ML092650290: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[TMI-09-090, Update 8 of the Post-Defueling Monitored Storage Safety Analysis Report]]
| number = ML092650290
| issue date = 08/24/2009
| title = Update 8 of the Post-Defueling Monitored Storage Safety Analysis Report
| author name = Hagan J J
| author affiliation = GPU Nuclear Corp
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000320
| license number = DPR-073
| contact person =
| case reference number = TMI-09-090
| document type = Letter
| page count = 2
}}
 
=Text=
{{#Wiki_filter:'1.NUCLEAR GPU Nuclear, Inc.Three Mile Island Nuclear Station Route 441 South Post Office Box 480 Middletown, PA 17057-0480 Tel 717-948-8461 August 24, 2009 TMI-09-090 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
 
==SUBJECT:==
THREE MILE ISLAND NUCLEAR STATION, UNIT 2 (TMI-2)POSSESSION ONLY LICENSE NO. DPR-73 DOCKET NO. 50-320 UPDATE 8 OF THE POST-DEFUELING MONITORED STORAGE SAFETY ANALYSIS REPORT
 
==Dear Sirs:==
Enclosed are the revised pages associated with Update 8 of the Post-Defueling Monitored Storage Safety Analysis Report (PDMS SAR) for TMI-2. The last revision of the PDMS SAR was issued as Update 7 on August 22, 2007. Update 8 revises the PDMS SAR to reflect the current plant configuration and administrative processes, and to make some editorial changes. The revised pages are indicated on the list of effective pages, which should be kept in the front of the binder containing the PDMS SAR. Also included are binder sleeves for Update 8. Changes made from Update 7 to Update 8 of the PDMS SAR are identified by bold face type within the document, and a bold line vertically drawn in the margin adjacent to the portion actually changed.GPU Nuclear will issue the next revision of the PDMS SAR no later than 24 months from the date of this submittal. Please contact Adam Miller of TMI-1 Regulatory Assurance at (717) 948-8128 if you have any questions regarding Update 8 to the PDMS SAR.Sincerely, Joseph J. Hagan President
& Chief Nuclear Officer JJH/awm cc: USNRC TMI-2 Region I Inspector USNRC TMI-2 Project Manager NRC Regional Administrator, Region I Ten (10) Copies to DCD}}

Latest revision as of 22:33, 16 April 2019