ML12089A601: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000247/2010001]]
| number = ML12089A601
| issue date = 03/03/2010
| title = Entergy Prefiled Hearing Exhibit ENT000344 - Annual Assessment Letter - Indian Point Nuclear Generating Units 2 and 3 (Reports 05000247/2010001 & 05000286/2010001)
| author name = Lew D C
| author affiliation = NRC/RGN-I/DRP
| addressee name = Pollock J E
| addressee affiliation = Entergy Nuclear Operations, Inc
| docket = 05000247, 05000286
| license number = DPR-026, DPR-064
| contact person = SECY RAS
| case reference number = RAS 22132, ASLBP 07-858-03-LR-BD01, 50-247-LR, 50-286-LR, IR-10-001
| package number = ML12089A599
| document type = Legal-Pre-Filed Exhibits
| page count = 8
}}
See also: [[followed by::IR 05000247/2010001]]
 
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY
REGION 475 ALLENDALE KING OF PRUSSIA. PENNSYLVANIA
March 3, 2010 Mr. Joseph E. Pollock Site Vice President
Entergy Nuclear Operations, Inc. Indian Point Energy Center 450 Broadway, GSB Buchanan, NY 10511-0249
ANNUAL ASSESSMENT
LETTER -INDIAN POINT NUCLEAR GENERATING
UNITS 2 AND 3 (REPORTS 05000247/2010001
& 05000286/2010001)
Dear Mr. Pollock: On February 12, 2010. the NRC staff completed
its performance
review of Indian Point Nuclear Generating
{Indian Point} Units 2 and 3. Our technical
staff reviewed performance
indicators (Pis) for the most recent quarter and inspection
results from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment
of your safety performance
during this period and our plans for future inspections
at your facility.
This performance
review and enclosed inspection
plan do not include security information.
A separate letter designated
and marked as "Official
Use Only -Security Information" will include the security cornerstone
review and resultant
inspection
plan. Overall, Indian Point Units 2 and 3 operated in a manner that preserved
public health and safety and fully met all cornerstone
objectives, Plant performance
at Unit 2 for the most recent quarter, as well as for the first three quarters of the assessment
cycle, was within the Licensee Response column of the NRC's Action Matrix based on all inspection
findings being classified
as having very low safety significance (Green) and an Pis indicating
performance
at a level requiring
no additional
NRC oversight (Green). Therefore, we plan to conduct reactor oversight
process (ROP) baseline inspections
at Unit 2. Plant performance
for the most recent quarter at Unit 3 was within the Regulatory
Response column of the NRC's Action Matrix, based on all inspection
findings being classified
as having very low safety significance (Green) and one PI of low to moderate safety significance (White) in the Initiating
Events cornerstone.
Specifically, the Unit 3 "Unplanned
Scrams per 7000 Critical Hours" PI exceeded the GreenlWhite
threshold
of greater than three scrams per 7000 critical hours in the third and fourth quarters of the assessment
cycle. On January 28. 2010, we were notified by your staff of your readiness
for the NRC to conduct a supplemental
inspection
to review your actions taken to address the Unit 3 "Unplanned
Scrams per 7000 Critical Hours" PI. Therefore, we plan to conduct a supplemental
inspection
using 
J, Pollock 2 Inspection
Procedure
95001, "Inspection
for One or Two White Inputs in a Strategic
Performance
Area," beginning
on April 19, 2010, This inspection
is conducted
to provide assurance
that the root causes and contributing
causes of risk significant
performance
issues are understood, the extent of condition
is identified, and the corrective
actions are sufficient
to prevent recurrence.
In addition to the baseline inspection
program at Units 2 and 3, and the supplemental
inspection
at Unit 3, we plan to conduct independent
spent fuel storage installation
inspections.
With regard to the replacement
Alert and Notification
System (ANS), we plan to monitor your performance
through the Alert and Notification
System PI and through baseline inspections.
Specifically.
our inspection
plan includes focused problem identification
and resolution
baseline inspections
to review your corrective
actions related to the replacement
ANS test results from December 2009. Additionally.
the NRC plans to continue to monitor your activities
related to final review and approval of the replacement
ANS by the Federal Emergency
Management
Agency. During this assessment
period, the NRC staff continued
augmented
oversight
of your activities
related to on-site groundwater
contamination
in accordance
with the ROP Deviation
Memorandum
in effect for calendar year 2009 [ADAMS Ref. ML083590057]1.
A team of NRC inspectors
conducted
an onsite inspection
in August and September
2009. to review your activities
associated
with characterization
and mitigation
of onsite groundwater
contamination.
Based on the inspection
results documented
in an inspection
report dated October 19, 2009, [ADAMS Ref. ML092920121]
and NRC's monitoring
of sampling activities
and independent
testing of groundwater
samples, the NRC concluded
that you have satisfied
the closure requirements
detailed in the Deviation
Memorandum
regarding
the establishment, implementation, and maintenance
of an effective
groundwater
program to provide continued
radiological
monitoring
of the groundwater
conditions
at the Indian Point Energy Center (lPEC). Therefore, we plan to implement
normal baseline inspections
to assess your implementation
of the groundwater
monitoring
program at IPEC. The enclosed inspection
plan details the baseline inspections, less those related to physical protection.
scheduled
through June 30, 2011. The inspection
plan is provided to allow for the resolution
of any scheduling
conflicts
and personnel
availability
issues well in advance of inspector
arrival onsite. Routine resident inspections
are not listed due to their ongoing and continuous
nature. The inspections
in the last six months of the inspection plan
are tentative
and may be revised at the mid-cycle
safety performance
review. In accordance
with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure
will be made available
electronically
for public inspection
in the NRC Public Document Room or from the Publicly Available
Records (PARS) component
of NRC's document system (ADAMS). ADAMS is accessible
from the NRC Web site at
rm/adams.html (the Public Electronic
Reading Room). 1 DeSignation
in parentheses
refers to ADAMS Accession
Number. Documents
referencedln
this letter are publicly available
using the Accession
Number in ADAMS. 
J. Pollock 3 If circumstances
arise which cause us to change this inspection
plan, we will contact you to discuss the change as soon as possible.
Please contact Mel Gray at 610-337-5209
with any questions
you may have regarding
this letter or the inspection
plan. Director, Division of Reactor Projects Docket Nos. 50-247 and License No. DPR-26 and Enclosures:
Indian Point Nuclear Generating
Unit and Unit 3 Inspection/Activity cc w/encl: Distribution
via 
J. Pollock 3 If circumstances
arise which cause us to change this inspection
plan. we will contact you to discuss the change as soon as possible. Please
contact Mel Gray at
with any questions
you may have regarding
this letter or the inspection
plan. Sincerely, IRA! David C. Lew Director, Division of Reactor Projects Docket Nos. 50-247 and 50-286 License No. DPR-26 and DPR-64 Enclosures:
Indian Point Nuclear Generating
Unit 2 and Unit 3 Inspection/Activity
Plans Distribution
wfencl: S. Collins, RA (R10RAMAIL
RESOURCE)
P. Cataldo, DRP, SRI M. Dapas, DRA (R10RAMAIL
RESOURCE)
M. Halter, DRP, RI D. Lew, DRP (R1DRPMAIL
RESOURCE)
D. Hochmuth, DRP J. Clifford, DRP (R1DRPMAIL
RESOURCE)
RidsNrrPMlndianPoint
Resource D. Roberts, DRS (R1DRSMail
Resource)
RidsNrrDorlLpl1-1
Resource P. Wilson, DRS (R1DRSMaii
Resource)
ROPreport
Resource@nrc.gov
L. Trocine, RI OEDO DRS Branch Chiefs (6) M. Gray, DRP L. Scholl, DRS B. Bickett, DRP D. Silk, DRS S. McCarver, DRP J. Trapp, DRS M. Osborn, DRP D. Screnci, PAO E. Keighley, DRP N. Sheehan, PAO B. Haagensen, Acting SRI R. Barkley, ORA A. Ayegbusi, DRP, RI SUNSI Review Complete:
__B=B___,(Reviewer's
Initials)
ML 100620868
DOCUMENT NAME: G;\DRP\BRANCHZ\ROP\ROP
10\Annual
Assessment
Letters\lPEC
2010 Annual Assessment
LetterR4.doc
After declaring
this document "An Official Agency Record" it will be released to the Public. To receive a copy of this document, Indicate in the box: "C" =Copy without attachment/enclosure
;;:: "E" C opy with ch men t/en cI 'N o copy atta osure 'N"= OFFICE RIIDRP I RIIDRP I RlfDRP I 1 J NAME BBickettiBB
MGraylMXG
DLew/DCL I DATE 02/24/2010
0212412010
03/03/2010
OFFICIAL RECORD COpy 
Page 1 of2 0212412010
Report 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 11:02:07 Planned Start 0112512010
0112912010
02/08/2010
02112/2010
0611412010
06/1812010
07/1212010
07/23/2010
03115/2010
03/1912010
03115/2010
03/1912010
03/15/2010
03119/2010
03/1512010
03/19/2010
03115/2010
0312612010
03/1512010
0312612010
05/0312010
05/07/2010
05/1712010
05/2112010
06128/2010
07/0212010
0612812010
0710212010
06/28/2010
0710212010
09t27/2010
10/0112010
09/13f2010
09/1712010
09/13/2010
09/1712010
09/13/2010
09/1712010
09/1312010
09t17/20i0
09/13/2010
09/17f2010
1210612010
12/1012010
12106(2010
1211012010
12/06(2010
12110/2010
Indian Point Inspection
/ Activity Plan 01/0112010
-06/30/2011
Title TRI FIRE -TRIENNIAL
FIRE PROTECTION
INSPECTION
3 IP 7111105T Fire Protection
IP 71111051 Fire Protection
[Triennial]
7/12EXAM -U21NITIAL
OPERATOR LICENSING
EXAM 4 U01787 FY10 -INDIAN POINT U2 INITIAL OPERATOR LICENSING
EXAM U01787 FY10 -INDIAN POINT U2 INITIAL OPERATOR LICENSING
EXAM 71124 -UNIT 2 OUTAGE HP INSP-ACCESSIALARAlAlR
IP 71124.01 Radiological
Hazard Assessment
and Exposure Controls IP 71124.02 Occupational
ALARA Planning and Controls IP 71124.03 In-Plant Airborne Radioactivity
Control and Mitigation
PIR -ANS CORRECTIVE
ACTION FOLLOW-UP
IF 71152*Reviews
In-depth Reviews 7111108P -U2 INSERVICE
INSPECTION
1 IP 7111108P Inservlce
Inspectlon
Activities*
PWR TI-172 -U2 TI2515/172
DISSIMILAR
METAL WELDS IP 2515/172 Reactor Coolant System Dissimiliar
Metal Butt Welds 711528 -PI&R 4 IP 711526 1dentification
and Resolutlon
of Problems IP 711528 Identification
and Resolution
of Problems 71124 -HP INSP -DOSEIREMPIISFSI
1 IP 60855 Operation
Of An ISFSI IP 71124.04 Occupational
Dose Assessment
IP 71124.07 Public Radiation
Safety 71111118 * REQUAL INSP (IP2) WITH P/F RESULTS 3 IP 71111118 Licensed Operator Requalification
Program EPEX -EP EXERCISE EVALUATION
4 IP 7111401 Exercise Evaluation
IP 7111404 Emergency
Action level and Emergency
Plan Changes IP 71151-EP01
Dril1lExercise
Perfomnance
IP 71151*EP02
ERO Drill Participation
IF 71151-EP03
Alert 8. Notification
System 71124 -OCC HP INSPECTION*ALARAIACCESSIPI
IP 71124.01 Radiological
Hazard Assessment
and Exposure Controls IP 71124.02 Occupational
ALARA Planning and Controls IP 71151-OROl
Occupational
Exposure Control Effectiveness
is report does not Include INPO and OUT AGE activities.
This report shows only on-site and announced
inspection
procedures. . -
1 Page 2 of2 Indian Point 0212412010
11:02:07 Inspection
1 Activity Plan Report 22 01/01/2010
-06130/2011
Planned Dates Start 2 12/0612010
2 01/1012011
2 01/10/2011
2 0312112011
2 0611312011
2 06/1312011
End Title 71124 -OCC HP INSPECTION-ALARAIACCESS/PI
12110/2010
IP 71151-PR01
RETS/ODCM
Radiological
Effluent 71124 01/14/2011
IP 71124.05 TI-177 01/14/2011
IP 25151177 71124 03/25/2011
IF 71124.01 71124 0611712011
IP 60855 06'17/2011
IP 71124.08 -HP INSP-INSTRUMENTS
1 Radiation
Monitoring
Instrumentation
-MANAGING GAS ACCUMULATION
IN ECCS Managing Gas Accumulation
In Emergency
Core Cooling, Decay Heat Removal & Containment
Spray System -HP INSP-ACCESS
1 Radiological
Hazard Assessment
and Exposure Controls -HP INSP-RAO WASTE & ISFSI 1 Operation
Of An ISFSI Radioactive
Solid Waste Processing
and Radioactive
Material Handling, Storage, and Transportation
his report does not Include INPO and OUTAGE
This report shows only on-site and announced
inspection 
Page 1 012 Indian Point 3 0212412010
13:06:06 Inspection
I Activity Plan Report 22 01/01/2010
-0613012011
Planned Oates Start End I Insoection
Activitv I' Title TRI FIRE -IP3 PORTIONS OF THE TR( FIRE 3 01/25/2010
0112912010
IP 71111051 Fire Protection
[Triennial]
71124 -HP OUTAGE INSPECTION
3 03/15/2010
03/19/2010
IP 71124.01 Radiological
Hazard Assessment
and Exposure Controls PIR -ANS CORRECTIVE
ACTION FOLLOW-UP
1 3 03/15/2010
03/1912010
IP 71152-Reviews
In-{jepit1
Reviews 71124 -HP OUTAGE INSPECTION
1 3 0312212010
0312612010
IP 71124.02 Occupational
AlARA Planning and Controls 3 03122/2010
0312612010
IP 71124.03 In-Plant Airborne Radioactivity
Control and Mitigation
95001 -95001 SUPPLEMENTAL
INSPECTION
2 3 0411912010
0412312010
IP 95001 Supplemental
Inspection
For One Or Two White Inputs In A Strategic
Performance
Area -U31NITIAL
OPERATOR LICENSING
EXAM 10/04EXM 5 3 0910612010
09/10/2010
U01789 FY11 -INDIAN POINT U3 INITIAL OPERATOR LICENSING
EXAM 3 10/04/2010
10/15/2010
U01789 FYi1 -INDIAN POINT U3 INITIAL OPERATOR LICENSING
EXAM 71124 -HP-DOSE I REMP IISFSI 1 3 0612812010
07/0212010 I P 71124.04 Occupational
Dose Assessment
3 0612812010
07/0212010
IP 71124.07 Public Radiation
Safety EP EX -EP EXERCISE EVAlUAT!ON
4 3 0911312010
09/1712010
IP 7111401 Exercise Evaluation
3 09113/2010
09/17/2010
IP 7111404 Emergency
Action Level and Emergency
Plan Changes 3 0911312010
09/1712010
IP 71151-EP01
DrilllExercise
Performance
3 0911312010
09/1712010
IP 71151*EP02
ERO Drill Participation
3 09/13/2010
0911712010
IP 71151-EP03
Alert & Notification
System CDBI -COMPONENT
DESIGN BASES INSPECTION
6 3 10104/2010
10/0812010
IP 7111121 Component
Design Bases Inspection
3 10/1812010
10/29/2010
IP 7111121 Component
Design Bases Inspection
71124 -HP-ACCESS/ALARAIPI
VERIFICATION
3 1210612010
1211012010
IP 71124.01 Radiological
Hazard Assessmerlt
and Exposure Controls 3 1210612010
12110/2010
IP 71124.02 Occupational
Al.ARA Planning and Controls 3 1210612010
1211012010
IP 71151*0R01
Occupational
Exposure Control Effectiveness
3 1210612010
1211012010
IP 71151-PR01
RETS/ODCM
Radiological
Effluent 71124 -HP INSTRUMENTS
1 3 01/10/2011
01/14/2011
IP 71124.05 Radiation
Monitoring
Instrumentation
TI*177 * MANAGING GAS ACCUMULATION
IN ECCS 2 3 01/1012011
01114/2011
IP 25151177 Managing Gas Accumulation
In Emergency
Core Cooling. Decay Heat Removal & Containment
Spray System his report does not include INPQ and OUTAGE activities.
This report shows only on-site and announced
inspection
procedures. 
Page 2 012 0212412010
13:08:08 Report 22 Planned Dates Start End 3 03(1412011
03/25/2011
3 0312112011 0312512011
3 0510912011
05/1312011
3 05123/2011
05/27/2011
3 06/1312011
06/1712011
7111108P IP 7111108P 71124 IP 71124.01 TRI fiRE IP 7111105T IP 7111105T 71124 IP 71124.08 Indian Point 3 Inspection
I Activity Plan 01/01/2010
* 06/3012011
Title * U3 INSERVICE
INSPECTION
1 Inservice
Inspection
ActlvlUes
-PWR -HP ACCESS Radiological
Hazard Assessment
and Exposure Controls -TRIENNIAL
FIRE PROTECTION
INSPECTION
3 Fire Protection
[Trienniaij
Fire Protection
[TriennlaO
-HP-RAD WASTE IISFSI Radioactive
Solid Waste Processing
and Radioactive
Material Handling.
Storage, and Transportation
his report does not include INPO and OUTAGE
This report shows only on-site and announced
inspection
}}

Revision as of 03:44, 30 April 2019