ML13261A293: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[BSEP 13-0100, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors]]
| number = ML13261A293
| issue date = 09/05/2013
| title = Brunswick, Units 1 and 2 - Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors
| author name = Pope A H
| author affiliation = Duke Energy Progress, Inc
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000324, 05000325
| license number = DPR-062, DPR-071
| contact person =
| case reference number = BSEP 13-0100
| document type = Annual Report, Letter
| page count = 4
}}
 
=Text=
{{#Wiki_filter:@DUKEENERGY,Brunswick Nuclear PlantP.O. Box 10429Southport, NC 28461SEP 0 5 2013Serial: BSEP 13-0100U.S. Nuclear Regulatory Commission ATTN: Document Control DeskWashington, DC 20555-0001
 
==Subject:==
 
==Reference:==
 
Brunswick Steam Electric Plant, Unit Nos. 1 and 2Renewed Facility Operating License Nos. DPR-71 and DPR-62Docket Nos. 50-325 and 50-324Annual Report of Emergency Core Cooling System Evaluation Model Changesand ErrorsLetter from Annette H. Pope (CP&L) to the Nuclear Regulatory Commission, Annual Report of Emergency Core Cooling System Evaluation Model Changesand Errors, dated September 10, 2012, ADAMS Accession NumberML12298A357 Ladies and Gentlemen:
In accordance with 10 CFR 50.46, Acceptance criteria for emergency core cooling systems forlight-water nuclear power reactors, paragraph (a)(3)(ii),
Duke Energy Progress, Inc., formerlyknown as Carolina Power & Light Company (CP&L), is submitting the annual report of theemergency core cooling system (ECCS) evaluation model changes and errors for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2. The enclosed report covers the period fromAugust 10, 2012, through August 5, 2013.Both BSEP units employ a mixed core design containing co-resident AREVA ATRIUM-10 andATRIUM 1OXM fuel.This document contains no regulatory commitments.
Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager -Regulatory
: Affairs, at (910) 457-2487.
Sincerely, Annbtte H. PopeManager -Organizational Effectiveness Brunswick Steam Electric PlantKULa U.S. Nuclear Regulatory Commission Page 2 of 2WRM/wrm
 
==Enclosure:==
 
10 CFR 50.46 Report for Brunswick Units 1 and 2cc (with enclosure):
U. S. Nuclear Regulatory Commission, Region IIATTN: Mr. Victor M. McCree, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200Atlanta, GA 30303-1257 U. S. Nuclear Regulatory Commission ATTN: Mr. Christopher Gratton (Mail Stop OWFN 8G9A)11555 Rockville PikeRockville, MD 20852-2738 U. S. Nuclear Regulatory Commission ATTN: Ms. Michelle P. Catts, NRC Senior Resident Inspector 8470 River RoadSouthport, NC 28461-8869 Chair -North Carolina Utilities Commission P.O. Box 29510Raleigh, NC 27626-0510 Enclosure BSEP 13-0100Page 1 of 210 CFR 50.46 Reportfor Brunswick Units I and 2Plant:Report Revision Date:Current Operating Cycles:Evaluation Model:Fuel:Brunswick Steam Electric Plant, Units 1 and 2August 5, 2013Unit 1 -Cycle 19Unit 2 -Cycle 21EMF-2361(P)(A),
Revision 0EXEM BWR-2000 ECCS Evaluation Model, May 2001.ATRIUM-10 (A10)Net AbsolutePCT Effect PCT EffectA. Cumulative 10 CFR 50.46 Changes and Error +10F 1IFCorrections
-Previously ReportedB. 10 CFR 50.46 Changes and Error Corrections
-ThisReporting PeriodN o ne ......C. Absolute Sum of 10 CFR 50.46 Changes and Error +1&deg;F 1&deg;FCorrections (based on licensing basis PCT of 19040F)D. Evaluated Effective Licensing Basis PCTincluding Changes and Error Corrections Licensing Cumulative Basis Incremental Estimated Estimated PCTFuel Type PCT Change in PCT PCT < 2200&deg;FA10 19040F +10F 19050F Yes Enclosure BSEP 13-0100Page 2 of 2Plant:Report Revision Date:Current Operating Cycles:Evaluation Model:Fuel:Brunswick Steam Electric Plant (BSEP), Units 1 and 2August 5, 2013Unit 1 -Cycle 19Unit 2 -Cycle 21EMF-2361(P)(A),
Revision 0EXEM BWR-2000 ECCS Evaluation Model, May 2001.ATRIUM 1OXM (A10XM)Net AbsolutePCT Effect PCT EffectA. Cumulative 10 CFR 50.46 Changes and Error 0&deg;F 0&deg;FCorrections
-Previously ReportedB. 10 CFR 50.46 Changes and Error Corrections
-ThisReporting PeriodN one ......C. Absolute Sum of 10 CFR 50.46 Changes and Error 0&deg;F 0&deg;FCorrections (based on licensing basis PCT of 1871 OF)D. Evaluated Effective Licensing Basis PCTincluding Changes and Error Corrections Licensing Cumulative Basis Incremental Estimated Estimated PCTFuel Type PCT Change in PCT PCT < 2200&deg;FA1OXM 1871&deg;F 0&deg;F 1871&deg;F Yes}}

Latest revision as of 11:55, 21 April 2019