{{Adams
#REDIRECT [[NG-15-0020, Inservice Inspection Report]]
| number = ML15054A007
| issue date = 02/19/2015
| title = Duane Arnold Energy Center, Inservice Inspection Report
| author name = Vehec T A
| author affiliation = NextEra Energy Duane Arnold, LLC
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000331
| license number = DPR-049
| contact person =
| case reference number = NG-15-0020
| document type = Inservice/Preservice Inspection and Test Report, Letter
| page count = 8
}}
 
=Text=
{{#Wiki_filter:NEXTeraEN ERGYOMFebruary 19, 2015 NG-1 5-002010 CFR 50.55aU. S. Nuclear Regulatory Commission ATTN: Document Control DeskWashington, DC 20555-0001 Duane Arnold Energy CenterDocket No. 50-331Renewed Op. License No. DPR-49Inservice Inspection ReportIn accordance with the Code of Federal Regulations, Title 10, Part 50.55a, NextEraEnergy Duane Arnold, LLC, submits the attached Inservice Inspection (ISI) SummaryReport (Owner's Activity Report, Form OAR-i) for the Duane Arnold Energy Center(DAEC). This report has been prepared in accordance with Section Xl of the AmericanSociety of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, 2001Edition with addenda through 2003, and ASME Code Case N-532-4.
This reportincludes the examinations performed at the DAEC during Cycle 24 operations andRefueling Outage No. 24 (RF024) of the fourth 10-year ISI interval.
This letter contains no new commitments nor revises any previous commitments.
If you h e any questions, please contact J. Michael Davis at (319) 851-7032.
T. A. VehecVice President, Duane Arnold Energy CenterNextEra Energy Duane Arnold, LLCAttachment cc: Administrator, Region Ill, USNRCProject Manager, DAEC, USNRCSenior Resident Inspector, DAEC, USNRCNextEra Energy Duane Arnold, LLC, 3277 DAEC Road, Palo, IA 52324 Attachment for NG- 15-0020Page 1 of 6NextEra Energy Duane Arnold, LLCDuane Arnold Energy CenterInservice Inspection Summary ReportForCycle 24 and RFO 24Duane Arnold Energy Center3277 DAEC RdPalo, IA 52324Date of Commercial ServiceFebruary 1, 1975 Attachment for NG- 15-0020Page 2 of 6INDEXSum m ary .................................................................................................................
Section 1O A R-1 Form , O w ner's A ctivity Report .................................................................
Section 2Table 1 ...................................................................................................................
Section 3Table 2 ...................................................................................................................
Section 4 Attachment for NG-15-0020 Page 3 of 6Section 1SummaryThe Duane Arnold Energy Center, Fourth Ten-Year Inservice Inspection (ISI) Plan wasdeveloped to comply with 10 CFR 50.55a(g),
which implements, by reference, the AmericanSociety of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, 2001Edition with 2003 Addenda.The following summary report is being submitted pursuant to the reporting requirements ofASME Section XI as amended by ASME Code Case N-532-4.This summary report contains the Form OAR-I Owner's Activity Report and Tables 1 and 2 ofthe Code Case for Duane Arnold Energy Center during Cycle 24 and Refueling Outage No. 24(RF024).
Delamination found on the Torus was evaluated for continued service underCondition Evaluation 2003574-02.
RF024 is the first outage of the third period in the fourthinspection interval.
This report includes Repair/Replacement Activities from November 27, 2012to November 25, 2014.
Attachment for NG- 15-0020Page 4 of 6Section 2OAR-1 FormOwner's Activity ReportFORM OAR-1 OWNER'S ACTIVITY REPORTReport Number NG-15-0020 Plant Duane Arnold Energy Center, 3277 DAEC Road, Palo, IA 52324Unit No. 1 Commercial Service Date February 1, 1975 Refueling Outage No. RF024Current Inspection Interval ISI -Fourth Interval IWE -Second IntervalCurrent Inspection period ISI -Third Period IWE -Second PeriodEdition and Addenda of Section Xl applicable to the inspection plan 2001 Edition with 2003 AddendaDate and revision of inspection plan ISI -April 8, 2014 Rev. 9 IWE- December 6, 2011 Rev. 2Edition and Addenda of Section X1 applicable to repairs and replacements, if different than the inspection plan SameCode Cases used: N-460, N-532-4, N-702CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this Owner's Activity Report are correct; (b) and theexaminations and tests metthe Inspection Plan as required by the ASME Code, Section XI; and (c)the repair/replacement act *i es and evaluations supporting the completion of RF024 conform to therequirements of SectioF,01/.
Signed ///Date 2,11&113Site Ai4e President CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and PressureVessel Inspectors and the State or Province of Iowa and employed by HSBCT of HartfordConnecticut have inspected the items described in this Owner's Activity Report, and state that, to thebest of my knowledge and belief, the Owner has performed all activities represented by this report inaccordance with the requirements of Section XI.By signing this certificate neither the inspector nor his employer makes any warranty, expressed orimplied, concerning the repair/replacements activities and evaluation described in this report.Furthermore, neither the inspector nor his employer shall be liable in any manner for any personalinjury or property damage or a loss of any kind arising from or connected with this inspection.
:Commissions NB14084ANI, IA1622National Board, State, Province, and Endorsements Attachment for NG-l15-0020 Page 5 of 6Section 3Table 1Items with Flaws or Relevant Condition that RequiredEvaluation for Continued ServiceExamination Categoryand Item Number Item Description Evaluation Description IWE Torus Shell Surfaces Accessible CE 2003574-02 E-C E4.11 areas and Wetted Areas Evaluation of coatingswhich compared coatingthickness allowances inaccordance with calculation CAL-A 1l-001 Attachment for NG- 15-0020Page 6 of 6Section 4Table 2Abstract of Repair/Replacement Activities Required for Continued ServiceCode Item Description Description of Date Repair/Replacement Class Work Completed Plan Number1E235A Chiller3 Condenser Replaced Head 06/12/2014 40250850-01 3 1E235B Chiller Replaced Head 06/26/2014 40309663-02 Condenser 1E237B Chiller Oil3 Cooler Replaced Head 06/26/2014 40311201-01 3 1E053B3 Jacket Water Weld Repair Cover 07/08/2014 40292949-01 Cooler PlateV22-0017 HPCI2 Turbine Steam Exhaust Repaired Disc 11/01/2014 40210757-07 Check/Stop Valve2 Pipe Support on Replace Pipe Strap 11/02/2014 40267420-01 EBC0082 1T219B Pipe Support Replace Pipe Strap 11/02/2014 40272112-01 2 EBB0l4 HPCI Steam Replaced Pipe Clamp 11/21/2014 40077652-01
____ ___ Supply _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
BLIND CARBON COPY LIST FOR NG-15-0020 February 19, 2015F. Dohmen S. PreslerIRMS D. ChurchGDS Associates, Inc. CTS ProjectORG (P. Vandersee)
CNRBM. Davis Ryan Lange (ANII)G. Pry D. Slivon
 
==Subject:==
 
Inservice Inspection Report}}