#REDIRECT [[L-2014-060, Withdrawal of License Amendment Request No. 212: Potential Non-Conservative Action and Surveillance Requirement in Technical Specification 3.5.2 on ECCS Subsystems]]
| number = ML14104B433
| issue date = 03/26/2014
| title = Turkey Point, Units 3 and 4 - Withdrawal of License Amendment Request No. 212: Potential Non-Conservative Action and Surveillance Requirement in Technical Specification 3.5.2 on ECCS Subsystems
| author name = Kiley M W
| author affiliation = Florida Power & Light Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000250, 05000251
| license number =
| contact person =
| case reference number = L-2014-060, TAC MF0084, TAC MF0085
| document type = Letter
| page count = 2
| project = TAC:MF0084, TAC:MF0085
| stage = Withdrawal
}}
 
=Text=
{{#Wiki_filter:0I PL.10 CFR 50.90L-2014-060MAR 2 6 2014U. S. Nuclear Regulatory CommissionAttn.: Document Control DeskWashington, D.C. 20555-0001Re: Turkey Point Units 3 and 4Docket Nos. 50-250 and 50-251Withdrawal of License Amendment Request No. 212: Potential Non-Conservative Action andSurveillance Requirement in Technical Specification 3.5.2 on ECCS Subsystems
 
==References:==
(1) Florida Power & Light Company letter L-2012-368, "License Amendment Request No. 212Regarding Potential Non-Conservative Action and Surveillance Requirement in TechnicalSpecification 3.5.2 on ECCS Subsystems," dated October 30, 2012.(2) Email from Audrey Klett, NRC Project Manager for Turkey Point Nuclear Plant, to TurkeyPoint Licensing Department, "Request for Additional Information (RAI) for Turkey PointLAR 212 (TACs MF0084 and MF0085)," dated November 7, 2013.In Reference 1, Florida Power & Light Company (FPL) applied for changes to the TechnicalSpecifications (TS) contained in Appendix A to the Renewed Operating Licenses for Turkey PointUnits 3 and 4, DPR-31 and DPR-41 respectively. The proposed changes concern Emergency CoreCooling Systems (ECCS) TS 3/4.5.2, ECCS Subsystems -Tayg Greater Than or Equal To 350'F andTS 3/4.8.1.1, Electrical Power Systems -A.C. Sources -Operating.FPL submitted the Reference I application to address nonconservative TS contained in TS 3/4.5.2. Inaddition, changes were proposed to TS 3/4.8.1.1 and TS 3/4.5.2 to address overlapping requirementsfor electrical power supply to the high head safety injection pumps. The NRC staff forwarded to FPLa Request for Additional Information (RAI) via Reference 2 regarding the FPL application. As aresult of subsequent discussions with the NRC staff regarding the RAI and proposed TS changes, FPLis withdrawing the Reference 1 application to restructure the request and proposed changes. FPL willsubmit a revised application at a later date.In the interim, until the non-conservative TS are revised, compensatory administrative controlswill remain in place.This letter contains no new commitments and no revisions to existing commitments.In accordance with 10 CFR 50.91(b)(1), a copy of this letter is being forwarded to the StateDesignee of Florida.
Florida Power & Light Company Page 2 of 2Turkey Point Nuclear Plant L-2014-060Withdrawal of License Amendment Request No. 212Should you have any questions regarding this submission, please contact Mr. Robert J. Tomonto,Licensing Manager at 305-246-7327.Very truly yours,Michael KileySite Vice PresidentTurkey Point Nuclear Plantcc: USNRC Regional Administrator, Region IIUSNRC Project Manager, Turkey Point Nuclear PlantUSNRC Senior Resident Inspector, Turkey Point Nuclear PlantMs. Cindy Becker, Florida Department of Health
}}