ML072420339: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[DCL-07-084, Inservice Inspection Report for Fourteenth Refueling Outage]]
| number = ML072420339
| issue date = 08/27/2007
| title = Inservice Inspection Report for Fourteenth Refueling Outage
| author name = Jacobs D
| author affiliation = Pacific Gas & Electric Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000275
| license number = DPR-080
| contact person =
| case reference number = DCL-07-084, OL-DPR-80
| document type = Inservice/Preservice Inspection and Test Report, Letter
| page count = 52
}}
 
=Text=
{{#Wiki_filter:Pacific Gas and Electric Company'Donna Jacobs Diablo Canyon Power Plant Vice President R 0. Box 56 Nuclear Services Avila Beach, CA 93424 805.545.4600 August 27, 2007 Fax: 805.545.4234 PG&E Letter DCL-07-084 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Diablo Canyon Unit 1 Inservice Inspection Report for Unit 1 Fourteenth Refueling Outage Dear Commissioners and Staff: In accordance with ASME Section XI, paragraph IWA 6230, enclosed is the Diablo Canyon Power Plant Unit 1 Fourteenth Refueling Outage Inservice Inspection (ISI)Report. This report provides the results of the ISI examination of Class 1 and 2 components and supports.There are no new or revised regulatory commitments as defined by the Nuclear Energy Institute 99-04, "Guidelines for Managing NRC Commitment changes," dated July 1999, in this report.If you have any questions regarding the information enclosed or other ISI Program activities, please contact Gary Close, Manager Technical Support Engineering, at (805) 545-4122.Sincerely, Donn acobs ddm/469/A0661378 Enclosure cc: Diablo Distribution cc/enc: Michael A. Brown, NRC Acting Senior Resident Bruce S. Mallett, NRC Region IV Alan B. Wang, NRC Project Manager State of California, Pressure Vessel Unit A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway # Comanche Peak , Diablo Canyon , Palo Verde # South Texas Project
* Wolf Creek Enclosure PG&E Letter DCL-07-084 INSERVICE INSPECTION REPORT FOR DCPP UNIT 1 FOURTEENTH REFUELING OUTAGE Diablo Canyon Power Plant Unit I USNRC Docket No. 50-275 Operating License No. DPR-80 Prepared By: Reviewed By: Approved By: Commercial Operation Date May 7,1985 Thomas L. Alcott and Chris Beard, ISI Specialists James Hill, Lead ISI Specialist Gary anager Technical Support Engineering This report is submitted as required by ASME Boiler and Pressure Vessel Code, Section XI, to the United States Nuclear Regulatory Commission.
Document Date: 8/08/07 Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106 Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 SECTION A.B.C.D.E.F.G.H.I.TABLE OF CONTENTS TITLE Introduction ASME Code Data Report Form NIS-1 (Basis of Summary)I. Class 1 2. Class 2 Class 1 Components
: 1. Vessels a. Reactor Vessel b. Pressurizer
: c. Steam Generators
: 2. Pumps and Valves 3. Piping 4. Integral Attachments
: 5. Supports Class 2 Components
: 1. Vessels 2. Piping 3. Integral Attachments
: 4. Supports System Pressure Tests Containment Penetration
-Appendix J Preservice Inspection Items Augmented Examinations Repairs and Replacements
: 1. ASME Code Data Report Form NIS-2 (Indexed by System)Manufacturers Data Reports For Nuclear/Pressure Vessels J.
SECTION A INTRODUCTION SECTION A INTRODUCTION Inservice inspection (ISI) of scheduled ASME Section XI components and their supports at Pacific Gas and Electric Company's Diablo Canyon Power Plant (DCPP) Unit 1 was completed during the fourteenth refueling outage from April through May, 2007. The DCPP Unit 1 fourteenth refueling outage (1R14) was the first outage in the first period within the third 10-year ISI interval.In addition to the ASME Code examinations reported here, a 100% ultrasonic examination and bare metal examination was conducted on the reactor vessel top head penetration nozzles. No evidence of boric acid leakage was found. The results are on file at the plant site.This report is submitted as required by ASME Section XI, paragraph IWA-6240, and is organized in several sections.
An introduction is provided in Section A. Section B contains the completed ASME Code Data Report Form NIS-1 for Class 1 and 2 components.
Sections C and D detail the Class 1 and 2 examinations performed, date of examination (for group items or for more than one type of examination performed, the date provided is the most recent examination date), any unusual conditions noted, corrective actions if required, and explanatory remarks.System pressure tests on Class 1 and 2 systems conducted during the period following 1R13, and up to and including 1R14, are reported in Section E.Appendix J, containment penetration pressure tests are reported in Section F.Preservice inspections were performed on certain components, as required after repairs or replacements.
These items are detailed in Section G.Augmented exams are reported in Section H.Section I of this report, Repair / Replacement Activities, contains the completed ASME Code Data Report Form NIS-2 for those 1R14 work packages closed prior to and including June 30, 2007 and for any mid cycle and 1 R13 packages closed after January 4, 2006. NIS-2 reports for 1R14 work packages that are closed after June 30, 2007 will be included in the next outage report. Corrective actions and work order package documentation are on file at DCPP and are referenced by work order number in the NIS-2 reports.
SECTION B ASME CODE DATA NIS-1 FORMS FORM NIS-1 OWNER'S DATA REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules 1.2.3.5.7.Owner Pacific Gas & Electric Company, 77 Beale St., San Francisco, CA 94106 Plant Diablo Canyon Power Plant, P.O. Box 56, Avila Beach, CA 93424 Plant Unit One 4. Owner Certificate of Authorization (if required)
N/A Commercial Service Date 05/07/85 6. National Board Number for Unit N/A Component Inspected ASME Code Class 1 Items Component or Manufacturer or Installer Manufacturer or State or Province National Board Appurtenance Installer Serial No. No. No.Reactor Vessel Combustion Engineering CE 66204 11475-76 20760 Head Westinghouse Steam Gen 1-1 Westinghouse 1041 N/A 68-12 Steam Gen 1-2 Westinghouse 1042 N/A 68-13 Steam Gen 1-3 Westinghouse 1043 N/A 68-14 Steam Gen 1-4 Westinghouse 1044 N/A 68-15 Reactor Coolant .Westinghouse 507 N/A N/A Pump 1-2 Class 1 Valves Various N/A N/A N/A Class 1 Supports Various N/A N/A N/A Class 1 Piping Wismer & Becker/Kellogg N/A N/A N/A Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided (1) size is 8 V2 in. x 11 in., (2) information in items 1 through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-1 (back)8. Examination Dates 04/07 to 05/07 9. Inspection Period Identification:
First 10. Inspection Interval Identification:
Third 11. Applicable Edition of Section XI 2001 Addenda 2003 12. Date/Revision of Inspection Plan: February 2007 Revision A 13. Abstract of Examinations and Tests. Include a list of examinations and tests and a statement concerning status of work required for current interval.
Refer to ISI Report 14. Abstract of Results of Examinations and Tests.Refer to ISI Report 15. Abstract of Corrective Measures.
Refer to ISI Report We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI, and c) corrective measures taken conform to the rules of the ASME Code, Section XI.Certificate of Authorization No. (if ipplicable)
N/A ExpirationDate N/A Date ;"/iWf20 __J__Signed Engineering Manager By .Owner Gary Close CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of California and employed by HSB-CT of Harford, CT have inspected the components described in this Owners' Data Report during the period 04/07 to 05/07 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Data Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Data Report.Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Date 115" 20 Commissions CA 1828, NB 9990 A.N.I.C.'1411spector's -Sigiiature/Kenny Kim National Board, State, Province and No.
FORM NIS-1 OWNER'S DATA REPORT FOR INSERVICE INSPECTIONS As reauired by the Provisions of the ASME Code Rules I. Owner Pacific Gas & Electric Company, 77 Beale St., San Francisco, CA 94106 2. Plant Diablo Canyon Power Plant, P.O. Box 56, Avila Beach, CA 93424 3. Plant Unit One 4. Owner Certificate of Authorization (if required)
N/A 5. Commercial Service Date 05/07/85 6. National Board Number for Unit N/A 7. Component Inspected ASME Code Class 2 Items Component or Manufacturer or Installer Manufacturer or State or Province National Board Appurtenance Installer Serial No. No. No.Class 2 Piping Various N/A N/A N/A Supports Class 2 Piping M.W. Kellogg/ Pullman N/A N/A N/A Power S. 1. Pump 1-1 Pacific Pumps 45497 N/A N/A+ + t t+ + t+ +.4. .4.4- .4-Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided (1) size is 8 1/22 in. x 11 in., (2) information in items 1 through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-1 (back)8. Examination Dates 04/07 to 05/07 9. Inspection Period Identification:
First 10. Inspection Interval Identification:
Third 11. Applicable Edition of Section XI 2001 Addenda 2003 12. Date/Revision of Inspection Plan: February 2007, Revision A 13. Abstract of Examinations and Tests. Include a list of examinations and tests and a statement concerning status of work required for current interval.
Refer to ISI Report 14. Abstract of Results of Examinations and Tests. Refer to ISI Report 15. Abstract of Corrective Measures.
Refer to ISI Report We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI, and c) corrective measures taken conform to the rules of the ASME Code, Section XI.Certificate of Authorization Nj. (if applicable)
N/A Expiration t)ate /A Date 19__4__ ; 2001 Signed Engineering Manager By ,/AL...i,,a.
.Owner GaJy Close CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of California and employed by HSB-CT of Harford, CT have inspected the components described in this Owners' Data Report during the period 04/07 to 05/07 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Data Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Data Report.Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Date 2 / 20C Commissions CA 1828, NB 9990 A.N.I.C.Inspes Signature/Kenny Kim National Board, State, Province and No.
SECTION C CLASS ONE COMPONENTS Pacific Gas and Electric Company THIRD INTERVAL, FIRST PERIOD, FIRST REFUELING OUTAGE REPORT (1R14)ASME SECTION XI SYSTEMS -CLASS 1 DIABLO CANYON POWER PLANT -UNIT 1 SERVICE DATE: 05/07/85 MAJOR ITEM: REACTOR VESSEL PAGE I of 1 PAGE I of 1 CATEGORY ITEM DI B-G-1 B6.10 RI Hc B6.20 RI H{B6.50 RI W COMPONENT
/ESCRIPTION LINE WELD OR COMPONENT No.RPV1 Nuts I to 18 RPV1 Studs I to 18 RPV1 Washer I to 18 EXAM EXAM TYPE DATE VI Closure ead Nuts VI Closure ead Studs V1 Closure ashers RPV Bolting> 2" diam.VT-1 UT VT-1 5-13-07 5-13-07 5-13-07 COMMENTS 18 Items Examined, 33% Completed 18 Items Examined, 33% Completed 18 Items Examined, 33% Completed RESULTS NRI NRI NRI B-N-I, 2,& 3 B13.10 Reactor Vessel 1 Reactor Vessel 1 Reactor Vessel 1 Interior Interior Interior VT-3 5-23-07 1 Item Examined, 100% Completed NRI Pacific Gas and Electric Company DIABLO CANYON POWER PLANT -UNIT 1 SERVICE DATE: 05/07/85 THIRD INTERVAL, FIRST PERIOD, FIRST REFUELING OUTAGE REPORT (1R14) MAJOR ITEM: STEAM GENERATORS ASME SECTION XI SYSTEMS -CLASS 1 CAT B16.20 STEAM GENERATOR TUBING (The following percentages apply to inservice tubes.) PAGE 1 of 1 SCOPE PROBE SG 11 SG12 SG 13 SG 14 Full length (except Bobbin 100% 100% 100% 100%Rows 1 and 2 U-bends)Rows I to 2 U-bends Plus Point 100% 100% 100% 100%Rows 3 to 8 U-bends Plus Point 20% 20% 20% 20%Repeat PWSCC inds. at Plus Point 100% 100% 100% 100%dents & top of tubesheet HotLeg top of tubesheet Plus Point 100% 100% 100% 100%> 5 volt dented TSP Plus Point 100% hot leg and cold leg 100% 1H to 7C 20% iH-7H, plus expanded 100% 1H to 6H intersections (Note 1) 20% 6C scope; 100% cold leg 20% 7H> 2 and < 5 volt dented Plus Point 100% hot leg and cold leg 100% 1H to 7C 20% 1H plus expanded 100% 1H to 6H TSP intersections (Note 1) 20% 6C scope; 100% 7C to 4C 20% 7H< 2 volt dented TSP Plus Point 100% 1H NA NA NA intersections (Note 1) 20% 2H> 1.7 volt distorted OD Plus Point 100% 100% 100% 100%bobbin signals (DOS) at TSP intersections Distorted ID bobbin Plus Point 100% 100% 100% 100%signals (DIS) at TSP intersections
>5 volt free span dings Plus Point 20% 20% 20% 20%> 2 volt ding coincident Plus Point 20% 20% 20% 20%with AVB location Paired dings Plus Point 20% 20% 20% 20%New cold leg thinning Plus Point 100% 100% 100% 100%(CLT) indications (Note 2)Bobbin "I" codes Plus Point 100% 100% 100% 100%TSP ligament inds. Plus Point 100% 100% 100% 100%Tubes plugged 17 25 14 6 Note 1: For each 20% sample, inspected at least 50 dents, or else inspected 100% if there were less than 50 dents.Note 2 : Included >1.5 volt repeat CLT indications not inspected since 1R12 Pacific Gas and Electric Company DIABLO CANYON POWER PLANT -UNIT I SERVICE DATE: 05/07/85 MAJOR ITEM: BOLTING THIRD INTERVAL, FIRST PERIOD, FIRST REFUELING OUTAGE REPORT (1R14)ASME SECTION XI SYSTEMS -CLASS 1 PAGE 1 of 1 CATEGORY COMPONENT
/ WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO. TYPE DATE COMMENTS RESULTS B-G-1 B6.200 RCP 1-2 Main Flange Nuts B-G-2 B7.50 U1 Pipe Flange Bolting B7.60 RCP Lower Seal Housing Bolts Pump Bolting> 2" diam.S6-727-6 RCP 1-2 Lower Seal Housing RCP 1-2 Nuts 1-24 VT-i 5-7-07 24 Items Examined; 100% Completed NRI RV-8010C Inlet Flange Studs RCP Seal Housing Socket Head Screws VT-i 5-10-07 12 Studs Examined, 100% Completed VT-1 5-5-07 12 Screws Examined, 100% Completed NRI NRI Pacific Gas and Electric Company THIRD INTERVAL, FIRST PERIOD, FIRST REFUELING OUTAGE REPORT (1R14)ASME SECTION XI SYSTEMS -CLASS 1 DIABLO CANYON POWER PLANT -UNIT 1 SERVICE DATE: 05/07/85 MAJOR ITEM: PUMPS and VALVES PAGE 1 of 1 CATEGORY COMPONENT
/ WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO. TYPE DATE COMMENTS RESULTS B-K B10.30 RCPumpWelded RCP 1-2 Attachment Support Lug Lug Weld No. 2 PT 5-11-07 1 Item Inspected; 50% Completed NRI B-M-1 B-M-2 B 12.50 Accumulator Inj Lp 2: Valve Interior S6-253-10SPL+
8948B Interior VT-3 5-9-07 1 Item Inspected; 100% Completed NRI Pacific Gas and Electric Company THIRD INTERVAL, FIRST PERIOD, FIRST REFUELING OUTAGE REPORT (1R14)ASME SECTION XI SYSTEMS -CLASS 1 DIABLO CANYON POWER PLANT -UNIT 1 SERVICE DATE: 05/07/85 MAJOR ITEM: PIPING PAGE 1 of 2 CATEGORY ITEM DESCRIPTION RI-ISI Loop 1 Spray Line (RB)Pressurizer Spray Line Pzr RV-8010A Inlet Pzr RV-8010B Inlet Pzr RV-8010C Inlet Loop I CL Drain RCDT Loop 3 CL Drain RCDT HL Recirc bef V-8702 COMPONENT
/LINE$6-13-4SPL
$6-15-4SPL S6-729-6SPL+
S6-728-6SPL+
S6-727-6SPL+
S6-958-2SPL+
S6-960-2SPL+
S6-109-14SPL WELD OR COMPONENT NO.WIB-414 WIB-411 WIB-394 WIB-316 WIB-326 WIB-335 WIB-22 WIB-251 WIB-237 EXAM TYPE UT UT UT UT UT UT PT PT UT EXAM DATE 5-8-07 5-8-07 COMMENTS RI-ISI: 14 Items Inspected; 21% Completed PAGE 1 of 2 5-8-07 5-4-07 5-4-07 5-4-07 5-12-07 5-12-07 5-3-07 RESULTS NMI NM NRI NRI NMI NRI NRI NMI NMI Pacific Gas and Electric Company THIRD INTERVAL, FIRST PERIOD, FIRST REFUELING OUTAGE REPORT (1R14)ASME SECTION XI SYSTEMS -CLASS 1 DIABLO CANYON POWER PLANT -UNIT 1 SERVICE DATE: 05/07/85 MAJOR ITEM: PIPING PAGE 2 of 2 CATEGORY COMPONENT/
WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO. TYPE DATE COMMENTS RESULTS RI-ISI Reac Cool Pp 1-2 S6-55-2 WIB-984 PT 5-13-07 NRI cont'd Seal Wtr In WIB-985 PT 5-13-07 NR!Reac Cool Pp 1-4 S6-57-2 Seal Wtr In WIB-1018 WIB-1016 PT 5-6-07 PT 5-6-07 NRI NRI NRI WIB-1010 PT 5-6-07 Pacific Gas and Electric Company DIABLO CANYON POWER PLANT -UNIT 1 SERVICE DATE: 05/07/85 THIRD INTERVAL, FIRST PERIOD, FIRST REFUELING OUTAGE REPORT (1R14) MAJOR ITEM: SUPPORTS ASME SECTION XI SYSTEMS -CLASS 1 PAGE 1 of 1 CATEGORY F-A SUPPORTS F1.10 SUPPORT COMPONENTS The required inservice inspection was performed on 21 (6% Total Population)
Class 1 supports during the fourteenth refueling outage between the dates of 05/02/07 and 05/25/07.
The supports were found acceptable.
Data reports are on file.LINE SUPPORT LINE SUPPORT LINE SUPPORT LINE SUPPORT 6 Support A 16 51-24V 730 48-26CS 3845 11-15SL 14 52-19V 24 52-3V 1172 48-27V 3857 2156-35 14 42-63R 51 2152-72 1665 56N-4R 3857 2156-36 14 11-17SL 235 10-24SL 1665 56N-5V 15 42-5R 254 10-4SL 1995 57N-34R 15 11-143R 729 48-IR 1995 57N-33R SECTION D CLASS TWO COMPONENTS Pacific Gas and Electric Company THIRD INTERVAL, FIRST PERIOD, FIRST REFUELING OUTAGE REPORT (1R14)ASME SECTION XI SYSTEMS -CLASS 2 DIABLO CANYON POWER PLANT -UNIT 1 SERVICE DATE: 05/07/85 MAJOR ITEM: Piping PAGE 1 of I PAGE 1 of 1 CATEGORY COMPON ITEM DESCRIPTION LINE RI-ISI Cent Charg Pump S6-45-4 (RB) 1-1 Disch Cent Charg Pump S6-46-4 1-2 Disch Charging Injection S6-2033-4 Out iENT /WELD OR EXAM COMPONENT NO. TYPE WIC-45A UT EXAM DATE COMMENTS 4-26-07 RI-ISI: 5 Items Inspected; 13% Completed RESULTS NRI NR!WIC-46A RB-2033-4 WIC-2033A WIC- 1 979A UT 4-26-07 UT 4-26-07 UT 4-26-07 UT 4-26-07 NRI NRI NRI Charging Inj Out S6-1979-4 Cold Legs Pacific Gas and Electric Company DIABLO CANYON POWER PLANT -UNIT 1 SERVICE DATE: 05/07/85 THIRD INTERVAL, FIRST PERIOD, FIRST REFUELING OUTAGE. REPORT (1R14) MAJOR ITEM: INTEGRAL ATTACHMENTS ASME SECTION XI SYSTEMS -CLASS 2 PAGE 1 of 1 CATEGORY COMPONENT
/ WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO. TYPE DATE COMMENTS RESULTS C-C C3.10 Pressure Vessels Welded Attach's.C3.20 Lp 4 HIL to RHR Welded Attach's.RHR to H/L 1 &2.Welded Attach's.S/G Stm Out 1-1.Welded Attach's S/G FW Sup 1-1.Welded Attach's RHR to C/L 1 &2.Welded Attach's CCP 1-1 Disch.Welded Attach's Seal Injection Filter 1-1 Support Leg Attachment VT-3 5-31-07 VT-3 in-lieu of PT per relief request NDE-SFL; 1 Item Examined; 100% Completed PT 5-16-07 6 Items Examined; 2.5% Completed PT 5-12-07 NRI Line S 1-927-14111 Line S 1-985-12111P Line K15-228-28V Line K16-554-16V Line S6-509-81II 57S-20V Attach.Paramount 40-46A Attach. X219 1020-1V Attach.Lugs 1037-7V Attach.Paramount 57N-5R Attach.Paramount 73-35R Attach. Lugs MT MT 5-9-07 5-9-07 NRI NR.I NRI NRI NRI NRI PT 5-7-07 PT 5-11-07 Line S6-45-4 Pacific Gas and Electric Company THIRD INTERVAL, FIRST PERIOD, FIRST REFUELING OUTAGE REPORT (1R14)ASME SECTION XI SYSTEMS -CLASS 2 DIABLO CANYON POWER PLANT -UNIT 1 SERVICE DATE: 05/07/85 MAJOR ITEM: BOLTING PAGE 1 of 1 CATEGORY COMPONENT
/ WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO. TYPE DATE COMMENTS RESULTS C-D C4.30 SI Pump 1-1: Safety Injection 8 Studs >2" dia. UT 5-11-07 Bolting >2" dia. Pump 1-1 (Items 1 thru 7 & 11)8 Studs Inspected; 100% Completed NRI Pacific Gas and Electric Company DIABLO CANYON POWER PLANT -UNIT 1 SERVICE DATE: 05/07/85 THIRD INTERVAL, FIRST PERIOD, FIRST REFUELING OUTAGE REPORT (1R14) MAJOR ITEM: PIPING SUPPORTS ASME SECTION XI SYSTEMS -CLASS 2 PAGE 1 of 1 CATEGORY F-A SUPPORTS F1.20 SUPPORT COMPONENTS The required inservice inspections were performed on 22 (2.6% Total Population)
Class 2 hangers prior to and during the fourteenth refueling outage between the dates of 04/26/07 and 05/31/07.
Results were found acceptable.
Data reports are on fle.LINE SUPPORT LINE SUPPORT LINE SUPPORT LINE SUPPORT S/G 1-2 SG-01-02-NE RHRPp 1-1 4-22SL 508 15-65SL 927 12-7SL S/G 1-2 SG-01-02-NW RHR Pp 1-1 4-23SL 509 15-80SL 927 56N-2R S/G 1-2 SG-01-02-SE SI Pp 1-1 Pump Pedestal 509 57N-5R 927 57S-20V and Base S/G 1-2 SG-0 1-02-SW CCP 1-1 Four Supporte 554 1037-7V 985 40-46A S/G 1-2 Belly Band 228 1020-1V 557 1049-17SL 3844 42-36R Seal Injection 3 Support Legs 314 13-58SL Filter 1-1 1 1 SECTION E SYSTEM PRESSURE TESTS Pacific Gas and Electric Company THIRD INTERVAL, FIRST PERIOD, FIRST REFUELING OUTAGE REPORT (1R14)ASME SECTION XI SYSTEMS -CLASS 1 & 2 DIABLO CANYON POWER PLANT -UNIT I SERVICE DATE: 05/07/85 MAJOR ITEM: PRESSURE TESTS PAGE 1 of 1 TEST CLASS DESCRIPTION EXAM COMMENTS NO. DATE RESULTS 2 3 4 5 6 7 8 Reactor Coolant System and Connected Piping Excess Letdown between 8166 & 8167 Pressurizer Auxiliary spray Alternate Charging RHR & SI to Cold Legs Charging Injection Inside Cont.Safety Injection Inside Cont, From 8905A-D to 8949A-D RHR Between 8702 & 8701 05/27/07 05/27/07 05/27/07 05/27/07 05/27/07 05/27/07 05/27/07 05/27/07 STP-R8A STP-R8A STP-R8A STP-R8A STP-R8A STP-R8A STP- R8A STP-R8A NRI NRI NRI NRI NRI NR1 NRI NRI Pacific Gas and Electric Company THIRD INTERVAL, FIRST PERIOD, FIRST REFUELING OUTAGE REPORT (1R14)ASME SECTION XI SYSTEMS -CLASS 1 & 2 DIABLO CANYON POWER PLANT -UNIT 1 SERVICE DATE: 05/07/85 MAJOR ITEM: PRESSURE TESTS PAGE 2 of 2 TEST CLASS DESCRIPTION EXAM COMMENTS NO. DATE RESULTS 3 12 18 22 27 28 2 2 2 2 2 2 Auxiliary Feedwater Pump X-1 Discharge Charging Injection 8801A & B to 8820 Accumulator, RHR & Charging Test Lines Safety Injection Pumps Discharge to Hot Legs from 8802A & B to 8904A-D Cont Spray Pump Disch Piping to 9006A Cont Spray Pump Disch Piping to 9006B 5/31/07 5/27/07 5/3/07 5/27/07 5/4/07 5/6/07 NRI NMI NMI NM NRI NRI SECTION F Appendix-J Containment Penetration Pressure Test Pacific Gas and Electric Company DIABLO CANYON POWER PLANT -UNIT 1 SERVICE DATE: 05/07/85 THIRD INTERVAL, FIRST PERIOD, FIRST REFUELING OUTAGE REPORT (1R14) MAJOR ITEM: Containment Penetration Appendix J ASME SECTION XI SYSTEMS -CLASS 1 & 2 PAGE 1 of 1 PEN STP Results EXAM PEN STP Results EXAM PEN STP Results EXAM NO. NO. DATE NO. NO. DATE NO. NO. DATE 19 20 22 23 30 31 35 45 51B 56 V-619 V-620 V-623 V-623 V-630 V-631 V-635 V-645 V-651B V-656 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable 5/3/07 5/3/07 5/3/07 5/3/07 5/6/07 5/16/07 5/18/07 5/19/07 5/12/07 5/12/07 61 62 63 65 68 69 71 76A 76B 52E V-661 V-662 V-663 V-665 V-668 V-668 V-671 V-676A V-676B V-678 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable 5/24/07 5/24/07 5/22/07 4/16/07 5/9/07 5/9/07 5/14/07 5/21/07 5/15/07 5/8/07 52F 78A 78B 79 82A 82B 82C 83B V-678 V-678 V-678 V-679 V-682A V-682B V-682B V-683 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable 5/8/07 5/8/07 5/8/07 5/7/07 5/8/07 5/8/07 5/8/07 5/14/07 SECTION G PRESERVICE INSPECTION ITEMS Pacific Gas and Electric Company DIABLO CANYON POWER PLANT -UNIT 1 SERVICE DATE: 05/07/85 THIRD INTERVAL, FIRST PERIOD, FIRST REFUELING OUTAGE REPORT (1R114) MAJOR ITEM: PSI ASME SECTION XI SYSTEMS -CLASS 1 & 2 PRESERVICE INSPECTION ITEMS PAGE 1 of 1 The reauired Dreservice inspections were performed on 5 components and 12 supports during the fourteenth refueling outage.Other Name of Work Order Oter CATEGORY Component System Exam Type No. Line No B-G-l RCP 1-2 Case Hydraulic Nut 7 VT- I CO210949-02 RCP 1-2 B-G-2 RCS-I-RV-8010A 7 VT- I R0282969 729 RCS-1-RV-8010B 7 VT-1 R0282901 728 RCS-1-RV-8010C 7 VT- I R0282906 727 RPV Head Pen-76 CETNA 7 VT-I C0211487 RVI F-A 1049-4SL 3 VT-3 C0205901 556 1049-ISL 3 VT-3 C0205899 557 1033-ISL 4 VT-3 C0206529 226 11-91SL 4 VT-3 C0211198 593 73-144 8 VT-3 C0195432 1466 CCP 1-3 8 VT-3 C0195440 CCP3 CCP 1-3 8 VT-3 CO 196060 CCP3 10-25SL 9 VT-3 C0206509 235 12-70SL 9 VT-3 C0206514 1976 4-45SL 10 VT-3 C0206505 930 15-118SL 10 VT-3 C0206523 2458 16-55SL 14 VT-3 C0206524 321 Y SECTION H AUGMENTED EXAMINATIONS Pacific Gas and Electric Company THIRD INTERVAL, FIRST PERIOD, FIRST REFUELING OUTAGE REPORT (1R14)CONTAINMENT EXAMS DIABLO CANYON POWER PLANT -UNIT 1 SERVICE DATE: 05/07/85 MAJOR ITEM: AUGMENTED EXAMINATIONS PAGE 1 of 1 CATEGORY COMPONENT
/ WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO. TYPE DATE COMMENTS RESULTS Augmented RC Pump 1-1 Flywheel RC Pump 1-1 Flywheel Flywheel Inner Half UT Radius 5-7-07 NRI SECTION I REPAIRS AND REPLACEMENTS FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106 2. Plant Diablo Canyon Power Plant Date June 30, 2007 Sheet I of I Unit 1 P.O. Box 56, Avila Beach, CA 93424 3. Work Performed by 4. Identification of System Owner See Above Repair Org. P.O. No., Job No., etc.Feedwater System (03)5. (a) Applicable Construction Code (See Work Order) 19 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements
-Addenda, Code Cases 2001- 03 Addenda, Code Case N/A N/A 6. Identification of components.
7 ASME Manufacturer National Other Corrected, Code Nameof Nameof Work Order Year Serial Board Identification Yeir Removed, or g Stamped No. No. Line No Installed (Yes or No)FW-1-535 Kerotest Corp ASN2-5 N/A C0206640 Line-555 N/A Replaced (1) [ N/A Line-556 PGE N/A N/A C0205385 Line-556 N/A Replaced (2) El No El 7. Description of Work (1) Replaced Valve; (2) Installed and Removed Temporary Supports 8. Tests Conducted:
Hydrostatic
[] Pneumatic
[ Nominal Operating Pressure Z Exempt El Other Pressure 1005 PSIG Test Temp. 545 OF 9. Remarks Pressure and temperature shown is 'Main Steam'.CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this comforms to the requirements of the ASME Code, Section XI Type Code Symbol Stamp N/A Certificatq of Authorization No. N/A Expiration Date N/A Signed jdo---v v w Engineering Manager 017Q-7 (Owner or Owner'sDesignee)
Gary Close / (Title)CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California,., And employed by HSB-CT of Hartford, CT'(Date)have inspected the components described in this Owner's Report during the period 1/04 ,2006 to 6/30 ,2007 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in the Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.Furthermore, neither the Igspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arisin om or cp rficte -ith this inspection.
/7.) t ;2'~~..t-Inspector O //O-"/ Commissions CA 1828-NB 9990 A.N.I.C enny D. Kim (Title) (Datg5 (State or Province, National Board)Not .Supplemental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106 Date June 30, 2007 Sheet I of 2 2. Plant Diablo Canyon Power Plant Unit 1 P.O. Box 56, Avila Beach, CA 93424 3. Work Performed by 4. Identification of System Owner See Above Turbine Steam Supply System (04)Repair Org. P.O. No., Job No., etc.5. (a) Applicable Construction Code (See Work Order) 19 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements
-Addenda, Code Cases 1989, No Addenda, Code Case N/A N/A 6. Identification of components."F ASME Manufacturer National Other Corrected, Code Work Order Year NameofSerial Board No.Liedn Stamped Component Manufacturer No. Built No. No. Line No Installed (Yes or No)MS-1-RV-12 Dresser BM07858 N/A C0199509 Line-1065 N/A Replaced (1) (2) El Yes MS-1-FCV-44 Schutte and N690549 N/A R0194577 Line-225 N/A Replaced (3) 0 No Koerting Co Pacific 22-336SL Scientific 7826 N/A CO 194742 Line- 1020 N/A Replaced (7) 0 No Pacific 10-96SL Scientific 6853 N/A C0200327 Line-3915 N/A Replaced (7) El Yes 7. Description of Work (I)Replaced Valve; (2)Replaced Inlet Bolting; (3)Replaced Internals; (7) Replaced Snubber 8. Tests Conducted:
Hydrostatic El Pneumatic
[ Nominal Operating Pressure Z Exempt [] Other Pressure 1005 PSIG Test Temp. 545 OF [ 1989 Code Pressure Test Conducted at NOP lAW Code Case N-416-1 9. Remarks Pressure and temperature shown is 'Main Steam'.......---.. ..............................................--------------------- --- --------i- ......................................................CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this comforms to the requirements of the ASME Code, Section XI Type Code Symbol Stamp N/A C tificate of Authorization No. N/A Expiration Date N/A Signed Vif _ 1 Q.vt. Engineering Manager  (Owner or Owner'sDesignee)
Gary Cloj) (Title) (Date)CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, And employed by HSB-CT of Hartford, CT have inspected the components described in this Owner's Report during the period 1/04 ,2006 to 6/30 ,2007 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in the Owner's Report in accordance with the requirements of theASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arisia-frn or cpej.wf tis inspection.
Z -L--- Inspector Commissions CA 1828 -NB 9990 A.N.I.C Kenny D. Kim' (Title) / (Dafe) / (State or Province, National Board)Note. Supplemental sheets in the form of lists, sketches, or drawings may be used 4rovided (1) size is 8 1/2 x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI 1. Owner Pacific Gas and Electric Company Date June 30, 2007 77 Beale Street, San Francisco, CA 94106 Sheet 2 of 2 2. Plant Diablo Canyon Power Plant Unit I P.O. Box 56, Avila Beach, CA 93424 3. Work Performed by 4. Identification of System Owner See Above Repair Org. P.O. No., Job No., etc.Turbine Steam Supply System (04)5. (a) Applicable Construction Code See Work Order 19 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements
--Addenc 2001-da, Code Cases N/A 03 Addenda, Code Case N/A 6. Identification of components.
Manufacturer National Work Other Corrected, ASME Nameof Name of Serial Board Order Identification Yea Removed, or Code Component Manufacturer No. No. No. Line No Installed S d (Yes or No)MS-1-5398 Velan 901105-10 N/A C0206099 K15-1.5" N/A Repaced (1) (5) [ Yes MS-_-FCV-42 Schutte and N690546 N/A C0211232 Line-226 N/A Replaced (6) E3 No Koerting Co.II MS-1-PCV-22 Copes-Vulcan 6910.95009 N/A C0211346 Line-225 N/A Replaced (6) 13 No MS-1-5399 Velan 901105-8 N/A C0203185 N/A N/A Replaced(l) 0 Yes MS- 1-PCV-22 Copes-Vulcan 6910.95009 N/A C0205273 Line-225 N/A Replaced (3) El No MS-1-RV-223 Dresser BM-07867 N/A C0205299 Line-227 N/A Replaced(2)(4)
[ No MS-1-RV-4 Dresser BM-07854 N/A C0205308 Line-228 N/A Replaced(2)(4)
Z No[]1033-1SL Pacific 1742 N/A C0206529 Line-226 N/A Replaced (7) EL Yes_____________
Scientific I______ ________ ______11-91SL Pacific 7846 N/A C0211198 Line-593 N/A Replaced (7) El No Scientific El El El El El 01 El El El 7. Remarks (1)Replaced Valve; (2)Replaced Inlet Bolting; (3)Replaced Internals; (4)Replaced Spacer; (5)Replaced Piping;(6)Replaced Bonnet Bolting; (7) Replaced Snubber FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106 Date June 30, 2007 Sheet I of 2 Unit 1 2. Plant Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 3. Work Performed by 4. Identification of System Owner See Above Repair Org. P.O. No., Job No., etc.Reactor Coolant System (07)5. (a) Applicable Construction Code (See Work Order) 19 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements
-Addenda, Code Cases 1989, No Addenda, Code Case N/A N/A 6. Identification of components.ASME Manufacturer National Other Corrected, Code Name of Name of Work Order Year Serial Board Identification Removed, or , Stamped Component Manufacturer.
No. Built nsld(es No. No. Line No Installed (Yes or No)RCP 1-2 Westinghouse 9-114E91 IG05 N/A CO 196993 N/A N/A Repiaced(l)
(2) E] No RCS-0-RV-8010 Crosby Valve U2A N/A R0263732 Stock N/A Replaced (6) El Yes Pacific 10-128SL Scientific 23090 N/A C0194779 Line-14 N/A Replaced (7) 0 No 10-128SLPacitfic 10-13SL Pacific 9834 N/A C0197234 Line- 16 N/A Replaced (8)(9) El No ScientificIII I1 7. Description of Work (1) Replaced Internals; (2) Replaced Flange Bolting; (6) Replaced Nozzle (7)Replaced Snubber; (8)Replaced Load Pin; (9)Replaced Spherical Bearing 8. Tests Conducted:
Hydrostatic
[] Pneumatic
[ Nominal Operating Pressure El Exempt 0 Other Pressure PSIG Test Temp. OF I] 1989 Code Pressure Test Conducted at NOP IAW Code Case N-416-1 9. Remarks......................................................................................................................................................
CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this comforms to the requirements of the ASME Code, Section XI Type Code Symbol Stamp N/A Certifi of Auth-i ation No. N/A Expiration Date N/A Signed 0 .1,1-- Engineering Manager '(Owner or Owner'sDesignee)
Gary Close (Title) (Date)CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, And employed by HSB-CT of Hartford, CT have inspected the components described in this Owner's Report during the period 1/04 ,2006 to 6/30 ,2007 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in the Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arisin conntet w1ithis inspection.
Inspector ,g/ -Commissions CA 1828 -NB 9990 A.N.I.C-,,,enny D. Kim (Title) / (D ae) (State or Province, National Board)Note: pplemental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106 2. Plant Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 Date June 30, 2007 Sheet 2 of 2 Unit 1 3. Work Performed by 4. Identification of System Owner See Above Repair Org. P.O. No., Job No., etc.Reactor Coolant System (07)5. (a) Applicable Construction Code See Work Order 19 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements
-Addenda, Code Cases N/A 2001- 03 Addenda, Code Case N/A 6. Identification of components.
*. ASME Manufacturer National Work Other Corrected, ASMe Serial Board Order Identification Built Removed, ore Compnent Manuactuer BiltStamped Component Manufacturer No. No. No. Line No Installed (Yes or No)RCP 1-2 Westinghouse 9-114E91 IG05 N/A C0201e155 N/A N/A Replaced (3) No RCP 1-2 Westinghouse 9-114E91 1G05 N/A C0210949 N/A N/A Replaced (4) 0l No SG 1-1 Westinghouse 1041 68-12 R0287619 SGI1 1984 Repaired (5) C3 Yes SGl-3 Westinghouse 1043 68-14 R0287620 SG13 1984 Repaired (5) El Yes SG 1-4 Westinghouse 1044 68-15 R0287621 SG14 1984 Repaired (5) El Yes SG 1-2 Westinghouse 1042 68-13 R0287622 SG12 1984 Repaired (5) El Yes 7. Remarks (3) Replaced Seal House Bolting; (4) Replaced 1 Flange Nut; (5) Plugged Tubes FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI 1. Owner Pacific Gas and Electric Company 2. Plant 77 Beale Street, San Francisco, CA 94106 Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 Date June 30, 2007 Sheet 1 of 2 Unit 1 3. Work Performed by 4. Identification of System Owner See Above Chemical and Volume Control System (08)Repair Org. P.O. No., Job No., etc, 5. (a) Applicable Construction Code (See Work Order) 19 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements
-Addenda, Code Cases 1989, No Addenda, Code Case N/A N-416-1 6. Identification of components., ASME Manufacturer OtherCorce, od Name of Name of Mauatrr National Work Order Ohr Year Corrected, Code Component Manufacturer Serial BoardaNo.
N Identification Removed, or ; Stamped No. Line No Installed (Yes or No)CCP 1-2 Pacific Pumps 49187 N/A C0182573 CCP2 N/A Replaced (1) 0l No CVCS-1-8356B Anchor ET315-1-5 N/A C0198712 Line-59/1480 N/A Replaced (4)(5) 0 No Darling PDP 1-3 Union Pump 274173 N/A R0178767 PDP1 N/A Replaced (11) 0 No 22-512SL Anchor 919 N/A C0194762 Line-58 N/A Replaced (12) E3 No I Darling I 7. Description of Work (1) Replaced Mechanical Seal Plate; (4) Replaced Valve; (5) Replaced Piping;(11) Replaced Valves; (12) Replaced Snubber 8. Tests Conducted:
Hydrostatic E] Pneumatic E] Nominal Operating Pressure Z Exempt E] Other Pressure
* PSIG Test Temp. N/R 'F 2 1989 Code Pressure Test Conducted at NOP IAW Code Case N-416-1 9. Remarks *** R0178767, 2500 psig; C0198712, Seal Water Inj return inservice; C0195440, 2600 psig;C0195441 & C0195552, 2500 psig; C0206690, 104 psig CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this comforms to the requirements of the ASME Code, Section XI Type Code Symbol Stamp N/A ertificate ofAuthorization No. N/A Expiration Date N/A Signed 0-4" F- Engineering Manager Tr"i 7 (Owner or Owner'sDesignee)
Gary Close (Title) (Date)CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, And employed by HSB-CT of Hartford, CT have inspected the components described in this Owner's Report during the period 1/04 ,2006 to 6/30 ,2007 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in the Owner's Report in accordance with the retuirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kinc arising frow/or connected wia t hs-nspection.
_/ , as Inspector
? 1 / ' Commissions CA 1828-NB9990 A.N.I.C Kenny D. Kim (Title) (Date) (State or Province, National Board)Note: 5ple`mental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI 1. Owner Pacific Gas and Electric Company Date June 30, 2007 77 Beale Street, San Francisco, CA 94106 Sheet 2 of 2 2. Plant Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 Unit 1 3. Work Performed by 4. Identification of System Owner See Above Repair Org. P.O. No., Job No., etc.Chemical and Volume Control System (08)5. (a) Applicable Construction Code See Work Order 19 Edition __ Addenda, Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements
-2001- 03 Addenda, Code Case N/A 6. Identification of components.
..= ASME Name of Name of Manufacturer National Work Order Other Corrected, = Code Name ofdentifiWrkaOrde Year Serial Board Identification Removed, or = Stamped Component Manufacturer No. No. No. Line No Built Installed (Yes or No)CCP 1-2 Pacific Pumps 49187 N/A C0200712 CCP2 N/A Replaced (7) El No CCP 1-3 Flowserve 05RLCA02489010 N/A C0195440 CCP3 2007 Replaced (2) 0 No Corp. 01 1 RO-441 PG&E N/A N/A CO 195441 Line-47 2006 Replaced (3) [ No RO-443 PG&E N/A N/A C0195552 Line-7067 2006 Replaced (3) 0 No CCP 1-3 Flowserve 05RLCA02489010 N/A C0196060 CCP3 2007 Replaced (6) El No Corp. 01 CCP I-3 Flowserve 05RLCA02489010 N/A C0209928 CCP3 2007 Replaced (6) El No Corp. 01 Control CVCS-1-FCV-110A Components 102993-010-1 N/A C0206690 Line-736 2007 Replaced(8) 0 No Inc.23-345R PG&E N/A N/A C0195247 Line-7066 N/A Replaced (9) El No 23-352R PG&E N/A N/A C0195255 Line-7066 N/A Replaced (9) E] No 23-357R PG&E N/A N/A C0195372 Line-7066 N/A Replaced (9) El No 23-358R PG&E N/A N/A C0195374 Line-7066 N/A Replaced (9) El No 23-344A PG&E N/A N/A C0195377 Line-7066 N/A Replaced (9) El No 23-348R PG&E N/A N/A C0195380 Line-7066 N/A Replaced (9) El No 288-152R PG&E N/A N/A C0195388 Line-47 N/A Replaced (9) El No 288-154R PG&E N/A N/A C0195390 Line-47 N/A Replaced (9) El No 288-156R PG&E N/A N/A C0195392 Line-47 N/A Replaced (9) El No 288-155R PG&E N/A N/A C0195391 Line-44 N/A Replaced (9) El No 73-144 PG&E N/A N/A C0195432 Line-1466 N/A Replaced (10) El No 288-80R PG&E N/A N/A C0195436 Line-44 N/A Replaced (10) El No 99-108 PG&E N/A N/A C0206693 Line-736 N/A Replaced (10) E] No 99-440 PG&E N/A N/A C0206694 Line-736 N/A Replaced (10) El No 99-78B PG&E N/A N/A C0206696 Line-2401 N/A Replaced (10) El No 7. Remarks (2) Replaced Pump and associated piping/valves lAW DCN 049704; (3) Fabricated Orfice Plate (6) Modified Base Plate;(7) Modified Mech. Seal Gland Plate; (8) Replaced Valve; (9) Installed New Support; (10) Modified Support FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106 Date June 30, 2007 Sheet I of 2 Unit 1 2. Plant Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 3. Work Performed by 4. Identification of System Owner See Above Repair Org. P.O. No., Job No., etc.Safety Injection System (09)5. (a) Applicable Construction Code (See Work Order) 19 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements
-Addenda, Code Cases 1989, No Addenda, Code Case N/A N-416-1 6. Identification of components.
S.~ ASME Manufacturer National Other Corrected, g Code ManufaturSerialtionar Work Order Identification Year Removed, or = Stamped Name of Name of Serial Board No. LieBouilltd
~ ' ( eso Component Manufacturer No.No Built pe Copoet aufcurrNo.
No. Line No Installed (Yes or No)Anchor SI-1-8805B Ar 6820-1-21 N/A C0174232 Line-1988 Yes Replaced (1) El Yes Darling N Line-7076 PG&E N/A N/A CO 197316 Line-7076 N/A Replaced (2) [ No Line-7077 PG&E N/A N/A CO0197316 Line-7077 N/A Replaced (2) []No 74-41 R PG&E N/A N/A CO 197317 Line-4296 N/A Replaced (4) El No Pacific 22-296SL Scientific 25315 N/A CO 194741 Line-3858 N/A Replaced (3) El No 56-25 PG&E N/A N/A CO 196820 Line-n1991 N/A Replaced (4) E No 56-24 PG&E N/A N/A CO196821 Line- 1991 N/A Replaced (4) El No 288-158A PG&E N/A N/A CO197317 Line-7077 N/A Replaced (5) El No 7. Description of Work (1) Replaced Bonnet Bolting; (2) Installed New Piping; (3)Replaced Snubber; (4) Removed Support;(5) Installed Support 8: Tests Conducted:
Hydrostatic E] Pneumatic 0 Nominal Operating Pressure E Exempt El Other Pressure 190 PSIG Test Temp. N/R 'F E 1989 Code Pressure Test Conducted at NOP IAW Code Case N-416-1 9. Remarks CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this comforms to the requirements of the ASME Code, Section XI Type Code Symbol Stamp N/A Ce-tificate of 4uthorization No. N/A Expiration Date N/A Signed ,G l i , a Q&2..- Engineering Manager R-7 yto-)7 (Owner or Owner'sDesignee)
Gary Cli4 (Title) (Vale)CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, And employed by HSB-CT of Hartford, CT have inspected the components described in this Owner's Report during the period 1/04 ,2006 to 6/30 ,2007 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in the Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arisin om or cn~rted w is inspection.
w --:.- .. -e. Inspector
.-Commissions CA 1828- NB 9990 A.N.I.C nny D. I'irn (Title) (D 4e) (State or Province, National Board)Note: Supemental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 x 11 in., (2) information in items 1 through'6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106 2. Plant Diablo Canyon Power Plant Date June 30, 2007 Sheet 2 of 2 Unit 1 P.O. Box 56, Avila Beach, CA 93424 3. Work Performed by 4. Identification of System Owner See Above Safety Injection System (09)Repair Org. P.O. No., Job No., etc.5. (a) Applicable Construction Code See Work Order 19 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements
-Addenda, Code Cases N/A 2001- 03 Addenda, Code Case N/A 6. Identification of components.
ASME Manufacturer Other Corrected,e Name of Name of .National Work Order Year C C SerialIdentification Removed, or Component Manufacturer Board No. No. Built r Stamped No. Line No Installed (Yes or No)10-25SL Pacific 14588 N/A C0206509 Line-235 N/A Replaced (3) El No Scientific 12-70SL Pacific 103 N/A C0206514 Line-1976 N/A Replaced (6) El Yes Scientific Line-2749 PG&E N/A N/A C0210710 RHR Sump N/A Replaced (7) El No Line-2750 PG&E N/A N/A C0210710 RHR Sump N/A Replaced (7) No______ ___ _ ____ _ _____El _ _ __________
_ ______El _ _ _______ ~El ____________
_ ______El _ _ __________
_ ______El _ _ __________
_ ______El _ _ _7. Remarks (3) Replaced Snubber; (6)Replaced Clamp Nut; (7) New Welded Attachements to Piping FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106 2. Plant Diablo Canyon Power Plant Date June 30, 2007 Sheet 1 of 2 Unit I P.O. Box 56, Avila Beach, CA 93424 3. Work Performed by 4. Identification of System Owner See Above Residual Heat Removal System (10)Repair Org. P.O. No., Job No., etc.5. (a) Applicable Construction Code (See Work Order) 19 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements
-Addenda, Code Cases 1989, No Addenda, Code Case N/A N/A 6. Identification of components.
m ASME Name of N of Manufacturer National WokOd Other Yea Corrected, Code Serial Board Identification Removed, or Stamped Component Manufacturer No. BuiltStme No. No. Line No Installed (Yes or No)RHR-1-RV-8707 Crosby Valve N7237-00-0001 N/A C0199341 94-2513 N/A Replaced (I) El No ED]7. Description of Work (1) Replaced Nozzle and Returned to Stock;8. Tests Conducted:
Hydrostatic El Pneumatic El Nominal Operating Pressure [I Exempt F] Other Pressure PSIG Test Temp. OF 9. Remarks CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this comforms to the requirements of the ASME Code, Section XI Type Code Symbol Stamp N/A o/ uthorization No. N/A Expiration Date N/A Signed j IC Engineering Manager k,; 1.'7 (Owner or Owner'sDesignee)
Gary Close (Title) (fate)CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, And employed by HSB-CT of Hartford, CT have inspected the components described in this Owner's Report during the period 1/04 ,2006 to 6/30 ,2007 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in the Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.Furthermore, neither the Inspectoy nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arisiniffm or connje,, is inspection.
.,, it"Ins- etor ,e L/,g- A Commissions CA 1828 -NB 9990 A.N.I.C_K'kny D. Kim (Title) ate) (State or Province, National Board)Note: pplemental sheets in the form of lists, sketches, or drawings may be usec/provided (1) size is 8 1/2 x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106 Date June 30, 2007 Sheet 2 of 2 Unit 1 2. Plant Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 3. Work Performed by 4. Identification of System Owner See Above Repair Org. P.O. No., Job No., etc.Residual Heat Removal System (10)5. (a) Applicable Construction Code See Work Order 19 Edition __(b) Applicable Edition of Section XI Utilized for Repairs or Replacements
-Addenda, Co 2001, 03 de Cases N/A Addenda, Code Case N/A 6. Identification of components.
ASME Manufacturer National OtherCorceod Name of Name of Work Order .Year Corrected, Code Serial Board Identification Removed, or r Stamped No. No. Line No Built Installed (Yes or No)4-45SL Pacific 23084 N/A C0206505 Line-930 N/A Replaced (2) E] Yes 4-45SLScientific Pacific 15-118SL Scientific 13627 N/A C0206523 Line-2458 N/A Replaced (2) El Yes Scientific]
El El El El El E]E]-11 El El E]El 7. Remarks (2) Replaced Snubber FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106 Date June 30, 2007 Sheet I of I Unit I 2. Plant Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 3. Work Performed by 4. Identification of System Owner See Above Repair Org. P.O. No., Job No., etc.Containment Spray System (12)5. (a) Applicable Construction Code (See Work Order) 19 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements
-Addenda, Code Cases 2001- 03 Addenda, Code Case N/A N/A 6. Identification of components.
"* ASME Manufacturer National Other Corrected, Code Nameof Nameof Work Order Year Serial Board Identification Removed, or Stamped Component Manufacturer No. Built No. No. Line No Installed (Yes or No)58S-142R PG&E N/A N/A R0221534 Line-264 N/A Replaced (1) El No El 7. Description of Work (1) Replaced Support Items 8. Tests Conducted:
Hydrostatic E] Pneumatic E] Nominal Operating Pressure L] Exempt E] Other Pressure PSIG Test Temp. OF 9. Remarks......................................................................................................................................................
CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this comforms to the requirements of the ASME Code, Section XI Type Code Symbol Stamp N/A .,rtificatsof A thorization No. N/A Expiration Date N/A Signed ,l.,- Engineering Manager I t'O7 (Owner or Owner'sDesignee)
'Gary Clse (Title) (Ddle),ERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, And employed by HSB-CT of Hartford, CT have inspected the components described in this Owner's Report during the period 1/04 ,2006 to 6/30 ,2007 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in the Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arisi tom or coyaftctdyv this inspection.
X Inspector 1E Commissions CA 1828 -NB 9990 A.N.I.C&deg;-'K"enny D. Wim- (Title) / (I te) (State or Province, National Board)Note: Supplemental sheets in the form of lists, sketches, or drawings may be sed provided (1) size is 8 1/2 x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106 2. Plant Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 Date June 30, 2007 Sheet 1 of I Unit 1 3. Work Performed by 4. Identification of System Owner See Above Component Cooling Water System (14)Repair Org. P.O. No., Job No., etc.5. (a) Applicable Construction Code (See Work Order) 19 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements
-Addenda, Code Cases 2001 03 Addenda, Code Case N/A N/A 6. Identification of components.ASME Manufacturer National Other Corrected, Code Name of Name of Work Order Year Component M ft Serial Board No. Identification Built Removed, or Stamped No. No. Line No Installed (Yes or No)16-55SL Pacific 13624 N/A C0206524 Line-321 N/A Replaced(l)
El No Scientific
__________
_____ _ _____El ___7. Description of Work (1) Replaced Snubber 8. Tests Conducted:
Hydrostatic E] Pneumatic 0 Nominal Operating Pressure LI Exempt LII Other Pressure _______PSIG Test Temp. O___ F 9. Remarks CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this comforms to the requirements of the ASME Code, Section XI Type Code Symbol Stamp N/A e ificate 9jf AtJorization No. N/A Expiration Date N/A Signed /,.I4L Engineering Manager (Owner or Owner'sDesignee)
Gary Clos (Title) I (g!ate)CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, And employed by HSB-CT of Hartford, CT have inspected the components described in this Owner's Report during the period 1/04 ,2006 to 6/30 ,2007 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in the Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.Furthermore, neither the Inspector nor h* employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising fr. or connected wi is inspection.
-'.- Inspector
./-Commissions CA 1828 -NB 9990 A.N.I.C S y' D. Ki (Title) (Date)/ (State or Province, National Board)Note: SMV-remental sheets in the form of lists, sketches, or drawings may be used-provided (1) size is 8 1/2 x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106 2. Plant Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 Date June 30, 2007 Sheet I of I Unit 1 3. Work Performed by 4. Identification of System Owner See Above Containement Structures (45)Repair Org. P.O. No., Job No., etc.5. (a) Applicable Construction Code (See Work Order) 19__ Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements
-Addenda, Code Cases 2001 03 Addenda, Code Case N/A N/A 6. Identification of components."F ASME Name of Name of Manufacturer National Work Order Other Year Corrected, a Code Serial Board Identification Removed, or M Stamped No. No. Line No Installed H (Yes or No)Penetration-60 Brand Utility N/A N/A C0210115 MP60 N/A Replaced (1) [ No Services, Inc Penetration-60 Brand Utility N/A N/A C0210185 MP60 N/A Replaced (1) D No Services, Inc E]7. Description of Work (1) Modified Temporary Flange 8. Tests Conducted:
Hydrostatic E] Pneumatic El Nominal Operating Pressure LI Exempt F1 Other Pressure PSIG Test Temp. 'F 9. Remarks CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this comforms to the requirements of the ASME Code, Section XI Type Code Symbol Stamp N/A iertificate of Au horization No. N/A Expiration Date N/A Signed ;R Lk -Engineering Manager 7 (Owner or Owner'sDesignee)
Gary Clote (Title) (Date)CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, And employed by HSB-CT of Hartford, CT have inspected the components described in this Owner's Report during the period 1/04 ,2006 to 6/30 ,2007 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in the Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arisin* et or con jcte( this inspection.
' ..-- Inspecor Commissions CA 1828- NB 9990 A.N.I.C Noteenny D. Kim (Title) (Dite) / (State or Province, National Board)Note: "Supplemental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106 Date June 30, 2007 Sheet 1 of I Unit I 2. Plant Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 3. Work Performed by 4. Identification of System Owner See Above Incore Flux Mapping System (48)Repair Org. P.O. No., Job No., etc.5. (a) Applicable Construction Code (See Work Order) 19 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements
-Addenda, Code Cases 2001- 03 Addenda, Code Case N/A N/A 6. Identification of components.
S ASME Manufacturer National Other Corrected, Code Name of Name of Work Order Year Serial Board Identification Removed, or ] Stamped No. No. Line No Installed (Yes or No)A-09 Westinghouse N/A N/A C0211264 RVST N/A Replaced (I) 0 No F-08 Westinghouse N/A N/A C0211264 RVST N/A Replaced (1) 0 No L-15 Westinghouse N/A N/A C0211264 RVST N/A Replaced (1) 0 No J-10 Westinghouse N/A N/A C0211264 RVST N/A Replaced (1) 0 No H-15 Westinghouse N/A N/A C0211528 RVST N/A Replaced (2) 0 No 7. Description of Work (1) Shorten and Reposition Flux Thimble Tubes; (2)Replaced Fitting 8. Tests Conducted:
Hydrostatic E] Pneumatic E] Nominal Operating Pressure E Exempt .L Other Pressure 2235 PSIG Test Temp. N/R OF 9. Remarks CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this comforms to the requirements of the ASME Code, Section XI Type Code Symbol Stamp N/A rtificate of juthorization No. N/A Expiration Date N/A Signed N/ e,,, &7 ZUEc.. Engineering Manager &#xfd;/( 7Y0 -7 (Owner or Owner'sDesignee)
Gary Clkse (Title) (Date)CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, And employed by HSB-CT of Hartford, CT have inspected the components described in this Owner's Report during the period 1/04 ,2006 to 6/30 2007 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in the Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arisingro or conn. ed ith is inspection.
--Inspector F1/6 -/-" Commissions CA 1828 -NB 9990 A.N.I.C enny D. iimr (Title) i(Di e) (State or Province, National Board)Notez Supplemental sheets in the form of lists, sketches, or drawings may be sed provided (1) size is 8 1/2 x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is num ered and the number of sheets is recorded at the top of this form.
SECTION J Manufacturers Data Reports For Nuclear/Pressure Vessels FORM N-lA MANUFACTURERS DATA REPORT FOR NUCLEAR VESSELS SHEET CONTRACT Alternate Form for Single Chamber Completely Shop-Fabricated Vessels Only 1 Of 2 23066 As required by the Provisions of the ASME Code'Rules and the National Board Combustion Engineering, Inc., 911 West Main Street, Chattanooga, Tennessee I. Manufactured by .........
... ...............................
..*I............
..................
....... ... ....... ..- .................
.............
I..........
..... ................
..........(Nanm' d addzssf M!an Westinghouse Eiectric&Corporation, 1 .u. ox Pittsburgh, Pennsylvania
: 2. Manufactured for ......................................................................................................
:. V rtV s elN 6 2.56 0 , s g ; J ~ n Bd N 76 ...................................
6 T W...................... (ear-ue an1970sofP rc qe Vy e r...... N atl ......... ..... .... .. ..............
... ..................................
ilt ... ..............
...........
.3. Type .............
Vessel No.(PL4(aeadadesONU YrBul 1970 -(Hori=. or Vert. (Mfrs. Serial) (State & State No.q 13 11-1/2 Nom. 10- Corr, 4. Shell: ..F.... T. .. T.'.. .QQQ...k.
.34 in. Allow. In. Diam.4.....Ft.....nLength
...42...Ft..FII.ZA9 (Kind & Spec. No.) (Min. of range specified)
: 5. Seams: Long ...............
9 ..................
l-f.T. ..... X9,1 ...........
X-R ...... ...............
Efficiency
........................................
%(If Class B)Girth .H.T. .Y. ... 'XR Yes No. of Courses ...3 6. Heads: (a) Material.
... .. ..........
T.s Q .QQ ....... (b)
_. ......
.............
T.S....8.Q Q. ..........
Location Crown Knuckle Elliptical Conical Hemispherical Flat Side to Pressure (Top bottom, ends) Thickness Radius Radius Ratio Apex Angle 32 R3adi Diameter (Convex or Concave)(a)T..A ........ .. ...... aa-.2 zi,32 ...................................
...83- -.. ... .. Concave (b)....TDP tee...S. .0...... ... ......................
....... .............
If removable, bolts used -.. ... ..... e...................... .r.%.. ..............
...........
...........(Material.
Spec. No. T.S., Size, Number) f 7. Constructed for. Charpy impact...Q.
ftlb Hydrostatic Desi.gn xptacmi press.2 ...?5.QQ psi. at max. temp....6
..R F. at temp. of ..........
/aQ ...........
OF. Press 3125 psi S. Safety or Relief Valve Outlets: Number ..............................
Size ...........
S..................
Location ............................................................
1 ......................
: 9. Nozzles: Purpose (Inlet, Reinforcement How R t Number Diam. or Size Type Material Thickness Material Attached 27"-15d/16y
,.Ii .D.5 .oging A-500-64.C.
2-5/16 .1..r. Welded 0 Inspection Manholes, No ... .............
Size ...............
Location........
Openings:
Handholes, No. .. ...... Size ...............
Location.
..... ..r  Threaded, No ..............................
Size..............................
Location ...... .... .. pt..F .... .................
: 11. Supports:
Skirt ....NQ...o.............
Lugs..A..4......:........
Legs ...........
:.........
Other .. ..................
:...... ttached ......... ..............
..11 Sppots: (Yes or No) .(Number) (Number) (Describe) e 12. Rema1,5. Pressurized Water Reac:tor Vessel. Other .............
Jr 12 Re ............
:. ..........
.............
X...............
................
................
r ...................-A..... .. ....... A. .............
...........
0.. ...........
.............
4...... 9 K .........
Q ..........
Qs- g ... .................................
........-.
........... .....................
...... ....... ... .5.... .........
u... p.1.a g&#xfd;. ...........
1-T r..c2 nirfi~rbrr e ...................
I.........A
..........
I .... S~te is.p~1 .... .. ....WRIN ff. ..... .... ....................................
.. .. .. .... .- .: ... ..... ..... ...... ...... ....(Brief description bf purpose of the vessel -Sta.-- -- .............
If Posiweld Heat-Treated.
2 List other Internal or external pressure with coincident temperature when applicable.
We certify that the statements made in this report are correct and that al details of material design, constction, antdworkmanshigohtl vessel conform to the ASiME Code for Nuclear Vessels.rig n N. *DaIe November 20 1970 S- -Combustion En inering, Inc.D ate.........................................
........ igned .................................................................
By ................................................................
iaeires pAntl0o 1972 (Manufacturer)
H. .N. Dinwiddie Certificatexirs..
..............................
Authorization........................................................
CERTIFICATION OF DESIGN Design Information on file at.......
.....................................
Stress analyl Seport on file at .........E.n.nee.rin.g..
c.. a.ttnoga.
enn..................
'L.Porse Design spa .fi lions certified by ...........................
.............
Prof. Eng.....Y..
........ State..C.al,+/-.t-Reg.
No. 7...32.........
Stre mn. report certified by Fr.nk .P. Hill,. Jr. Prof. Eng Yes State ...... Reg. No. 7257 Qv/CERTIFICATE OF SHOP INSPECTION SV f MADE BY ZCmbustion Engineering, Inc. Chattanooga, Tenn.'th'4indersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State afnd emlydby&p Ins. Cq,. dCneciu.............
and employed by ..t..Q .~d.......
...
...........
..~s , ..i ........ ..a ... ...... ..... ... ..W 5 ve inspected the pressure vessel deg-cribed in this manufacturer's data report on .........
A. ...............................
197... and s ate that to the best of my knowledge and belief, the manufacturer has constructed this pressure vessel in accordance with the ASME$* ode for Nuclear Vessels.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the pressure vessel described in this manufacturer's data report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Date.. oy.. .e.. 20r.....2.0
....................
19.2Q0 National Board No. 2928...........
or '9 Z I eZCommi ssions. .........................................................................
Co mmi ssions................na.......
te. d................
74 tMrTsp 11 &#xfd;P, Inspectors Signature National noard or Stats and No.
,~2 CONTRACT 23066 FORM N-lA SUPPLEMENTAL DATA REPORT FOR NUCLEAR VESSELS* Alternate Form for Single Chamber Completely Shop-Fabricated Vessels Only As required by the Provisions of the ASME Code-Rules and the National Board SHEET 2 Of 2 1M ucCombustioe Engineering.
Inc. a 91VWest Main St.. Chattanooga, Tennessee 2. Manufactured for...tWesttinghouse Electric Corp.rXd 6 ddls o ,ac sburgh, Pennsylvania
=.........................
.....................
6 ...................................
Vert zar;;Q 2 6 3. Type ................
...........
Vessel No. (... .4 ....... ( ...... Natl. Ed. No...Q.. .......................
Year Built .9.70 (Horiz. or Vert (Mfrs. Serial) (State &State No.)5 ........................
Vert Nom.8- Corr. 5-4 .S h e l l a te ria iG ...B .C 1 .1 r s 8 0, .0.i nk ...In .A llo w ..... .In .D i m .4 t. ..F t.1 .L L en g th .4 ..... .F t ..en .(Kind & Spec. No.) (Mlin. of range specified)
S. Seams: Long ....................................
H.T.lI .........................
X.R ... ..... Efficiency
....... ..........
%(If Class B)Girth ......................................
H .T.' ..........................
X.R ..............................
No. of Courses .......................................
A-533 Gr.B Cl. 1 8O 000 6. Heads: (a) Material ..................................................
...(b) Material ...........................................................
T.S. .....Location Crown Knuckle Elliptical Conical Hemispherical Flat Side to Pressure (Top, bottom, ends) Thickness Radius Radius Ratio Apex Angle Ra dins Diameter (Convex or Concave)(a) Botm 551 83888-3/ -Concave (B oto). -6.... a.18.........
..........
......................
............
.. .. ...8 (b) ....
...m.. ............
.. 1..6... .........
...........................
.... ..................
.. ...... : ... ...-... ............
....................
...... ...o...n..c...a...v..e...............
I f ..............................................!. ........................................ .......O .................7 .........................................................................................If(Material, Spec. No. T.S., Size, Number) her * .......................................................
Other fastenin ..........................(Describe or Attach Sketch)7. Constructed for Charpy impact ......................
ft-lb Hydrosatic r oeaigpe&..........ps.ama.temp.
0  Pneumatic or )~Test o a g e...p 2.........
F. at temp. of ...... OF. Combination I Press. ...... psi.8. Safety or Reelief Valve Outlets: Number ..............................
Size .............................
Location ........ ......................................................................
: 9. Nozzles: Purpose (idtj .Reinforcement How Outlet,, ) Number Diam. or Size Type Material Thickne s Material tce Body 4 2.3.Iz./4.........I....D.. ... Forgi.ng A-508-64 Cl. 2-11/32 Integral...
W...........
.......................
A....... ....73 ..nt...... ..10. Inspection Manholes, No ..............................
Size ..........................
Location..........
...............
Openings:
Handholes, No .............................
Size .............................
Location .......................................................................................................
Threaded, No ..............................
Size ..............................
Location ....................................................................................................
: 11. Supports:
Skirt.,,.-..
o)-Lugs ...(Nme)....Legs..(ub.r)...
Other ..(.D.e.sci).....
Attached.
....-..........
We.a..&.H.ow..................
: 12. Remarks: ... ........................
..............
.................................................
..... Attache...
..........................................................................
1...Remar....s:...........................................................................................................................................................................................
:.........................
.. .............
.........................
,.............o........
......
....................
................................................
.......................................................................................(Brief description of purpose of the vessel -State Contents.)
* If Postweld Heat-Treated.
2 List other internal or external pressure with coincident temperature when applicable.
We certify that the statements made in this report are correct and that all details of material design, construction, and workmanship of this vessel conform to the ASME Code for Nuclear Vessels.D atee ............................................
19 ........ Signed ..............................................................................................
By ................................................................(Manufacturer)
Certificate of Authorization Expires .........................................................................................................................................................................................
CERTIFICATION OF DESIGN Design inform ation on file at ................................-.......................................................................................................................................................
Stress analysis report on file at ....................................................................................................................................................................................
Design specifications certified by ..............................................................................
Prof. Eng ....................
State ................
Reg. No ...............
Stress analysis report certified by ..............................................................................
Prof. Eng .....................
State ................
Reg. No ................
.CERTIFICATE OF SHOP INSPECTION VESSEL MADE BY .............................................-.......
.. ... ..... ..... .....at.... ..........................
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State of ................................
and employed by ................................................................................................
of............
have inspected the pressure vessel described in this manufacturer's data report on .. ...........19 ....... , and state that to the best of my knowledge and belief, the manufacturer has constructed this pressure vessel in accordance with the ASME Code for Nuclear Vessels.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the pressure vessel described in this manufacturer's data report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Date .............................................
.19 ........................................................................................................................
C om m ission s ..........................................................................
C ...................
Inspectors Signature National Board or State and No.}}

Latest revision as of 19:18, 17 April 2019