ML12205A001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[L-12-263, Change to Schedule for Submittal of License Renewal Application]]
| number = ML12205A001
| issue date = 07/19/2012
| title = Change to Schedule for Submittal of License Renewal Application
| author name = Sena P P
| author affiliation = FirstEnergy Nuclear Operating Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000440
| license number = NPF-058
| contact person =
| case reference number = L-12-263
| document type = Letter
| page count = 2
| project =
| stage = Other
}}
 
=Text=
{{#Wiki_filter:FENOC FirstEnergy Nuclear Operating Company 341 White Pond Drive Akron, Ohio 44320 Peter P. Sena III 330-436-1350 President and Chief Operating Officer July 19, 2012 L-12-263 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
 
==SUBJECT:==
Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Change to Schedule for Submittal of License Renewal Application By letter dated July 22, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. MLI102110085), FirstEnergy Nuclear Operating Company (FENOC) provided the planned submittal date for the License Renewal Application for the Perry Nuclear Power Plant (PNPP).The preparation and submittal schedule for the PNPP License Renewal Application has been revised to ensure adequate time to prepare a quality application and complete the requisite reviews. As requested by the Nuclear Regulatory Commission (NRC) in Regulatory Issue Summary (RIS) 2009-06, "Importance of Giving NRC Advance Notice of Intent To Pursue License Renewal," FENOC hereby submits the updated schedule information.
The application is now scheduled to be submitted in September of 2015.This schedule is provided for NRC use in planning the PNPP License Renewal Application reviews.There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Clifford I. Custer, Fleet License Renewal Project Manager, at 724-682-7139.
Sinc,efely, Peter P. Sena III ,403§ Perry Nuclear Power Plant L-12-263 Page 2 cc: NRC Region III Administrator NRC Resident Inspector NRR DORL Project Manager NRC DLR Director}}