ML18019A158: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML18019A158 | | number = ML18019A158 | ||
| issue date = 01/16/2018 | | issue date = 01/16/2018 | ||
| title = X-Energy, LLC - Updated Design and Licensing Submittal Information NRC Regulatory Issue Summary (RIS) 2017-08 - Process for Scheduling and Allocating Resources for Fiscal Years 2020 Through 2022 for the Review of New Licensing Applications | | title = X-Energy, LLC - Updated Design and Licensing Submittal Information NRC Regulatory Issue Summary (RIS) 2017-08 - Process for Scheduling and Allocating Resources for Fiscal Years 2020 Through 2022 for the Review of New Licensing Applications | ||
| author name = Bowers H | | author name = Bowers H | ||
| author affiliation = X-Energy, LLC | | author affiliation = X-Energy, LLC | ||
Line 13: | Line 13: | ||
| document type = Letter, NRC Regulatory Issue Summary | | document type = Letter, NRC Regulatory Issue Summary | ||
| page count = 5 | | page count = 5 | ||
}} | }} | ||
See also: [[followed by::RIS 2017-08]] | See also: [[followed by::RIS 2017-08]] | ||
=Text= | =Text= | ||
{{#Wiki_filter:X-energy January 16, 2018 Ms. Amy Cubbage U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D.C. 20555-0001 Subject: UPDATED DESIGN AND LICENSING SUBMITIAL INFORMATION NRC REGULATORY ISSUE SUMMARY (RIS)2017-08 PROCESS FOR SCHEDULING AND ALLOCATING RESOURCES FOR FISCAL YEARS 2020 THROUGH 2022 FOR THE REVIEW OF NEW LICENSING APPLICATIONS FOR LIGHT-WATER REACTORS AND NON-LIGHT-WATER REACTORS X Energy, LLC 7701 Greenbelt Road Suite 320 Greenbelt, MD 20770 +1301-358-5600 XEOO-R-Rl-RD-L-000027 The purpose of this letter is to submit responses to Regulatory Issue Summary (RIS) 2017-08 on behalf of X Energy, LLC (''X-energy"). This submission also updates the prior X-energy submitted responses to RIS 2015-07 (response dated November 23, 2015) and RIS 2013-18 (response dated March 28, 2014). X-energy is a private, wholly-owned U.S. company that is pursuing the commercialization of an advanced high temperature gas-cooled pebble bed reactor (HTGR), designated as Xe-100 (X-energy 200 MWt), using U.S.-developed uranium oxicarbide (UCO) TRISO-coated particle fuel, in conjunction with NRC approval. X-energy's design approach leverages over 50 years of research, proven design, and operational experience in HTGR using a pebble bed architecture. In addition to developing the design of the Xe-100 pebble bed reactor, X-energy, through a US DOE cooperative agreement, is actively fabricating UCO based kernels, TRISO particles, and spherical pebble fuel elements in a well-equipped, X-energy operated facility at the Oak Ridge National Laboratory (ORNL). In the future, this work in TRISO-based fuel element production (referred to as our "TRISO-X" program) will be spun off into a separate fuel fabrication company that will ultimately provide fuel for all UCO TRISO-based reactor designs, which may include some Accident Tolerant Fuel (ATF) designs applicable to the existing fleet of light water reactors. The Xe-100 design and TRISO fuel manufacturing are well aligned with, and leverage, the Department of Energy's (DOE) Next Generation Nuclear Plant (NGNP) and Advanced Gas Reactor (AGR) fuel qualification initiatives, _with the fuel qualification program established as the number 1 priority by the Energy Policy Act of 2005 (EPACT2005). In fact, the on-going TR ISO-based fuel fabrication activities at ORNL take place in the laboratory previously used to produce AGR qualification test articles. The Xe-100 utilizes intrinsically safe features with a simplified plant design to assure enhanced safety and security. Furthermore, the Xe-100 offers several inherent features reducing proliferation risks and, with the potential to utilize a future thorium-based fuel cycle, has the capacity to recycle spent fuel and reduce current stockpiles of plutonium with the very high burn-ups inherent to the Thorium fuel cycle. X-energy has no affiliation, official or otherwise, with any other company working on the pebble bed approach to HTGRs. X-energy is U.S.-owned and operates out of facilities in Greenbelt, Maryland and Oak Ridge, Tennessee. MD O:) y&ol {\) f_ 0 U.S. Nuclear Regulatory Commission January 16, 2018 X-energy's responses to RIS 2017-08 contains commercially sensitive proprietary information and, as such, we are requesting that this information be withheld from public disclosure in accordance with 10 CFR 2.390, "Public inspections, exemptions, request for withholding," paragraph (a)(4). Since Commercially Proprietary information constitutes much of replies herein, a public version is not being submitted. Accordingly, Enclosure 1 is the Non-Public version of energy's responses to RIS 2017-08 which contains non-redacted sensitive information. This proprietary information is appropriately marked and an affidavit providing the basis for this request is provided in Enclosure 2. | {{#Wiki_filter:X-energy January 16, 2018 Ms. Amy Cubbage U.S. Nuclear Regulatory | ||
Commission | |||
Sincerely,President X Energy, LLC Cc: Amy Cubbage, NRC, TWFN (NRO/DSRA/ARPB) James Hammelman, NRC, TWFN 4 A60 John Monninger, NRC TWFN 9 F41 John Segala, NRC, TWFN (NRO/DSRA/ARPB) Brian Smith, NRC, RGN-1 (R-I/DRP/PB4/BRO) | ATIN: Document Control Desk Washington, D.C. 20555-0001 | ||
Subject: UPDATED DESIGN AND LICENSING | |||
SUBMITIAL | |||
1) Response to RIS 2017-08 2) Affidavit Page 2 of 20 X-energy Affidavit Page 18 of 20 Enclosure 2 to X-energy Letter XE-X1-LD-GO-L03-100264 X-energy Enclosure 2 to X-energy Letter XE-X1-LD-GO-L03-100264 I, Harlan W. Bowers, President of X-Energy, LLC (X-energy) do hereby affirm and state: 1. I am authorized to execute this affidavit on behalf of X-energy. I am further authorized to review information submitted to or discussed with the Nuclear Regulatory Commission (NRC) and apply for the withholding of information from disclosure. The purpose of this affida-vit is to provide the information required by 10 CFR 2.390(b) in support of X-energy's request for proprietary treatment of certain commercial information submitted in enclosure 1 to X-energy's letter, XE-X1-LD-GO-L03-100264, from myself to the NRC which provides response to Regulatory Issues Summary (RIS) 2017-08. 2. I have knowledge of the criteria used by X-energy in designating information as sensitive, proprietary, or confidential. 3. Pursuant to the provision of paragraph (a)(4) of 10 CFR 2.390, the following is furnished for consideration by the NRC in determining whether the information sought to be withheld from public disclosure should be withheld. a. The information sought to be withheld from public disclosure in Enclosure 1 is owned by X-energy, its affiliates or third parties to whom X-energy has an obligation to maintain its confidentiality. This information was prepared with the explicit understanding that the information itself would be treated as proprietary and confidential and has been held in confidence by X-energy. b. The information sought to be protected in Enclosure 1 is not available to the public to the best of my knowledge and belief. c. The information contained in Enclosure 1 is of the type that is customarily held in confidence by X-energy, and there is a rational basis for doing so. The information X-energy is requesting to be withheld from public disclosure includes commercial information related to on-going and planned activities associated with our Xe-100 high temperature gas pebble bed reactor design and the X-energy TRISO-X fuel program. X-energy limits access to this privileged information to maintain confidentiality. d. Enclosure 1 contains information about the planned activities of X-energy related to the creation and submittal of licensing activities, forecast design development timeframes, fuel fabrication facility deployment plans, and commercial strategy of our Xe-100 advanced reactor. Public disclosure of the information contained in Enclosure 1 would create substantial harm to X-energy because it would reveal valuable business information regarding X-energy's competitive expectations, assumptions, current position and strategy. Its use by a competitor could substantially improve their competitive position in the design, manufacture, licensing, construction and operation of a similar product. Page 19 of 20 X-energy Enclosure 2 to X-energy Letter XE-X1-LD-GO-L03-100264 e. The Proprietary Information contained in Enclosure 1 is transmitted to the NRC in confidence and under the provisions of 10 CFR 2.390; it is to be received in confidence by the NRC. The information is properly marked. I declare under the penalty of perjury that the foregoing is true and correct. Executed on J af'M,UN~ [1 j 20 ( 8 [Month Day, Year] Harlan W. Bowers President X Energy, LLC Subscribed and sworn to before me, Notary Public, this/?'" day oifo "'"''jP My Commission expires: \' 11,l,'* | INFORMATION | ||
NRC REGULATORY | |||
ISSUE SUMMARY (RIS)2017-08 | |||
PROCESS FOR SCHEDULING | |||
AND ALLOCATING | |||
RESOURCES | |||
FOR FISCAL YEARS 2020 THROUGH 2022 FOR THE REVIEW OF NEW LICENSING | |||
APPLICATIONS | |||
FOR LIGHT-WATER | |||
REACTORS AND NON-LIGHT-WATER | |||
REACTORS X Energy, LLC 7701 Greenbelt | |||
Road Suite 320 Greenbelt, MD 20770 +1301-358-5600 | |||
XEOO-R-Rl-RD-L-000027 | |||
The purpose of this letter is to submit responses | |||
to Regulatory | |||
Issue Summary (RIS) 2017-08 on behalf of X Energy, LLC (''X-energy"). | |||
This submission | |||
also updates the prior X-energy submitted | |||
responses | |||
to RIS 2015-07 (response | |||
dated November 23, 2015) and RIS 2013-18 (response | |||
dated March 28, 2014). X-energy is a private, wholly-owned | |||
U.S. company that is pursuing the commercialization | |||
of an advanced high temperature | |||
gas-cooled | |||
pebble bed reactor (HTGR), designated | |||
as Xe-100 (X-energy | |||
200 MWt), using U.S.-developed | |||
uranium oxicarbide (UCO) TRISO-coated | |||
particle fuel, in conjunction | |||
with NRC approval. | |||
X-energy's | |||
design approach leverages | |||
over 50 years of research, proven design, and operational | |||
experience | |||
in HTGR using a pebble bed architecture. | |||
In addition to developing | |||
the design of the Xe-100 pebble bed reactor, X-energy, through a US DOE cooperative | |||
agreement, is actively fabricating | |||
UCO based kernels, TRISO particles, and spherical | |||
pebble fuel elements in a well-equipped, X-energy operated facility at the Oak Ridge National Laboratory (ORNL). In the future, this work in TRISO-based | |||
fuel element production (referred | |||
to as our "TRISO-X" program) will be spun off into a separate fuel fabrication | |||
company that will ultimately | |||
provide fuel for all UCO TRISO-based | |||
reactor designs, which may include some Accident Tolerant Fuel (ATF) designs applicable | |||
to the existing fleet of light water reactors. | |||
The Xe-100 design and TRISO fuel manufacturing | |||
are well aligned with, and leverage, the Department | |||
of Energy's (DOE) Next Generation | |||
Nuclear Plant (NGNP) and Advanced Gas Reactor (AGR) fuel qualification | |||
initiatives, _with the fuel qualification | |||
program established | |||
as the number 1 priority by the Energy Policy Act of 2005 (EPACT2005). | |||
In fact, the on-going TR ISO-based | |||
fuel fabrication | |||
activities | |||
at ORNL take place in the laboratory | |||
previously | |||
used to produce AGR qualification | |||
test articles. | |||
The Xe-100 utilizes intrinsically | |||
safe features with a simplified | |||
plant design to assure enhanced safety and security. | |||
Furthermore, the Xe-100 offers several inherent features reducing proliferation | |||
risks and, with the potential | |||
to utilize a future thorium-based | |||
fuel cycle, has the capacity to recycle spent fuel and reduce current stockpiles | |||
of plutonium | |||
with the very high burn-ups inherent to the Thorium fuel cycle. X-energy has no affiliation, official or otherwise, with any other company working on the pebble bed approach to HTGRs. X-energy is U.S.-owned | |||
and operates out of facilities | |||
in Greenbelt, Maryland and Oak Ridge, Tennessee. | |||
MD O:) y&ol {\) f_ 0 | |||
U.S. Nuclear Regulatory | |||
Commission | |||
January 16, 2018 X-energy's | |||
responses | |||
to RIS 2017-08 contains commercially | |||
sensitive | |||
proprietary | |||
information | |||
and, as such, we are requesting | |||
that this information | |||
be withheld from public disclosure | |||
in accordance | |||
with 10 CFR 2.390, "Public inspections, exemptions, request for withholding," paragraph (a)(4). Since Commercially | |||
Proprietary | |||
information | |||
constitutes | |||
much of replies herein, a public version is not being submitted. | |||
Accordingly, Enclosure | |||
1 is the Non-Public | |||
version of energy's responses | |||
to RIS 2017-08 which contains non-redacted | |||
sensitive | |||
information. | |||
This proprietary | |||
information | |||
is appropriately | |||
marked and an affidavit | |||
providing | |||
the basis for this request is provided in Enclosure | |||
2. Sincerely, President | |||
X Energy, LLC Cc: Amy Cubbage, NRC, TWFN (NRO/DSRA/ARPB) | |||
James Hammelman, NRC, TWFN 4 A60 John Monninger, NRC TWFN 9 F41 John Segala, NRC, TWFN (NRO/DSRA/ARPB) | |||
Brian Smith, NRC, RGN-1 (R-I/DRP/PB4/BRO) | |||
Enclosures: | |||
1) Response to RIS 2017-08 2) Affidavit | |||
Page 2 of 20 | |||
X-energy Affidavit | |||
Page 18 of 20 Enclosure | |||
2 to X-energy Letter XE-X1-LD-GO-L03-100264 | |||
X-energy Enclosure | |||
2 to X-energy Letter XE-X1-LD-GO-L03-100264 | |||
I, Harlan W. Bowers, President | |||
of X-Energy, LLC (X-energy) | |||
do hereby affirm and state: 1. I am authorized | |||
to execute this affidavit | |||
on behalf of X-energy. | |||
I am further authorized | |||
to review information | |||
submitted | |||
to or discussed | |||
with the Nuclear Regulatory | |||
Commission (NRC) and apply for the withholding | |||
of information | |||
from disclosure. | |||
The purpose of this affida-vit | |||
is to provide the information | |||
required by 10 CFR 2.390(b) in support of X-energy's | |||
request for proprietary | |||
treatment | |||
of certain commercial | |||
information | |||
submitted | |||
in enclosure | |||
1 to X-energy's | |||
letter, XE-X1-LD-GO-L03-100264, from myself to the NRC which provides response to Regulatory | |||
Issues Summary (RIS) 2017-08. 2. I have knowledge | |||
of the criteria used by X-energy in designating | |||
information | |||
as sensitive, proprietary, or confidential. | |||
3. Pursuant to the provision | |||
of paragraph (a)(4) of 10 CFR 2.390, the following | |||
is furnished | |||
for consideration | |||
by the NRC in determining | |||
whether the information | |||
sought to be withheld from public disclosure | |||
should be withheld. | |||
a. The information | |||
sought to be withheld from public disclosure | |||
in Enclosure | |||
1 is owned by X-energy, its affiliates | |||
or third parties to whom X-energy has an obligation | |||
to maintain its confidentiality. | |||
This information | |||
was prepared with the explicit understanding | |||
that the information | |||
itself would be treated as proprietary | |||
and confidential | |||
and has been held in confidence | |||
by X-energy. | |||
b. The information | |||
sought to be protected | |||
in Enclosure | |||
1 is not available | |||
to the public to the best of my knowledge | |||
and belief. c. The information | |||
contained | |||
in Enclosure | |||
1 is of the type that is customarily | |||
held in confidence | |||
by X-energy, and there is a rational basis for doing so. The information | |||
X-energy is requesting | |||
to be withheld from public disclosure | |||
includes commercial | |||
information | |||
related to on-going and planned activities | |||
associated | |||
with our Xe-100 high temperature | |||
gas pebble bed reactor design and the X-energy TRISO-X fuel program. X-energy limits access to this privileged | |||
information | |||
to maintain confidentiality. | |||
d. Enclosure | |||
1 contains information | |||
about the planned activities | |||
of X-energy related to the creation and submittal | |||
of licensing | |||
activities, forecast design development | |||
timeframes, fuel fabrication | |||
facility deployment | |||
plans, and commercial | |||
strategy of our Xe-100 advanced reactor. Public disclosure | |||
of the information | |||
contained | |||
in Enclosure | |||
1 would create substantial | |||
harm to X-energy because it would reveal valuable business information | |||
regarding | |||
X-energy's | |||
competitive | |||
expectations, assumptions, current position and strategy. | |||
Its use by a competitor | |||
could substantially | |||
improve their competitive | |||
position in the design, manufacture, licensing, construction | |||
and operation | |||
of a similar product. Page 19 of 20 | |||
X-energy Enclosure | |||
2 to X-energy Letter XE-X1-LD-GO-L03-100264 | |||
e. The Proprietary | |||
Information | |||
contained | |||
in Enclosure | |||
1 is transmitted | |||
to the NRC in confidence | |||
and under the provisions | |||
of 10 CFR 2.390; it is to be received in confidence | |||
by the NRC. The information | |||
is properly marked. I declare under the penalty of perjury that the foregoing | |||
is true and correct. Executed on J af'M,UN~ [1 j 20 ( 8 [Month Day, Year] Harlan W. Bowers President | |||
X Energy, LLC Subscribed | |||
and sworn to before me, Notary Public, this/?'" day oifo "'"''jP My Commission | |||
expires: \' 11,l,'*1 1 1 , 1111 , ,,,\ ,. /' I;' ,..._.., __________ | |||
_, WANDA HOLBROOK Notary Public Anne Arundel County Maryland ' -~ \ ' ' .. ..:. , ... .. My Commission | |||
Expires: g-; d-~:. '. I Page 20 of 20 | |||
}} | }} |
Latest revision as of 16:54, 18 April 2019
ML18019A158 | |
Person / Time | |
---|---|
Site: | PROJ0818 |
Issue date: | 01/16/2018 |
From: | Bowers H X-Energy |
To: | Amy Cubbage Document Control Desk, Office of New Reactors |
References | |
RIS 2017-08, XE00-R-R1-RD-L-000027 | |
Download: ML18019A158 (5) | |
See also: RIS 2017-08
Text
X-energy January 16, 2018 Ms. Amy Cubbage U.S. Nuclear Regulatory
Commission
ATIN: Document Control Desk Washington, D.C. 20555-0001
Subject: UPDATED DESIGN AND LICENSING
SUBMITIAL
INFORMATION
NRC REGULATORY
ISSUE SUMMARY (RIS)2017-08
PROCESS FOR SCHEDULING
AND ALLOCATING
RESOURCES
FOR FISCAL YEARS 2020 THROUGH 2022 FOR THE REVIEW OF NEW LICENSING
APPLICATIONS
FOR LIGHT-WATER
REACTORS AND NON-LIGHT-WATER
REACTORS X Energy, LLC 7701 Greenbelt
Road Suite 320 Greenbelt, MD 20770 +1301-358-5600
XEOO-R-Rl-RD-L-000027
The purpose of this letter is to submit responses
to Regulatory
Issue Summary (RIS) 2017-08 on behalf of X Energy, LLC (X-energy").
This submission
also updates the prior X-energy submitted
responses
to RIS 2015-07 (response
dated November 23, 2015) and RIS 2013-18 (response
dated March 28, 2014). X-energy is a private, wholly-owned
U.S. company that is pursuing the commercialization
of an advanced high temperature
gas-cooled
pebble bed reactor (HTGR), designated
as Xe-100 (X-energy
200 MWt), using U.S.-developed
uranium oxicarbide (UCO) TRISO-coated
particle fuel, in conjunction
with NRC approval.
X-energy's
design approach leverages
over 50 years of research, proven design, and operational
experience
in HTGR using a pebble bed architecture.
In addition to developing
the design of the Xe-100 pebble bed reactor, X-energy, through a US DOE cooperative
agreement, is actively fabricating
UCO based kernels, TRISO particles, and spherical
pebble fuel elements in a well-equipped, X-energy operated facility at the Oak Ridge National Laboratory (ORNL). In the future, this work in TRISO-based
fuel element production (referred
to as our "TRISO-X" program) will be spun off into a separate fuel fabrication
company that will ultimately
provide fuel for all UCO TRISO-based
reactor designs, which may include some Accident Tolerant Fuel (ATF) designs applicable
to the existing fleet of light water reactors.
The Xe-100 design and TRISO fuel manufacturing
are well aligned with, and leverage, the Department
of Energy's (DOE) Next Generation
Nuclear Plant (NGNP) and Advanced Gas Reactor (AGR) fuel qualification
initiatives, _with the fuel qualification
program established
as the number 1 priority by the Energy Policy Act of 2005 (EPACT2005).
In fact, the on-going TR ISO-based
fuel fabrication
activities
at ORNL take place in the laboratory
previously
used to produce AGR qualification
test articles.
The Xe-100 utilizes intrinsically
safe features with a simplified
plant design to assure enhanced safety and security.
Furthermore, the Xe-100 offers several inherent features reducing proliferation
risks and, with the potential
to utilize a future thorium-based
fuel cycle, has the capacity to recycle spent fuel and reduce current stockpiles
of plutonium
with the very high burn-ups inherent to the Thorium fuel cycle. X-energy has no affiliation, official or otherwise, with any other company working on the pebble bed approach to HTGRs. X-energy is U.S.-owned
and operates out of facilities
in Greenbelt, Maryland and Oak Ridge, Tennessee.
MD O:) y&ol {\) f_ 0
U.S. Nuclear Regulatory
Commission
January 16, 2018 X-energy's
responses
to RIS 2017-08 contains commercially
sensitive
proprietary
information
and, as such, we are requesting
that this information
be withheld from public disclosure
in accordance
with 10 CFR 2.390, "Public inspections, exemptions, request for withholding," paragraph (a)(4). Since Commercially
Proprietary
information
constitutes
much of replies herein, a public version is not being submitted.
Accordingly, Enclosure
1 is the Non-Public
version of energy's responses
to RIS 2017-08 which contains non-redacted
sensitive
information.
This proprietary
information
is appropriately
marked and an affidavit
providing
the basis for this request is provided in Enclosure
2. Sincerely, President
X Energy, LLC Cc: Amy Cubbage, NRC, TWFN (NRO/DSRA/ARPB)
James Hammelman, NRC, TWFN 4 A60 John Monninger, NRC TWFN 9 F41 John Segala, NRC, TWFN (NRO/DSRA/ARPB)
Brian Smith, NRC, RGN-1 (R-I/DRP/PB4/BRO)
Enclosures:
1) Response to RIS 2017-08 2) Affidavit
Page 2 of 20
X-energy Affidavit
Page 18 of 20 Enclosure
2 to X-energy Letter XE-X1-LD-GO-L03-100264
X-energy Enclosure
2 to X-energy Letter XE-X1-LD-GO-L03-100264
I, Harlan W. Bowers, President
of X-Energy, LLC (X-energy)
do hereby affirm and state: 1. I am authorized
to execute this affidavit
on behalf of X-energy.
I am further authorized
to review information
submitted
to or discussed
with the Nuclear Regulatory
Commission (NRC) and apply for the withholding
of information
from disclosure.
The purpose of this affida-vit
is to provide the information
required by 10 CFR 2.390(b) in support of X-energy's
request for proprietary
treatment
of certain commercial
information
submitted
in enclosure
1 to X-energy's
letter, XE-X1-LD-GO-L03-100264, from myself to the NRC which provides response to Regulatory
Issues Summary (RIS) 2017-08. 2. I have knowledge
of the criteria used by X-energy in designating
information
as sensitive, proprietary, or confidential.
3. Pursuant to the provision
of paragraph (a)(4) of 10 CFR 2.390, the following
is furnished
for consideration
by the NRC in determining
whether the information
sought to be withheld from public disclosure
should be withheld.
a. The information
sought to be withheld from public disclosure
in Enclosure
1 is owned by X-energy, its affiliates
or third parties to whom X-energy has an obligation
to maintain its confidentiality.
This information
was prepared with the explicit understanding
that the information
itself would be treated as proprietary
and confidential
and has been held in confidence
by X-energy.
b. The information
sought to be protected
in Enclosure
1 is not available
to the public to the best of my knowledge
and belief. c. The information
contained
in Enclosure
1 is of the type that is customarily
held in confidence
by X-energy, and there is a rational basis for doing so. The information
X-energy is requesting
to be withheld from public disclosure
includes commercial
information
related to on-going and planned activities
associated
with our Xe-100 high temperature
gas pebble bed reactor design and the X-energy TRISO-X fuel program. X-energy limits access to this privileged
information
to maintain confidentiality.
d. Enclosure
1 contains information
about the planned activities
of X-energy related to the creation and submittal
of licensing
activities, forecast design development
timeframes, fuel fabrication
facility deployment
plans, and commercial
strategy of our Xe-100 advanced reactor. Public disclosure
of the information
contained
in Enclosure
1 would create substantial
harm to X-energy because it would reveal valuable business information
regarding
X-energy's
competitive
expectations, assumptions, current position and strategy.
Its use by a competitor
could substantially
improve their competitive
position in the design, manufacture, licensing, construction
and operation
of a similar product. Page 19 of 20
X-energy Enclosure
2 to X-energy Letter XE-X1-LD-GO-L03-100264
e. The Proprietary
Information
contained
in Enclosure
1 is transmitted
to the NRC in confidence
and under the provisions
of 10 CFR 2.390; it is to be received in confidence
by the NRC. The information
is properly marked. I declare under the penalty of perjury that the foregoing
is true and correct. Executed on J af'M,UN~ [1 j 20 ( 8 [Month Day, Year] Harlan W. Bowers President
X Energy, LLC Subscribed
and sworn to before me, Notary Public, this/?'" day oifo "'"jP My Commission
expires: \' 11,l,'*1 1 1 , 1111 , ,,,\ ,. /' I;' ,..._.., __________
_, WANDA HOLBROOK Notary Public Anne Arundel County Maryland ' -~ \ ' ' .. ..:. , ... .. My Commission
Expires: g-; d-~:. '. I Page 20 of 20