ML17352A413: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[NOC-AE-17003528, Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Revision 22 (Cover Letter Only)]]
| number = ML17352A413
| issue date = 12/12/2017
| title = South Texas Project, Units 1 and 2 - Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Revision 22 (Cover Letter Only)
| author name = Aguilera R A
| author affiliation = South Texas Project Nuclear Operating Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000498, 05000499
| license number =
| contact person =
| case reference number = NOC-AE-17003528, STI 34558128
| document type = Letter
| page count = 2
}}
 
=Text=
{{#Wiki_filter:-*-._ .*;;"!:.-. , SAFEGUARDS INFORMATION I South Texas Project Electric Generating Station P.O. Box 18.9 Wadsworth, Texas 77483 Attention: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 South Texas Project . Units 1 and 2 December 12, 2017 Noc.:AE-17003528 10 CFR 50.54 (p) .10 CFR 73.21 ENCLOSURE CONTAINS SAFEGUARDS INFORMATION. UPON SEPARATION THIS, PAGE IS DECONTROLLED . Docket Nos. STN 50-498, STN 50-499 South Texas Project Physical Security Plan, Training and Qualification Plan. and Safeguards Contingency Plan Revision 22 . . Enclosed is the South Texas Project Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 22. The changes to the Plan do not decrease the safeguards effectiveness of the Plan. Therefore, they are being submitted in accordance with
* 10 CFR 50.54 (p)(2). The basis for the 1 O CFR 50.54 (p)(2) conclusion is included in the enclosure.
* As allowed by NRG Regulatory Issue Summary 2001-05, dated January 25, 2001, the enclosed CD-ROM contains one copy of this entire submittal; i.e., this letter with the attachments listed below.
* Attachment 1, South Texas Project Physical Security Plan, Training and Qualification. Plan, and Safeguards Contingency Plan, Rev. 22
* Attachment 2, Change Synopsis, Revision 22
* Attachment 3, 10 CFR 50.54(p) Evaluation for STP Security Plan, Revision 22 The CD-ROM enclosure to this letter contains safeguards information and should be withheld from public disclosure in accordance with 1. 0 CFR 73.21.
* There are no commitments in this letter. If there are any questions regarding this letter, please contact Robyn Savage at (361) 972-7438. *fr~q~ R. A. Aguilera .
 
==Enclosure:==
CD,.ROM -Plan Submittal (Safeguards Information) SAFEGUARDS INFORMATION Manager, Plant Protection arid Emergency Response
* STI 34558128 I SAFEGUARDS INFORMATION I NOC-AE-17003528 Page 2 of 2 cc: (paper copy w/o enclosure) Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Michael Chambers Physical Security Inspector, Region IV U.S. Nuclear Regulatory Co!llmission 1600 East .Lamar Boulevard Arlington, TX 76011-4511 Lisa M. Regner Senior Project Manager U,S. Nuclear Regulatory Commission One White Flint North (08H04) 11555 Rockville Pike Rockville, MD 20852 NRC Resident Inspector U. S; Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN116 Wadsworth, TX -77483 ( (electronic copy w/o enclosure) Morgan, Lewis & Beckius LLP Paul Bessette U.S. Nuclear Regulatory Commission Lisa M. Regner NRG South Texas LP Mark Walker Jim von Suski! Skip Zahn. CPS Energy Kevin Pollo Cris Eugster L. D. Blaylock City of Austin
* Elaina Ball Jolin Wester Texas Dept. of State Health Services Helen Watkins Robert Free ENCLOSURE CONTAINS SAFEGUARDS INFORMATION. UPON SEPARATION, THIS PAGE IS DECONTROLLED I SAFEGUARDS INFORMATION I J 
}}

Latest revision as of 18:37, 18 April 2019