ML12054A117: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000368/2012301]]
| number = ML12054A117
| issue date = 02/23/2012
| title = Notification of NRC Initial Operator Licensing Examination 05000368/12-301
| author name = Haire M S
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Schwarz C J
| addressee affiliation = Entergy Operations, Inc
| docket = 05000368
| license number = NPF-006
| contact person = Osterholtz C C
| document report number = 50-368/12-301
| document type = Letter, License-Operator Examination Report
| page count = 3
}}
See also: [[followed by::IR 05000368/2012301]]
 
=Text=
{{#Wiki_filter:February 23, 2012
Christopher J. Schwarz, Site Vice President
Arkansas Nuclear One 
Entergy Operations, Inc.
1448 SR 333
Russellville, AR  72802-0967
 
SUBJECT: ARKANSAS NUCLEAR ONE, UNIT 2 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000368/2012301
Dear Mr. Schwarz:
 
In a telephone conversation on February 21, 2012, between Messrs. Clay Simpson, Operations
Training Superintendent; and Clyde Osterholtz, Chief Examiner, arrangements were made for
the administration of licensing examinations at Arkansas Nuclear One, Unit 2, during the week of
August 27, 2012.
 
As agreed during the telephone conversation, your staff will prepare the examinat
ions based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power
Reactors," Revision 9, S
upplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revi
sion 2, Supplement 1.  The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are
administered.
 
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by June 11, 2012.  The written examinations, operating tests, and supporting reference
materials identified in Attachment 3 to ES-201 will be due by July 9, 2012.  Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval.  All materials shall be complete and
ready-to-use.  We request that any personal, proprietary, sensitive unclassified, or safeguards
information in your response be contained in a separate enclosure and appropriately marked. 
Any delay in receiving the required examinations and reference materials, or the submittal of
inadequate or incomplete materials, may cause the examinations to be rescheduled.  In addition,
your support for on-site validation of the examinations is required during the week of July 30,
2012.
In order to conduct the requested written examinations and
operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
 
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
Mr. C. Schwarz - 2 - Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
 
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval number
3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if
any) (OMB approval number 3150-0090) at least 30 days before the first examination date.  If
the applications are not received at least 30 days before the examination date, a postponement
may be necessary.  Signed applications certifying that all training has been completed should be
submitted at least 14 days before the first examination date.
 
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013.  The public reporting burden
for this collection of information is estimated to average 50 hours per response, including the
time for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information.  Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV. 
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosures will be available electronically for public
inspection in the NRC'
s Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS).  ADAMS is accessible from the
electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. 
Thank you for your cooperation in this matter.  Mr. Simpson has been advised of the policies and
guidelines referenced in this letter.  If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Osterholtz at 817-200-1269, or myself at 817-
200-1159.
 
      Sincerely, 
 
  /RA/ SMGarchow for
      Mark S. Haire, Chief Operations Branch      Division of Reactor Safety
 
Docket:  50-368
License:  NPF-6
 
cc:  Electronic Distribution - Arkansas Nuclear One Unit 2 (ANO)
 
 
Mr. C. Schwarz - 3 - Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Tom.Blount@nrc.gov)
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
Resident Inspector (Jeff.Rotton@nrc.gov) 
 
Resident Inspector (William.Schaup@nrc.gov) Branch Chief, DRP/E (Don.Allen@nrc.gov)
Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)
Project Engineer (Jim.Melfi@nrc.gov)
Project Engineer (Daniel.Bradley@nrc.gov)
ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Kaly.Kalyanam@nrc.gov)
Acting Branch Chief, DRS/TSB (Ryan.Alexander@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
 
R:\_REACTORS\ANO\ANO2012301-LTR-cco.doc    ML120547A117 ADAMS:    No      Yes  SUNSI Review Complete Reviewer Initials: CCO
  Publicly Available  Non-Sensitive .  Non-publicly Available  Sensitive OE: OB C: OB  COsterholtz SGarchow for MHaire  /RA/ /RA/  02/21/2012 02/23/2012  OFFICIAL RECORD COPY    T=Telephone          E=E-mail        F=Fax
}}

Revision as of 04:33, 30 April 2019