DCL-09-064, Humboldt Bay, Unit 3, Request of Quality Assurance Program for Radioactive Material Packages Number 0202 Renewal: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[DCL-09-064, Request of Quality Assurance Program for Radioactive Material Packages Number 0202 Renewal]]
| number = ML092590062
| issue date = 09/04/2009
| title = Humboldt Bay, Unit 3, Request of Quality Assurance Program for Radioactive Material Packages Number 0202 Renewal
| author name = Conway J T
| author affiliation = Pacific Gas & Electric Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/FSME
| docket = 05000133, 05000275, 05000323, 07100202
| license number = DPR-007, DPR-080, DPR-082
| contact person =
| case reference number = DCL-09-064, HBL-09-010
| document type = Letter type:DCL
| page count = 2
}}
 
=Text=
{{#Wiki_filter:Pacific Gas and Electric CompanyJ John T. Conway 77 Beale Street Senior Vice President-Energy Supply & Mail Code B32 Chief Nuclear Officer San Francisco, CA 94105 415.973.3336 Internal:
223.3336 Fax: 415.973.2313 Alternate Address PG&E Letter DCL-09-064 Diablo Canyon Power Plant R a. Box 56 PG&E Letter HBL-09-010 Avila Beach, CA 93424 805.545.3333 U.S. Nuclear Regulatory Commission Fax: 805.545.4884 ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001 Docket No. 50-275, OP-DPR-80 Docket No. 50-323, OP-DPR-82 Docket No. 50-133, OP-DPR-7 Diablo Canyon Units 1 and 2 Humboldt Bay Power Plant Unit 3 Quality Assurance Program for Radioactive Material Packages Number 0202 Dear Commissioners and Staff: On April 20, 2004, Pacific Gas and Electric Company (PG&E) requested in PG&E Letter DCL-04-036/HBL-04-006, NRC approval of its previously approved Quality Assurance (QA) Program for Radioactive Material Packages Number 0202.The NRC approved the QA Program in a letter to PG&E dated May 20, 2004 (Approval Number 0202, Revision Number 7). The current QA Program expired on June 30, 2009.Pursuant to 10 CFR 71.38, PG&E is requesting a renewal of the previously approved QA Program for Radioactive Material Packages Number 0202.Pursuant to 10 CFR 71.101(f), PG&E intends to continue to apply its 10 CFR 50, Appendix B programs to radioactive material packages used at the Diablo Canyon Power Plant (DCPP) and Humboldt Bay Power Plant (HBPP).DCPP's QA Program was first submitted to the NRC as part of the original DCPP Final Safety Analysis Report (FSAR) in 1973, and was approved in NRC Supplemental Safety Evaluation Report No. 9, issued in June 1980. The latest docketed version of the DCPP QA Program is contained in Revision 18 of the FSAR Update, submitted to the NRC in PG&E Letter DCL-08-078, dated October 6, 2008.A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Caltaway
* Comanche Peak e DiabLo Canyon
* Palo Verde , San Onofre
* South Texas Project , Wolf Cree' -" A4/&550I Document Control Desk September 4, 2009 Page 2 PG&E Letter DCL-09-064 HBL-09-01 0 HBPP's QA Program was first submitted to the NRC as part of the SAFSTOR application on July 30, 1984, and was approved in NRC Safety Evaluation Report, dated April 29, 1987. The latest docketed version of the HBPP QA Program description, contained in Revision 7 of the Unit 3 Defueled Safety Analysis Report, and the most recent revision of the SAFSTOR QA Plan, Revision 21, were both submitted to the NRC in PG&E Letter HBL-08-003, dated March 7, 2008.There are no new regulatory commitments in this letter.Should you have any questions in regard to this document please feel free to call Mr. Mark Somerville at 805-545-4007.
Sincerely, Jo? .onway Senior Vice President
-Energy Supply and Chief Nuclear Officer ddm/4162/50256080 cc: E. William Brach, Director, Spent Fuel Project Office Elmo E. Collins, Jr., NRC Region IV Regional Administrator Robert Evans, NRC Region IV Inspector John B. Hickman, NRC Project Manager Michael S. Peck, NRC Senior Resident Inspector Alan B. Wang, NRC Project Manager Diablo Distribution PG Fossil Gen HBPP Humboldt Distribution A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
* Comanche Peak 9 Diablo Canyon
* Palo Verde
* San Onofre
* South Texas Project e Wolf Creek}}

Latest revision as of 22:42, 16 April 2019