ML082460319: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[L-08-248, Submittal of Semiannual Fitness-For-Duty Report, January - June 2008]]
| number = ML082460319
| issue date = 08/28/2008
| title = Submittal of Semiannual Fitness-For-Duty Report, January - June 2008
| author name = Allen B S
| author affiliation = FirstEnergy Nuclear Operating Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000346
| license number = NPF-003
| contact person =
| case reference number = L-08-248
| document type = Letter, License-Fitness for Duty (FFD) Performance Report
| page count = 5
}}
 
=Text=
{{#Wiki_filter:FENOC"EN % 5501 North State Route 2 FirstEnergy Nuclear Operating Company Oak Harbor, Ohio 43449 Barry S. Allen 4.19-321-7676 Vice President
-Nuclear Fax: 419-321-7582 August 28, 2008 L-08-248 10 CFR 26.71(d)United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001
 
==SUBJECT:==
Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Semiannual Fitness-For-Duty Report, January -June 2008 Pursuant to 10 CFR 26.71(d), "Recordkeeping Requirements," FirstEnergy Nuclear Operating Company (FENOC) submits the semiannual Fitness-For-Duty (FFD) report for the period of January through June 2008 for the Davis-Besse Nuclear Power Station, Unit 1 (DBNPS).Attachment 1 provides FENOC's DBNPS FFD Program Performance Data. Attachment 2 provides a summary of management actions taken by FENOC based on positive FFD testing results and presumptive positives, and a list of FFD event reports submitted by FENOC.There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Dale R. Wuokko, Manager, Site Regulatory Compliance, at (419) 321-7120.Sincerely, Barry S. Allen Attachments:
: 1. Fitness for Duty Program Performance Data 2. Summary of Management Actions Taken and List of FFD Event Reports Davis-Besse Nuclear Power Station, Unit 1 L-08-248 Page 2 of 2 cc: NRC Region III Administrator NRC Resident Inspector NRR Project Manager Utility Radiological Safety Board Attachment 1 L-08-248 Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 Page 1 of 2 NOP-LP-1002-01 Rev. 00 FirstEnerqy Nuclear Operatingq Company Company Davis-Besse Nuclear Power Station, Unit 1 Location Mark A. Hoffman, Supervisor, Nuclear Access June 30, 2008 6 Months Ending (419) 321-7338 clude area code)Contact Name Phone (inc Cutoffs: Screen/Confirmation (ng/ml) Z Appendix A to 10 CFR 26 Marijuana 100 / 15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/ 25 Opiates 300 / 300 Alcohol (%BAC) 0.04%0.03% (work status 1 hour or greater)0.02% (work status 2 hours or greater)
Attachment 1 L-08-248 Page 2 of 2 Breakdown of Confirmed Positive Tests for Specific Substances NOP-LP-1002-01 Rev. 00 Amphe- Phency- Refusal Marijuana Cocaine Opiates tamines didine Alcohol to Test 1 2 4 5 Licensee Employees 0 0 0 0 0 0 0 Long-Term Contractors 0 0 0 0 0 0 0 Short-Term Contractors 0 0 0 0 0 0 0 Total 0 0 o 0 0 0 0 0 0I]
Attachment 2 L-08-248 Summary of-Management Actions Taken and List of Fitness For Duty Event Reports Page 1 of 1 From January 1, 2008, through June 30, 2008, the Davis-Besse Nuclear Power Station (DBNPS) Fitness for Duty (FFD) records indicate zero positive results from both licensee and contractor personnel.
List of Events Reported No Fitness-For-Duty events were reported under the provisions of 10 CFR 26.73 by the DBNPS during this reporting period (January -June 2008).}}

Latest revision as of 08:18, 17 April 2019