{{Adams
#REDIRECT [[BVY 13-063, 2013 Summary Report - Inservice Inspection and Repair and Replacement]]
| number = ML13190A019
| issue date = 07/01/2013
| title = Vermont Yankee 2013 Summary Report - Inservice Inspection and Repair and Replacement
| author name = Wanczyk R J
| author affiliation = Entergy Nuclear Operations, Inc
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000271
| license number = DPR-028
| contact person =
| case reference number = BVY 13-063
| document type = Letter
| page count = 7
}}
 
=Text=
{{#Wiki_filter:i lift 1-6.-'60ýEntergy Entergy Nuclear Operations, Inc.Vermont Yankee 320 Governor Hunt Road Vernon, VT 05354 Tel 802 257 7711 Robert J. Wanczyk Licensing Manager BVY 13-063 July 1,2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
 
==SUBJECT:==
Vermont Yankee 2013 Summary Report -Inservice Inspection and Repair and Replacement Vermont Yankee Nuclear Power Station Docket No. 50-271 License No. DPR-28
 
==Dear Sir or Madam:==
This letter, in accordance with IWA-4000 and ASME Code Case N-532-4, provides a copy of the Inservice Inspection Summary Report for activities performed at the Vermont Yankee Nuclear Power Station for the period November 2, 2011 to March 4, 2013.Vermont Yankee hereby submits 2013 Form OAR-i, Owner Activity Report for Inservice Inspections.
Vermont Yankee's fourth ten year Inservice Inspection interval began September 1, 2003.There are no new regulatory commitments being made in this submittal.
If you have any questions concerning this submittal, please contact me at (802) 451-3166.Sincere[RJW/JTM]
 
==Attachment:==
 
OAR-1 Owner Activity Report Through RFO 30 (4 pages)cc listing (next page)4CA17 BVY 13-063 / page 2 of 2 cc: Mr. William M. Dean, Region 1 Administrator U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Mr. Richard Guzman, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop -08C2A 11555 Rockville Pike Rockville, MD 20852 USNRC Resident Inspector Vermont Yankee Nuclear Power Station 320 Governor Hunt Road Vernon, VT 05354 Mr. Christopher Recchia, Commissioner VT Department of Public Service 112 State Street, Drawer 20 Montpelier, VT 05620-2601 BVY 13-063 Attachment 1 Vermont Yankee Nuclear Power Station OAR-1 Owner Activity Report Through RFO 30
--Entergy Entergy Nuclear Vermont Yankee OAR-1 Owner Activity Report Through RFO 30 November 2, 2011 through March 4, 2013 Reviewed By: Reviewed By: Reviewed By: Approved By: Inservice Inspection Program Owner-,lRe-pait-r'depliacement Program Owner Supervisor.
Cod Programs Engineering Programs & Cmrponentso nager Date: (6!__!_Date: 6/116 / 13 Date: _/_ /--Date: "1/
Form OAR-1 Owner's Activity Report Report Number: 13-01-01 Plant: Entergy Nuclear Vermont Yankee Unit No.: I Current inspection interval: Current inspection period: Commercial service date: 11/30/1972 Refueling Outage no.: RFO 30 Third (Trd)(Is1, 2 li, 3 rd)Edition and Addenda of Section XI applicable to the inspection plans: 1998 Edition, through 2000 Addenda Date and revision of inspection plans: SEP-ISI-VTY-001 VTY Fourth Ten-Year Interval Inservice Inspection (ISI)Program Plan, Revision 7, 02/15/2012 Edition and Addenda of Section XI applicable to repair/replacement activities if different than the inspection 1J~ IA Af tt5-iII ~i~~~1, ~ VU~I IMIAA F ;x 1 Ja C2. D 1ii f A 'Ui D 'r t DUI Code Cases used: ASME Code Case N-532-4 (if applicable)
Certificate of Conformance I certify that (a) the statements made in this report are correct- (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XIL and (c) the repair/replacement activities and evaluations supporting the completion of RFO 30 4 confonn to the requirements of Section XI.( I refueli ou ge u iber)Date: (0 /",P- 1113 Sioned: lack Bovle/Director of EnzineerinDa
....... j ~Owner or Owner's Designee, Title (/, wrier or Owner's Desivee, Title t" /!Certificate of Inservice Inspection I, the undersigned, holding a valid conunission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of 4 -V-c t x-,"r employed by Hartford Steam Boiler of CT of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the owner has performed all activities represented by this report in accordance with the requirements of Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal inju-y or property damage or a loss of any kind arising from or connected with this inspection.
Elizabeth York / ,a Inspector's Sig ure Date:Le , 4v?Colmmissions
.41Z 14T 96/%/,!9A-///,,'
.. '4 e1 Natioial Board, State, Province.
and Endorsements OAR-1 Table 1 Items with Flaws or Relevant Conditions that Required Evaluation for Continued Service Examination Item Description Evaluation Description Category and Item Number None None None Page 1 of I Table 2-ABSTRACT OF REPAIRS, REPLACEMENTS OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Code Item Description Description of Work Date Completed Repair/Replacement Class Plan Number 3 Service Water 'T' near V70-817A Repair by replacement of component with leaking 3/14/2013 322369-01 1_ 1__ 3/4" socket weld. CR-VTY-2012-03565 I}}