ML15231A834: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 9: | Line 9: | ||
| docket = 05000346 | | docket = 05000346 | ||
| license number = | | license number = | ||
| contact person = Reeser D | | contact person = Reeser D | ||
| package number = ML15217A099 | | package number = ML15217A099 | ||
| document type = License-Operator, Part 55 Examination Related Material | | document type = License-Operator, Part 55 Examination Related Material | ||
Revision as of 18:37, 20 June 2019
| ML15231A834 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 03/06/2015 |
| From: | NRC/RGN-III |
| To: | FirstEnergy Nuclear Operating Co |
| Reeser D | |
| Shared Package | |
| ML15217A099 | List: |
| References | |
| Download: ML15231A834 (1) | |
Text
NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1 ES-301 Administrative Topics Outline Form ES-301-1 Facility: Davis Besse Date of Examination:
__6/15/15 thru 6/26/15
__ Examination Level RO Operating Test Number DB NRC 2015 Administrative Topic (See Note)
Type Code* Describe activity to be performed Conduct of Operations (RO A1.1) N , R 2.1.20 (4.6) Ability to interpret and execute procedure steps JPM New Perform manual RCS Leakage Calculation Conduct of Operations (RO A1.2) N, R 2.1. 4 (3.3) Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, "no
-solo" operation, maintenance of active license status, 10CFR55, etc JPM New Reactor Operator license maintenance Equipment Control (RO A2) N, R 2.2.41 (3.5) Ability to obtain and interpret station electrical and mechanical drawings JPM New Determine isolation boundary and effect on plant equipment Radiation Control NOT EVALUATED Emergency Procedures/Plan (RO A4) D , R 2.4.43 (3.2) Knowledge of emergency communications systems and techniques JPM 241 Emergency Plan Notification of Off
-Site Agencies NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics (which would require all 5 items). *Type Codes & Criteria (C)ontrol Room, (S)imulator, or Class(R)oom (D)irect from bank (< 3 for ROs;
(N)ew or (M)odified from bank (> 1) (P)revious 2 exams (< 1; randomly selected)