ML13241A199: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[NRC 2013-0083, Technical Requirements Manual Change Summary]]
| number = ML13241A199
| issue date = 08/28/2013
| title = Technical Requirements Manual Change Summary
| author name = Millen M
| author affiliation = NextEra Energy Point Beach, LLC
| addressee name =
| addressee affiliation = NRC/NRR, NRC/Document Control Desk
| docket = 05000266, 05000301
| license number = DPR-024, DPR-027
| contact person =
| case reference number = NRC 2013-0083
| document type = Letter
| page count = 2
}}
 
=Text=
{{#Wiki_filter:NEXT era POINT BEACH August28,2013 NRC 2013-0083 10 CFR 50.71(e) U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Technical Requirements Manual Change Summary In accordance with 10 CFR 50.71(e), NextEra Energy Point Beach , LLC (NextEra), is submitting changes made to the Point Beach Nuclear Plant Technical Requirements Manual (TRM). The enclosure contains the TRM change summary for the period January 1, 2012 , through December 31 , 2012. NextEra previously submitted the TRM change summary for January 1, 2011, through December 31, 2011 , on June 12, 2012 (ML 12164A752).
This letter contains no new commitments and no revisions to existing commitments.
If you have questions or require additional information, please contact Michael Millen at 920/755-7845. Very truly yours , NextEra Energy Point Beach, LLC Michael Millen Licensing Manager Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant , USNRC Resident Inspector , Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach , LLC , 6610 Nuclear Road , Two Rivers , WI 5424 1 Date of Change 11/16/12 11/16/12 3/26/12 3/26/12 ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL REQUIREMENT MANUAL CHANGE
 
==SUMMARY==
FOR 2012 Affected Affected Section Pages(s) Summary 2.1 4, 5, 10, Core operating limits report (COLR) for Unit 2 cycle 33. 12-15 3.5.1 3.5.1-4 Revised Table 3.5.1-1, Boric Acid Storage Tank Minimum Volume/Temperature
/Concentration.
3.7.3 All Changed the TLCO limit of steam generator secondary side pressure to :::; 170 psig. 3.7.6 3.7.6-8 Added Reference 9, Westinghouse letter WEP-11-81, dated December 14, 2011. Page 1 of 1}}

Latest revision as of 15:46, 11 April 2019