometimes a combina-tion of the two is used. Post-tensioned prestressing systems are described below in terms of types of tendons and end anchorages.


Wire Systems. Wire systents employ a tumber ot parallel wires grouped to form a tetndon. Wires manufactured in the United States conforni to ASTMt Specification A-421. "Uncoated Stress.Relieved Wire for FPrestressed Concrete." This specification provides for wires of two types (BA or WA). depending on w\hetite tltey are to be used with buttons or wedge.type anchorages.
Wire Systems. Wire systems use a number of parallel wires grouped to form a tendon. Wires manufactured in the United States conform to ASTM Specification A-421, "Uncoated Stress-Relieved Wire for Prestressed Concrete."'l This specification provides for wires of two types (BA or WA), depending on whether they are to be used with buttons or wedge anchorages.


USNRC REGULATORY
The BBRV system, developed in Switzerland by Birkenmaier, Brandestini, Ros, and Vogt, is a wire system used in both concrete reactor vessels and*Copies of this and other ASTM specifications referenced in this guide may be obtained from the American Society for Testing and Materials, 1916 Race Street, Philadelphia, Pennsylvania
GUIDES C,,,nierr-ns should be sent to the Secretarv of the U S Nuclear AreqUlallor Conui'I*,Ison.
19103.Comments should be gent to the Secretary of the Commission.


Wasin~l~gtoni.
U.S. Nuclear Regulatory Guides awe issued to describe and make available to the purlicico section.methods acceptable to the NRC sauff of Implementing specific peas of the Commission's regulations.


D C M56 Alttention Docketing ando Regulatory ire to and otike to Ihe Iyith. Seulit SeCtion .A methods acceptatle" o thtf NRC ftill tot rmpim enmrting specific par the rf Se Coninti.,5on I reguajutions.
to delineate techniques used by the staff In evalu- The guides arc slauad In the following ten broad divisons: ating specific problems or postulated acckdents, or to provide guidance to appli-cants. Regulatory Guides ere not substltutes for regulations, and compliance
1. Power Reactors .Products with them Is not required.


10 delineatei techniques used by th" tiltl an ttvalu lb. qutirmtesate issued in Ihar following ton brand divisionh Chirq it spi'ct c rutalems, or vustl.fle~d .Atc~dnlel.
Methods and solutions different from those set out in Z Research and Test Reactors 7. Transportation the guides will be acceptable if they provide a badis for the findings requisite to 3. Fuels and Materials Facilities S. Occupational Health the issuance or continuance of a permit or icense by the Commisslon.


or to Iriovad. g lsani.n I,, itpli cants ARguldiriao Guidesi at.e not subslitults fot regulations.
4. Environmental and Siting S. Antitrust Review Comments and suggestions for Improvments In those guides are encouraged
5. Materials and Plant Protection
10. General at all times. and guides will be revised, as appropriate, to accommodate com-ments and to reflect new information or experience.


and I Powser Reactors 6 Products with them inot retjtlleii Miridb dint SnIu Illto- fIoent front lhose set (,,ii itt 2 flese'rch and Yost Reacit% 7 Transtproation th: wit: he it th v'y provide a t ht,,% fit tie fandings requisite to 3
This guide was revwid as a Copies of published guldes may be obtained by written request Indicating the result of subetantive comments received from the public and edditional staff divisions desired to the U.S. Nuclear Regulatory Commission, Weshington.
8a Occuptilonl Heoalth the islsum Illo itlt!tte .ii1 rt tir the ICunmnmisiOn
4 Ern-tioninientl and Siting 9 Antitrust Reirew C(rrrriietlsfl1 trait+ Stiajleslilis
1,14111 IiiLVitullill11t5 ii ttlhlse ajiantaits itlt. rielt l later


====i. rts aild PIrItM ====
D.C.review. 2M. Attention:
tO Genet a lt ii tt11 , .J q wil" it t1i. l ,l a iI t aIaiiiI .t-1lu ,ict..ill.....l..late
Director.
;oin, MGMlls rid,1 tIa iiltte,'.t -ew it..I-li.iiiiiii t..(uial r --ý c ...l..irvit. .i1rntt...1it.


ian C(i:;aie of tulAtished guides rtady ble olbtainld lIv written request aidacating the INis iju li1.. ii tem .itm (l artaila ,it Iii t 1a 1111m1la .Ilrer its O , as, i i.'. .,il tie iPa divisions desired to the U tS Nucltear Regultatuor Commission.
Office of Standards Development.


W a~shtng lor .0 C tImulai ly usef ll iii t h li llil lii ' niri. .t l .t ..i ..i.. y IV .,..a....
containments built in the United States. The main feature of this system is the use of cold-formed buttonheads for direct bearing at each end of the wire.The prestressed concrete reactor vessel (PCRV) of the Fort St. Vrain station in Colorado uses the BBRV system with 169-wire tendons developing approximately
IOt2 5, Allen tion D lte .lol. Office of ,Slandaidi Develtopm ent The BBRV system, developed in Switzerland by Birkenmaier.
2000 kips capacity each. A number of containments using the BBRV system with 90, 163, 169, 170, and 186 wires per tendon have been built in the United States.The wire diameter is 1/4 inch (6.35 mm) in all cases except for the 163-wire tendon, which uses 7-mm (0.28 inch) wire.A wire-winding system was used to provide hoop prestress for the Hartlepool PCRVs in England. This method of providing hoop prestress is similar to that for conventional prestressed concrete tanks.Strand Systems. Strand systems use a number of"strands" that are bundled into a tendon. A strand is made up of a number of factory-twisted wires. Stress-relieved strand is made in two forms. The first is the seven-wire strand, which conforms to ASTM Specifica- tion A-416, "Uncoated Seven-Wire Stress-Relieved Strand for Prestressed Concrete." The second form consists of larger strands that are made of larger individual wires and may consist of more than seven wires per strand. The larger strands are not covered by ASTM specifications and have not been used for the construction of nuclear power plants in the United States.Strand systems have been introduced in the construc-tion of nuclear power plants by Strand-Wrap, VSL, (Vorspann System Losinger), Stressteel, Freyssinet, and SEEE (Societe d'Etudes et d'Equipements d'Enter-prises). The last two systems were considered but have not yet been used in the United States in nuclear power plants. Both the Freyssinet and SEEE systems have been used in Europe on concrete reactor vessels.The Strand-Wrap system has been reviewed and approved only for applying hoop prestressing to some PCRVs in the United States. The basic principles of applying hoop prestressing to the PCRV by the Strand-Wrap system are the same as those of a wire-winding system. In one of the design methods, steel-lined circumferential precast concrete channels are anchored to the outer cylindrical surface of the vessel by reinforcing bars extending radially inward from the precast channels.


Brandestini.
The strand is anchored at one end by means of a tapered wedge grip in the rib between adjacent channels and then wound around the vessel at the design tension for a number of turns and anchored in the next adjacent rib. Each band of circumferential prestressing consists of multiple layers of strand wound onto these channels.


Ros. and Vogt. is a wire system used in both concrete reactor vessels and containments built in the United States. The main feature of this svstenz is the. use of cold.lormed buttonheads for direct bearing at each end of the wire.Tie prestressed concrete reactor vcssel (PCRV) of the Fort St. Vrain station in Colorado employs the B3BRV system with 169-wire tendons developing approximately
Each layer consists of one contin-*Lines indicate substantive changes from previous issue.uous length of strand. A maximum hoop prestressing force of about 6600 kips per linear, foot of vessel height was to have been used in the design of the PCRV head region of the Delmarva Summit Power Station.**
2000 kips capacity each. A number of 2-ontainnienls utilizing the BBRV system with 90, 163. 16). 170. and 186 wires per tendon have been built in the United Slates. The wire diameter is 1/4 inch (6.35 imm) in all cases except fur the 1 63-wire tendon, which uses 7-mm (0.28 inch) wire.Strand Systems. Strand systems employ a number of"'strainds" that are bundled into a tendon. A strand is made tip tof a number of factory-twisted wires.Stress-relieved strand is made in two forms. The first is the seven-wire strand. which conforms to ASTM Specification A-416. *'Uncoated Seven-Wire Stress.Relieved Strand for Prestressed Concrete.-
The VSL strand system, which was developed in Switzerland, uses a wedge anchorage for strands. Each strand is drawn through the openings of both the bearing plate and the anchor head and is held by a two-piece split cone wedged tightly against the inner surface of the anchor head. As an example, the containment of the Rancho Seco Nuclear Generating Station in California uses the VSL system with tendons consisting of 55 strands, each tendon developing
The second forni consists of larger strands Iltat are made of larger individu al wires anid may consist of more thian seven wkires per strand. vhe larger strands are not covered hy ASTM spicifications and have not been used for the construction of nuclear power plants in lhe United Slates.Strand systems have been introduced in the construc-tion of nuclear power plants by Strand-Wrap, N'SL.(Vorspann System Losinger).  
2250 kips capacity.(The Freyssinet, SEEE, and VSL systems were formally presented as alternatives to the previously approved BBRV system. The VSL system was chosen by the applicant.
Stressteel.


Freyssinet.
Consequently, the Freyssinet and SEEE sys-tems were not reviewed by the NRC staff with regard to their acceptability for use in nuclear power plant containments.)
The Stressteel S/H multistrand system, which was developed in the United States by Stressteel Corporation in cooperation with Howlett Machine Works, is charac-terized by a three-piece slotted wedge cone that grips three strands in its serrated teeth, with a number of wedges in a single anchor plate making up a multistrand tendon of the desired size. As an example, the contain-ment of the Three Mile Island Nuclear Station Unit No.2 in Pennsylvania uses a Stressteel S/H multistrand system consisting of tendons with 54 1/2-inch, Grade 270K, 7-wire strands per tendon, each tendon develop-ing 2230 kips capacity.The Freyssinet system was named after the French engineer Eugene Freyssinet, who invented the anchorage device in 1939. The original anchorage device was for a wire system only. This is a commonly used commercial system. The anchorage consists of a male conical plug and a female conical recess. The plug, with the wires spaced evenly around its perimeter, anchors the wire by wedge action. As a result of mjjket requirements and subsequent developments, the Freyssinet system now also has available anchorages for strand tendons and other shapes of anchorage devices different from the original one. The same wedge principle for anchoring the tendon is retained, however. Concrete reactor vessels have been built in Europe using the Freyssinet strand system with a maximum tendon capacity of about 2000 kips.The SEEE system was developed in France by the Societe d'Etudes et d'Equipements d'Enterprises.


and SEEE (Societe d'Ettides et diEqtiipments d'Enterprises).
The system features threaded anchorage fittings extruded onto the ends of a group of strands. An anchoring nut is then threaded onto the anchorage fitting and turned**The Delmarva Summit Power Station has been canceled.1.103-2 tightly against the bearing plate. A tendon is composed of one or several such anchorage fittings on a common bearing plate.Bar Systems. Bar systems use a number of high-tensile-strength steel bars that are bundled into a tendon.'The bars are made from an alloy steel conforming to ASTM Specifications A-322 and A-29. A-322 is a general specification that covers only the chemical composition of many grade designations of alloy steel bars, and A-29 is a specification giving general requirements for hot-rolled and cold-finished carbon and alloy steel bars. The mechanical and physical requirements for the pre-stressing bars are covered by ASTM Specification A-722,"Uncoated High-Strength Steel Bar for Prestressing Concrete." Bars are cold-stretched and also stress-relieved by heat treatment to produce the prescribed mechanical proper-ties. Both deformed bars and smooth bars with threaded ends are available, but only smooth bars have been used for nuclear power plant construction in the United States.The Stressteel Corporation in the United States uses a bar system. The bars are stressed by means of a hydraulic jack that consists of a coupler and pulling bar.The normal commercial technique for anchoring uses anchor nuts. During stressing, the anchor nuts are continuously screwed down on washers and bearing plates, and the prestressing force is then transferred to the anchorage assembly by releasing the force in the jack. Wedge and grip-nut anchorages are also available to anchor the bar; they have the advantage of being able to grip the bar at any point along its length.The containment structure of H.B. Robinson Unit No. 2 in Hartsville, S.C., uses the Stressteel bar system anchored with Howlett Grip Nuts. The tendon, which is composed of six 1-3/8-inch-diameter Stressteel bars, develops a capacity of 1428 kips.Grouted and Ungrouted Tendons All of the concrete reactor vessels and containments designed and built in the United States use ungrouted tendons except for H.B. Robinson Unit 2 (bar tendons), Three Mile Island Unit 2 (strand tendons), and Forked River (strand tendons), all of which were designed for grouted tendons. On none of these, however, has design credit been given for any bond of the grouted tendons.Whether grouted or ungrouted tendons are used, a means of determining the functional capability of the structure during its lifetime should be available.
The last two systems were considered but have not yet been used in the United States in nuclear power plants.Both the Freyssinet and SEEE systems have been used in Europe on concrete reactor vessels.The Strand-Wrap system has been reviewed and approved only for applying hoop prestressing  
1o soine PCRVs in the Ltnited States. The basic principles of applying ltoop prestressing to the PCRV by the Sirand-Wrap system are the same as those for conventional prestressed concrete tanks and circular liquid containers ithat have been built using wire-winding machines.


Steel-lined circumferential precast concrete channels are anchored to the outer cylindrical surface of the vessel by reinforcing bars extending radially inward from the precast channels.
This results in a need for reliable quality assurance procedures for the tendon installations and in a need for a reliable structural inservice inspection program.C. REGULATORY
POSITION This regulatory guide covers the generic qualifications of post-tensioned prestressing systems used in concrete reactor vessels and containments, with no attempt to extend its scope to design aspects. The acceptability of any post-tensioned prestressing system in conjunction with a specific structure design would have to be evaluated on a case-by-case basis. Any proposed system submitted for NRC approval should address the fol-lowing: 1. Post-tensioned prestressing systems that have been approved in previous nuclear power plant license applica-tions are regarded as accepted systems. See Table A for identification.


The strand is anchored at one end by means of a tapered wedge grip in the rib between adjacent channels and then wound around the vessel at ihe design tension for a number of turns and anchored in the next adjacent rib. Each band of circumferential prestressing consists of multiple layers of strand wound onto these channels.
When the claim is made by an applicant that the prestressing system proposed is an accepted system, sufficient information should be provided with each application to demonstrate that the system pro-posed is the same as the one that was approved in previous nuclear power plant license applications.


Each layer consists of one contittuottis length of strand. A maximum hoop prestressing force of about 6600 kips per linear foot of vessel height is being used in the design of the PCRV head region of the Dehmarva Summit Power Station.The VSL strand system was.developed in Switzerland.
Prior approval of any system does not relieve the applicant of the responsibility for demonstrating that its system meets all the requirements of the Code for Concrete Reactor Vessels and Containments.*
2. Changes in prestressing element materials or in anchorage items of previously accepted systems that may require repeating the system performance tests are identified in Subsections CB and CC, Article 2466 of the Code for Concrete Reactor Vessels and Containments.


This system employs a wedge anchorage for strands.Each strand is drawn through the openings of both the bearing plate and the anchor head and is held by a two-piece split cone wedged tightly against the inner surface of the anchor head. As an example. the conttainmnent of the Rancho Seco Nuclear Generating Station* in California employs the VSL system with tendons consisting of 55 strands. each tendon developing
3. Any new post-tensioned prestressing system should meet the requirements set forth in the Code for Concrete Reactor Vessels and Containments.
2250 kips capacity.The Stressicel S/Il multistrand systemi was developed in the United States during 1967-1968 by Stressicel Corporationi in cooperation with llovwlett Machine Works. The system is characterized by a three-piece slotted wedge cone that grips three strands in its serrated teeth, with a number of wedges in a single anchor plate making up a ittllistrand lendon of the desired size.As at, example. the conlainment of the Three Mile Island Nuclear Station Unit No. 2 in Pennsylvania employs the St resstecl S/Il multistrand system coisisLing of tendons with 54 1/2-inch.


Grade 270K. 7-wire strands per tendon, each tendon developing
4. The use of any post-tensioned prestressing system should permit the application of an inservice inspection program that will verify the continued functional capa-bility of the structure.
2230 kips capacity.The Freyssinet systemn was naimted after (ie French engineer Eugene Freyssinet.


who itivented the anchorage device in I939. The original anchorage device was for a wire system only, This is a comn monly used commercial system. The anchorage consists of a male conical plug and a female conical recess. The plug. with the wires spaced evenly around ils perimeter, anchors tile wire by wedge action.As a result of market requiremenmts and subsequent developments.
Implementation of this program should not degrade the quality and reliability of the post-tensioned prestressing system. Regulatory Guides 1.35, "Inservice Inspection of Ungrouted Tendons in Prestressed Concrete Containment Structures," and 1.90, "Inservice Inspection of Prestressed Concrete Containment Structures with Grouted Tendons," should be consulted for recommendations concerning the use of ungrouted and grouted concrete containments, re-spectively.


the Freyssinet system now also has available anchorages for strand tendons and other shapes of anchorage devices different fron the original one. The swame wedge principle for the tendon is retained, however. Concrete reactor vessels have becn built in Europe using the Freyssinet strand system with a maximum tendon capacity of abouw 2000 kips.The SlEHk system was developed in France by Societe d'Etudes Ce d'Equipnments d'Enterprises.
*ASME Boiler and Pressure Vessel Code, Section III, Division 2 (the latest version, plus addenda, as endorsed by the Nuclear Regulatory Commission).  
This Code is currently under review for endorsement by the NRC staff. Copies may be obtained from the American Society of Mechanical Engineers, United Engineering Center, 345 East 47th Street, New York, N.Y.10017.1.103-3


The system features threaded anchorage fittings extruded onto the ends of a group of strands. An anchoring nut is then threaded onto the anchorage fitting and turned tightly against (lte bearing plate. A tendon is composed of one or several such anchorage fittings on a common bearing plate.Bar Systems. Bat systems employ a number of high-tensile-strength steel bars that are bundled into a*The Irey-yinet.
==D. IMPLEMENTATION==
The purpose of this section is to provide information to applicants regarding the NRC staff's plans for using this regulatory guide.ing with specified portions of the Commission's regula-tions, the procedure described herein is being and will continue to be used in the evaluation of submittals for construction permit applications until this guide is revised as a result of suggestions from the public or additional staff review.This guide reflects current NRC staff practice.


SI-l-, and VSL systemsl were formally prt.m-niled is allternatives to Ile previomstiy approved IItIRV system. Thme V'SL syteim was chosen by Mhe applicant.
There-fore, except in those cases in which the applicant proposes an acceptable alternative method for comply-TABLE A STATUS OF POSTTENSIONED
 
PRESTRESSING
Consequently.
SYSTEMS AS OF MAY 1976 Submitted For Licensing Review Reviewed For Licensing Acceptabii, .v Approved By the NRC Staff Used In U.S. Nuclear Power Plants To Date System BBRV 90, 169, 170, 186 Wires (1/4 in 0)163 Wires (7 mm i)VSL (55 strands)Stressteel S/H (54 strands)Freyssinet (strand)SEEE (strand)Stressteel
 
(6 1-3/8 in.bars)PCRV Strand-Wrap X X X X X X X X X X X X X X X X X X X X X 1.103-4}}
the Freyssinel and SIE systems were not rnvicwed by the NRC starf w ith regard to their acceptability for use in nutclear power plant Containments.
 
1.103-2 M tendon. "l Ie bars are mnade front an alloy steel conformiug to ASTM Specifications A-322 and A-29.A-322 is a general specificalion that covers only the chemical composition of many grade dcsignatioi., of alloy steel bars. and A-29 is a specification for generl requirements for hot-rolled and cold-finislted cat bun and alloy sled bars. No ASTM specinication covers the ininimuni mechanical and physical requtirementlls for the prestrcssing bars after processing.
 
as in the case (if' wires (A-42I ajnd strands (A-416) and it is for this reason that a speciticati )i* was written by tre Prestressed Concrete Institute.
 
Bars are cold-stretched and also stress-relieved by heat treatmenu Ito produce the prescribed mechanical properlies.
 
Bolih defornied bars and smooth bars with threaded ends are available.
 
hut only sinooth bars have been used for unclear plower plant conStructioll in tihe United Slates.The Stressicel Corporation in the United States employs a bar system. The bars are stressed by mneans of an hydraulic jack that consists of a coupler and pulling bar. The normal commercial tech tiique for anchoring uses anchor nuits. During stressing.
 
t[le anchor nuts are continuously screwed down on washers and bearing plates. and the prestressing force is then transferred to tile anchorage assembly by releasing the force in tihe jack. Wedge atn' grip-nut anchorages are also available to anchor the bar; they possess tile advantage of being able to grip the bar at any point along its length.The containment structure of H1.B. Robinson Unit No. 2 in ilartsville.
 
Soutlh Carolina.
 
employs lie Stresstecl bar system anchored with Howlett Grip Nuts.The tendon. comuposed of six I -3/8-inch-diatnuter Stressleel bars,. develops a cap',:ity of 1428 Kips.Grouted and Ungrouted Tendons All of the concrete reactor vessels and containments designed and built in tie United Slates use ungroited tendons except for H.B. Robinson Unit 2 (bar tendons), Three Mile Island Unit 2 (strand tendons), and Forked River (strand tendons), all of which were designed for grouted tendons. On none of these, however. has desigin credit been Oven for any bond of the grouted tendons.Whether grouted or ungrouted tendons are used, a means of determining ile functional capability oif [lie structure during its lifetime should be available.
 
This results in a need for reliable quality assurance procedures for t[le tendon installations and a need for a reliable structural inservice inspection program. To date, this has""(;uide Specification for Post-Tunsioning Materials," PCI Post-Tensioning Manual. Prestressed Concrete institute, 1972.been easier 1o acco inplish tltough lite use olftngrouted tendolns.C. REGULATORY
POSITION This regilatory
!!tuide the generic qualificatiors otf systenis lised in colnclete reactor vessels and conlainrlieits.
 
with Ilo) atlerlmi to extenid its scope to design aspecis. The accepiahility ol any posil-ellsiolled prestre.Nsirig syslelm ill conjunction with a specific structute design woitld lhave to bie evaluated on a case-by-case basis. Any proposed system submitted for NRC approval should consider tile following:
1. Post-tensiuned prestressitig systeirs that have beell approved in previous nuclear powcr plailt license applications are regarded as accepted systems. See Table A for idcntification.
 
When tie clain is nade by ail applicant that tile prestressing sysienr proposed is ail accepted systei., sufficient int' [rination shouttld be pro-vided with each iipplication to demonstrrtc that tile system proposed is the samne as tile that was approlJd iii !.ý'\vious muclear powel plant license ;ipplica iions. Pri:,-r approval of any system does Inol relieve tile applicanm of the responsibility for demonstrating that its svslenli leets all tle requirementIs of thle for Concrete Reactor Vessels and Containmenls.41
2. Changes in prestressiig element materials or in aichorage items of previously accepted systems that may require replieatig the., system peritrtnance tests are identified in Subsections
('11 and CC, Article 2406 of the Code for Concrete Reactor Vessels and Containmntetils.
 
3. Any new post-tensioned prestressing sysreiri should meet the requiremenls set fo7rth in tile Code to, Concrete Reactor Vessels and Containments.
 
4. The use of any prestressing system should permit the applicatio of ail iriservice inspection program that will verify the continued functional capability of tile structure.
 
Implemenlation of this program should not degrade the quality aid reliability of the post-tensiorled prestressing system.Regu.latory Guides 1.35. "'tisetvice Inspection ill UnIli.grouted Tendons iin Prestressed Concrete Containumen Strulctures.'
and I.90. "Inservice Inspection Pre-stressed Concrete Containnient Structures with (Grouted Tendons." should be consulted for recommiendations concerning the use of ungrouted and grouted concrete contlainrents, respectively."ASME Boiler and t'ressure Vessel ('ode. Section Itt. Division 2 (tile latest version, plus addenda, as endorsed by t(ie Nuclear Regutatory Commission).
This Code is currently under review f'or endorsement by the NRC staff.1.103-3 D. IMIVPLEMENTATION
porilons of't ile Ct ininlission'~s reglIluc ions. tile Ilethod dec~ribed hecrein %%ill be used inl tile evaluationt of suhbmittals for const ruction permit applicatiouns do cketed TheI. pur Ipos OfL 1 r iS isNC I io is ito provide ii tort u (on after J1 Liie 30, 1 976).(o alpp ic a mu s a utd li elscees regard in g tie staff's phlans for using~l this regullatory
-titl
 
====e. I all applicant ====
%%ishles wo use this repuiit:Iory lideill.'hit lt lhoste cCases ill which theile aplicalt proposes aft;dernaltive metho)d fotr %%ith spec.ified developing submnittals tku applicat:ions docketed til or bel'ore JuIte 30. 1976. the pertinemn portlnuls oi tlie application
\Mi] lhe evailaied oin the basis ol" this puide.TABLE A STATUS OF SYSTEMS AS OF MAY 11975 1Por I. iccnlsh~ii Revi'it'.x IRr i e',s , i~ c iv i; iahl it A'RC staff use(/In US. A'tich'ar 1'oivvr I'lants 7',) Dim, 00, 1 w), 170.t,ý(. Wiles (1/4 ill. r0)163 W i 10s VS L.( 'sranlds)St re~sscel sti ra nuls)i st rall ()(5stratid)
strcssicel ( 6 1-.3X it.POW'R Strand.WVrap x x x N x x x x x x x x x I x X x x x x POSTAGE AND rccs PAID U.S. NUCLCEAR RCGULATORY
COMMISSION
UNITED STATES NUCLEAR REGULATORY
COMMISSION
WASHINGTON.
 
0. C. 20555 OFFICIAL BUSINESS PLNALTY FOR PRIVATE USE. S300 1.103-4}}


{{RG-Nav}}
{{RG-Nav}}

Revision as of 15:50, 23 June 2019

Post-Tensioned Prestressing Systems for Concrete Reactor Vessels and Containments
ML12216A010
Person / Time
Issue date: 10/31/1976
From:
Office of Nuclear Regulatory Research, NRC/OSD
To:
References
RG-1.103, Rev 1
Download: ML12216A010 (4)


U.S. NUCLEAR REGULATORY

COMMISSION

REGULATORY

GUIDE OFFICE OF STANDARDS

DEVELOPMENT

REGULATORY

GUIDE 1.103 POST-TENSIONED

PRESTRESSING

SYSTEMS FOR CONCRETE REACTOR VESSELS AND CONTAINMENTS

Revision 1 October 1976

A. INTRODUCTION

General Design Criterion 1, "Quality Standards and Records," of Appendix A, "General Design Criteria for Nuclear Power Plants," to 10 CFR Part 50, "Licensing of Production and Utilization Facilities," requires that structures, systems, and components important to safety be designed, fabricated, and erected to quality standards commensurate with the importance of the safety func-tions to be performed.

This guide identifies the post-tensioned prestressing systems that have been reviewed and approved by the NRC staff for use in concrete reactor vessels and containments.

It also describes qualifications acceptable to the NRC staff for new post-tensioned prestressing systems.

B. DISCUSSION

A post-tensioned prestressing system is composed of a prestressing tendon combined with a method of stressing and anchoring the tendon to the hardened concrete.

The word "system" is commonly associated with the differ-ent proprietary post-tensioned prestressing systems on the market and is understood to include the type of tendon, anchorage device, and stressing equipment asso-ciated with a given system.It is not practical to discuss the details of all of the many post-tensioned prestressing systems available in the United States. Moreover, new post-tensioned prestressing systems are being developed, and existing ones are being modified.

For these reasons, the descriptions in this guide are limited to systems listed in Table A, all of which have been used or proposed for use.Some examples of use are presented in order to identify more :specifically, the system being discussed and provide a reference to some plants for which the systems in Table A have been proposed or approved.

The examples cited are not intended to indicate any restric-USNRC REGULATORY

GUIDES tion or preference in size of the tendon for a given system. Nor is this guide intended to discourage the development of refinements of current systems or the development of new prestressing systems or concepts.The qualifications that a post-tensioned prestressing system should meet in order to be' acceptable to the NRC staff are identified in the regulatory position.

Rock anchorage systems are not covered by this guide.Types of Systems The type of tendon selected usually dictates the choice of stressing equipment and also affects the choice oi end anchorages.

Basically, post-tensioned prestressing systems can be separated into three general categories according to the types of tendon in use: wire, strand, and bar systems.End anchorages for these tendons are based on either wedge or direct-bearing principles;

sometimes a combina-tion of the two is used. Post-tensioned prestressing systems are described below in terms of types of tendons and end anchorages.

Wire Systems. Wire systems use a number of parallel wires grouped to form a tendon. Wires manufactured in the United States conform to ASTM Specification A-421, "Uncoated Stress-Relieved Wire for Prestressed Concrete."'l This specification provides for wires of two types (BA or WA), depending on whether they are to be used with buttons or wedge anchorages.

The BBRV system, developed in Switzerland by Birkenmaier, Brandestini, Ros, and Vogt, is a wire system used in both concrete reactor vessels and*Copies of this and other ASTM specifications referenced in this guide may be obtained from the American Society for Testing and Materials, 1916 Race Street, Philadelphia, Pennsylvania

19103.Comments should be gent to the Secretary of the Commission.

U.S. Nuclear Regulatory Guides awe issued to describe and make available to the purlicico section.methods acceptable to the NRC sauff of Implementing specific peas of the Commission's regulations.

to delineate techniques used by the staff In evalu- The guides arc slauad In the following ten broad divisons: ating specific problems or postulated acckdents, or to provide guidance to appli-cants. Regulatory Guides ere not substltutes for regulations, and compliance

1. Power Reactors .Products with them Is not required.

Methods and solutions different from those set out in Z Research and Test Reactors 7. Transportation the guides will be acceptable if they provide a badis for the findings requisite to 3. Fuels and Materials Facilities S. Occupational Health the issuance or continuance of a permit or icense by the Commisslon.

4. Environmental and Siting S. Antitrust Review Comments and suggestions for Improvments In those guides are encouraged

5. Materials and Plant Protection

10. General at all times. and guides will be revised, as appropriate, to accommodate com-ments and to reflect new information or experience.

This guide was revwid as a Copies of published guldes may be obtained by written request Indicating the result of subetantive comments received from the public and edditional staff divisions desired to the U.S. Nuclear Regulatory Commission, Weshington.

D.C.review. 2M. Attention:

Director.

Office of Standards Development.

containments built in the United States. The main feature of this system is the use of cold-formed buttonheads for direct bearing at each end of the wire.The prestressed concrete reactor vessel (PCRV) of the Fort St. Vrain station in Colorado uses the BBRV system with 169-wire tendons developing approximately

2000 kips capacity each. A number of containments using the BBRV system with 90, 163, 169, 170, and 186 wires per tendon have been built in the United States.The wire diameter is 1/4 inch (6.35 mm) in all cases except for the 163-wire tendon, which uses 7-mm (0.28 inch) wire.A wire-winding system was used to provide hoop prestress for the Hartlepool PCRVs in England. This method of providing hoop prestress is similar to that for conventional prestressed concrete tanks.Strand Systems. Strand systems use a number of"strands" that are bundled into a tendon. A strand is made up of a number of factory-twisted wires. Stress-relieved strand is made in two forms. The first is the seven-wire strand, which conforms to ASTM Specifica- tion A-416, "Uncoated Seven-Wire Stress-Relieved Strand for Prestressed Concrete." The second form consists of larger strands that are made of larger individual wires and may consist of more than seven wires per strand. The larger strands are not covered by ASTM specifications and have not been used for the construction of nuclear power plants in the United States.Strand systems have been introduced in the construc-tion of nuclear power plants by Strand-Wrap, VSL, (Vorspann System Losinger), Stressteel, Freyssinet, and SEEE (Societe d'Etudes et d'Equipements d'Enter-prises). The last two systems were considered but have not yet been used in the United States in nuclear power plants. Both the Freyssinet and SEEE systems have been used in Europe on concrete reactor vessels.The Strand-Wrap system has been reviewed and approved only for applying hoop prestressing to some PCRVs in the United States. The basic principles of applying hoop prestressing to the PCRV by the Strand-Wrap system are the same as those of a wire-winding system. In one of the design methods, steel-lined circumferential precast concrete channels are anchored to the outer cylindrical surface of the vessel by reinforcing bars extending radially inward from the precast channels.

The strand is anchored at one end by means of a tapered wedge grip in the rib between adjacent channels and then wound around the vessel at the design tension for a number of turns and anchored in the next adjacent rib. Each band of circumferential prestressing consists of multiple layers of strand wound onto these channels.

Each layer consists of one contin-*Lines indicate substantive changes from previous issue.uous length of strand. A maximum hoop prestressing force of about 6600 kips per linear, foot of vessel height was to have been used in the design of the PCRV head region of the Delmarva Summit Power Station.**

The VSL strand system, which was developed in Switzerland, uses a wedge anchorage for strands. Each strand is drawn through the openings of both the bearing plate and the anchor head and is held by a two-piece split cone wedged tightly against the inner surface of the anchor head. As an example, the containment of the Rancho Seco Nuclear Generating Station in California uses the VSL system with tendons consisting of 55 strands, each tendon developing

2250 kips capacity.(The Freyssinet, SEEE, and VSL systems were formally presented as alternatives to the previously approved BBRV system. The VSL system was chosen by the applicant.

Consequently, the Freyssinet and SEEE sys-tems were not reviewed by the NRC staff with regard to their acceptability for use in nuclear power plant containments.)

The Stressteel S/H multistrand system, which was developed in the United States by Stressteel Corporation in cooperation with Howlett Machine Works, is charac-terized by a three-piece slotted wedge cone that grips three strands in its serrated teeth, with a number of wedges in a single anchor plate making up a multistrand tendon of the desired size. As an example, the contain-ment of the Three Mile Island Nuclear Station Unit No.2 in Pennsylvania uses a Stressteel S/H multistrand system consisting of tendons with 54 1/2-inch, Grade 270K, 7-wire strands per tendon, each tendon develop-ing 2230 kips capacity.The Freyssinet system was named after the French engineer Eugene Freyssinet, who invented the anchorage device in 1939. The original anchorage device was for a wire system only. This is a commonly used commercial system. The anchorage consists of a male conical plug and a female conical recess. The plug, with the wires spaced evenly around its perimeter, anchors the wire by wedge action. As a result of mjjket requirements and subsequent developments, the Freyssinet system now also has available anchorages for strand tendons and other shapes of anchorage devices different from the original one. The same wedge principle for anchoring the tendon is retained, however. Concrete reactor vessels have been built in Europe using the Freyssinet strand system with a maximum tendon capacity of about 2000 kips.The SEEE system was developed in France by the Societe d'Etudes et d'Equipements d'Enterprises.

The system features threaded anchorage fittings extruded onto the ends of a group of strands. An anchoring nut is then threaded onto the anchorage fitting and turned**The Delmarva Summit Power Station has been canceled.1.103-2 tightly against the bearing plate. A tendon is composed of one or several such anchorage fittings on a common bearing plate.Bar Systems. Bar systems use a number of high-tensile-strength steel bars that are bundled into a tendon.'The bars are made from an alloy steel conforming to ASTM Specifications A-322 and A-29. A-322 is a general specification that covers only the chemical composition of many grade designations of alloy steel bars, and A-29 is a specification giving general requirements for hot-rolled and cold-finished carbon and alloy steel bars. The mechanical and physical requirements for the pre-stressing bars are covered by ASTM Specification A-722,"Uncoated High-Strength Steel Bar for Prestressing Concrete." Bars are cold-stretched and also stress-relieved by heat treatment to produce the prescribed mechanical proper-ties. Both deformed bars and smooth bars with threaded ends are available, but only smooth bars have been used for nuclear power plant construction in the United States.The Stressteel Corporation in the United States uses a bar system. The bars are stressed by means of a hydraulic jack that consists of a coupler and pulling bar.The normal commercial technique for anchoring uses anchor nuts. During stressing, the anchor nuts are continuously screwed down on washers and bearing plates, and the prestressing force is then transferred to the anchorage assembly by releasing the force in the jack. Wedge and grip-nut anchorages are also available to anchor the bar; they have the advantage of being able to grip the bar at any point along its length.The containment structure of H.B. Robinson Unit No. 2 in Hartsville, S.C., uses the Stressteel bar system anchored with Howlett Grip Nuts. The tendon, which is composed of six 1-3/8-inch-diameter Stressteel bars, develops a capacity of 1428 kips.Grouted and Ungrouted Tendons All of the concrete reactor vessels and containments designed and built in the United States use ungrouted tendons except for H.B. Robinson Unit 2 (bar tendons), Three Mile Island Unit 2 (strand tendons), and Forked River (strand tendons), all of which were designed for grouted tendons. On none of these, however, has design credit been given for any bond of the grouted tendons.Whether grouted or ungrouted tendons are used, a means of determining the functional capability of the structure during its lifetime should be available.

This results in a need for reliable quality assurance procedures for the tendon installations and in a need for a reliable structural inservice inspection program.C. REGULATORY

POSITION This regulatory guide covers the generic qualifications of post-tensioned prestressing systems used in concrete reactor vessels and containments, with no attempt to extend its scope to design aspects. The acceptability of any post-tensioned prestressing system in conjunction with a specific structure design would have to be evaluated on a case-by-case basis. Any proposed system submitted for NRC approval should address the fol-lowing: 1. Post-tensioned prestressing systems that have been approved in previous nuclear power plant license applica-tions are regarded as accepted systems. See Table A for identification.

When the claim is made by an applicant that the prestressing system proposed is an accepted system, sufficient information should be provided with each application to demonstrate that the system pro-posed is the same as the one that was approved in previous nuclear power plant license applications.

Prior approval of any system does not relieve the applicant of the responsibility for demonstrating that its system meets all the requirements of the Code for Concrete Reactor Vessels and Containments.*

2. Changes in prestressing element materials or in anchorage items of previously accepted systems that may require repeating the system performance tests are identified in Subsections CB and CC, Article 2466 of the Code for Concrete Reactor Vessels and Containments.

3. Any new post-tensioned prestressing system should meet the requirements set forth in the Code for Concrete Reactor Vessels and Containments.

4. The use of any post-tensioned prestressing system should permit the application of an inservice inspection program that will verify the continued functional capa-bility of the structure.

Implementation of this program should not degrade the quality and reliability of the post-tensioned prestressing system. Regulatory Guides 1.35, "Inservice Inspection of Ungrouted Tendons in Prestressed Concrete Containment Structures," and 1.90, "Inservice Inspection of Prestressed Concrete Containment Structures with Grouted Tendons," should be consulted for recommendations concerning the use of ungrouted and grouted concrete containments, re-spectively.

  • ASME Boiler and Pressure Vessel Code,Section III, Division 2 (the latest version, plus addenda, as endorsed by the Nuclear Regulatory Commission).

This Code is currently under review for endorsement by the NRC staff. Copies may be obtained from the American Society of Mechanical Engineers, United Engineering Center, 345 East 47th Street, New York, N.Y.10017.1.103-3

D. IMPLEMENTATION

The purpose of this section is to provide information to applicants regarding the NRC staff's plans for using this regulatory guide.ing with specified portions of the Commission's regula-tions, the procedure described herein is being and will continue to be used in the evaluation of submittals for construction permit applications until this guide is revised as a result of suggestions from the public or additional staff review.This guide reflects current NRC staff practice.

There-fore, except in those cases in which the applicant proposes an acceptable alternative method for comply-TABLE A STATUS OF POSTTENSIONED

PRESTRESSING

SYSTEMS AS OF MAY 1976 Submitted For Licensing Review Reviewed For Licensing Acceptabii, .v Approved By the NRC Staff Used In U.S. Nuclear Power Plants To Date System BBRV 90, 169, 170, 186 Wires (1/4 in 0)163 Wires (7 mm i)VSL (55 strands)Stressteel S/H (54 strands)Freyssinet (strand)SEEE (strand)Stressteel

(6 1-3/8 in.bars)PCRV Strand-Wrap X X X X X X X X X X X X X X X X X X X X X 1.103-4