ML12356A177: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[L-MT-12-112, Kld TR-505, Rev. 1, Development of Evacuation Time Estimates, Part 7 of 8]]
| number = ML12356A177
| issue date = 11/30/2012
| title = Monticello, Unit 1, Kld TR-505, Rev. 1, Development of Evacuation Time Estimates, Part 7 of 8
| author name =
| author affiliation = KLD Engineering, PC
| addressee name =
| addressee affiliation = Northern States Power Co, NRC/NRR, Xcel Energy
| docket = 05000263
| license number = DPR-022
| contact person =
| case reference number = L-MT-12-112
| document report number = KLD TR-505, Rev 1
| document type = Report, Miscellaneous
| page count = 68
}}
 
=Text=
{{#Wiki_filter:Table K-1. Evacuation Roadway Network Characteristics Up Don Lae Sole0lw Fo*5.e m S Se m Legt No. ofWdh Wdh Rt Sped Gi 1 1 278 US 10 MINOR ARTERIAL 10244 2 12 4 1,900 70 4 2 1 658 US 10 MINOR ARTERIAL 2332 2 12 4 1,900 70 4 3 3 4 1-94 FREEWAY 1672 2 12 10 2,250 75 4 4 4 3 1-94 FREEWAY 1674 2 12 10 2,250 75 4 5 4 5 1-94 FREEWAY 1519 2 12 10 2,250 75 4 6 4 47 ON-RAMP TO CR 7 FREEWAY RAMP 2099 1 12 4 1,700 45 4 7 5 4 1-94 FREEWAY 1519 2 12 10 2,250 75 4 8 5 6 1-94 FREEWAY 1483 2 12 10 2,250 75 4 9 6 5 1-94 FREEWAY 1483 2 12 10 2,250 75 4 10 6 7 1-94 FREEWAY 9103 2 12 10 2,250 75 4 11 6 46 OFF-RAMP TO CR 7 FREEWAY RAMP 1434 1 12 4 1,700 45 4 12 7 6 1-94 FREEWAY 9104 2 12 10 2,250 75 4 13 7 50 1-94 OFF-RAMP FREEWAY RAMP 1097 1 12 4 1,700 45 4 14 7 52 1-94 FREEWAY 1101 2 12 10 2,250 75 4 15 8 9 1-94 FREEWAY 7703 2 12 10 2,250 75 9 16 8 51 OFF-RAMP TO CR 75 FREEWAY RAMP 862 1 12 4 1,700 45 4 17 8 52 1-94 FREEWAY 1026 2 12 10 2,250 75 4 18 9 8 1-94 FREEWAY 7703 2 12 10 2,250 75 9 19 9 10 1-94 FREEWAY 2239 2 12 10 2,250 75 9 20 10 9 1-94 FREEWAY 2232 2 12 10 2,250 75 9 21 10 11 1-94 FREEWAY 8298 2 12 10 2,250 75 9 22 11 10 1-94 FREEWAY 8298 2 12 10 2,250 75 9 23 11 12 1-94 FREEWAY 1900 2 12 10 2,250 75 9 24 12 11 1-94 FREEWAY 1905 2 12 10 2,250 75 9 Monticello Nuclear Generating Plant K-44 KLD Engineering, P.C.Evacuation Time Estimate Rev. 1 25 12 13 1-94 FREEWAY 5941 z 12 10 2,250 75 9 26 13 12 1-94 FREEWAY 5941 2 12 10 2,250 75 9 27 13 14 1-94 FREEWAY 1490 2 12 10 2,250 75 10 28 13 58 1-94 OFF-RAMP FREEWAY RAMP 744 1 12 4 1,750 45 9 29 14 13 1-94 FREEWAY 1490 2 12 10 2,250 75 10 30 14 59 1-94 OFF-RAMP FREEWAY RAMP 809 1 12 4 1,750 45 10 31 14 864 1-94 FREEWAY 2742 3 12 10 2,250 75 10 32 15 14 1-94 FREEWAY 12825 2 12 10 2,250 75 10 33 15 16 1-94 FREEWAY 3433 2 12 10 2,250 75 10 34 16 15 1-94 FREEWAY 3435 2 12 10 2,250 75 10 35 16 17 1-94 FREEWAY 8323 2 12 10 2,250 75 10 36 17 16 1-94 FREEWAY 8322 2 12 10 2,250 75 10 37 17 18 1-94 FREEWAY 1535 2 12 10 2,250 75 16 38 18 17 1-94 FREEWAY 1532 2 12 10 2,250 75 16 39 18 19 1-94 FREEWAY 824 2 12 10 2,250 75 16 40 19 18 1-94 FREEWAY 824 2 12 10 2,250 75 16 41 19 20 1-94 FREEWAY 2009 2 12 10 2,250 75 16 42 20 19 1-94 FREEWAY 2012 2 12 10 2,250 75 16 43 20 21 1-94 FREEWAY 8714 2 12 10 2,250 75 16 44 21 20 1-94 FREEWAY 8714 2 12 10 2,250 75 16 45 21 22 1-94 FREEWAY 6897 2 12 10 2,250 75 17 46 22 21 1-94 FREEWAY 6897 2 12 10 2,250 75 17 47 22 23 1-94 FREEWAY 2134 2 12 10 2,250 75 17 48 23 22 1-94 FREEWAY 2134 2 12 10 2,250 75 17 49 23 24 1-94 FREEWAY 13888 2 12 10 2,250 75 17 Monticello Nuclear Generating Plant Evacuation Time Estimate K-45 KLD Engineering, P.C.Rev. 1 Sauaion Fe Up Down Lan Shudr Flw Fo Ste temLngh N.o it Wit Rat Spe Gri Lin # Node Nod Roda Nam Roawa Typ (f. Lae f.0ft). (p)Nme 50 24 23 1-94 FREEWAY 13888 2 12 10 2,250 75 17 51 24 25 1-94 FREEWAY 7946 2 12 10 2,250 75 17 52 25 24 1-94 FREEWAY 7947 2 12 10 2,250 75 17 53 25 26 1-94 FREEWAY 7038 2 12 10 2,250 75 17 54 26 25 1-94 FREEWAY 7038 2 12 10 2,250 75 17 55 26 27 1-94 FREEWAY 2571 2 12 10 2,250 75 22 56 27 26 1-94 FREEWAY 2571 2 12 10 2,250 75 22 57 27 166 1-94 FREEWAY 771 2 12 10 2,250 75 22 58 27 197 OFF-RAM P TO CR 25 FREEWAY RAMP 982 1 12 4 1,750 45 22 59 28 29 1-94 FREEWAY 6995 2 12 10 2,250 75 22 60 28 166 1-94 FREEWAY 849 2 12 10 2,250 75 22 61 28 168 OFF-RAM P TO CR 25 FREEWAY RAMP 810 1 12 4 1,750 45 22 62 29 28 1-94 FREEWAY 6998 2 12 10 2,250 75 22 63 29 30 1-94 FREEWAY 1521 2 12 10 2,250 75 22 64 30 29 1-94 FREEWAY 1521 2 12 10 2,250 75 22 65 30 31 1-94 FREEWAY 1889 2 12 10 2,250 75 22 66 30 348 OFF-RAM P TO CR 39 FREEWAY RAMP 1547 1 12 4 1,750 40 22 67 31 30 1-94 FREEWAY 1889 2 12 10 2,250 75 22 68 31 32 1-94 FREEWAY 2913 2 12 10 2,250 75 22 69 32 31 1-94 FREEWAY 2918 2 12 10 2,250 75 22 70 32 33 1-94 FREEWAY 18771 2 12 10 2,250 75 30 71 33 32 1-94 FREEWAY 18771 2 12 10 2,250 75 30 72 33 34 1-94 FREEWAY 7048 2 12 10 2,250 75 31 73 34 33 1-94 FREEWAY 7048 2 12 10 2,250 75 31 74 34 35 1-94 FREEWAY 4729 2 12 10 2,250 75 31 Monticello Nuclear Generating Plant K-46 KLD Engineering, P.C.Evacuation Time Estimate Rev. 1 75 35 34 1-94 FREEWAY 4728 2 12 10 2,250 75 31 76 35 36 1-94 FREEWAY 1322 2 12 10 2,250 75 31 77 36 35 1-94 FREEWAY 1322 2 12 10 2,250 75 31 78 36 37 1-94 FREEWAY 3048 2 12 10 2,250 75 31 79 36 611 1-94 OFF-RAMP FREEWAY RAMP 448 1 13 4 1,750 45 31 80 37 36 1-94 FREEWAY 3042 2 12 10 2,250 75 31 81 37 38 1-94 FREEWAY 7117 2 12 10 2,250 75 31 82 38 37 1-94 FREEWAY 7117 2 12 10 2,250 75 31 83 38 39 1-94 FREEWAY 4295 2 12 10 2,250 75 31 84 39 38 1-94 FREEWAY 4299 2 12 10 2,250 75 31 85 39 40 1-94 FREEWAY 1084 2 12 10 2,250 75 31 86 39 659 1-94 OFF-RAMP FREEWAY RAMP 741 1 12 4 1,750 45 31 87 40 39 1-94 FREEWAY 1084 2 12 10 2,250 75 31 88 40 41 1-94 FREEWAY 8893 2 12 10 2,250 75 31 89 40 660 OFF-RAMP TO CR 241 FREEWAY RAMP 437 1 12 4 1,750 45 31 90 41 40 1-94 FREEWAY 8893 2 12 10 2,250 75 31 91 41 42 1-94 FREEWAY 4079 2 12 10 2,250 75 32 92 42 41 1-94 FREEWAY 4079 2 12 10 2,250 75 32 93 42 1168 1-94 FREEWAY 314 2 12 10 2,250 75 32 94 43 44 1-94 FREEWAY 773 2 12 10 2,250 75 41 95 43 858 1-94 OFF-RAMP FREEWAY RAMP 952 1 12 4 1,750 45 32 96 43 860 1-94 FREEWAY 662 2 12 10 2,250 75 41 97 44 43 1-94 FREEWAY 773 2 12 10 2,250 75 41 98 44 45 1-94 FREEWAY 1397 2 12 4 2,250 75 41 99 45 44 1-94 FREEWAY 1397 2 12 4 2,250 75 41 Monticello Nuclear Generating Plant Evacuation Time Estimate K-47 KLD Engineering, P.C.Rev. 1 Sauain Fe Stem Srar egh No f Wdh Wdh Rt Sped ri Lin # Nod Nod Rod a Na eSawVTp ft) Lns ( t) ( .pp ) (p) N m e 100 46 5 ON-RAMP TO 1-94 FREEWAY RAMP 424 1 12 4 1,700 45 4 101 46 49 CR 7 MAJOR ARTERIAL 761 2 12 4 1,750 45 4 102 47 5 ON-RAMP TO 1-94 FREEWAY RAMP 902 1 12 4 1,350 30 4 103 47 6 ON-RAMP TO 1-94 FREEWAY RAMP 961 1 12 4 1,700 45 4 104 47 46 CR 7 MAJOR ARTERIAL 772 2 12 4 1,900 45 4 105 48 47 CR 7 MINOR ARTERIAL 620 2 12 4 1,900 45 4 106 50 52 ON-RAMP TO 1-94 FREEWAY RAMP 1067 1 12 4 1,350 30 4 107 50 53 CR 75 COLLECTOR 850 1 12 4 1,700 60 4 108 51 50 CR 75 COLLECTOR 1406 1 12 4 1,700 60 4 109 51 52 ON-RAMP TO 1-94 FREEWAY RAMP 935 1 12 4 1,350 30 4 110 52 7 1-94 FREEWAY 1101 2 12 10 2,250 75 4 111 52 8 1-94 FREEWAY 1026 2 12 10 2,250 75 4 112 53 163 CR 75 COLLECTOR 408 1 12 10 1,700 55 4 113 54 55 CR 75 COLLECTOR 1731 1 12 10 1,700 60 4 114 55 165 CR 75 COLLECTOR 5352 1 12 10 1,700 65 4 115 56 48 CR 7 COLLECTOR 1544 1 12 4 1,700 40 4 116 57 58 SR 24 COLLECTOR 1006 1 12 4 1,750 40 9 117 57 63 SR 24 COLLECTOR 1094 1 12 4 1,750 40 9 118 58 57 SR 24 COLLECTOR 1006 1 12 4 1,700 40 9 119 58 59 SR 24 COLLECTOR 685 1 12 4 1,750 40 10 120 59 13 1-94 WB ON-RAMP FREEWAY RAMP 865 1 12 4 1,700 45 9 121 59 58 SR 24 COLLECTOR 685 1 12 4 1,750 40 10 122 60 59 SR 24 MINOR ARTERIAL 1714 2 12 4 1,750 40 10 123 60 97 CR 75 COLLECTOR 1114 1 12 4 1,700 40 10 124 60 99 SR 24 COLLECTOR 480 1 12 4 1,700 40 10 Monticello Nuclear Generating Plant Evacuation Time Estimate K-48 KLD Engineering, P.C.Rev. 1 125 bI b4 -SK Z4 LULL.LIUIR 2937 / 1 4 1,700 60 9 126 61 64 SR 24 COLLECTOR 2785 1 12 4 1,700 60 9 127 61 77 CR 46 COLLECTOR 7866 1 12 4 1,700 60 9 128 62 61 SR 24 COLLECTOR 2937 1 12 4 1,750 60 9 129 62 63 SR 24 COLLECTOR 5209 1 12 4 1,750 40 9 130 63 57 SR 24 COLLECTOR 1094 1 12 4 1,700 40 9 131 63 62 SR 24 COLLECTOR 5209 1 12 4 1,700 40 9 132 64 61 SR 24 COLLECTOR 2785 1 12 4 1,750 60 9 133 64 65 SR 24 COLLECTOR 4012 1 12 4 1,700 60 9 134 65 64 SR 24 COLLECTOR 4012 1 12 4 1,700 60 9 135 65 66 SR 24 COLLECTOR 731 1 12 4 1,700 60 15 136 66 65 SR 24 COLLECTOR 731 1 12 4 1,700 60 15 137 66 67 SR 24 COLLECTOR 3026 1 12 4 1,700 60 15 138 67 66 SR 24 COLLECTOR 3026 1 12 4 1,700 60 15 139 67 68 SR 24 COLLECTOR 562 1 12 4 1,700 50 15 140 68 67 SR 24 COLLECTOR 555 1 12 4 1,700 50 15 141 68 69 SR 24 COLLECTOR 3114 1 12 4 1,700 60 15 142 69 68 SR 24 COLLECTOR 3114 1 12 4 1,700 60 15 143 69 70 SR 24 COLLECTOR 3686 1 12 4 1,700 60 15 144 70 69 SR 24 COLLECTOR 3686 1 12 4 1,700 60 15 145 70 71 SR 24 COLLECTOR 635 1 12 4 1,700 60 15 146 71 70 SR 24 COLLECTOR 635 1 12 4 1,700 60 15 147 71 72 SR 24 COLLECTOR 2362 1 12 4 1,700 60 15 148 72 71 SR 24 COLLECTOR 2362 1 12 4 1,700 60 15 149 72 73 SR 24 COLLECTOR 6501 1 12 4 1,700 60 15 Monticello Nuclear Generating Plant Evacuation Time Estimate K-49 KLD Engineering, P.C.Rev. I 150 73 72 SR 24 COLLECTOR 6501 1 12 4 1,700 60 15 151 73 74 SR 24 COLLECTOR 4601 1 12 4 1,700 60 15 152 74 73 SR 24 COLLECTOR 4601 1 12 4 1,700 60 15 153 74 75 SR 24 COLLECTOR 3738 1 12 4 1,700 60 15 154 75 74 SR 24 COLLECTOR 3738 1 12 4 1,700 60 15 155 75 76 SR 24 COLLECTOR 1869 1 12 4 1,700 40 15 156 76 75 SR 24 COLLECTOR 1881 1 12 4 1,700 40 15 157 76 529 SR 24 COLLECTOR 2140 1 12 4 1,700 40 15 158 77 78 CR 46 COLLECTOR 3672 1 12 4 1,700 60 9 159 78 79 CR 46 COLLECTOR 790 1 12 4 1,700 40 9 160 79 80 CR 145 COLLECTOR 4159 1 12 4 1,700 60 9 161 80 81 CR 145 COLLECTOR 830 1 12 4 1,700 40 9 162 81 82 CR 145 COLLECTOR 1529 1 12 4 1,700 50 15 163 1 82 1 83 CR 145 COLLECTOR 1471 1 12 4 1,700 1 40 15 164 83 84 CR 145 COLLECTOR 1175 1 12 4 1,700 50 15 165 84 85 CR 145 COLLECTOR 1911 1 12 4 1,700 40 9 166 85 86 CR 45 COLLECTOR 3848 1 12 4 1,700 50 15 167 86 87 CR 45 COLLECTOR 1884 1 12 4 1,700 60 15 168 88 51 CR 75 MINORARTERIAL 1325 2 12 4 1,900 60 4 169 89 88 CR 75 COLLECTOR 1648 1 12 4 1,700 60 4 170 90 89 CR 75 COLLECTOR 8812 1 12 4 1,700 60 9 171 91 90 CR 75 COLLECTOR 5760 1 12 4 1,700 60 9 172 92 91 CR 75 COLLECTOR 2192 1 12 4 1,700 60 9 173 93 92 CR 75 COLLECTOR 4513 1 12 4 1,700 60 9 174 94 93 CR 75 COLLECTOR 1605 1 12 8 1,700 45 10 Monticello Nuclear Generating Plant Evacuation Time Estimate K-50 KLD Engineering, P.C.Rev. 1 175 95 94 CR 75 COLLECTOR 877 1 12 8 1,700 55 10 176 95 96 CR 75 COLLECTOR 1024 1 12 8 1,700 45 10 177 96 95 CR 75 COLLECTOR 1024 1 12 8 1,700 55 10 178 96 97 CR 75 COLLECTOR 854 1 12 8 1,700 40 10 179 97 60 CR 75 COLLECTOR 1114 1 12 4 1,750 40 10 180 97 96 CR 75 COLLECTOR 856 1 12 8 1,700 45 10 181 98 95 MAIN ST LOCAL ROADWAY 565 1 12 0 1,350 30 10 182 99 60 SR 24 COLLECTOR 480 1 12 4 1,750 40 10 183 99 986 SR 24 COLLECTOR 1636 1 12 4 1,700 40 10 184 100 101 SR 24 COLLECTOR 1524 1 12 4 1,700 60 10 185 100 986 SR 24 COLLECTOR 2024 1 12 4 1,700 40 10 186 101 100 SR 24 COLLECTOR 1524 1 12 4 1,700 60 10 187 101 683 SR 24 COLLECTOR 1547 1 12 4 1,750 60 10 188 102 103 SR 24 COLLECTOR 2066 1 12 4 1,700 60 10 189 102 683 SR 24 COLLECTOR 6784 1 12 4 1,750 60 10 190 103 102 SR 24 COLLECTOR 2066 1 12 4 1,700 60 10 191 103 104 SR 24 COLLECTOR 1582 1 12 4 1,700 40 10 192 104 103 SR 24 COLLECTOR 1582 1 12 4 1,700 40 10 193 104 105 SR 24 COLLECTOR 222 1 12 4 1,700 40 10 194 105 104 SR 24 COLLECTOR 222 1 12 4 1,700 40 10 195 105 106 SR 24 COLLECTOR 405 1 12 4 1,750 40 10 196 106 105 SR 24 COLLECTOR 405 1 12 4 1,700 40 10 197 106 273 US 10 MINOR ARTERIAL 1777 2 12 4 1,900 70 10 198 106 274 US 10 MINOR ARTERIAL 2265 2 12 4 1,900 70 10 199 106 314 CR 6 MINOR ARTERIAL 476 1 12 4 1,700 40 10 Monticello Nuclear Generating Plant KLD Engineering, P.C.Evacuation Time Estimate Rev. 1 Monticello Nuclear Generating Plant Evacuation Time Estimate K-51 KLD Engineering, P.C.Rev. 1 Up- Don San Shule Flo Flo Stea Stea Legt No of Wit Witatped Gi 200 107 18 ON-RAMP 1-94 FREEWAY RAMP 510 1 12 4 1,700 40 16 201 107 108 CR 8 COLLECTOR 658 1 12 4 1,700 55 16 202 108 113 CR 8 COLLECTOR 4415 1 12 4 1,700 60 16 203 109 107 CR8 COLLECTOR 572 1 12 4 1,700 55 10 204 109 132 CR 75 COLLECTOR 5846 1 12 4 1,700 60 10 205 110 111 CR 8 COLLECTOR 1395 1 12 4 1,700 60 16 206 111 112 CR8 COLLECTOR 462 1 12 4 1,700 60 16 207 112 114 CR 8 COLLECTOR 3829 1 12 4 1,700 60 16 208 113 110 CR 8 COLLECTOR 2115 1 12 4 1,700 60 16 209 114 115 CR 8 COLLECTOR 2225 1 12 4 1,700 40 16 210 115 116 CR 8 COLLECTOR 3088 1 12 4 1,700 60 16 211 116 117 CR 8 COLLECTOR 1233 1 12 4 1,700 40 16 212 117 118 CR 8 COLLECTOR 2717 1 12 4 1,700 60 16 213 118 119 CR 8 COLLECTOR 1295 1 12 4 1,700 40 16 214 119 120 CR 8 COLLECTOR 4430 1 12 4 1,700 60 16 215 120 121 CR 8 COLLECTOR 850 1 12 4 1,700 60 16 216 121 122 CR8 COLLECTOR 3219 1 12 4 1,700 60 16 217 122 123 CR 8 COLLECTOR 3392 1 12 4 1,700 60 16 218 122 162 CR 39 COLLECTOR 3946 1 12 4 1,750 60 16 219 123 124 CR 8 COLLECTOR 1073 1 12 4 1,700 60 16 220 124 125 CR 8 COLLECTOR 7688 1 12 4 1,700 60 28 221 125 923 CR 8 COLLECTOR 5238 1 12 4 1,700 60 28 222 126 392 CR 8 COLLECTOR 1506 1 12 4 1,700 50 28 223 127 128 CR 39 COLLECTOR 1214 1 12 4 1,700 40 16 224 128 129 CR 39 COLLECTOR 1724 1 12 4 1,700 40 16 K-52 KLD Engineering, P.C.Monticello Nuclear Generating Plant Evacuation Time Estimate K-52 KLD Engineering, P.C.Rev. 1 5 I iU 59 LULLELI OK 5958 1 1Z 4 1,700 60 16 226 130 131 CR 39 COLLECTOR 5672 1 12 4 1,700 60 16 227 131 76 CR 39 COLLECTOR 2906 1 12 4 1,700 60 15 228 132 133 CR 75 COLLECTOR 1091 1 12 4 1,700 60 10 229 133 134 CR 75 COLLECTOR 2760 1 12 4 1,700 60 10 230 134 135 CR 75 COLLECTOR 695 1 12 4 1,700 60 10 231 135 136 CR 75 COLLECTOR 697 1 12 4 1,700 60 10 232 136 137 CR 75 COLLECTOR 1576 1 12 4 1,700 60 10 233 137 138 CR 75 COLLECTOR 926 1 12 4 1,700 60 10 234 138 139 CR 75 COLLECTOR 3785 1 12 4 1,700 60 10 235 139 140 CR 75 COLLECTOR 2663 1 12 4 1,700 60 10 236 140 141 CR 75 COLLECTOR 1292 1 12 4 1,700 60 10 237 141 142 CR 75 COLLECTOR 803 1 12 4 1,700 60 10 238 142 143 CR 75 COLLECTOR 3426 1 12 4 1,700 60 10 239 143 60 CR 75 COLLECTOR 1004 1 12 4 1,750 40 10 240 144 63 CR 7 COLLECTOR 3519 1 12 4 1,750 60 10 241 145 144 CR 7 COLLECTOR 1927 1 12 4 1,700 60 10 242 146 145 CR 7 COLLECTOR 538 1 12 4 1,700 40 10 243 147 146 CR7 COLLECTOR 3069 1 12 4 1,700 60 10 244 148 147 CR 7 COLLECTOR 437 1 12 4 1,700 40 10 245 149 148 CR 7 COLLECTOR 853 1 12 4 1,700 50 10 246 150 149 CR 7 COLLECTOR 526 1 12 4 1,700 40 10 247 151 61 CR 104 COLLECTOR 8037 1 12 4 1,750 60 10 248 151 150 CR 7 COLLECTOR 2129 1 12 4 1,700 60 10 249 152 151 CR 7 COLLECTOR 5319 1 12 4 1,700 60 10 Monticello Nuclear Generating Plant Evacuation Time Estimate K-53 KLD Engineering, P.C.Rev. 1 250 153 152 CR 7 COLLECTOR 6710 1 12 4 1,700 60 16 251 154 153 CR 7 COLLECTOR 2719 1 12 4 1,700 60 16 252 155 154 CR 7 COLLECTOR 1856 1 12 4 1,700 60 16 253 156 155 CR7 COLLECTOR 655 1 12 4 1,700 60 16 254 157 156 CR 7 COLLECTOR 1152 1 12 4 1,700 60 16 255 158 157 CR 7 COLLECTOR 655 1 12 4 1,700 40 16 256 159 158 CR7 COLLECTOR 3216 1 12 4 1,700 50 16 257 160 159 CR 7 COLLECTOR 1357 1 12 4 1,700 40 16 258 161 160 CR 7 COLLECTOR 5901 1 12 4 1,700 60 16 259 161 162 CR 7 COLLECTOR 6094 1 12 4 1,750 60 16 260 162 127 CR 39 COLLECTOR 1476 1 12 4 1,700 60 16 261 163 164 CR 75 COLLECTOR 998 1 12 10 1,700 55 4 262 164 54 CR 75 COLLECTOR 541 1 12 10 1,700 55 4 263 165 56 CR 75 COLLECTOR 589 1 12 4 1,700 65 4 264 166 27 1-94 FREEWAY 769 2 12 10 2,250 75 22 265 166 28 1-94 FREEWAY 847 2 12 10 2,250 75 22 266 167 28 ON-RAMP TO 1-94 FREEWAY RAMP 944 1 12 4 1,700 45 22 267 167 166 ON-RAMP TO 1-94 FREEWAY RAMP 716 1 12 4 1,350 30 22 268 167 168 SR 25 MINOR ARTERIAL 898 2 12 4 1,750 60 22 269 167 197 SR 25 MINOR ARTERIAL 204 2 12 4 1,750 40 22 270 168 167 SR 25 MINOR ARTERIAL 898 2 12 4 1,900 60 22 271 168 1018 SR 25 MINOR ARTERIAL 409 2 12 4 1,750 60 22 272 169 170 SR 25 MINOR ARTERIAL 2171 2 12 4 1,750 60 22 273 169 557 CO HWY 75 MINOR ARTERIAL 3530 2 12 4 1,900 40 22 274 169 889 SR 25 MINOR ARTERIAL 425 2 12 4 1,900 60 22 Monticello Nuclear Generating Plant K-54 KLD Engineering, P.C.Evacuation Time Estimate Rev. 1 z/5 I /U 1bl bK Lb MINUKAKILKIAL Zl/l z 1Z 4 1,750 50 22 276 170 171 SR 25 COLLECTOR 500 1 12 4 1,700 60 22 277 171 172 SR 25 COLLECTOR 2197 1 12 4 1,700 60 22 278 172 173 SR 25 COLLECTOR 5427 1 12 4 1,700 60 22 279 173 198 SR 25 COLLECTOR 4706 1 12 4 1,700 40 22 280 174 175 SR 25 MINOR ARTERIAL 2928 2 12 4 1,900 60 22 281 174 391 SR 25 MINOR ARTERIAL 2751 2 12 4 1,750 60 22 282 174 868 SCHOOL BLVD COLLECTOR 626 1 12 4 1,700 40 22 283 175 1143 SR 25 COLLECTOR 2550 1 12 4 1,700 60 29 284 176 177 SR 25 COLLECTOR 3793 1 12 4 1,750 60 29 285 177 178 SR 25 COLLECTOR 5077 1 12 4 1,700 60 29 286 177 365 CR 37 COLLECTOR 3532 1 12 4 1,700 60 29 287 178 179 SR 25 COLLECTOR 1373 1 12 4 1,700 60 29 288 179 180 SR 25 COLLECTOR 3877 1 12 4 1,700 60 29 289 180 181 SR 25 COLLECTOR 1419 1 12 4 1,700 60 29 290 181 182 SR 25 COLLECTOR 2861 1 12 4 1,700 60 29 291 182 183 SR 25 COLLECTOR 770 1 12 4 1,700 50 29 292 183 184 SR 25 COLLECTOR 6177 1 12 4 1,700 50 29 293 184 185 SR 25 COLLECTOR 3205 1 12 4 1,700 50 29 294 185 186 SR 25 COLLECTOR 1725 1 12 4 1,700 50 35 295 186 187 SR 25 COLLECTOR 2486 1 12 4 1,750 50 35 296 187 428 SR 55 MINOR ARTERIAL 3083 2 12 4 1,900 50 35 297 187 906 SR 25 LOCAL ROADWAY 831 1 12 4 1,350 30 35 298 187 908 SR 55 MINOR ARTERIAL 104 2 12 4 1,900 50 35 299 188 189 SR 25 LOCAL ROADWAY 799 1 12 4 1,350 30 35 Monticello Nuclear Generating Plant Evacuation Time Estimate K-55 KLD Engineering, P.C.Rev. 1 300 188 486 CR 35 COLLECTOR 573 1 12 4 1,350 30 35 301 189 702 1ST ST S LOCAL ROADWAY 1792 1 12 4 1,575 35 36 302 189 914 SR 25 COLLECTOR 460 1 12 4 1,700 40 35 303 190 191 SR25 COLLECTOR 6005 1 12 4 1,700 40 36 304 191 192 SR 25 COLLECTOR 1870 1 12 4 1,700 50 38 305 192 193 SR 25 COLLECTOR 1537 1 12 4 1,700 50 38 306 193 194 SR 25 COLLECTOR 788 1 12 4 1,700 60 38 307 194 195 SR 25 COLLECTOR 5095 1 12 4 1,700 60 38 308 195 196 SR 25 COLLECTOR 2911 1 12 4 1,700 60 38 309 197 167 SR 25 MINOR ARTERIAL 204 2 12 4 1,900 40 22 310 197 391 SR 25 MINOR ARTERIAL 965 2 12 4 1,750 60 22 311 198 199 SR 25 COLLECTOR 828 1 12 4 1,700 40 19 312 198 1082 CR 68 COLLECTOR 863 1 11 0 1,700 45 19 313 199 200 SR 25 COLLECTOR 510 1 12 4 1,750 60 19 314 200 255 US 10 MINOR ARTERIAL 994 2 12 4 1,750 40 19 315 200 256 US 10 MINOR ARTERIAL 2324 2 12 4 1,900 55 18 316 201 197 OAKWOOD DR E LOCAL ROADWAY 538 1 12 4 1,750 35 22 317 202 170 CR 11 COLLECTOR 2566 1 12 4 1,750 60 22 318 203 202 CR 11 COLLECTOR 1005 1 12 4 1,700 60 22 319 204 203 CR 11 COLLECTOR 3958 1 12 4 1,700 60 22 320 206 204 CR 11 COLLECTOR 2939 1 12 4 1,700 60 17 321 207 206 CR 11 COLLECTOR 1101 1 12 4 1,700 60 17 322 208 207 CR 11 COLLECTOR 4037 1 12 4 1,700 60 17 323 208 209 CR 11 COLLECTOR 13850 1 1 121 4 1 1,700 60 j 17 324 209 210 CR 11 COLLECTOR 1 780 1 1 121 4 1 1,7501 35 17 Monticello Nuclear Generating Plant Evacuation Time Estimate K-56 KLD Engineering, P.C.Rev. 1 325 210 211 CR 11 COLLECTOR 3174 1 12 4 1,700 60 17 326 210 261 US 10 MINOR ARTERIAL 7102 2 12 4 1,900 65 18 327 210 262 US 10 MINOR ARTERIAL 8748 2 12 4 1,900 70 17 328 211 212 CR 11 COLLECTOR 2600 1 12 4 1,700 60 17 329 212 213 CR 11 COLLECTOR 5066 1 12 4 1,700 60 11 330 213 214 CR 11 COLLECTOR 5225 1 12 4 1,700 60 11 331 214 215 CR 11 COLLECTOR 7911 1 12 4 1,700 60 11 332 215 216 CR 11 COLLECTOR 2626 1 12 4 1,700 60 11 333 216 217 CR 11 COLLECTOR 2643 1 12 4 1,700 60 11 334 216 937 CR 4 COLLECTOR 5376 1 12 1 1,700 60 11 335 216 938 CR 4 COLLECTOR 3914 1 12 1 1,700 60 11 336 217 218 CR 11 COLLECTOR 2627 1 12 4 1,700 60 11 337 218 219 CR 11 COLLECTOR 5299 1 12 4 1,700 60 11 338 219 220 CR 11 COLLECTOR 4883 1 12 4 1,700 60 6 339 220 221 CR 11 COLLECTOR 1987 1 12 4 1,700 60 6 340 221 222 CR 11 COLLECTOR 3298 1 12 4 1,750 60 6 341 222 223 CR 11 COLLECTOR 5317 1 12 4 1,700 60 6 342 222 588 57TH ST COLLECTOR 8071 1 12 4 1,750 40 6 343 223 224 CR 11 COLLECTOR 3310 1 12 4 1,700 60 6 344 224 225 CR 11 COLLECTOR 729 1 12 4 1,700 60 6 345 225 226 CR 11 COLLECTOR 1283 1 12 4 1,700 60 6 346 226 227 CR 11 COLLECTOR 6549 1 12 4 1,700 60 6 347 227 228 CR 11 COLLECTOR 2064 1 12 4 1,700 60 6 348 228 229 CR 11 COLLECTOR 1964 1 12 4 1,700 60 6 349 228 347 CR 3 COLLECTOR 3884 1 12 4 1,700 55 6 Monticello Nuclear Generating Plant Evacuation Time Estimate K-57 KLD Engineering, P.C.Rev. I 350 IZ9 NJ CR 3 CULLELIUR 156/1 1 1z 4 1,700 60 3 351 229 873 CR 11 COLLECTOR 3120 1 12 4 1,700 60 2 352 230 231 US 10 MINOR ARTERIAL 5887 2 12 4 1,900 60 32 353 231 230 US 10 MINOR ARTERIAL 5889 2 12 4 1,900 60 32 354 231 232 US 10 MINOR ARTERIAL 2488 2 12 4 1,900 60 32 355 232 231 US 10 MINOR ARTERIAL 2487 2 12 4 1,900 60 32 356 232 233 US 10 MINOR ARTERIAL 3009 2 12 4 1,900 60 26 357 233 232 US 10 MINOR ARTERIAL 3009 2 12 4 1,900 60 26 358 233 827 US 10 OFF-RAMP FREEWAY RAMP 1172 1 12 4 1,750 45 26 359 233 829 US 10 MAJOR ARTERIAL 932 2 12 4 1,900 65 26 360 234 235 US 10 MINOR ARTERIAL 1095 2 12 4 1,900 65 26 361 234 828 US 10 OFF-RAMP FREEWAY RAMP 1270 1 12 4 1,700 45 26 362 234 829 US 10 MINOR ARTERIAL 796 2 12 4 1,900 65 26 363 235 234 US 10 MINOR ARTERIAL 1095 2 12 4 1,900 65 26 364 235 236 US 10 MINOR ARTERIAL 1704 2 12 4 1,900 65 26 365 236 235 US 10 MINOR ARTERIAL 1704 2 12 4 1,900 65 26 366 236 237 US 10 MINOR ARTERIAL 1409 2 12 4 1,750 65 26 367 237 236 US 10 MINOR ARTERIAL 1411 2 12 4 1,900 65 26 368 237 754 US 10 MINOR ARTERIAL 880 2 12 4 1,750 65 25 369 237 758 MAIN ST NW MINOR ARTERIAL 461 1 12 4 1,700 40 26 370 238 239 US 10 MINOR ARTERIAL 1821 2 12 4 1,750 65 25 371 238 754 US 10 MINOR ARTERIAL 1173 2 12 4 1,750 65 25 372 239 238 US 10 MINOR ARTERIAL 1810 2 12 4 1,900 65 25 373 239 240 US 10 MINOR ARTERIAL 1314 2 12 4 1,900 65 25 374 240 239 US 10 MINOR ARTERIAL 1314 2 12 4 1,750 65 25 Monticello Nuclear Generating Plant Evacuation Time Estimate K-58 KLD Engineering, P.C.Rev. 1 3/ 4 9U U 1U MINUK AKItR-IAL 912 J 4 1,750 65 25 376 241 242 US 10 MINOR ARTERIAL 3000 2 12 4 1,900 65 25 377 241 990 US 10 MINOR ARTERIAL 1085 2 12 4 1,750 65 25 378 242 241 US 10 MINOR ARTERIAL 2999 2 12 4 1,900 65 25 379 242 993 US 10 MINOR ARTERIAL 2345 2 12 4 1,750 65 25 380 243 244 US 10 MINOR ARTERIAL 2696 2 12 4 1,900 65 25 381 243 993 US 10 MINOR ARTERIAL 457 2 12 4 1,750 65 25 382 244 243 US 10 MINOR ARTERIAL 2696 2 12 4 1,900 65 25 383 244 245 US 10 MINOR ARTERIAL 1391 2 12 4 1,750 65 25 384 245 244 US 10 MINORARTERIAL 1391 2 12 4 1,900 65 25 385 245 1155 US 10 MINOR ARTERIAL 5204 2 12 4 1,900 65 24 386 246 247 US 10 MINOR ARTERIAL 1433 2 12 4 1,900 65 24 387 246 1155 US 10 MINOR ARTERIAL 4734 2 12 4 1,750 65 24 388 247 246 US 10 MINOR ARTERIAL 1433 2 12 4 1,900 65 24 389 247 248 US 10 MINOR ARTERIAL 3397 2 12 4 1,900 70 24 390 248 247 US 10 MINOR ARTERIAL 3397 2 12 4 1,900 70 24 391 248 249 US 10 MINOR ARTERIAL 1277 2 12 4 1,900 70 24 392 249 248 US 10 MINOR ARTERIAL 1281 2 12 4 1,900 70 24 393 249 250 US 10 MINOR ARTERIAL 2206 2 12 4 1,900 70 20 394 250 249 US 10 MINOR ARTERIAL 2205 2 12 4 1,900 70 20 395 250 251 US 10 MINOR ARTERIAL 1276 2 12 4 1,900 70 20 396 251 250 US 10 MINOR ARTERIAL 1281 2 12 4 1,900 70 20 397 251 252 US 10 MINOR ARTERIAL 4115 2 12 4 1,900 70 19 398 252 251 US 10 MINOR ARTERIAL 4115 2 12 4 1,900 70 19 399 252 253 US 10 MINOR ARTERIAL 3344 2 12 4 1,900 70 19 Monticello Nuclear Generating Plant Evacuation Time Estimate K-59 KLD Engineering, P.C.Rev. I 1400 253 1 252 1 US 10 MINOR ARTERIAL 3345 2 12 4 1,900 70 19 401 253 252 US 10 MINOR ARTERIAL 3266 2 12 4 1,750 70 19 402 254 253 US 10 MINOR ARTERIAL 3266 2 12 4 1,900 70 19 403 254 255 US 10 MINOR ARTERIAL 2651 2 12 4 1,750 55 19 404 255 200 US 10 MINOR ARTERIAL 994 2 12 4 1,750 40 19 405 255 254 US 10 MINOR ARTERIAL 2651 2 12 4 1,750 55 19 406 255 279 CR 5 COLLECTOR 3933 1 12 4 1,700 40 19 407 256 200 US 10 MINOR ARTERIAL 2324 2 12 4 1,750 55 18 408 256 257 US 10 MINOR ARTERIAL 919 2 12 4 1,900 55 18 409 257 256 US 10 MINOR ARTERIAL 919 2 12 4 1,900 55 18 410 257 1056 US 10 MINOR ARTERIAL 3708 2 12 4 1,900 65 18 411 258 259 US 10 MINOR ARTERIAL 1361 2 12 4 1,900 65 18 412 258 1056 US 10 MINOR ARTERIAL 273 2 12 4 1,900 65 18 413 259 258 US 10 MINOR ARTERIAL 1363 2 12 4 1,750 65 18 414 259 260 US 10 MINOR ARTERIAL 3480 2 12 4 1,900 65 18 415 260 259 US 10 MINOR ARTERIAL 3483 2 12 4 1,900 65 18 416 260 261 US 10 MINOR ARTERIAL 2648 2 12 4 1,900 65 18 417 261 210 US 10 MINOR ARTERIAL 7102 2 12 4 1,750 70 18 418 261 260 US 10 MINOR ARTERIAL 2649 2 12 4 1,900 65 18 419 262 210 US 10 MINOR ARTERIAL 8748 2 12 4 1,750 70 17 420 262 263 US 10 MINOR ARTERIAL 6024 2 12 4 1,750 70 11 421 263 262 US 10 MINOR ARTERIAL 6024 2 12 4 1,900 70 11 422 263 264 US 10 MINOR ARTERIAL 2729 2 12 4 1,900 70 11 423 264 263 US 10 MINOR ARTERIAL 2729 2 12 4 1,750 70 11 424 264 265 US 10 MINOR ARTERIAL 2294 2 12 4 1,900 70 11 Evacuation Time Estimate Rev. 1 Monticello Nuclear Generating Plant Evacuation Time Estimate K-60 KLD Engineering, P.C.Rev. 1 4Z! Z:) b4 Ub 1U MINUKAKiILKIAL ZZ94 2 4 1,900 70 11 426 265 935 US 10 MINOR ARTERIAL 2735 2 12 4 1,900 70 11 427 266 267 US 10 MINOR ARTERIAL 1171 2 12 4 1,900 65 11 428 266 695 US 10 MINOR ARTERIAL 3142 2 12 4 1,900 70 11 429 267 266 US 10 MINOR ARTERIAL 1172 2 12 4 1,900 65 11 430 267 303 SR 25 COLLECTOR 7587 1 12 4 1,700 60 11 431 267 978 US 10 MINOR ARTERIAL 7120 2 12 4 1,900 70 11 432 268 269 US 10 MINOR ARTERIAL 1758 2 12 4 1,900 70 10 433 268 978 US 10 MINOR ARTERIAL 4203 2 12 4 1,900 70 11 434 269 268 US 10 MINOR ARTERIAL 1754 2 12 4 1,900 70 10 435 269 270 US 10 MINOR ARTERIAL 3499 2 12 4 1,900 70 10 436 270 269 US 10 MINOR ARTERIAL 3498 2 12 4 1,900 70 10 437 270 271 US 10 MINOR ARTERIAL 3047 2 12 4 1,900 70 10 438 271 270 US 10 MINOR ARTERIAL 3048 2 12 4 1,900 70 10 439 271 272 US 10 MINOR ARTERIAL 2446 2 12 4 1,900 70 10 440 272 271 US 10 MINOR ARTERIAL 2445 2 12 4 1,900 70 10 441 272 981 US 10 MINOR ARTERIAL 2866 2 12 4 1,900 70 10 442 273 106 US 10 MINOR ARTERIAL 1778 2 12 4 1,750 70 10 443 273 981 us 10 MINOR ARTERIAL 1803 2 12 4 1,900 70 10 444 274 106 US 10 MINOR ARTERIAL 2265 2 12 4 1,750 70 10 445 274 275 US 10 MINOR ARTERIAL 1449 2 12 4 1,900 70 10 446 275 274 US 10 MINOR ARTERIAL 1449 2 12 4 1,900 70 10 447 275 276 US 10 MINORARTERIAL 4196 2 12 4 1,900 70 5 448 276 275 US 10 MINOR ARTERIAL 4196 2 12 4 1,900 70 5 449 276 277 US 10 MINOR ARTERIAL 9506 2 12 4 1,900 70 5 Monticello Nuclear Generating Plant Evacuation Time Estimate K-61 KLD Engineering, P.C.Rev. 1 450 277 276 US 10 MINOR ARTERIAL 950b 2 12 4 1,900 70 5 451 277 278 US 10 MINOR ARTERIAL 8548 2 12 4 1,900 70 5 452 278 1 us 10 MINOR ARTERIAL 10244 2 12 4 1,900 70 4 453 278 277 US 10 MINOR ARTERIAL 8548 2 12 4 1,900 70 5 454 279 255 CR 5 COLLECTOR 3933 1 12 4 1,750 40 19 455 279 280 CR 5 COLLECTOR 2589 1 12 4 1,700 40 19 456 279 1002 GLENWOOD AVE LOCAL ROADWAY 2699 1 11 0 1,700 45 19 457 280 279 CR 5 COLLECTOR 2589 1 12 4 1,700 40 19 458 280 1078 CR 5 COLLECTOR 3956 1 12 4 1,700 40 19 459 281 282 CR 5 COLLECTOR 1080 1 12 4 1,700 60 19 460 281 1078 CR 5 COLLECTOR 1094 1 12 4 1,700 40 19 461 282 281 CR 5 COLLECTOR 1080 1 12 4 1,700 60 19 462 282 283 CR 5 COLLECTOR 1015 1 12 4 1,700 60 18 463 283 282 CR 5 COLLECTOR 1015 1 12 4 1,700 60 18 464 283 1063 CR 5 COLLECTOR 2041 1 12 4 1,700 60 12 465 284 285 CR 5 COLLECTOR 3671 1 12 4 1,700 60 12 466 285 983 CR 5 COLLECTOR 1484 1 12 4 1,700 60 12 467 286 287 CR 5 COLLECTOR 1977 1 12 4 1,700 60 12 468 287 288 CR 5 COLLECTOR 1479 1 12 4 1,700 60 12 469 288 289 CR 5 COLLECTOR 2067 1 12 4 1,700 60 12 470 289 290 CR 5 COLLECTOR 1005 1 12 4 1,700 60 12 471 290 291 CR 5 COLLECTOR 1276 1 12 4 1,700 60 12 472 291 292 CR 5 COLLECTOR 1665 1 12 4 1,700 60 12 473 292 293 CR 5 COLLECTOR 6331 1 12 4 1,700 60 12 474 293 294 CR 5 COLLECTOR 5236 1 12 4 1,700 60 12 Monticello Nuclear Generating Plant Evacuation Time Estimate K-62 KLD Engineering, P.C.Rev. 1 StemSraSegh N.o it Wit Rat Speed Gri 475 294 295 CR 5 COLLECTOR 1390 1 12 4 1,700 60 12 476 295 296 CR 5 COLLECTOR 1106 1 12 4 1,700 60 12 477 295 726 CR 4 COLLECTOR 6219 1 12 4 1,700 55 12 478 296 298 CR5 COLLECTOR 1978 1 12 4 1,700 60 12 479 298 299 CR 5 COLLECTOR 2179 1 12 4 1,700 60 7 480 299 300 CR 5 COLLECTOR 1239 1 12 4 1,700 60 7 481 300 301 CR 5 COLLECTOR 10461 1 12 4 1,700 60 7 482 301 302 CR 5 COLLECTOR 15886 1 12 4 1,700 60 7 483 302 1005 CR 5 COLLECTOR 4335 1 12 4 1,700 60 3 484 303 304 SR 25 COLLECTOR 7980 1 12 4 1,700 60 11 485 304 305 SR 25 MINOR ARTERIAL 2676 1 12 4 1,700 60 11 486 305 979 SR 25 MINOR ARTERIAL 5046 1 12 4 1,700 60 6 487 306 307 SR 25 MINOR ARTERIAL 5340 1 12 4 1,700 60 6 488 306 588 57TH ST COLLECTOR 13067 1 12 4 1,750 40 6 489 307 308 SR 25 MINOR ARTERIAL 1654 1 12 4 1,700 60 6 490 308 309 SR 25 MINOR ARTERIAL 1031 1 12 4 1,700 60 6 491 309 310 SR 25 MINOR ARTERIAL 4316 1 12 4 1,700 60 6 492 310 313 SR 25 MINOR ARTERIAL 997 1 12 4 1,700 60 6 493 311 312 SR 25 MINOR ARTERIAL 11699 1 12 4 1,700 60 6 494 311 336 CR 3 COLLECTOR 3990 1 12 4 1,700 40 6 495 311 344 CR 3 COLLECTOR 2357 1 12 4 1,700 55 6 496 313 311 SR 25 MINOR ARTERIAL 1934 1 12 4 1,700 60 6 497 314 315 CR 6 COLLECTOR 5833 1 12 4 1,700 60 10 498 315 316 CR 6 COLLECTOR 1172 1 12 4 1,700 40 5 499 316 317 CR 6 COLLECTOR 1577 1 12 4 1,700 40 5 Monticello Nuclear Generating Plant Evacuation Time Estimate K-63 KLD Engineering, P.C.Rev. 1 500 317 318 CR 6 COLLECTOR 578 1 12 4 1,700 40 5 501 318 319 CR 6 COLLECTOR 1082 1 12 4 1,700 40 5 502 319 320 CR 6 COLLECTOR 1089 1 12 4 1,700 40 5 503 320 321 CR 6 COLLECTOR 1629 1 12 4 1,700 40 5 504 321 322 CR 6 COLLECTOR 2406 1 12 4 1,700 40 5 505 322 323 CR 6 COLLECTOR 3496 1 12 4 1,700 60 5 506 323 324 CR6 COLLECTOR 919 1 12 4 1,700 40 5 507 324 325 CR 6 COLLECTOR 2674 1 12 4 1,700 60 5 508 325 326 CR 6 COLLECTOR 1901 1 12 4 1,700 40 5 509 326 327 CR 6 COLLECTOR 2213 1 12 4 1,700 60 5 510 327 328 CR 6 COLLECTOR 2064 1 12 4 1,700 60 5 511 328 329 CR 6 COLLECTOR 810 1 12 4 1,700 60 5 512 329 330 CR 6 COLLECTOR 6656 1 12 4 1,700 60 5 513 330 331 CR 6 COLLECTOR 990 1 12 4 1,700 60 5 514 330 336 CR 3 COLLECTOR 4000 1 12 4 1,700 40 5 515 330 337 CR 3 COLLECTOR 1840 1 12 4 1,700 60 5 516 331 332 CR 6 COLLECTOR 1849 1 12 4 1,700 60 5 517 332 333 CR 6 COLLECTOR 2871 1 12 4 1,700 60 5 518 333 334 CR 6 COLLECTOR 1913 1 12 4 1,700 60 1 519 334 335 CR 6 COLLECTOR 2330 1 12 4 1,700 60 1 520 336 311 CR 3 COLLECTOR 3990 1 12 4 1,700 40 6 521 336 330 CR 3 COLLECTOR 4000 1 12 4 1,700 40 5 522 337 338 CR3 COLLECTOR 1195 1 12 1 4 1,700 60 5 523 338 339 CR 3 COLLECTOR 2041 1 12 4 1,700 60 5 524 339 1 340] CR 3 COLLECTOR 561 1 12 4 1,700 40 5 Monticello Nuclear Generating Plant Evacuation Time Estimate K-64 KLD Engineering, P.C.Rev. 1 525 340 341 CR 3 CULLI-IRUK 14839 1 1z 4 1,/UU 5 526 341 342 CR 3 COLLECTOR 1690 1 12 4 1,700 40 5 527 342 343 CR 3 COLLECTOR 2670 1 12 4 1,700 40 5 528 343 1 CR 3 COLLECTOR 13768 1 12 4 1,700 60 4 529 344 311 CR 3 COLLECTOR 2357 1 12 4 1,700 55 6 530 344 345 CR 3 COLLECTOR 8965 1 12 4 1,700 55 6 531 345 344 CR 3 COLLECTOR 8965 1 12 4 1,700 55 6 532 345 346 CR3 COLLECTOR 1939 1 12 4 1,700 55 6 533 346 345 CR 3 COLLECTOR 1939 1 12 4 1,700 55 6 534 346 347 CR 3 COLLECTOR 9526 1 12 4 1,700 55 2 535 347 228 CR 3 COLLECTOR 3889 1 12 4 1,700 55 6 536 347 346 CR 3 COLLECTOR 9526 1 12 4 1,700 55 2 537 348 349 CR 18 COLLECTOR 1091 1 12 4 1,750 40 22 538 348 388 CR 39 COLLECTOR 720 1 12 4 1,750 40 22 539 349 30 ON-RAMP TO 1-94 FREEWAY RAMP 1278 1 12 4 1,700 40 22 540 349 348 CR 18 MINOR ARTERIAL 1091 2 12 4 1,750 40 22 541 350 349 CR 18 MINOR ARTERIAL 599 2 12 4 1,750 40 22 542 351 350 CR 18 MINOR ARTERIAL 182 2 12 4 1,900 20 22 543 352 351 CR 18 MINOR ARTERIAL 191 2 12 4 1,900 20 22 544 354 352 CR 18 MINOR ARTERIAL 519 2 12 4 1,900 40 22 545 354 355 CR 18 COLLECTOR 3995 1 12 4 1,700 40 30 546 354 383 SCHOOL BLVD COLLECTOR 3886 1 12 4 1,700 40 22 547 354 1108 CR 18 COLLECTOR 854 1 11 0 1,700 45 22 548 355 356 CR 18 COLLECTOR 2657 1 12 4 1,700 40 30 549 356 357 CR 18 COLLECTOR 1293 1 12 4 1,700 40 30 Monticello Nuclear Generating Plant Evacuation Time Estimate K-65 KLD Engineering, P.C.Rev. 1 Sauain Fe Up Down Lan Shole Flo Flo Stem Sra egh No f Wdh Wdh Rt Speed Gri Lik N d Noe. Rod a Nam Rod a Typ (ft. Lae (f t' (f S. p ) (p) N m e 550 357 358 CR 18 COLLECTOR 1371 1 12 4 1,700 40 30 551 358 359 CR 37 COLLECTOR 1777 1 12 4 1,700 40 30 552 358 366 CR 37 COLLECTOR 2812 1 12 4 1,700 60 30 553 359 358 CR 37 COLLECTOR 1769 1 12 4 1,700 40 30 554 359 360 CR 37 COLLECTOR 1673 1 12 4 1,700 50 30 555 360 359 CR 37 COLLECTOR 1673 1 12 4 1,700 50 30 556 360 361 CR 37 COLLECTOR 1658 1 12 4 1,700 40 30 557 361 360 CR 37 COLLECTOR 1658 1 12 4 1,700 40 30 558 361 362 CR 37 COLLECTOR 1654 1 12 4 1,700 60 30 559 362 361 CR 37 COLLECTOR 1654 1 12 4 1,700 60 30 560 362 363 CR 37 COLLECTOR 2505 1 12 4 1,700 60 30 561 363 362 CR 37 COLLECTOR 2505 1 12 4 1,700 60 30 562 363 364 CR 37 COLLECTOR 4125 1 12 4 1,700 60 30 563 364 363 CR 37 COLLECTOR 4125 1 12 4 1,700 60 30 564 364 365 CR 37 COLLECTOR 769 1 12 4 1,700 60 29 565 365 177 CR 37 COLLECTOR 3532 1 12 4 1,750 60 29 566 365 364 CR 37 COLLECTOR 769 1 12 4 1,700 60 29 567 366 367 CR 37 COLLECTOR 2767 1 12 4 1,700 40 30 568 367 368 CR 37 COLLECTOR 1911 1 12 4 1,700 60 30 569 368 369 CR 37 COLLECTOR 1901 1 12 4 1,700 60 30 570 369 370 CR 37 COLLECTOR 1365 1 12 4 1,700 40 30 571 370 382 CR 37 COLLECTOR 8566 1 12 4 1,750 60 30 572 371 372 CR 39 COLLECTOR 1714 1 12 4 1,700 50 22 573 371 388 CR 39 MINOR ARTERIAL 732 2 12 4 1,750 40 22 574 372 371 CR 39 COLLECTOR 1723 1 12 4 1,700 50 22 K-66 KLD Engineering, P.C.Monticello Nuclear Generating Plant Evacuation Time Estimate K-66 KLD Engineering, P.C.Rev. 1 575 372 373 CR 39 COLLECTOR 2443 1 12 4 1,700 50 22 576 373 372 CR 39 COLLECTOR 2442 1 12 4 1,700 50 22 577 373 374 CR 39 COLLECTOR 1410 1 12 4 1,700 50 23 578 374 375 CR 39 COLLECTOR 1682 1 12 4 1,700 50 23 579 375 376 CR 39 COLLECTOR 2654 1 12 10 1,700 55 23 580 376 377 CR 39 COLLECTOR 2282 1 12 10 1,700 55 23 581 377 988 CR 39 COLLECTOR 4555 1 12 10 1,700 60 23 582 378 379 CR 39 COLLECTOR 1965 1 12 10 1,700 60 23 583 379 380 CR 39 COLLECTOR 2152 1 12 10 1,700 60 24 584 380 381 CR 39 COLLECTOR 5277 1 12 10 1,700 60 24 585 381 984 CR 39 COLLECTOR 5337 1 12 10 1,700 60 24 586 382 1031 CR 37 COLLECTOR 5303 1 12 4 1,700 60 30 587 382 1045 CR 18 COLLECTOR 272 1 12 4 1,700 50 30 588 383 354 SCHOOL BLVD COLLECTOR 3886 1 12 4 1,700 40 22 589 383 384 SCHOOL BLVD COLLECTOR 705 1 12 4 1,700 40 22 590 384 383 SCHOOL BLVD COLLECTOR 705 1 12 4 1,700 40 22 591 384 385 SCHOOL BLVD COLLECTOR 1139 1 12 4 1,700 40 22 592 385 384 SCHOOL BLVD COLLECTOR 1139 1 12 4 1,700 40 22 593 385 386 SCHOOL BLVD COLLECTOR 501 1 12 4 1,700 40 22 594 386 385 SCHOOL BLVD COLLECTOR 501 1 12 4 1,700 40 22 595 386 387 SCHOOL BLVD COLLECTOR 388 1 12 4 1,700 40 22 596 387 386 SCHOOL BLVD COLLECTOR 388 1 12 4 1,700 40 22 597 387 868 SCHOOL BLVD COLLECTOR 1830 1 12 4 1,700 40 22 598 388 348 CR 39 COLLECTOR 718 1 12 4 1,750 40 22 599 388 371 CR 39 COLLECTOR 731 2 12 4 1,900 40 22 K-67 KLD Engineering, P.C.Monticello Nuclear Generating Plant Evacuation Time Estimate K-67 KLD Engineering, P.C.Rev. 1 600 391 174 SR 25 MINOR ARTERIAL 2751 2 12 4 1,750 60 22 601 391 197 SR 25 MINOR ARTERIAL 965 2 12 4 1,750 60 22 602 392 393 CR8 COLLECTOR 1055 1 12 4 1,700 40 28 603 393 917 CR 8 COLLECTOR 706 1 12 4 1,700 40 28 604 394 395 CR7 COLLECTOR 889 1 12 4 1,700 40 28 605 394 419 SR 55 COLLECTOR 1990 1 12 4 1,700 40 28 606 394 420 SR 55 COLLECTOR 1171 1 12 4 1,700 40 28 607 395 456 CR 7 COLLECTOR 395 1 12 4 1,700 40 28 608 395 925 CR8 COLLECTOR 1127 1 12 0 1,700 40 28 609 396 397 CR 8 COLLECTOR 681 1 12 0 1,700 40 28 610 397 398 CR 8 COLLECTOR 1386 1 12 0 1,700 50 28 611 398 399 CR 8 COLLECTOR 535 1 12 4 1,350 30 28 612 399 400 CR 8 COLLECTOR 470 1 12 4 1,700 40 28 613 400 401 CR8 COLLECTOR 736 1 12 4 1,700 40 28 614 401 402 CR 8 COLLECTOR 2945 1 12 4 1,700 60 28 615 402 403 CR 8 COLLECTOR 3214 1 12 4 1,700 40 28 616 403 404 CR 8 COLLECTOR 3703 1 12 4 1,700 60 28 617 404 405 CR 8 COLLECTOR 2103 1 12 4 1,700 60 34 618 405 406 CR8 COLLECTOR 5273 1 12 4 1,700 60 34 619 406 407 CR 8 COLLECTOR 2677 1 12 4 1,700 60 34 620 407 408 CR 8 COLLECTOR 5241 1 12 4 1,700 60 34 621 408 409 CR 8 COLLECTOR 5307 1 12 4 1,700 60 34 622 408 464 CR 35 COLLECTOR 10450 1 12 4 1,700 60 34 623 409 410 CR 8 COLLECTOR 1870 1 12 4 1,700 45 34 624 410 411 CR 8 COLLECTOR 2904 1 12 4 1,700 50 34 K-68 KLD Engineering, P.C.Monticello Nuclear Generating Plant Evacuation Time Estimate K-68 KLD Engineering, P.C.Rev. 1 625 413 412 SR 55 COLLECTOR 2384 1 12 4 1,700 60 27 626 414 413 SR 55 COLLECTOR 3610 1 12 4 1,700 60 27 627 415 414 SR 55 COLLECTOR 4518 1 12 4 1,700 60 27 628 416 415 SR 55 COLLECTOR 13798 1 12 4 1,700 60 27 629 416 651 CR 6 COLLECTOR 1875 1 12 1 1,700 60 27 630 417 416 SR 55 COLLECTOR 4489 1 12 4 1,700 65 27 631 418 417 SR 55 COLLECTOR 1099 1 12 4 1,700 60 27 632 419 919 SR 55 COLLECTOR 902 1 12 4 1,700 60 28 633 420 394 SR 55 COLLECTOR 1171 1 12 4 1,750 40 28 634 420 421 SR 55 COLLECTOR 1881 1 12 4 1,700 60 28 635 421 420 SR 55 COLLECTOR 1882 1 12 4 1,700 60 28 636 421 422 SR 55 COLLECTOR 988 1 12 4 1,700 60 28 637 422 421 SR 55 COLLECTOR 988 1 12 4 1,700 60 28 638 422 423 SR 55 COLLECTOR 7583 1 12 4 1,700 60 28 639 423 422 SR 55 COLLECTOR 7583 1 12 4 1,700 60 28 640 423 424 SR 55 COLLECTOR 2888 1 12 4 1,700 60 28 641 424 423 SR 55 COLLECTOR 2888 1 12 4 1,700 60 28 642 424 425 SR 55 COLLECTOR 7295 1 12 4 1,700 60 28 643 425 424 SR 55 COLLECTOR 7293 1 12 4 1,700 60 28 644 425 426 SR 55 COLLECTOR 4955 1 12 4 1,700 60 29 645 425 516 CR9 COLLECTOR 364 1 12 4 1,575 35 29 646 426 425 SR 55 COLLECTOR 4955 1 12 4 1,700 60 29 647 426 427 SR 55 COLLECTOR 6123 1 12 4 1,750 60 29 648 427 426 SR 55 COLLECTOR 6123 1 12 4 1,700 60 29 649 427 428 SR 55 COLLECTOR 1746 1 12 4 1,700 60 35 Monticello Nuclear Generating Plant Evacuation Time Estimate K-69 KLD Engineering, P.C.Rev. 1 650 428 187 SR 55 COLLECTOR 3083 1 12 4 1,750 50 35 651 428 427 SR155 COLLECTOR 1746 1 12 4 1,750 60 35 652 429 430 SR 55 MINOR ARTERIAL 1987 2 12 4 1,750 50 36 653 430 696 5TH ST NE COLLECTOR 610 1 12 4 1,700 40 36 654 430 700 SR 55 MINORARTERIAL 3156 2 12 4 1,750 50 36 655 431 432 SR 55 MINORARTERIAL 2077 2 12 4 1,900 60 36 656 432 1035 SR 55 COLLECTOR 2633 1 12 4 1,750 60 36 657 433 434 SR 55 COLLECTOR 5108 1 12 4 1,700 60 38 658 434 435 SR 55 COLLECTOR 2661 1 12 4 1,700 60 38 659 435 436 SR 55 COLLECTOR 3580 1 12 4 1,700 60 38 660 436 437 SR 55 COLLECTOR 1982 1 12 4 1,700 60 39 661 437 438 SR 55 COLLECTOR 3187 1 12 4 1,700 60 39 662 438 439 SR 55 COLLECTOR 1936 1 12 4 1,700 60 39 663 440 519 SR 55 COLLECTOR 1515 1 12 4 1,700 40 28 664 441 393 CR 37 COLLECTOR 2920 1 12 6 1,700 60 28 665 442 441 CR 37 COLLECTOR 4637 1 12 6 1,700 60 28 666 443 442 CR 37 COLLECTOR 1415 1 12 6 1,700 50 28 667 444 443 CR 37 COLLECTOR 4923 1 12 6 1,700 60 28 668 445 444 CR 37 COLLECTOR 924 1 12 6 1,700 60 28 669 446 445 CR 37 COLLECTOR 1966 1 12 6 1,700 50 28 670 446 447 CR 37 COLLECTOR 2750 1 12 6 1,700 60 28 671 447 448 CR 37 COLLECTOR 1628 1 12 6 1,700 60 29 672 448 449 CR 37 COLLECTOR 2467 1 12 6 1,700 60 29 673 449 450 CR 37 COLLECTOR 2181 1 12 6 1,700 60 29 674 450 451 CR 37 COLLECTOR 2781 1 12 6 1,700 60 29 Monticello Nuclear Generating Plant K-70 Evacuation Time Estimate KLD Engineering, P.C.Rev. 1 Up- Down Lan Shudr Flw Fo Stea Stea Legt No Sf Wit idh Rt Spe Gri 675 451 452 CR 37 COLLECTOR 2306 1 12 6 1,700 60 29 676 452 453 CR 37 COLLECTOR 4843 1 12 6 1,700 60 29 677 452 465 CR 12 COLLECTOR 2447 1 12 4 1,700 60 29 678 453 454 CR 37 COLLECTOR 3227 1 12 6 1,700 60 29 679 454 455 CR 37 COLLECTOR 4752 1 12 6 1,700 60 29 680 455 177 CR 37 COLLECTOR 2447 1 12 4 1,750 60 29 681 456 457 CR 7 COLLECTOR 439 1 12 4 1,700 40 28 682 457 921 CR 7 COLLECTOR 1004 1 12 4 1,700 40 28 683 458 459 CR 7 COLLECTOR 1203 1 12 4 1,700 55 28 684 459 460 CR 7 COLLECTOR 6620 1 12 4 1,700 60 28 685 460 461 CR 7 COLLECTOR 1084 1 12 4 1,700 55 28 686 461 462 CR 7 COLLECTOR 4563 1 12 4 1,700 60 28 687 462 463 CR 7 COLLECTOR 7896 1 12 4 1,700 60 34 688 463 464 CR 7 COLLECTOR 7946 1 12 4 1,700 60 34 689 464 518 CR 35 COLLECTOR 2815 1 12 4 1,700 60 34 690 464 1034 CR 7 COLLECTOR 2637 1 12 4 1,700 60 34°691 465 466 CR 12 COLLECTOR 790 1 12 4 1,700 60 29 692 466 467 CR 12 COLLECTOR 4690 1 12 4 1,700 60 29 693 467 468 CR 12 COLLECTOR 7974 1 12 4 1,700 60 29 694 468 987 CR 12 COLLECTOR 2537 1 12 4 1,750 50 29 695 469 190 SR 25 COLLECTOR 1090 1 12 4 1,700 40 36 696 469 470 CR 12 COLLECTOR 1207 1 12 4 1,700 40 36 697 470 471 CR 12 COLLECTOR 514 1 12 4 1,700 40 36 698 471 472 CR 12 COLLECTOR 431 1 12 4 1,700 40 35 699 472 473 CR 12 COLLECTOR 458 1 12 4 1,700 40 35 Monticello Nuclear Generating Plant K-71 KLD Engineering, P.C.Evacuation Time Estimate Rev. 1 700 473 474 CR 12 COLLECTOR 1274 1 12 4 1,700 40 35 701 474 475 CR 12 COLLECTOR 784 1 12 4 1,700 40 35 702 475 476 CR 12 COLLECTOR 2347 1 12 4 1,700 40 35 703 476 477 CR 12 COLLECTOR 1469 1 12 4 1,700 60 37 704 477 478 CR 12 COLLECTOR 1146 1 12 4 1,700 40 37 705 478 479 CR 12 COLLECTOR 1087 1 12 4 1,700 60 37 706 479 480 CR 12 COLLECTOR 2863 1 12 4 1,700 60 37 707 480 481 CR 12 COLLECTOR 1389 1 12 4 1,700 60 37 708 481 482 CR 12 COLLECTOR 3896 1 12 4 1,700 60 37 709 482 483 CR 12 COLLECTOR 1093 1 12 4 1,700 40 37 710 483 484 CR 12 COLLECTOR 2778 1 12 4 1,700 60 37 711 484 485 CR 12 COLLECTOR 1052 1 12 4 1,700 60 37 712 486 188 CR 35 COLLECTOR 573 1 12 4 1,750 30 35 713 486 487 CR 35 COLLECTOR 2077 1 12 4 1,700 40 35 714 487 486 CR 35 COLLECTOR 2078 1 12 4 1,700 40 35 715 487 488 CR 35 COLLECTOR 834 1 12 4 1,700 40 35 716 488 487 CR 35 COLLECTOR 835 1 12 4 1,700 40 35 717 488 489 CR 35 COLLECTOR 1281 1 12 4 1,700 40 35 718 489 488 CR 35 COLLECTOR 1279 1 12 4 1,700 40 35 719 489 490 CR 35 COLLECTOR 700 1 12 4 1,700 40 35 720 490 489 CR 35 COLLECTOR 700 1 12 4 1,700 40 35 721 490 491 CR 35 COLLECTOR 832 1 12 4 1,700 40 35 722 491 490 CR 35 COLLECTOR 825 1 12 4 1,700 40 35 723 491 492 CR 35 COLLECTOR 2182 1 12 4 1,700 40 35 724 492 491 CR 35 COLLECTOR 2182 1 12 4 1,700 40 35 Monticello Nuclear Generating Plant Evacuation Time Estimate K-72 KLD Engineering, P.C.Rev. 1
/ 4.' !L 4 LK J.') LULLILIUK sb6 I 4 1,/UU 4U5 726 493 492 CR 35 COLLECTOR 869 1 12 4 1,700 40 35 727 493 494 CR 35 COLLECTOR 1144 1 12 4 1,700 40 35 728 494 493 CR 35 COLLECTOR 1144 1 12 4 1,700 40 35 729 494 495 CR 35 COLLECTOR 1030 1 12 4 1,700 40 35 730 495 494 CR 35 COLLECTOR 1027 1 12 4 1,700 40 35 731 495 496 CR 35 COLLECTOR 1242 1 12 4 1,700 40 35 732 496 495 CR 35 COLLECTOR 1240 1 12 4 1,700 40 35 733 496 497 CR 35 COLLECTOR 1349 1 12 4 1,700 40 35 734 497 496 CR 35 COLLECTOR 1349 1 12 4 1,700 40 35 735 497 498 CR 35 COLLECTOR 2145 1 12 4 1,700 40 35 736 498 497 CR 35 COLLECTOR 2145 1 12 4 1,700 40 35 737 498 499 CR 9 COLLECTOR 3622 1 12 4 1,700 60 34 738 499 500 CR 35 COLLECTOR 735 1 12 4 1,700 50 34 739 500 501 CR 35 COLLECTOR 2550 1 12 4 1,700 60 34 740 501 502 CR 35 COLLECTOR 731 1 12 4 1,700 50 34 741 502 503 CR 35 COLLECTOR 605 1 12 4 1,700 50 34 742 503 504 CR 35 COLLECTOR 715 1 12 4 1,700 50 34 743 504 505 CR 35 COLLECTOR 915 1 12 4 1,700 50 34 744 505 408 CR 35 COLLECTOR 10501 1 12 4 1,700 60 34 745 505 506 DEMPSEY AVE COLLECTOR 5157 1 12 4 1,700 50 34 746 506 507 DEMPSEY AVE COLLECTOR 5252 1 12 4 1,700 50 34 747 508 498 CR 9 COLLECTOR 4684 1 12 4 1,700 60 34 748 509 508 CR 9 COLLECTOR 1632 1 12 4 1,700 45 34 749 510 517 CR 9 COLLECTOR 677 1 12 4 1,700 45 35 Monticello Nuclear Generating Plant Evacuation Time Estimate K-73 KLD Engineering, P.C.Rev. I 750 511 510 CR 9 COLLECTOR 1245 1 12 4 1,700 45 35 751 512 511 CR 9 COLLECTOR 1699 1 12 4 1,700 45 29 752 513 512 CR9 COLLECTOR 1444 1 12 4 1,700 45 29 753 514 513 CR9 COLLECTOR 1246 1 12 4 1,700 45 29 754 515 514 CR9 COLLECTOR 519 1 12 4 1,575 35 29 755 516 515 CR9 COLLECTOR 629 1 12 4 1,700 40 29 756 517 509 CR 9 COLLECTOR 628 1 12 4 1,700 45 34 757 519 418 SR 55 COLLECTOR 8701 1 12 4 1,700 60 28 758 519 520 CR 37 COLLECTOR 1331 1 12 4 1,700 40 28 759 520 521 CR 37 COLLECTOR 2115 1 12 4 1,700 60 28 760 521 522 CR 37 COLLECTOR 3858 1 12 4 1,700 60 28 761 522 523 CR 37 COLLECTOR 4764 1 12 4 1,700 60 28 762 523 524 CR 37 COLLECTOR 3623 1 12 4 1,700 50 27 763 524 525 CR 37 COLLECTOR 1707 1 12 4 1,700 50 27 764 524 656 CR 6 COLLECTOR 5923 1 12 1 1,700 60 27 765 525 526 CR 37 COLLECTOR 1686 1 12 4 1,700 40 27 766 526 527 CR 37 COLLECTOR 2611 1 12 4 1,700 60 27 767 527 528 CR 37 COLLECTOR 3975 1 12 4 1,700 60 27 768 529 530 SR 24 COLLECTOR 1553 1 12 4 1,700 40 27 769 530 531 SR 24 COLLECTOR 1975 1 12 4 1,700 40 27 770 530 648 CR 6 COLLECTOR 2106 1 12 4 1,700 40 27 771 531 532 SR 24 COLLECTOR 1522 1 12 4 1,700 40 27 772 532 533 SR 24 COLLECTOR 1442 1 12 4 1,700 40 15 773 533 534 SR 24 COLLECTOR 2935 1 12 4 1,700 40 15 774 534 535 SR 24 COLLECTOR 940 1 12 4 1,700 40 27 Monticello Nuclear Generating Plant K-74 KLD Engineering, P.C.Evacuation Time Estimate Rev. 1
//5 535 53b SK 4 LULLTRIUK 31U84 1 1z 4 1,7U0 40 27 776 536 537 SR 24 COLLECTOR 1415 1 12 4 1,700 40 27 777 537 538 SR 24 COLLECTOR 1527 1 12 4 1,700 40 27 778 538 539 SR 24 COLLECTOR 1885 1 12 4 1,700 40 27 779 539 415 SR 24 COLLECTOR 1527 1 12 4 1,700 40 27 780 540 120 CR 39 COLLECTOR 5175 1 12 6 1,700 60 16 781 541 540 CR 39 COLLECTOR 1586 1 12 6 1,700 60 16 782 542 541 CR 39 COLLECTOR 3364 1 12 6 1,700 60 16 783 543 542 CR 39 COLLECTOR 3530 1 12 6 1,700 55 16 784 544 543 CR 39 COLLECTOR 1755 1 12 6 1,700 60 16 785 545 544 CR 39 COLLECTOR 1525 1 12 6 1,700 60 16 786 546 545 CR 39 COLLECTOR 2804 1 12 6 1,700 60 17 787 547 546 CR 39 COLLECTOR 2358 1 12 6 1,700 60 17 788 548 547 CR 39 COLLECTOR 2136 1 12 6 1,700 60 17 789 549 548 CR 39 COLLECTOR 3094 1 12 6 1,700 60 17 790 550 549 CR 39 COLLECTOR 1450 1 12 6 1,700 55 17 791 551 550 CR 39 COLLECTOR 1990 1 12 6 1,700 55 17 792 552 553 CR 39 COLLECTOR 4081 1 12 6 1,750 60 17 793 552 885 CR 39 COLLECTOR 5220 1 12 6 1,750 60 17 794 553 878 CR 39 COLLECTOR 6727 1 12 6 1,700 60 17 795 554 555 CR 39 COLLECTOR 356 1 12 6 1,575 35 22 796 555 556 CR 39 COLLECTOR 849 1 12 6 1,750 35 22 797 555 874 4TH ST E LOCAL ROADWAY 824 1 11 0 1,350 30 22 798 556 879 CO HWY 75 MINOR ARTERIAL 836 2 12 4 1,900 40 22 799 557 1014 CO HWY 75 MINOR ARTERIAL 700 2 12 4 1,750 40 22 Monticello Nuclear Generating Plant Evacuation Time Estimate K-75 KLD Engineering, P.C.Rev. 1 8uu 558 559 PLAN I ALCESS KUAL) CULLEL I UK 58U 1 12 4 1,700 40 17 801 559 560 PLANT ACCESS ROAD COLLECTOR 2646 1 12 4 1,700 40 17 802 559 565 PLANT ACCESS ROAD COLLECTOR 296 1 12 4 1,700 40 17 803 560 561 PLANT ACCESS ROAD COLLECTOR 623 1 12 4 1,700 40 17 804 561 577 PLANT ACCESS ROAD COLLECTOR 123 1 12 4 1,700 40 17 805 562 563 CO HWY 75 COLLECTOR 2581 1 12 4 1,700 50 17 806 563 564 CO HWY 75 COLLECTOR 3124 1 12 4 1,700 55 17 807 564 556 CO HWY 75 COLLECTOR 3243 1 12 4 1,750 55 22 808 565 566 PLANT ACCESS ROAD COLLECTOR 571 1 12 4 1,700 40 17 809 566 567 PLANT ACCESS ROAD COLLECTOR 1036 1 12 4 1,700 40 17 810 567 568 PLANT ACCESS ROAD COLLECTOR 233 1 12 4 1,700 40 17 811 568 569 CR 75 COLLECTOR 7823 1 12 8 1,700 60 17 812 569 570 CR 75 COLLECTOR 3256 1 12 8 1,700 60 17 813 570 571 CR 75 COLLECTOR 1410 1 12 4 1,700 60 17 814 571 572 CR 75 COLLECTOR 2009 1 12 4 1,700 60 17 815 572 573 CR 75 COLLECTOR 3855 1 12 4 1,700 60 17 816 573 574 CR 75 COLLECTOR 4169 1 12 4 1,700 60 17 817 574 575 CR 75 COLLECTOR 1953 1 12 4 1,700 60 16 818 575 576 CR 75 COLLECTOR 2457 1 12 4 1,700 60 16 819 576 109 CR 75 COLLECTOR 7262 1 12 4 1,700 60 16 820 577 562 CO HWY 75 COLLECTOR 1249 1 12 4 1,700 40 17 821 578 266 EDGEWOOD ST COLLECTOR 1090 1 12 0 1,700 40 11 822 578 948 EDGEWOOD ST COLLECTOR 3397 1 12 0 1,700 40 11 823 579 580 CR 23 COLLECTOR 4266 1 12 4 1,700 50 11 824 579 947 EDGEWOOD ST COLLECTOR 2293 1 12 0 1,700 40 11 Monticello Nuclear Generating Plant Evacuation Time Estimate K-76 KLD Engineering, P.C.K-76 KLD Engineering, P.C.Rev. 1 825 580 1 581 1 CR 23 COLLECTOR 3025 I 12 4 1,700 50 11 826 580 581 CR 23 COLLECTOR 978 1 12 4 1,700 50 11 827 582 583 CR 23 COLLECTOR 5148 1 12 4 1,700 50 11 828 582 936 CR 4 COLLECTOR 3984 1 12 1 1,700 60 11 829 582 584 CR 23 COLLECTOR 2278 1 12 4 1,700 50 11 830 584 585 CR 23 COLLECTOR 2190 1 12 4 1,700 50 11 831 585 586 CR 23 COLLECTOR 2446 1 12 4 1,700 50 11 832 586 587 CR 23 COLLECTOR 2509 1 12 4 1,700 50 11 833 587 980 CR 23 COLLECTOR 5368 1 12 4 1,700 50 6 834 588 222 57TH ST COLLECTOR 8071 1 12 4 1,750 40 6 835 588 306 57TH ST COLLECTOR 13067 1 12 4 1,750 40 6 836 589 264 CR 23 COLLECTOR 1775 1 12 4 1,700 40 11 837 589 934 CR 23 COLLECTOR 2610 1 12 4 1,700 40 11 838 590 349 CHELSEA RD LOCAL ROADWAY 951 1 12 4 1,750 40 22 839 590 1032 CHELSEA RD LOCAL ROADWAY 3404 1 12 4 1,700 40 22 840 591 953 CR 37 COLLECTOR 1448 1 12 4 1,700 40 31 841 592 593 CR 37 COLLECTOR 481 1 12 4 1,700 40 31 842 593 594 CR 37 COLLECTOR 375 1 12 4 1,750 40 31 843 594 595 CR 37 COLLECTOR 798 1 12 4 1,700 40 31 844 595 596 CR 37 COLLECTOR 340 1 12 4 1,575 35 31 845 596 597 CR 37 COLLECTOR 483 1 12 4 1,575 35 31 846 597 598 CR 37 COLLECTOR 981 1 12 4 1,700 40 31 847 598 599 CR 37 COLLECTOR 777 1 12 4 1,700 40 31 848 599 600 CR 37 MINOR ARTERIAL 422 1 12 4 1,700 40 31 849 600 36 1-94 EB ON-RAMP FREEWAY RAMP 755 1 12 4 1,700 45 31 Monticello Nuclear Generating Plant Evacuation Time Estimate K-77 KLD Engineering, P.C.Rev. 1 851 601 594 CR 19 MINOR ARTERIAL 733 1 12 4 1,750 40 31 852 602 601 CR 19 MINOR ARTERIAL 696 2 12 4 1,900 60 31 853 602 956 CR 19 MINOR ARTERIAL 2207 2 12 4 1,900 60 31 854 603 956 CR 19 MINOR ARTERIAL 1496 2 12 4 1,900 60 31 855 603 962 CR 19 MINOR ARTERIAL 3951 2 12 4 1,750 50 31 856 604 605 CR 19 COLLECTOR 448 1 12 4 1,750 40 31 857 605 871 CENTRAL AVE E MINOR ARTERIAL 1372 2 12 4 1,750 45 31 858 605 966 CR 19 COLLECTOR 1627 1 12 4 1,700 50 31 859 606 607 CR 19 COLLECTOR 7900 1 12 4 1,700 50 40 860 607 1157 CR 19 COLLECTOR 4432 1 12 4 1,700 50 40 861 609 1027 CR 19 MINOR ARTERIAL 609 2 12 4 1,750 40 31 862 610 381 CR 19 MINOR ARTERIAL 8133 1 12 4 1,700 60 31 863 610 1023 CR 19 MINOR ARTERIAL 5156 1 12 4 1,700 60 31 864 611 600 CR 37 LOCAL ROADWAY 708 1 12 4 1,700 40 31 865 611 612 CR 37 COLLECTOR 1712 1 12 4 1,700 60 31 866 612 611 CR 37 COLLECTOR 1712 1 12 4 1,750 60 31 867 612 613 CR 37 COLLECTOR 3102 1 12 4 1,700 60 31 868 613 614 CR 37 COLLECTOR 6186 1 12 4 1,700 60 31 869 614 615 CR 37 COLLECTOR 998 1 12 4 1,700 50 31 870 615 616 CR 37 COLLECTOR 3982 1 12 4 1,700 60 31 871 616 617 CR 37 COLLECTOR 1272 1 12 4 1,700 50 31 872 617 618 CR 37 COLLECTOR 1844 1 12 4 1,700 60 31 873 618 619 CR 37 COLLECTOR 6222 1 12 4 1,700 60 31 874 619 676 CR 37 COLLECTOR 2645 1 12 4 1,750 60 32 Monticello Nuclear Generating Plant Evacuation Time Estimate K-78 KLD Engineering, P.C.Rev. 1 S** SSaturation FreeS 875 620 430 CR 35 MINOR ARTERIAL 1462 2 12 4 1,750 60 36 876 621 620 CR 35 MINOR ARTERIAL 1547 2 12 4 1,900 50 36 877 622 621 CR 35 MINOR ARTERIAL 944 2 12 4 1,900 50 36 878 623 1140 CR 35 COLLECTOR 5155 1 12 4 1,700 50 36 879 624 623 CR 35 COLLECTOR 5332 1 12 4 1,700 60 36 880 625 624 CR 35 COLLECTOR 6947 1 12 4 1,700 60 39 881 626 625 CR 35 COLLECTOR 1909 1 12 4 1,700 40 39 882 627 626 CR 35 COLLECTOR 4847 1 12 4 1,700 60 39 883 628 627 CR 35 COLLECTOR 1647 1 12 4 1,700 40 39 884 628 629 CR 35 COLLECTOR 5265 1 12 4 1,700 60 39 885 629 630 CR 35 COLLECTOR 5257 1 12 4 1,700 60 30 886 630 631 CR 35 COLLECTOR 5287 1 12 4 1,700 60 30 887 631 632 CR 35 MINOR ARTERIAL 2712 1 12 4 1,700 60 30 888 632 633 CR 35 COLLECTOR 1060 1 12 4 1,700 40 31 889 632 968 30TH ST COLLECTOR 2355 1 12 4 1,700 40 31 890 633 634 CR 35 COLLECTOR 2584 1 12 4 1,700 50 31 891 634 635 CR 35 COLLECTOR 1410 1 12 4 1,700 50 31 892 635 636 CENTRAL AVE E MINOR ARTERIAL 2155 2 12 4 1,900 45 31 893 636 605 CENTRAL AVE E MINOR ARTERIAL 946 2 12 4 1,750 45 31 894 637 638 SR 241 MINOR ARTERIAL 6060 2 12 4 1,750 50 31 895 638 639 SR 241 MINOR ARTERIAL 6221 2 12 4 1,900 50 31 896 639 640 SR 241 MINOR ARTERIAL 573 2 12 4 1,900 30 31 897 640 659 SR 241 MINOR ARTERIAL 592 2 12 4 1,750 40 31 898 641 642 CR 39 COLLECTOR 2544 1 12 10 1,700 60 24 899 642 643 CR 39 COLLECTOR 2128 1 12 10 1,700 60 25 Monticello Nuclear Generating Plant Evacuation Time Estimate K-79 KLD Engineering, P.C.Rev. 1 900 143 b44 CR 39 COLLECTOR 1909 1 12 10 1,700 60 25 901 644 645 CR 39 COLLECTOR 4532 1 12 10 1,700 60 25 902 645 646 CR 39 COLLECTOR 3358 1 12 10 1,700 60 25 903 645 1021 CR 37 COLLECTOR 349 1 12 4 1,700 40 25 904 646 647 CR 39 MINORARTERIAL 3441 2 12 10 1,750 60 31 905 647 832 CR 39 COLLECTOR 726 1 12 4 1,750 40 32 906 647 836 CR 42 MINOR ARTERIAL 1643 2 12 4 1,750 60 31 907 648 649 CR 6 COLLECTOR 2851 1 12 4 1,700 60 27 908 649 650 CR 6 COLLECTOR 6591 1 12 4 1,700 60 27 909 650 416 CR 6 COLLECTOR 2069 1 12 4 1,700 60 27 910 651 652 CR 6 COLLECTOR 1639 1 12 1 1,700 50 27 911 652 653 CR 6 COLLECTOR 2429 1 12 1 1,700 50 27 912 653 654 CR 6 COLLECTOR 2282 1 12 1 1,700 50 27 913 654 655 CR6 COLLECTOR 4218 1 12 1 1,700 45 27 914 655 524 CR 6 COLLECTOR 1325 1 12 1 1,700 50 27 915 656 657 CR 6 COLLECTOR 5299 1 12 1 1,700 60 33 916 658 1 US 10 MINOR ARTERIAL 2332 2 12 4 1,900 70 4 917 659 40 ON-RAMP TO 1-94 FREEWAY RAMP 530 1 12 4 1,700 45 31 918 659 660 SR 241 COLLECTOR 686 1 12 4 1,750 40 31 919 660 661 CR 36 COLLECTOR 1922 1 12 4 1,700 50 31 920 661 662 CR 36 COLLECTOR 1738 1 12 4 1,700 50 31 921 662 663 CR 36 COLLECTOR 4218 1 12 4 1,700 50 31 922 663 664 CR 36 COLLECTOR 1589 1 12 4 1,700 50 32 923 664 665 CR 36 COLLECTOR 1055 1 12 4 1,700 50 32 924 665 866 CR 36 COLLECTOR 591 1 12 4 1,750 30 32 Monticello Nuclear Generating Plant Evacuation Time Estimate K(-80 KLD Engineering, P.C.Rev. 1 925 667 866 53RD ST NE COLLECTOR 1128 1 12 4 1,750 40 32 926 668 865 SR 101 FREEWAY 1914 2 12 4 2,250 65 32 927 669 668 SR 101 FREEWAY 2081 2 12 4 2,250 65 32 928 670 669 SR 101 FREEWAY 3224 3 12 4 2,250 65 32 929 671 672 SR 101 MINOR ARTERIAL 3110 2 12 4 1,900 60 32 930 672 673 SR 101 MINOR ARTERIAL 864 2 12 4 1,750 60 32 931 673 858 SR 101 MAJOR ARTERIAL 1323 2 12 4 1,750 60 32 932 674 670 SR 101 FREEWAY 952 4 12 4 2,250 65 32 933 676 674 SR 101 ON-RAMP FREEWAY RAMP 1191 2 12 4 1,900 45 32 934 678 674 SR 101 FREEWAY 1607 2 12 4 2,250 60 32 935 679 678 SR 101 FREEWAY 2561 2 12 4 2,250 60 32 936 681 682 CR 8 COLLECTOR 11385 1 12 4 1,700 60 10 937 682 683 CR 8 COLLECTOR 10076 1 12 4 1,750 60 10 938 683 101 SR 24 COLLECTOR 1545 1 12 4 1,700 60 10 939 683 102 SR 24 COLLECTOR 6782 1 12 4 1,700 60 10 940 683 684 CR 8 COLLECTOR 1331 1 12 4 1,700 60 10 941 684 685 CR 8 COLLECTOR 5853 1 12 4 1,700 60 10 942 685 686 CR 8 COLLECTOR 1540 1 12 4 1,700 60 10 943 686 687 CR 8 COLLECTOR 1 1708 1 12 4 1 1,700 1 60 10 944 687 688 CR 8 COLLECTOR 1234 1 12 4 1,700 60 9 945 688 689 CR 8 COLLECTOR 4232 1 12 4 1,700 60 9 946 689 690 CR 8 COLLECTOR 1370 1 12 4 1,700 60 9 947 690 691 CR 8 COLLECTOR 1984 1 12 4 1,700 60 4 948 691 692 CR 8 COLLECTOR 1345 1 12 4 1,700 60 4 949 692 693 CR 8 COLLECTOR 2852 1 12 4 1,700 60 4 Monticello Nuclear Generating Plant K-81 KILD Engineering, P.C.Evacuation Time Estimate Rev. 1 950 693 694 CR8 CULLECUOR 39/3 1 12 4 1,100 60 4 951 695 266 US 10 MINOR ARTERIAL 3142 2 12 4 1,900 65 11 952 695 935 US 10 MINOR ARTERIAL 1522 2 12 4 1,900 70 11 953 695 977 CR 8 COLLECTOR 8478 1 12 4 1,700 60 11 954 696 430 5TH ST NE COLLECTOR 610 1 12 4 1,750 40 36 955 696 697 5TH ST NE COLLECTOR 621 1 12 4 1,700 40 36 956 697 696 5TH ST NE COLLECTOR 621 1 12 4 1,700 40 36 957 697 698 5TH ST NE COLLECTOR 663 1 12 4 1,700 40 36 958 698 697 5TH ST NE COLLECTOR 663 1 12 4 1,700 40 36 959 698 901 5TH ST NE COLLECTOR 402 1 12 4 1,700 40 35 960 699 901 5TH ST NE COLLECTOR 389 1 12 4 1,700 40 35 961 699 915 SR 25 LOCAL ROADWAY 563 1 12 4 1,350 30 35 962 700 431 SR 55 MINOR ARTERIAL 1519 2 12 4 1,750 50 36 963 700 701 2NDSTS COLLECTOR 833 1 12 4 1,700 45 36 964 701 700 2NDSTS COLLECTOR 833 1 12 4 1,750 45 36 965 701 909 2NDSTS COLLECTOR 974 1 12 4 1,700 45 36 966 702 189 1ST ST S LOCAL ROADWAY 1792 1 12 4 1,350 30 36 967 702 909 2ND ST S COLLECTOR 744 1 12 4 1,700 45 36 968 703 704 CR3 COLLECTOR 1127 1 12 4 1,700 40 3 969 704 705 CR 3 COLLECTOR 2146 1 12 4 1,700 40 7 970 705 302 CR 3 COLLECTOR 4322 1 12 4 1,700 40 7 971 706 246 US 10 ON-RAMP FREEWAY RAMP 730 1 12 4 1,700 45 24 972 707 706 CR 15 COLLECTOR 5008 1 12 4 1,700 40 24 973 708 707 CR 15 COLLECTOR 1676 1 12 4 1,700 40 20 974 709 708 CR 15 COLLECTOR 2835 1 12 4 1,700 40 20 Monticello Nuclear Generating Plant Evacuation Time Estimate K-82 KLD Engineering, P.C.Rev. 1 975 710 709 CR 15 COLLECTOR 1418 1 12 4 1,700 40 20 976 711 710 CR 15 COLLECTOR 2187 1 12 4 1,700 40 20 977 712 711 CR 15 COLLECTOR 1407 1 12 4 1,700 40 20 978 713 712 CR 15 COLLECTOR 862 1 12 4 1,700 40 20 979 714 713 CR 15 COLLECTOR 1430 1 12 4 1,700 40 20 980 714 715 CR 15 COLLECTOR 2172 1 12 4 1,700 40 20 981 715 716 CR 15 COLLECTOR 837 1 12 4 1,700 40 20 982 716 717 CR 15 COLLECTOR 1532 1 12 4 1,700 40 20 983 717 718 CR 15 COLLECTOR 5124 1 12 4 1,700 40 13 984 718 982 CR 15 COLLECTOR 693 1 12 4 1,700 40 13 985 719 720 CR 15 COLLECTOR 2005 1 12 4 1,700 40 13 986 720 721 CR 15 COLLECTOR 4928 1 12 4 1,700 40 13 987 721 722 CR 15 COLLECTOR 3865 1 12 4 1,700 40 13 988 722 723 CR 15 COLLECTOR 6847 1 12 4 1,700 40 13 989 723 724 CR 15 COLLECTOR 1900 1 12 4 1,700 40 13 990 724 725 CR 15 COLLECTOR 1154 1 12 4 1,750 40 13 991 725 729 CR 4 COLLECTOR 8872 1 12 4 1,700 55 13 992 726 727 CR 4 COLLECTOR 2240 1 12 4 1,700 55 12 993 727 728 CR4 COLLECTOR 2575 1 12 4 1,700 55 12 994 728 725 CR 4 COLLECTOR 4065 1 12 4 1,750 55 13 995 729 730 CR 4 COLLECTOR 1411 1 12 4 1,700 60 13 996 730 782 CR 4 COLLECTOR 734 1 12 4 1,700 40 13 997 731 732 CR 4 COLLECTOR 1408 1 12 4 1,700 40 13 998 732 1103 CR 4 COLLECTOR 1776 1 12 4 1,750 45 13 999 733 734 US 169 MINOR ARTERIAL 4023 2 12 4 1,900 65 13 Monticello Nuclear Generating Plant Evacuation Time Estimate K-83 KLD Engineering, P.C.Rev. I Sauain Fe Up- Do n Lan Shudr Flw Fo Stea Stea Legt No. of Wdh Wdh Rae Sed Gi Link Node Nod Rod a Nam Rod a Typ (f. Lane (f. f. ) (p) N m e 1000 734 735 US 169 MINOR ARTERIAL 4683 2 12 4 1,900 65 8 1001 735 736 US 169 MINOR ARTERIAL 6815 2 12 4 1,900 65 8 1002 736 737 US 169 MINOR ARTERIAL 1421 2 12 4 1,900 65 8 1003 737 738 US 169 MINOR ARTERIAL 1333 2 12 4 1,900 65 8 1004 738 739 US 169 MINOR ARTERIAL 5576 2 12 4 1,900 65 8 1005 740 733 US 169 MINOR ARTERIAL 2040 2 12 10 1,750 65 13 1006 741 740 US 169 MINOR ARTERIAL 6713 2 12 10 1,900 65 13 1007 742 741 US 169 MINOR ARTERIAL 2382 2 12 10 1,900 65 13 1008 743 1106 US 169 MINOR ARTERIAL 2742 2 12 10 1,900 65 13 1009 744 743 US 169 MINOR ARTERIAL 3034 2 12 10 1,900 65 13 1010 745 744 US 169 MINOR ARTERIAL 2444 2 12 4 1,900 65 14 1011 746 745 US 169 MINOR ARTERIAL 3508 2 12 4 1,900 65 14 1012 747 746 US 169 MINOR ARTERIAL 2747 2 12 4 1,900 70 14 1013 748 747 US 169 MINOR ARTERIAL 1838 2 12 4 1,900 70 14 1014 749 748 US 169 MINOR ARTERIAL 3770 2 12 4 1,900 70 26 1015 750 749 US 169 MINOR ARTERIAL 2544 2 12 4 1,900 70 26 1016 751 758 MAIN ST NW MINOR ARTERIAL 2058 1 12 4 1,700 40 26 1017 751 825 US 169 MINOR ARTERIAL 1658 2 12 4 1,900 60 26 1018 752 755 US 169 MINOR ARTERIAL 2105 2 12 4 1,750 65 26 1019 753 752 US 169 MINOR ARTERIAL 1538 2 12 4 1,900 65 26 1020 754 237 US 10 MINOR ARTERIAL 867 2 12 4 1,750 65 25 1021 754 238 US 10 MINOR ARTERIAL 1160 2 12 4 1,900 65 25 1022 755 751 US 169 MINOR ARTERIAL 3291 2 12 4 1,750 65 26 1023 756 754 JACKSON AVE COLLECTOR 1961 1 12 4 1,750 40 25 1024 757 755 SCHOOL ST COLLECTOR 514 1 12 4 1,750 40 26 Monticello Nuclear Generating Plant K-84 KLD Engineering, P.C.Evacuation Time Estimate Rev. 1 1025 757 821 SCHOOL ST MINOR ARTERIAL 1644 2 12 4 1,750 40 26 1026 758 237 MAIN ST NW MINOR ARTERIAL 461 2 12 4 1,750 40 26 1027 758 751 MAIN ST NW MINOR ARTERIAL 2058 1 12 4 1,750 40 26 1028 759 750 US 169 MINOR ARTERIAL 2105 2 12 4 1,900 70 26 1029 759 760 US 169 MINORARTERIAL 1935 2 12 4 1,900 70 26 1030 760 1008 US 169 MINOR ARTERIAL 4143 2 12 4 1,750 70 26 1031 761 753 JACKSON AVE COLLECTOR 428 1 12 4 1,750 40 26 1032 762 760 US 169 ON-RAMP FREEWAY RAMP 947 1 12 4 1,700 45 26 1033 762 763 CR 33 COLLECTOR 962 1 12 4 1,700 50 26 1034 763 759 US 169 ON-RAMP FREEWAY RAMP 940 1 12 4 1,700 45 26 1035 764 763 CR 33 COLLECTOR 504 1 12 4 1,700 50 26 1036 765 764 CR 33 COLLECTOR 3147 1 12 4 1,700 50 26 1037 780 762 CR 33 COLLECTOR 1554 1 12 4 1,700 50 26 1038 781 780 CR 33 COLLECTOR 2563 1 12 4 1,700 50 21 1039 781 815 CR 77 COLLECTOR 1042 1 12 4 1,700 50 21 1040 782 731 CR 4 COLLECTOR 2552 1 12 4 1,700 40 13 1041 783 782 CR 1 COLLECTOR 306 1 12 4 1,700 60 13 1042 784 783 CR 1 COLLECTOR 816 1 12 4 1,700 60 13 1043 785 784 CR 1 COLLECTOR 7003 1 12 4 1,700 60 13 1044 786 785 CR 1 COLLECTOR 1248 1 12 4 1,700 40 13 1045 787 786 CR 1 COLLECTOR 1947 1 12 4 1,700 60 13 1046 788 787 CR 1 COLLECTOR 1609 1 12 4 1,700 40 13 1047 789 788 CR 1 COLLECTOR 1155 1 12 4 1,700 60 13 1048 790 789 CR 1 COLLECTOR 1367 1 12 4 1,700 40 13 1049 791 790 CR 1 COLLECTOR 935 1 12 4 1,700 60 13 Monticello Nuclear Generating Plant K-85 KLD Engineering, P.C.Evacuation Time Estimate Rev. 1 1050 792 791 CR 1 COLLECTOR 2610 1 12 4 1,700 60 13 1051 793 792 CR 1 COLLECTOR 955 1 12 4 1,700 60 13 1052 794 793 CR 1 COLLECTOR 1080 1 12 4 1,700 40 13 1053 795 794 CR 1 COLLECTOR 2535 1 12 4 1,700 60 13 1054 796 795 CR 1 COLLECTOR 1119 1 12 4 1,700 40 13 1055 797 796 CR 1 COLLECTOR 1359 1 12 4 1,700 40 13 1056 798 797 CR 1 COLLECTOR 773 1 12 4 1,700 40 13 1057 799 798 CR 1 COLLECTOR 3422 1 12 4 1,700 60 13 1058 799 808 221ST AVE COLLECTOR 5536 1 12 4 1,700 60 13 1059 800 799 CR 1 COLLECTOR 2091 1 12 4 1,700 60 13 1060 801 800 CR 1 COLLECTOR 2421 1 12 4 1,700 60 21 1061 802 1051 CR 1 COLLECTOR 2468 1 12 4 1,700 60 21 1062 803 802 CR 1 COLLECTOR 1932 1 12 4 1,700 40 21 1063 803 804 CR 1 COLLECTOR 1365 1 12 4 1,700 60 21 1064 804 803 CR 1 COLLECTOR 1365 1 12 4 1,700 60 21 1065 804 805 CR 1 COLLECTOR 2217 1 12 4 1,700 60 21 1066 805 804 CR 1 COLLECTOR 2216 1 12 4 1,700 60 21 1067 805 806 CR 1 COLLECTOR 996 1 12 4 1,700 60 21 1068 806 805 CR 1 COLLECTOR 996 1 12 4 1,700 60 21 1069 806 807 CR 1 MINOR ARTERIAL 895 2 12 4 1,900 60 21 1070 807 1046 CR 1 MINOR ARTERIAL 2490 2 12 4 1,900 60 21 1071 808 809 221ST AVE COLLECTOR 3278 1 12 4 1,700 60 13 1072 809 747 221ST AVE COLLECTOR 1451 1 12 4 1,700 60 13 1073 810 811 CR 1 MINOR ARTERIAL 2009 2 12 4 1,900 60 25 1074 811 812 CR 1 MINOR ARTERIAL 1829 2 12 4 1,900 60 25 Monticello Nuclear Generating Plant Evacuation Time Estimate K-86 KLD Engineering, P.C.K-86 KLD Engineering, P.C.Rev. 1 1075 812 813 CR 1 MINUR ARTERIAL 13b2 2 12 4 1,900 10 25 1076 813 814 CR 1 MINOR ARTERIAL 1185 2 12 4 1,750 60 25 1077 814 819 CR 77 COLLECTOR 3208 1 12 4 1,700 50 25 1078 814 820 CR 1 MINOR ARTERIAL 371 2 12 4 1,900 60 25 1079 815 781 CR 77 COLLECTOR 1042 1 12 4 1,700 50 21 1080 815 816 CR 77 COLLECTOR 1075 1 12 4 1,700 50 21 1081 816 815 CR 77 COLLECTOR 1071 1 12 4 1,700 50 21 1082 816 817 CR 77 COLLECTOR 890 1 12 4 1,700 50 21 1083 817 816 CR 77 COLLECTOR 890 1 12 4 1,700 50 21 1084 817 818 CR 77 COLLECTOR 1084 1 12 4 1,700 50 21 1085 818 817 CR 77 COLLECTOR 1080 1 12 4 1,700 50 21 1086 818 819 CR 77 COLLECTOR 1548 1 12 4 1,700 50 21 1087 819 814 CR 77 COLLECTOR 3208 1 12 4 1,750 50 25 1088 819 818 CR 77 COLLECTOR 1548 1 12 4 1,700 50 21 1089 820 822 CR 1 MINOR ARTERIAL 1201 2 12 4 1,750 60 25 1090 821 756 JACKSON AVE COLLECTOR 778 1 12 4 1,700 40 25 1091 821 757 SCHOOL ST MINOR ARTERIAL 1644 2 12 4 1,750 40 26 1092 821 822 SCHOOL ST COLLECTOR 2711 1 12 4 1,750 40 25 1093 822 239 CR 1 MINOR ARTERIAL 1408 2 12 4 1,750 40 25 1094 822 821 SCHOOL ST MINOR ARTERIAL 2711 2 12 4 1,750 40 25 1095 823 757 FREEPORT AVE MINOR ARTERIAL 665 2 12 4 1,750 40 26 1096 824 821 JACKSON AVE COLLECTOR 758 1 12 4 1,750 40 25 1097 824 1012 JACKSON AVE MINOR ARTERIAL 2383 2 12 4 1,900 40 25 1098 825 826 US 169 MINOR ARTERIAL 1270 2 12 4 1,900 60 26 1099 826 827 US 169 MINOR ARTERIAL 1271 2 12 4 1,750 60 26 Monticello Nuclear Generating Plant Evacuation Time Estimate K-87 KLD Engineering, P.C.Rev. 1 1100 827 830 US 169 MINOR ARTERIAL 812 2 12 4 1,900 60 26 1101 828 831 SR 101 FREEWAY 1355 2 12 4 2,250 60 26 1102 829 233 US 10 MAJOR ARTERIAL 929 2 12 4 1,900 65 26 1103 829 234 US 10 MAJOR ARTERIAL 794 2 12 4 1,900 65 26 1104 830 828 US 169 MINOR ARTERIAL 448 2 12 4 1,900 60 26 1105 830 829 US 10 EB ON-RAMP FREEWAY RAMP 760 1 12 4 1,350 30 26 1106 831 835 SR 101 FREEWAY 2064 2 12 4 2,250 60 26 1107 832 833 SR 101 ON-RAMP FREEWAY RAMP 1619 1 12 4 1,700 45 32 1108 833 834 SR 101 FREEWAY 2160 2 12 4 2,250 60 32 1109 834 843 SR 101 FREEWAY 2340 2 12 4 2,250 60 32 1110 835 833 SR 101 FREEWAY 1161 2 12 4 2,250 60 32 1111 836 647 CR 42 COLLECTOR 1643 1 12 4 1,750 60 31 1112 836 838 CR 42 MINOR ARTERIAL 978 2 12 4 1,750 60 31 1113 837 832 CR 39 COLLECTOR 1012 1 12 4 1,750 40 26 1114 838 836 CR 42 MINOR ARTERIAL 978 2 12 4 1,750 60 31 1115 838 839 CR 42 COLLECTOR 840 1 12 4 1,700 60 31 1116 839 840 CR 42 COLLECTOR 1043 1 12 4 1,700 60 31 1117 840 841 CR 42 COLLECTOR 2580 1 12 4 1,750 60 32 1118 841 844 QUAM AVE COLLECTOR 465 1 12 4 1,700 40 32 1119 843 679 SR 101 FREEWAY 1940 2 12 4 2,250 60 32 1120 843 841 SR 101 OFF-RAMP FREEWAY RAMP 742 1 12 4 1,750 45 32 1121 844 845 QUAM AVE COLLECTOR 794 1 12 4 1,700 40 32 1122 845 846 QUAM AVE COLLECTOR 2613 1 12 4 1,700 40 32 1123 846 676 QUAM AVE COLLECTOR 560 1 12 4 1,750 40 32 1124 1 847 [ 836 187TH ST COLLECTOR 689 1 12 4 1,750 40 32 Monticello Nuclear Generating Plant K-88 KLD Engineering, P.C.Evacuation Time Estimate Rev. 1 StemSraegh N.o Wit Wit Rat Speed Gri 1125 848 838 85TH ST COLLECTOR 596 1 12 4 1,750 40 32 1126 854 671 141ST AVE N COLLECTOR 838 1 12 4 1,750 40 32 1127 855 673 S DIAMOND LAKE RD MINOR ARTERIAL 628 2 12 4 1,750 40 32 1128 856 855 S DIAMOND LAKE RD MINOR ARTERIAL 621 2 12 4 1,750 40 32 1129 857 855 NORTHDALE BLVD COLLECTOR 536 1 12 4 1,750 40 32 1130 858 859 SR 101 MINOR ARTERIAL 663 2 12 4 1,900 50 32 1131 859 860 ON-RAMP TO 1-94 FREEWAY RAMP 464 1 12 4 1,350 30 32 1132 859 1167 SR 101 MINOR ARTERIAL 78 2 12 4 1,750 50 41 1133 860 43 1-94 FREEWAY 662 2 12 10 2,250 75 41 1134 860 1168 1-94 FREEWAY 501 2 12 10 2,250 75 32 1135 863 733 CR 4 COLLECTOR 2405 1 12 4 1,750 60 13 1136 864 15 1-94 FREEWAY 10083 2 12 10 2,250 75 10 1137 865 671 SR 101 MINOR ARTERIAL 6177 2 12 4 1,750 60 32 1138 866 865 SR 101 ON-RAMP FREEWAY RAMP 904 1 12 4 1,350 30 32 1139 868 174 SCHOOL BLVD MINOR ARTERIAL 638 2 12 4 1,750 40 22 1140 868 387 SCHOOL BLVD COLLECTOR 1836 1 12 4 1,700 40 22 1141 869 602 57TH ST NE COLLECTOR 1099 1 11 0 1,750 40 31 1142 870 603 CR 18 MINOR ARTERIAL 582 2 12 4 1,750 40 31 1143 871 604 SR 241 COLLECTOR 1266 1 12 4 1,750 40 31 1144 871 960 SR 241 MINOR ARTERIAL 1588 2 12 4 1,750 45 31 1145 872 871 SUMMIT DR LOCAL ROADWAY 392 1 12 4 1,750 40 31 1146 874 876 4TH ST E LOCAL ROADWAY 843 1 11 0 1,350 30 22 1147 874 879 MINNESOTA ST LOCAL ROADWAY 829 1 11 0 1,350 30 22 1148 875 882 4TH ST E LOCAL ROADWAY 357 1 11 0 1,350 30 22 1149 875 888 WALNUT ST LOCAL ROADWAY 408 1 11 0 1,350 30 22 Monticello Nuclear Generating Plant K-89 Evacuation Time Estimate KLD Engineering, P.C.Rev. 1 1150 876 875 4TH ST E LOCAL ROADWAY 829 1 11 0 1,350 30 22 1151 876 880 LINN ST LOCAL ROADWAY 824 1 11 0 1,350 30 22 1152 877 552 BRIARWOOD AVE NE COLLECTOR 3750 1 10 0 1,700 45 17 1153 878 554 CR 39 COLLECTOR 2427 1 12 6 1,575 35 17 1154 879 880 CO HWY 75 MINOR ARTERIAL 812 2 12 4 1,900 40 22 1155 880 881 CO HWY 75 MINOR ARTERIAL 861 2 12 4 1,900 40 22 1156 881 169 CO HWY 75 MINOR ARTERIAL 364 2 12 4 1,750 40 22 1157 882 889 SR 25 MINOR ARTERIAL 392 2 12 4 1,900 60 22 1158 882 1163 SR 25 MINOR ARTERIAL 576 2 12 4 1,750 60 22 1159 883 553 CAMERON AVE NE COLLECTOR 4308 1 11 0 1,750 45 17 1160 884 885 AETNA AVE NE COLLECTOR 3051 1 10 0 1,750 45 17 1161 885 551 CR 39 COLLECTOR 1025 1 12 6 1,700 60 17 1162 886 545 CLEMENTA AVE NW COLLECTOR 4278 1 12 0 1,700 45 17 1163 887 886 PARK RD COLLECTOR 1019 1 10 0 1,125 25 17 1164 888 881 WALNUT ST LOCAL ROADWAY 405 1 11 0 1,350 30 22 1165 889 169 SR 25 MINOR ARTERIAL 425 2 12 4 1,750 60 22 1166 889 882 SR 25 MINOR ARTERIAL 392 2 12 4 1,900 60 22 1167 890 889 W 3RD ST LOCAL ROADWAY 826 1 11 0 1,350 30 22 1168 891 890 W 3RD ST LOCAL ROADWAY 939 1 11 0 1,350 30 22 1169 892 890 PALM ST LOCAL ROADWAY 238 1 11 0 1,350 30 22 1170 893 891 WRIGHT ST LOCAL ROADWAY 233 1 10 0 1,350 30 22 1171 894 896 1ST AVE NE LOCAL ROADWAY 377 1 12 0 1,350 30 35 1172 895 894 DIVISION ST E LOCAL ROADWAY 711 1 12 0 1,350 30 35 1173 896 188 1ST ST NE LOCAL ROADWAY 400 1 12 0 1,750 30 35 1174 896 897 1ST AVE N E LOCAL ROADWAY 357 1 12 0 1,350 30 35 Monticello Nuclear Generating Plant Evacuation Time Estimate K-90 KLD Engineering, P.C.Rev. 1 Up Down Lan Shole Flo Flow Steam Strea Legt No of Wit Wit Rat Spee Grid 1175 897 900 2ND ST NE LOCAL ROADWAY 413 1 12 0 1,350 30 35 1176 897 902 1ST AVE NE LOCAL ROADWAY 778 1 12 0 1,350 30 35 1177 898 897 2ND ST NE LOCAL ROADWAY 394 1 12 0 1,350 30 35 1178 898 903 2ND AVE NE LOCAL ROADWAY 758 1 12 0 1,350 30 35 1179 899 898 2ND ST NE LOCAL ROADWAY 314 1 12 0 1,350 30 36 1180 900 188 SR 25 LOCAL ROADWAY 363 1 12 4 1,750 30 35 1181 901 698 5TH ST NE COLLECTOR 402 1 12 4 1,700 40 35 1182 901 699 5TH ST NE COLLECTOR 389 1 12 4 1,750 40 35 1183 902 901 1ST AVE NE LOCAL ROADWAY 352 1 12 0 1,350 30 35 1184 903 698 2ND AVE NE LOCAL ROADWAY 349 1 12 0 1,350 30 35 1185 904 906 8TH ST NW COLLECTOR 898 1 12 0 1,350 30 35 1186 905 904 8TH ST NW COLLECTOR 676 1 12 0 1,350 30 35 1187 906 699 SR 25 LOCAL ROADWAY 998 1 12 4 1,750 30 35 1188 906 907 SR 25 LOCAL ROADWAY 739 1 12 0 1,350 30 35 1189 907 908 SR 25 LOCAL ROADWAY 69 1 12 0 675 15 35 1190 908 429 SR 55 MINOR ARTERIAL 1259 2 12 4 1,750 50 35 1191 909 701 2NDSTS COLLECTOR 978 1 12 4 1,700 45 36 1192 909 702 2NDSTS MINOR ARTERIAL 745 1 12 4 1,700 45 36 1193 909 910 2NDSTS LOCAL ROADWAY 731 1 12 0 1,350 30 36 1194 910 909 2ND ST S LOCAL ROADWAY 731 1 12 0 1,350 30 36 1195 910 911 2NDSTS LOCAL ROADWAY 579 1 12 0 1,350 30 36 1196 911 910 2ND ST S LOCAL ROADWAY 579 1 12 0 1,350 30 36 1197 911 912 2ND ST S LOCAL ROADWAY 366 1 12 0 1,350 30 36 1198 912 911 2NDSTS LOCAL ROADWAY 366 1 12 0 1,350 30 36 1199 912 913 2ND ST S LOCAL ROADWAY 314 1 12 0 1,350 30 35 K-91 KLD Engineering, P.C.Monticello Nuclear Generating Plant Evacuation Time Estimate K-91 KLD Engineering, P.C.Rev. I Saturation Fre Up- Don Lan Shule Flo Flo Stra Ste 0 Legt No of Wit Wit Rat Spe Gri 1200 1 913 912 1 2NDSTS LOCAL ROADWAY 314 I 12 0 1,350 30 35 1201 913 914 2NDSTS LOCAL ROADWAY 61 1 12 0 1,350 30 35 1202 914 469 SR 25 COLLECTOR 1482 1 12 4 1,700 40 35 1203 914 913 2ND ST S LOCAL ROADWAY 61 1 12 0 1,350 30 35 1204 915 900 SR 25 LOCAL ROADWAY 566 1 12 4 1,350 30 35 1205 916 915 3RD ST NW LOCAL ROADWAY 512 1 12 0 1,350 30 35 1206 917 394 CR 8 COLLECTOR 593 1 12 4 1,750 40 28 1207 918 917 CONGRESS ST W LOCAL ROADWAY 652 1 12 0 1,350 30 28 1208 919 440 SR 55 COLLECTOR 1380 1 12 4 1,700 60 28 1209 920 919 SPRUCE AVE N LOCAL ROADWAY 947 1 12 0 1,350 30 28 1210 921 458 CR 7 COLLECTOR 4444 1 12 4 1,700 60 28 1211 922 921 4TH ST W COLLECTOR 1076 1 12 0 1,350 30 28 1212 923 126 CR 8 COLLECTOR 1238 1 12 4 1,700 60 28 1213 924 923 65TH ST NW COLLECTOR 1558 1 12 0 1,350 40 28 1214 925 395 CR8 COLLECTOR 1127 1 12 0 1,700 40 28 1215 925 396 CR 8 COLLECTOR 810 1 12 0 1,700 40 28 1216 926 925 LINDEN AVE S LOCAL ROADWAY 429 1 12 0 1,350 30 28 1217 927 589 CENTRAL AVE LOCAL ROADWAY 653 1 12 0 1,350 30 11 1218 928 927 CENTRAL AVE LOCAL ROADWAY 1149 1 12 0 1,350 30 11 1219 929 214 CR 24 COLLECTOR 3816 1 12 0 1,700 45 11 1220 930 695 BRADLEY BLVD LOCAL ROADWAY 424 1 12 0 1,700 40 11 1221 931 930 BRADLEY BLVD LOCAL ROADWAY 1890 1 12 0 1,700 40 11 1222 932 931 BRADLEY BLVD LOCAL ROADWAY 721 1 12 0 1,700 40 11 1223 933 932 BRADLEY BLVD LOCAL ROADWAY 582 1 12 0 1,700 40 11 1224 934 579 CR 23 COLLECTOR 2657 1 12 4 1,700 40 11 Monticello Nuclear Generating Plant Evacuation Time Estimate K-92 KLD Engineering, P.C.Rev. 1 1225 935 265 US 10 MINOR ARTERIAL 2735 2 12 4 1,900 70 11 1226 935 695 US 10 MINOR ARTERIAL 1522 2 12 4 1,900 70 11 1227 936 582 CR 4 COLLECTOR 3984 1 12 1 1,700 60 11 1228 936 937 CR 4 COLLECTOR 5351 1 12 1 1,700 60 11 1229 937 216 CR 4 COLLECTOR 5376 1 12 1 1,700 60 11 1230 937 936 CR 4 COLLECTOR 5351 1 12 1 1,700 60 11 1231 938 216 CR 4 COLLECTOR 3914 1 12 1 1,700 60 11 1232 938 939 CR 4 COLLECTOR 6588 1 12 1 1,700 60 12 1233 939 938 CR 4 COLLECTOR 6588 1 12 1 1,700 60 12 1234 939 940 CR 4 COLLECTOR 1837 1 12 1 1,700 60 12 1235 940 941 CR 4 COLLECTOR 2345 1 12 1 1,700 60 12 1236 941 942 CR 4 COLLECTOR 1285 1 12 1 1,700 45 12 1237 942 1072 CR 4 COLLECTOR 3086 1 12 1 1,700 55 12 1238 943 939 185TH AVE SE COLLECTOR 2154 1 12 0 1,700 60 12 1239 944 938 173RD AVE SE COLLECTOR 1886 1 12 0 1,700 60 12 1240 945 218 87TH ST SE COLLECTOR 3321 1 12 0 1,700 50 11 1241 946 586 82ND ST SE COLLECTOR 2800 1 12 0 1,700 45 11 1242 947 579 EDGEWOOD ST COLLECTOR 2293 1 12 0 1,700 40 11 1243 947 948 EDGEWOOD ST COLLECTOR 577 1 12 0 1,700 40 11 1244 948 578 EDGEWOOD ST COLLECTOR 3397 1 12 0 1,700 40 11 1245 948 947 EDGEWOOD ST COLLECTOR 577 1 12 0 1,700 40 11 1246 949 947 BRENDA BLVD LOCAL ROADWAY 553 1 12 0 1,575 35 11 1247 950 948 BRANT CT LOCAL ROADWAY 467 1 12 0 1,350 30 11 1248 951 947 BRENDA BLVD LOCAL ROADWAY 243 1 12 0 1,575 35 11 1249 952 953 KAHLER DR NE LOCAL ROADWAY 232 1 12 0 1,350 30 31 Monticello Nuclear Generating Plant K-93 Evacuation Time Estimate KLD Engineering, P.C.Rev. 1 1150 953 954 CR31 LULLILIUK 181/ 1 1z 4 1,100 4U 31 1251 954 592 CR 37 COLLECTOR 335 1 12 4 1,700 40 31 1252 955 954 KALLAND DR NE LOCAL ROADWAY 1071 1 12 0 1,350 30 31 1253 956 602 CR 19 MINOR ARTERIAL 2206 2 12 4 1,750 60 31 1254 956 603 CR 19 MINOR ARTERIAL 1496 2 12 4 1,750 60 31 1255 957 956 53RD ST NE LOCAL ROADWAY 820 1 12 0 1,350 30 31 1256 958 638 COUNTY HWY 22 COLLECTOR 1458 1 12 0 1,750 45 31 1257 959 637 LARABEE AVE NE COLLECTOR 771 1 12 0 1,750 40 31 1258 960 637 SR 241 MINOR ARTERIAL 1664 2 12 4 1,750 45 31 1259 961 960 EDGEWOOD DR SE COLLECTOR 820 1 12 0 1,750 45 31 1260 962 604 CR 19 MINOR ARTERIAL 1333 2 12 4 1,750 50 31 1261 963 962 BIRCH AVE NW LOCAL ROADWAY 714 1 12 0 1,750 40 31 1262 964 606 CR 19 COLLECTOR 1874 1 12 4 1,700 50 31 1263 965 964 CARISSA LN SW LOCAL ROADWAY 521 1 12 0 1,350 30 31 1264 966 964 CR 19 COLLECTOR 1300 1 12 4 1,700 50 31 1265 967 966 WILLOW DR SW LOCAL ROADWAY 574 1 12 0 1,350 30 31 1266 968 606 30TH ST COLLECTOR 2816 1 12 4 1,700 40 31 1267 969 968 KALENDA AVE NE LOCAL ROADWAY 465 1 12 0 1,350 30 31 1268 970 603 50TH ST NE COLLECTOR 2889 1 12 0 1,750 50 31 1269 971 863 4TH ST W COLLECTOR 4246 1 12 0 1,750 45 13 1270 972 863 4TH ST W COLLECTOR 3145 1 12 0 1,750 45 13 1271 973 972 8TH AVE S LOCAL ROADWAY 1669 1 12 0 1,350 30 13 1272 974 97 MAPLE ST LOCAL ROADWAY 450 1 12 0 1,350 30 10 1273 975 161 112TH ST NW COLLECTOR 1218 1 12 0 1,700 45 16 1274 976 628 GARRISON RD COLLECTOR 1278 1 12 0 1,700 40 30 Monticello Nuclear Generating Plant Evacuation Time Estimate K-94 KLD Engineering, P.C.K-94 KLD Engineering, P.C.Rev. 1 Up Don Lane Shole Flow Flo Str a Strea Le gt No. of Widt Wi t Rate Sp e Gri 1275 977 681 CR 8 COLLECTOR 7876 1 12 4 1,700 60 10 1276 978 267 US 10 MINOR ARTERIAL 7120 2 12 4 1,900 70 11 1277 978 268 US 10 MINOR ARTERIAL 4204 2 12 4 1,900 70 11 1278 979 306 SR 25 MINOR ARTERIAL 5214 1 12 4 1,750 60 6 1279 980 588 CR 23 COLLECTOR 5179 1 12 4 1,750 50 6 1280 981 272 US 10 MINOR ARTERIAL 2866 2 12 4 1,900 70 10 1281 981 273 US 10 MINOR ARTERIAL 1802 2 12 4 1,900 70 10 1282 982 719 CR 15 COLLECTOR 604 1 12 4 1,700 40 13 1283 983 286 CR 5 COLLECTOR 1191 1 12 4 1,700 60 12 1284 984 641 CR 39 COLLECTOR 2620 1 12 10 1,700 60 24 1285 985 610 80TH ST NE LOCAL ROADWAY 5209 1 12 0 1,700 40 31 1286 986 99 SR 24 COLLECTOR 1635 1 12 4 1,700 40 10 1287 986 100 SR 24 COLLECTOR 2023 1 12 4 1,700 40 10 1288 987 427 CR 12 COLLECTOR 1174 1 12 4 1,750 50 35 1289 988 378 CR 39 COLLECTOR 1356 1 12 10 1,700 60 23 1290 989 232 171ST AVE NW LOCAL ROADWAY 402 1 12 4 1,900 30 32 1291 990 240 US 10 MINOR ARTERIAL 912 2 12 4 1,900 65 25 1292 990 241 US 10 MINOR ARTERIAL 1085 2 12 4 1,900 65 25 1293 991 990 CO RD 44 LOCAL ROADWAY 1169 1 12 0 1,750 40 25 1294 992 990 UPLAND AVE LOCAL ROADWAY 1032 1 12 0 1,750 40 25 1295 993 242 US 10 MINOR ARTERIAL 2345 2 12 4 1,900 65 25 1296 993 243 US 10 MINOR ARTERIAL 457 2 12 4 1,900 65 25 1297 994 993 JOPLIN ST LOCAL ROADWAY 502 2 12 0 1,750 40 25 1298 995 994 JOPLIN ST LOCAL ROADWAY 1040 2 12 0 1,900 40 25 1299 996 995 JOPLIN ST LOCAL ROADWAY 1254 2 12 0 1,900 40 25 K-95 KLD Engineering, P.C.Monticello Nuclear Generating Plant Evacuation Time Estimate K-95 KLD Engineering, P.C.Rev. 1 1300 997 996 JOPLIN ST LOCAL ROADWAY 1466 1 12 0 1,700 40 25 1301 998 1000 WACO ST LOCAL ROADWAY 567 1 12 0 1,700 40 24 1302 999 998 WACO ST LOCAL ROADWAY 1549 1 12 0 1,700 40 24 1303 1000 245 WACO ST LOCAL ROADWAY 620 1 12 0 1,750 40 24 1304 1001 252 172ND ST LOCAL ROADWAY 1793 1 12 0 1,700 40 19 1305 1002 254 CR 43 NW COLLECTOR 3932 1 11 0 1,750 40 19 1306 1002 1073 GLENWOOD AVE LOCAL ROADWAY 6551 1 11 0 1,700 45 19 1307 1002 1123 CR 43 NW COLLECTOR 3935 1 11 0 1,700 50 19 1308 1003 1004 ROLLING RIDGE RD LOCAL ROADWAY 1506 1 12 0 1,700 40 11 1309 1004 263 ROLLING RIDGE RD LOCAL ROADWAY 762 1 12 0 1,750 40 11 1310 1006 753 193RD AVE LOCAL ROADWAY 877 1 12 0 1,750 40 26 1311 1007 1006 193RD AVE LOCAL ROADWAY 1550 1 12 0 1,700 40 26 1312 1008 753 US 169 MINOR ARTERIAL 2681 2 12 4 1,750 70 26 1313 1009 1008 198TH AVE LOCAL ROADWAY 623 1 12 4 1,700 40 26 1314 1010 1009 198TH AVE LOCAL ROADWAY 708 1 12 4 1,700 40 26 1315 1011 1008 197TH AVE LOCAL ROADWAY 497 1 12 4 1,700 40 26 1316 1012 761 JACKSON AVE MINOR ARTERIAL 510 2 12 4 1,900 40 26 1317 1013 49 43RD ST S LOCAL ROADWAY 609 1 12 4 1,750 40 4 1318 1014 1016 CO HWY 75 MINOR ARTERIAL 2476 2 12 4 1,750 40 22 1319 1015 1014 DRIVEWAY LOCAL ROADWAY 581 1 12 4 1,750 40 22 1320 1016 388 CO HWY 75 MINOR ARTERIAL 951 2 12 4 1,750 40 22 1321 1017 1016 HART BLVD LOCAL ROADWAY 631 1 12 4 1,750 40 22 1322 1018 168 SR 25 MINOR ARTERIAL 410 2 12 4 1,750 60 22 1323 1018 1163 SR 25 MINOR ARTERIAL 668 2 12 4 1,900 60 22 1324 1019 1018 7TH ST W LOCAL ROADWAY 694 1 12 4 1,750 35 22 Monticello Nuclear Generating Plant K-96 KLD Engineering, P.C.Evacuation Time Estimate Rev. 1 1325 1020 1018 7TH ST E LOCAL ROADWAY 654 1 12 4 1,750 40 22 1326 1021 1022 CR 37 COLLECTOR 3723 1 12 4 1,700 40 31 1327 1022 618 CR 37 COLLECTOR 7815 1 12 4 1,700 40 31 1328 1023 609 CR 19 MINOR ARTERIAL 2455 1 12 4 1,700 60 31 1329 1024 1023 70TH ST NE LOCAL ROADWAY 5203 1 12 4 1,700 40 31 1330 1024 1025 MACIVER AVE NE LOCAL ROADWAY 4147 1 12 4 1,700 40 31 1331 1025 1026 MACIVER AVE NE LOCAL ROADWAY 942 1 12 4 1,700 40 31 1332 1026 612 MACIVER AVE NE LOCAL ROADWAY 402 1 12 4 1,700 40 31 1333 1027 1030 CR 19 MINOR ARTERIAL 1501 2 12 4 1,750 40 31 1334 1028 1027 OUTLETS OF ALBERTVILLE LOCAL ROADWAY 617 1 12 4 1,750 35 31 1335 1029 1027 OUTLETS OF ALBERTVILLE LOCAL ROADWAY 743 1 12 4 1,750 35 31 1336 1030 594 CR 19 MINOR ARTERIAL 500 1 12 4 1,750 40 31 1337 1031 591 CR 37 COLLECTOR 1699 1 12 4 1,700 40 31 1338 1032 1033 CHELSEA RD LOCAL ROADWAY 3412 1 12 4 1,700 40 22 1339 1033 391 CHELSEA RD LOCAL ROADWAY 619 1 12 4 1,750 40 22 1340 1035 433 SR 55 COLLECTOR 4585 1 12 4 1,700 60 38 1341 1036 1037 CALDER AVE NE COLLECTOR 3950 1 12 0 1,700 40 36 1342 1036 1038 10TH ST NE LOCAL ROADWAY 2383 1 12 4 1,700 40 36 1343 1037 1035 CALDER AVE NE COLLECTOR 174 1 12 0 1,750 40 36 1344 1038 431 10TH ST NE LOCAL ROADWAY 459 1 12 4 1,750 40 36 1345 1039 870 CR 18 COLLECTOR 2612 1 12 4 1,700 50 31 1346 1040 1039 CR 18 COLLECTOR 2287 1 12 4 1,700 50 31 1347 1041 1040 CR 18 COLLECTOR 774 1 12 4 1,700 50 31 1348 1042 1041 CR 18 COLLECTOR 601 1 12 4 1,700 50 31 1349 1043 1042 CR 18 COLLECTOR 1205 1 12 4 1,700 50 31 Monticello Nuclear Generating Plant K-97 KLD Engineering, P.C.Evacuation Time Estimate Rev. 1 liO 11U44 IM Ul RI LULLLIUK 15)/ 1 1z 4 1,1!111 50 30 1351 1045 1044 CR 18 COLLECTOR 3043 1 12 4 1,700 50 30 1352 1046 810 CR 1 MINOR ARTERIAL 1348 2 12 4 1,900 60 21 1353 1047 1046 196TH AVE NW LOCAL ROADWAY 788 1 10 0 1,350 30 21 1354 1048 806 CR 32 LOCAL ROADWAY 1769 1 12 4 1,700 60 21 1355 1049 810 CR 44 COLLECTOR 188 1 11 0 1,575 35 25 1356 1050 1049 CR 44 COLLECTOR 511 1 11 0 1,700 45 25 1357 1051 801 CR 1 COLLECTOR 762 1 12 4 1,700 60 21 1358 1052 1051 RANCH RD NW COLLECTOR 1485 1 12 0 1,700 55 21 1359 1053 258 CR 81 COLLECTOR 2517 1 12 4 1,750 45 18 1360 1054 1056 US 10 ON-RAMP FREEWAY RAMP 310 1 11 0 1,350 30 18 1361 1055 1054 CR 17 COLLECTOR 858 1 11 0 1,700 45 18 1362 1056 257 US 10 MINOR ARTERIAL 3708 2 12 4 1,900 65 18 1363 1056 258 US 10 MINOR ARTERIAL 273 2 12 4 1,750 65 18 1364 1057 1053 CR 81 COLLECTOR 1062 1 12 4 1,700 45 18 1365 1058 1057 CR 81 COLLECTOR 1131 1 12 4 1,700 45 18 1366 1059 1058 CR 81 COLLECTOR 586 1 12 4 1,700 60 18 1367 1060 1057 CR 73 COLLECTOR 637 1 11 0 1,700 45 18 1368 1061 1060 CR 73 COLLECTOR 862 1 11 0 1,700 40 18 1369 1062 1061 CR 73 COLLECTOR 1532 1 11 0 1,700 40 18 1370 1063 284 CR 5 COLLECTOR 805 1 12 4 1,700 60 12 1371 1063 1064 CR 75 COLLECTOR 1104 1 11 0 1,700 45 12 1372 1064 1065 CR 75 COLLECTOR 2606 1 11 0 1,700 45 12 1373 1065 1066 CR 75 COLLECTOR 931 1 11 0 1,700 45 12 1374 1066 1067 CR 75 COLLECTOR 1514 1 11 0 1,700 45 12 Monticello Nuclear Generating Plant Evacuation Time Estimate K-98 KLD Engineering, P.C.Rev. 1 1375 1 1067 1 1068 1 CR 75 COLLECTOR 2298 1 11 0 1,700 45 12 1376 1067 1068 CR 75 COLLECTOR 2395 1 11 0 1,700 45 12 1377 1069 1070 CR 75 COLLECTOR 1067 1 11 0 1,700 45 12 1378 1070 1070 CR 75 COLLECTOR 3636 1 11 0 1,700 45 12 1379 1071 1072 CR 75 COLLECTOR 6640 1 11 0 1,700 45 12 1380 1072 293 CR 4 COLLECTOR 2601 1 12 1 1,700 55 12 1381 1073 1001 172ND ST LOCAL ROADWAY 2181 1 12 0 1,700 40 19 1382 1074 280 HIAWATHA AVE LOCAL ROADWAY 940 1 11 0 1,575 35 19 1383 1075 1074 HIAWATHA AVE LOCAL ROADWAY 1582 1 11 0 1,575 35 19 1384 1076 1075 HIAWATHA AVE LOCAL ROADWAY 889 1 11 0 1,575 35 18 1385 1077 1076 HIAWATHA AVE LOCAL ROADWAY 782 1 11 0 1,575 35 18 1386 1078 280 CR 5 COLLECTOR 3955 1 12 4 1,700 40 19 1387 1078 281 CR 5 COLLECTOR 1095 1 12 4 1,700 40 19 1388 1079 1078 HIGHLINE DR COLLECTOR 812 1 11 0 1,700 45 19 1389 1080 1079 HIGHLINE DR COLLECTOR 829 1 11 0 1,700 45 18 1390 1081 1080 HIGHLINE DR COLLECTOR 1045 1 11 0 1,700 45 18 1391 1082 198 CR 68 COLLECTOR 863 1 11 0 1,700 45 19 1392 1082 1083 CR 68 COLLECTOR 1019 1 11 0 1,700 45 23 1393 1083 1082 CR 68 COLLECTOR 1019 1 11 0 1,700 45 23 1394 1083 1084 CR 68 COLLECTOR 2210 1 11 0 1,700 45 23 1395 1084 1083 CR 68 COLLECTOR 2210 1 11 0 1,700 45 23 1396 1084 1085 CR 68 COLLECTOR 5109 1 11 0 1,700 60 23 1397 1085 1086 CR 14 NW COLLECTOR 1641 1 11 0 1,700 60 23 1398 1086 1087 CR 14 NW COLLECTOR 1398 1 11 0 1,700 50 23 1399 1087 1088 CR 14 NW COLLECTOR 840 1 11 0 1,700 50 23 Monticello Nuclear Generating Plant Evacuation Time Estimate K-99 KILD Engineering, P.C.Rev. 1 UP Don Lan Shole Flo Flow Strea Strea Legt No of Wit Wit Rat Spee Grid 1400 1088 1089 CR 14 NW COLLECTOR 624 1 11 0 1,700 60 23 1401 1089 1090 CR 14 NW COLLECTOR 6630 1 11 0 1,700 60 23 1402 1089 1100 CR 43 COLLECTOR 5281 1 11 0 1,700 60 23 1403 1090 1091 CR 14 NW COLLECTOR 4107 1 11 0 1,700 60 23 1404 1091 1092 CR 14 NW COLLECTOR 2947 1 11 0 1,700 60 24 1405 1092 1093 CR 14 NW COLLECTOR 1280 1 11 0 1,700 60 24 1406 1093 1094 CR 14 NW COLLECTOR 437 1 11 0 1,700 45 24 1407 1094 1095 CR 14 NW COLLECTOR 1167 1 11 0 1,700 45 24 1408 1095 1096 CR 14 NW COLLECTOR 1265 1 11 0 1,700 45 24 1409 1096 706 CR 14 NW COLLECTOR 1384 1 11 0 1,700 45 24 1410 1097 254 CR 43 COLLECTOR 707 1 11 0 1,750 45 19 1411 1098 1097 CR 43 COLLECTOR 310 1 11 0 1,700 45 19 1412 1099 1098 CR 43 COLLECTOR 1037 1 11 0 1,700 60 19 1413 1099 1100 CR 43 COLLECTOR 1920 1 11 0 1,700 60 23 1414 1100 1089 CR 43 COLLECTOR 5281 1 11 0 1,700 60 23 1415 1100 1099 CR 43 COLLECTOR 1920 1 11 0 1,700 60 23 1416 1101 1102 266TH AVE LOCAL ROADWAY 1156 1 11 0 1,700 30 13 1417 1102 1103 CR 46 COLLECTOR 3445 1 11 0 1,700 45 13 1418 1103 863 CR 4 COLLECTOR 5381 1 12 4 1,750 45 13 1419 1104 1103 CR 46 COLLECTOR 1382 1 11 0 1,700 45 13 1420 1105 1104 CR 46 COLLECTOR 3147 1 11 0 1,700 45 13 1421 1106 742 US 169 MINOR ARTERIAL 1816 2 12 10 1,900 65 13 1422 1107 1106 243RD AVE NW COLLECTOR 2980 1 11 0 1,700 40 13 1423 1108 1109 CR 18 COLLECTOR 904 1 11 0 1,700 45 22 1424 1109 1110 CR 18 COLLECTOR 544 1 11 0 1,700 45 22 Monticello Nuclear Generating Plant K-100 KLD Engineering, P.C.Evacuation Time Estimate Rev. 1 14Z5 110 1111 CK 18 CULLt:LIUK 133R 1 11 U 1,700 45 30 1426 1111 1147 CR 18 COLLECTOR 1518 1 11 0 1,700 60 30 1427 1112 1113 CR 18 COLLECTOR 5006 1 11 0 1,700 60 30 1428 1113 1114 CR 18 COLLECTOR 6772 1 11 0 1,700 60 30 1429 1114 1115 CR 18 COLLECTOR 2106 1 11 0 1,700 60 30 1430 1115 1116 CR 18 COLLECTOR 2064 1 11 0 1,700 60 30 1431 1116 1117 CR 18 COLLECTOR 715 1 11 0 1,700 45 30 1432 1117 382 CR 18 COLLECTOR 522 1 11 0 1,750 45 30 1433 1118 447 CLEMENTA AVE NW COLLECTOR 7256 1 11 0 1,700 45 29 1434 1119 1118 80TH ST NW COLLECTOR 5514 1 11 0 1,700 45 29 1435 1120 1119 BAKER AVE NW COLLECTOR 2755 1 9 0 1,350 30 29 1436 1121 917 CONGRESS ST E LOCAL ROADWAY 414 1 12 0 1,350 30 28 1437 1122 271 95TH AVE SE COLLECTOR 1122 1 11 0 1,700 50 10 1438 1123 1124 CR 43 NW COLLECTOR 1812 1 11 0 1,700 50 19 1439 1124 1125 CR 43 NW COLLECTOR 1766 1 11 0 1,700 50 19 1440 1125 1126 CR 43 NW COLLECTOR 3986 1 11 0 1,700 50 19 1441 1126 1127 CR 43 NW COLLECTOR 415 1 11 0 1,700 45 12 1442 1127 1128 CR 43 NW COLLECTOR 758 1 11 0 1,700 45 12 1443 1128 1129 CR 43 NW COLLECTOR 526 1 11 0 1,700 45 12 1444 1129 1130 CR 43 NW COLLECTOR 839 1 11 0 1,700 60 12 1445 1130 1131 CR 43 NW COLLECTOR 476 1 11 0 1,700 60 12 1446 1131 1132 CR 43 NW COLLECTOR 3296 1 11 0 1,700 60 12 1447 1132 1133 CR 43 NW COLLECTOR 860 1 11 0 1,700 60 12 1448 1133 1134 CR 43 NW COLLECTOR 2284 1 11 0 1,700 60 12 1449 1134 982 CR 43 NW COLLECTOR 1175 1 11 0 1,700 45 13 Monticello Nuclear Generating Plant Evacuation Time Estimate K-101 KLD Engineering, P.C.Rev. 1 145U 1135 bZ4 LAKEN AVE NE COLLECTORU 4/99 I 1z U 1,700U 5U 1451 1136 623 BISON BLVD 1452 1137 1136 30TH ST NE 1453 1138 1136 BISON BLVD COLLECTOR 5191 1 12 0 1,700 45 36 LOCAL ROADWAY 2473 1 12 0 1,350 30 36 COLLECTOR 4088 1 12 0 1,700 45 29 1454 1139 1140 CALDER AVE NE COLLECTOR 1297 1 12 0 1,700 40 36 1455 1140 622 CR 35 MINOR ARTERIAL 1169 1 12 4 1,700 50 36 1456 1140 1141 CALDER AVE NE COLLECTOR 3396 1 12 0 1,700 40 36 1457 1141 1036 CALDER AVE NE COLLECTOR 1848 1 12 0 1,700 40 36 1458 1142 429 CR 114 LOCAL ROADWAY 1453 1 12 0 1,750 30 36 1459 1143 176 SR 25 COLLECTOR 5511 1 12 4 1,700 60 29 1460 1144 1143 85TH ST NE COLLECTOR 3022 1 12 0 1,700 45 29 1461 1145 391 DALTON AVE NE COLLECTOR 1040 1 12 4 1,750 40 22 1462 1146 1110 BRIAR OAKES BLVD LOCAL ROADWAY 707 1 12 0 1,350 30 22 1463 1147 1112 CR 18 COLLECTOR 615 1 11 0 1,700 60 30 1464 1148 1147 GATEWATER DR LOCAL ROADWAY 500 1 12 0 1,350 30 30 1465 1149 373 GILLARD AVE NE LOCAL ROADWAY 1047 1 12 0 1,350 30 22 1466 1150 1059 CR 81 COLLECTOR 1747 1 12 4 1,700 60 18 1467 1151 1150 CR 81 COLLECTOR 1655 1 12 4 1,700 60 18 1468 1152 1151 CR 81 COLLECTOR 1462 1 12 4 1,700 60 18 1469 1153 1059 LAKE RIDGE RD LOCAL ROADWAY 589 1 10 0 1,350 30 18 1470 1154 380 KADLER AVE NE COLLECTOR 1535 1 12 0 1,350 45 24 1471 1155 245 US 10 MINOR ARTERIAL 5204 2 12 4 1,750 65 24 1472 1155 246 US 10 MINOR ARTERIAL 4733 2 12 4 1,900 65 24 1473 1156 1155 HWY 10 SERVICE RD LOCAL ROADWAY 343 1 12 0 1,350 30 24 1474 1157 608 CR 19 COLLECTOR 2485 1 12 4 1,700 50 40 K-102 KID Engineering, P.C.Monticello Nuclear Generating Plant Evacuation Time Estimate K-102 KLD Engineering, P.C.Rev. 1 Up Don Lan Shole Flo Flow 1475 1158 1157 CR 34 COLLECTOR 2722 1 12 0 1,700 50 40 1476 1159 1158 CR 34 COLLECTOR 4151 1 12 0 1,700 50 40 1477 1160 607 15TH ST NE LOCAL ROADWAY 1570 1 12 0 1,350 30 40 1478 1161 972 8TH AVE S LOCAL ROADWAY 759 1 12 0 1,350 30 13 1479 1162 1105 CR 46 COLLECTOR 1024 1 11 0 1,700 45 13 1480 1163 882 SR 25 MINOR ARTERIAL 575 2 12 4 1,900 60 22 1481 1163 1018 SR 25 MINOR ARTERIAL 667 2 12 4 1,750 60 22 1482 1164 1163 W 5TH ST LOCAL ROADWAY 577 1 11 0 1,350 30 22 1483 1165 1166 SR 101 MINOR ARTERIAL 428 2 12 4 1,900 50 41 1484 1167 1169 SR 101 MINOR ARTERIAL 640 2 12 4 1,750 50 41 1485 1168 42 1-94 FREEWAY 314 2 12 10 2,250 75 32 1486 1168 860 1-94 FREEWAY 501 2 12 10 2,250 75 32 1487 1168 1167 1-94 OFF-RAMP FREEWAY RAMP 666 1 13 4 1,750 45 32 1488 1169 1165 SR 101 MINOR ARTERIAL 190 2 12 4 1,900 50 41 1489 1170 1171 INDUSTRIAL BLVD COLLECTOR 229 1 12 6 1,750 40 41 1490 1171 1169 INDUSTRIAL BLVD COLLECTOR 112 1 12 6 1,750 40 41 1491 8003 3 1-94 FREEWAY 662 2 12 10 2,250 75 4 1492 8045 45 1-94 FREEWAY 444 2 12 4 2,250 75 41 1493 8230 230 US 10 MINOR ARTERIAL 1771 2 12 4 1,900 60 32 Exit Link 3 8003 1-94 FREEWAY 662 2 12 10 2,250 75 4 Exit Link 45 8045 1-94 FREEWAY 444 2 12 4 2,250 75 41 Exit Link 49 8049 CR 7 MAJOR ARTERIAL 578 2 12 4 1,900 45 4 Exit Link 87 8087 CR 45 COLLECTOR 1389 1 12 4 1,700 60 15 Exit Link 196 8196 SR 25 COLLECTOR 1693 1 12 4 1,700 60 38 Exit Link 230 8230 US 10 MINOR ARTERIAL 1770 2 12 4 1,900 60 32 Monticello Nuclear Generating Plant K-103 KLD Engineering, P.C.Evacuation Time Estimate Rev. 1 Exit Link 312 8312 SR25 MINORARTERIAL 3083 1 12 4 1,700 60 2 Exit Link 335 8335 CR 6 COLLECTOR 4945 1 12 4 1,700 60 1 Exit Link 873 8873 CR 11 COLLECTOR 677 1 12 4 1,700 60 2 Exit Link 1005 8302 CR 5 COLLECTOR 924 1 12 4 1,700 60 3 Exit Link 1034 8464 CR 7 COLLECTOR 750 1 12 4 1,700 60 34 Exit Link 485 8485 CR 12 COLLECTOR 2128 1 12 4 1,700 60 37 Exit Link 411 8411 CR 8 COLLECTOR 1464 1 12 4 1,700 60 34 Exit Link 412 8412 SR 55 COLLECTOR 4706 1 12 4 1,700 60 27 Exit Link 439 8439 SR 55 COLLECTOR 1589 1 12 4 1,700 60 39 Exit Link 507 8507 DEMPSEY AVE COLLECTOR 2647 1 12 4 1,700 50 34 Exit Link 518 8518 CR 35 COLLECTOR 2689 1 12 4 1,700 60 34 Exit Link 528 8528 CR 37 COLLECTOR 2359 1 12 4 1,700 60 27 Exit Link 608 8608 CR 19 COLLECTOR 485 1 12 4 1,700 50 40 Exit Link 657 8657 CR 6 COLLECTOR 2224 1 12 1 1,700 60 33 Exit Link 658 8658 US 10 MINOR ARTERIAL 1719 2 12 4 1,900 70 4 Exit Link 694 8874 CR 8 COLLECTOR 1253 1 12 4 1,700 60 4 Exit Link 739 8739 US 169 MINOR ARTERIAL 2370 2 12 4 1,900 65 8 Exit Link 1166 8166 SR 101 MINOR ARTERIAL 293 2 12 4 1,900 50 41 Evacuation Time Estimate Rev. 1 Monticello Nuclear Generating Plant Evacuation Time Estimate K-104 KILD Engineering, P.C.Rev. 1 Table K-2. Nodes in the Link-Node Analysis Network which are Controlled 1 2602356 1 1247687 Stop 4 28 2677077 1165853 Yield 22 46 2585992 1237061 Stop 4 47 2585686 1236352 Stop 4 49 2586194 1237795 Actuated 4 50 2590440 1226588 Stop 4 51 2591846 1226627 Stop 4 53 2589590 1226590 Stop 4 56 2585316 1234245 Stop 4 58 2609716 1207130 TACP -Actuated 9 59 2610155 1207656 Actuated 10 60 2611631 1208527 Actuated 10 61 2607696 1197166 TACP -Actuated 9 63 2609139 1205126 TACP -Actuated 9 65 2606758 1190545 TACP -Uncontrolled 15 76 2604588 1162620 Stop 15 95 2611176 1211328 Stop 10 97 2611137 1209525 Stop 10 100 2615333 1210376 TACP -Uncontrolled 10 106 2625646 1219985 TACP -Actuated 10 108 2631448 1191007 TACP -Uncontrolled 16 109 2631484 1192235 TACP -Uncontrolled 10 120 2625806 1167766 Stop 16 124 2623414 1159642 TACP -Uncontrolled 28 130 2613164 1162724 TACP -Uncontrolled 16 131 2607491 1162749 TACP -Uncontrolled 15 160 2621065 1175942 TACP -Uncontrolled 16 161 2621041 1170040 TACP -Uncontrolled 16 162 2620969 1163947 TACP -Actuated 16 168 2676543 1166462 TACP -Actuated 22 169 2677627 1168679 Actuated 22 170 2678987 1170371 TACP -Actuated 22 174 2674891 1161941 Actuated 22 177 2667463 1149220 Actuated 29 179 2664053 1143852 TACP -Uncontrolled 29 187 2656635 1123586 TACP -Actuated 35 188 2656597 1120265 Actuated 35 Monticello Nuclear Generating Plant Evacuation Time Estimate K-105 KLD Engineering, P.C.Rev. 1 189 2656704 1119479 Stop 35 197 2676079 1165462 TACP-Actuated 22 198 2689704 1177223 Stop 19 200 2690048 1178496 Actuated 19 203 2676237 1172611 TACP -Uncontrolled 22 210 2671023 1187255 TACP-Actuated 17 214 2671211 1203318 Stop 11 216 2671099 1213854 Stop 11 218 2671033 1219124 Stop 11 220 2670748 1229299 TACP -Uncontrolled 6 222 2670771 1234584 TACP-Actuated 6 228 2670832 1253832 Stop 6 232 2740776 1160067 Actuated 32 234 2738652 1164189 Yield 26 237 2736791 1167797 Actuated 26 239 2733454 1169612 Actuated 25 245 2720767 1169066 Actuated 24 246 2711527 1172722 Yield 24 252 2700303 1178399 Stop 19 254 2693693 1178469 Actuated 19 255 2691042 1178500 Actuated 19 258 2682871 1179170 Actuated 18 263 2660011 1197100 Actuated 11 264 2657962 1198903 Stop 11 266 2650734 1205361 Stop 11 267 2649865 1206147 Yield 11 271 2633638 1216469 Stop 10 280 2690955 1185022 Stop 19 293 2692511 1213897 Stop 12 300 2692344 1227008 TACP-Uncontrolled 7 302 2692002 1253352 Stop 7 306 2649634 1234647 TACP -Actuated 6 311 2646830 1249255 Stop 6 330 2638841 1249304 Stop 5 348 2683748 1163682 TACP-Actuated 22 349 2683737 1162591 TACP-Actuated 22 352 2683720 1161716 Yield 22 354 2683715 1161197 Stop 22 Monticello Nuclear Generating Plant Evacuation Time Estimate K-106 KLD Engineering, P.C.Rev. 1
.. S **S Grid X Corint Y oriae otoa 358 2684050 1151938 Stop 30 373 2688553 1164475 Stop 22 380 2706053 1163130 Stop 24 381 2711311 1162684 Stop 24 382 2700837 1146652 TACP -Actuated 30 383 2679830 1161108 Stop 22 387 2677123 1161009 Stop 22 388 2683873 1164372 Actuated 22 391 2675771 1164548 Actuated 22 393 2624172 1143036 Stop 28 394 2624152 1141737 Actuated 28 395 2624200 1140849 Stop 28 403 2626930 1131527 TACP -Uncontrolled 28 408 2626713 1112534 Stop 34 415 2592612 1152537 Stop 27 416 2604888 1146237 Stop 27 427 2653121 1126894 TACP -Actuated 35 429 2657687 1122718 Actuated 36 430 2659242 1121540 Actuated 36 431 2661283 1117346 Actuated 36 440 2619982 1141649 TACP -Uncontrolled 28 452 2652766 1146474 TACP -Uncontrolled 29 459 2623397 1133772 TACP -Uncontrolled 28 464 2616264 1112606 Stop 34 465 2652854 1144028 TACP -Uncontrolled 29 467 2653055 1138578 TACP -Uncontrolled 29 468 2653099 1130604 TACP -Uncontrolled 29 469 2657884 1117936 Stop 36 498 2641334 1120091 Stop 34 524 2605570 1134460 Stop 27 539 2592685 1154062 Stop 27 545 2642256 1168639 Stop 17 552 2661205 1169117 Stop 17 553 2665285 1169194 TACP -Actuated 17 554 2674436 1168959 Stop 22 556 2675033 1169913 TACP -Actuated 22 568 2662167 1177581 Stop 17 570 2652799 1183495 TACP -Uncontrolled 17 K-107 KLD Engineering, P.C.Monticello Nuclear Generating Plant Evacuation Time Estimate K-107 KLD Engineering, P.C.Rev. 1 577 2666547 1175417 Stop 17 579 2657919 1205944 Stop 11 582 2656388 1213833 Stop 11 586 2661843 1221810 Stop 11 588 2662700 1234500 TACP -Actuated 6 589 2657983 1200678 Stop 11 594 2711400 1144331 Actuated 31 602 2711215 1142927 Actuated 31 603 2711129 1139225 Actuated 31 604 2711077 1133941 Actuated 31 605 2711089 1133494 Actuated 31 606 2711042 1128693 Stop 31 609 2711408 1146941 TACP -Uncontrolled 31 610 2711363 1154551 Stop 31 611 2715562 1144124 Actuated 31 612 2717274 1144123 Stop 31 618 2729951 1149484 Stop 31 623 2669240 1122783 Stop 36 624 2674572 1122754 Stop 39 628 2687359 1128333 Stop 39 629 2692624 1128362 TACP -Uncontrolled 39 630 2697880 1128453 TACP -Uncontrolled 30 637 2715590 1134032 Actuated 31 638 2721595 1134844 Actuated 31 647 2736510 1159997 Actuated 31 659 2728595 1136718 Actuated 31 660 2729137 1137140 Actuated 31 671 2740032 1134158 Actuated 32 673 2740037 1130202 Actuated 32 676 2738818 1149504 Actuated 32 683 2617671 1212362 TACP -Actuated 10 695 2653070 1203259 Stop 11 698 2657387 1121726 Stop 35 699 2656596 1121757 Actuated 35 700 2660708 1118745 Actuated 36 703 2686426 1255964 Stop 3 725 2707133 1219165 TACP -Actuated 13 728 2703068 1219167 TACP -Uncontrolled 12 Monticello Nuclear Generating Plant Evacuation Time Estimate K-108 KLD Engineering, P.C.Rev. 1 S. 555 5Grid X. Coriae Y oriae otoa 733 2731442 1219115 Actuated 13 747 2736947 1193283 Stop 14 751 2739264 1167991 Actuated 26 753 2737394 1174650 Actuated 26 754 2736082 1168318 Actuated 25 755 2738280 1171131 Actuated 26 757 2737766 1171112 Actuated 26 759 2738070 1183383 Yield 26 760 2737884 1181457 Yield 26 781 2733925 1180769 Stop 21 782 2718006 1219813 Stop 13 806 2726850 1179877 Stop 21 810 2728311 1175441 Stop 25 814 2733303 1172568 Actuated 25 821 2736124 1171057 Actuated 25 822 2733413 1171020 Actuated 25 827 2739307 1163974 Actuated 26 828 2738619 1162920 Yield 26 832 2737236 1160010 Actuated 32 836 2736529 1158354 Actuated 31 838 2736530 1157376 Actuated 31 841 2738718 1153811 Actuated 32 855 2739409 1130211 Actuated 32 858 2740100 1128890 Actuated 32 863 2729035 1218981 Actuated 13 866 2739312 1140986 Actuated 32 868 2675404 1161583 Stop 22 871 2712342 1133914 Actuated 31 875 2676950 1168082 Stop 22 878 2672008 1168961 TACP -Uncontrolled 17 879 2675783 1169542 Stop 22 880 2676521 1169204 Stop 22 881 2677291 1168819 Stop 22 882 2677278 1167941 Stop 22 885 2655995 1169201 TACP -Actuated 17 886 2642238 1172917 Stop 17 888 2677131 1168447 Stop 22 889 2677462 1168288 Stop 22 Monticello Nuclear Generating Plant Evacuation Time Estimate K-109 KLD Engineering, P.C.Rev. 1 890 2678207 1167928 Stop 22 891 2679059 1167536 Stop 22 897 2656995 1120613 Stop 35 900 2656582 1120628 Stop 35 901 2656985 1121743 Stop 35 906 2656614 1122755 Stop 35 908 2656705 1123509 Yield 35 909 2658985 1118904 Stop 36 913 2657028 1119118 Stop 35 914 2656969 1119103 Stop 35 915 2656589 1121194 Stop 35 917 2624163 1142330 Stop 28 919 2621305 1141343 Stop 28 921 2624162 1139011 Stop 28 923 2623568 1146718 Stop 28 925 2625327 1140831 Stop 28 938 2675013 1213842 Stop 12 939 2681601 1213842 Stop 12 942 2686824 1213903 TACP -Uncontrolled 12 947 2655628 1205853 Stop 11 948 2655050 1205856 Stop 11 953 2709076 1145948 Stop 31 954 2710702 1145136 Stop 31 956 2711191 1140720 Stop 31 960 2713930 1133910 Actuated 31 962 2711083 1135274 Actuated 31 964 2711002 1130568 Stop 31 966 2711022 1131868 Stop 31 968 2708226 1128681 Stop 31 972 2729037 1215836 Stop 13 977 2644591 1203217 TACP -Uncontrolled 11 979 2649694 1229433 TACP -Uncontrolled 6 980 2662862 1229324 TACP -Uncontrolled 6 982 2705575 1198104 Stop 13 984 2716648 1162618 TACP -Uncontrolled 24 987 2653082 1128068 TACP -Uncontrolled 35 988 2700735 1163582 TACP -Uncontrolled 23 990 2731300 1169986 Actuated 25 K-lb KID Engineering, P.C.Monticello Nuclear Generating Plant Evacuation Time Estimate K-110 KLD Engineering, P.C.Rev. 1 993 2725254 1169217 Actuated 25 994 2725487 1168773 Stop 25 996 2725621 1166484 Stop 25 1000 2720543 1168488 Stop 24 1002 2693724 1182400 Stop 19 1008 2737573 1177326 Actuated 26 1012 2736781 1174101 Stop 26 1014 2681280 1166616 Actuated 22 1016 2683153 1164997 Actuated 22 1018 2676732 1166825 Actuated 22 1022 2729841 1157298 Stop 31 1023 2711445 1149396 Stop 31 1027 2711398 1146332 Actuated 31 1035 2663860 1113439 Actuated 36 1045 2700838 1146380 TACP -Uncontrolled 30 1046 2727769 1176675 Stop 21 1051 2726922 1188024 Stop 21 1057 2682872 1182748 Stop 18 1059 2681616 1183848 Stop 18 1078 2689549 1188714 Stop 19 1102 2723695 1222503 Stop 13 1106 2736198 1207461 Stop 13 1110 2685608 1160217 Stop 22 1118 2641986 1154661 Stop 29 1119 2647497 1154856 Stop 29 1136 2669275 1127974 Stop 36 1140 2664085 1122800 Stop 36 1143 2672328 1157100 Stop 29 1147 2687454 1158083 Stop 30 1155 2715902 1170915 Stop 24 1157 2710782 1116363 Stop 40 1163 2677048 1167413 Stop 22 1167 2740025 1128152 Actuated 41 1169 2740040 1127513 Actuated 41 1 Coordinates are in the North American Datum of 1983 Minnesota South State Plane Zone Monticello Nuclear Generating Plant Evacuation Time Estimate K-111 KLD Engineering, P.C.Rev. 1}}

Latest revision as of 23:54, 11 April 2019