ML17086A321: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[L-2017-056, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CPR 50.46 Annual Report]]
| number = ML17086A321
| issue date = 03/27/2017
| title = St. Lucie, Units 1 and 2 - Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CPR 50.46 Annual Report
| author name = Snyder M J
| author affiliation = Florida Power & Light Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000335, 05000389
| license number =
| contact person =
| case reference number = L-2017-056
| document type = Annual Operating Report, Letter
| page count = 4
}}
 
=Text=
{{#Wiki_filter:* F=PL. .. U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 MAR 2 7 20t7 Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CPR 50.46 Annual Report L-2017-056 10 CPR 50.46 Pursuant to 10 CPR 50.46(a)(3)(ii), the nature of any change to or error discovered in the evaluation models for emergency core cooling systems (ECCS), or in the application of such models, that affect the fuel cladding temperature calculations for St. Lucie Units 1 and 2 is reported in the attachment to this letter. The estimated effect from any such change or error on the limiting ECCS analysis for each unit is also addressed. The data interval for this report is from January 1, 2016 through December 31, 2016. Please contact Ken Prehafer at 772-467-77 48 should you have any questions regarding this submittal. Sincerely, Licensing Manager St. Lucie Plant MJS/K\W Attachment cc: USNRC Regional Administrator, Region II USNRC Senior Resident Inspector, St. Lucie Nuclear Plant Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957 L-2017-056 Attachment  Page 1 of 3 St. Lucie Units 1 and 2 10 CFR 50.46 Annual Report  Emergency core cooling system (ECCS) analyses for St. Lucie Unit 1 and St. Lucie Unit 2 are performed by AREVA and Westinghouse Electric Company (W), respectively. The following information pertaining to the evaluation models for small break loss of coolant accidents (SBLOCA) and large break loss of coolant accidents (LBLOCA), and the application of such models to each St. Lucie Unit, is provided pursuant to 10 CFR 50.46(a)(3)(ii). A summary of calculated peak cladding temperature (PCT) changes is provided in Tables 1 and 2 (for St. Lucie Units 1 and 2, respectively). The data interval for this report is from January 1, 2016 through December 31, 2016. A discussion of the changes follows. 1.0  ST LUCIE UNIT 1  1.1 Changes to SBLOCA  No errors were found in the SBLOCA ECCS performance analysis since the previous annual report of Reference 3.1. Table 1 provides a summary of PCT changes for St. Lucie Unit 1. 1.2 Changes to LBLOCA  No errors were found in the LBLOCA ECCS performance analysis since the previous annual report of Reference 3.1. Table 1 provides a summary of PCT changes for St. Lucie Unit 1. 2.0 ST. LUCIE UNIT 2  2.1 Changes to SBLOCA  No errors were found in the SBLOCA ECCS performance analysis since the previous annual report of Reference 3.1. Table 2 provides a summary of PCT changes for St. Lucie Unit 2. 2.2 Changes to LBLOCA  No errors were found in the LBLOCA ECCS performance analysis since the previous annual report of Reference 3.1. Table 2 provides a summary of PCT changes for St. Lucie Unit 2. 
 
==3.0 REFERENCES==
3.1 Letter L-2016-049, Eric Katzman to U.S. Nuclear Regulatory Commission Attn: Document Control Desk, "St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report," March 2, 2016 (ML 16077A230).
 
L-2017-056 Attachment  Page 2 of 3 Table 1:  2016 St. Lucie Unit 1 SBLOCA and LBLOCA PCT Summary  Unit 1 SBLOCA Summary Evaluation Model: EMF-2328(P)(A) Rev. 0 as supplemented by ANP-3000(P), Revision 0.
Evaluation Model PCT: 1828&deg;F Net PCT Effect Absolute PCT Effect A Prior 10 CFR 50.46 Changes or Error Corrections - up to Year 2015 +22 &deg;F 82 &deg;F B Prior 10 CFR 50.46 Changes or Error Corrections - Year 2016 None None C 10 CFR 50.46 Changes in Year 2016 Since Item B None None D Sum of 10 CFR 50.46 Changes +22 &deg;F 82 &deg;F    The sum of the PCT from the most recent analysis using an acceptable evaluation model and the estimates of PCT impact for changes and errors identified since this analysis 1850 F < 2200 F  Unit 1 LBLOCA Summary Evaluation Model:    EMF-2103(P)(A) Rev. 0 as supplemented by ANP-2903(P), Revision 1.
Evaluation Model PCT:  1788&deg;F Net PCT Effect Absolute PCT Effect A Prior 10 CFR 50.46 Changes or Error Corrections - up to Year 2015 +6 &deg;F 6&deg;F B Prior 10 CFR 50.46 Changes or Error Corrections - Year 2016 None None C 10 CFR 50.46 Changes in Year 2016 Since Item B  Incorrect cutback ratio applied to gadolina bearing rods +0 &deg;F 0 &deg;F D Sum of 10 CFR 50.46 Changes +6 &deg;F 6&deg;F    The sum of the PCT from the most recent analysis using an acceptable evaluation model and the estimates of PCT impact for changes and errors identified since this analysis 1794 F < 2200 F L-2017-056 Attachment  Page 3 of 3  Table 2:  2016 St. Lucie Unit 2 SBLOCA and LBLOCA PCT Summary  Unit 2 SBLOCA Summary Evaluation Model:  CENPD-137, Supplement 2-P-A (S2M)  Evaluation Model PCT:  1903&deg;F    Net PCT Effect Absolute PCT Effect A Prior 10 CFR 50.46 Changes or Error Corrections - up to Year 2015 0 &deg;F 0 &deg;F B Prior 10 CFR 50.46 Changes or Errors Corrections -
Year 2016 None None C 10 CFR 50.46 Changes in Current Year Since Item B None None D Sum of 10 CFR 50.46 Changes 0 &deg;F 0 &deg;F  The sum of the PCT from the most recent analysis using an acceptable evaluation model and the estimates of PCT impact for changes and errors identified since this analysis 1903 &deg;F  < 2200 &deg;F  Unit 2 LBLOCA Summary Evaluation Model:  CENPD-132, Supplement 4-P-A (1999 EM) Evaluation Model PCT:  2087&deg;F    Net PCT Effect Absolute PCT Effect A Prior 10 CFR 50.46 Changes or Error Corrections - up to Year 2015 (Reference 3.1) 0 &deg;F 0 &deg;F B Prior 10 CFR 50.46 Changes or Errors Corrections -
Year 2016 None None C 10 CFR 50.46 Changes in Current Year Since Item B None None D Sum of 10 CFR 50.46 Changes 0 &deg;F 0 &deg;F  The sum of the PCT from the most recent analysis using an acceptable evaluation model and the estimates of PCT impact for changes and errors identified since this analysis 2087 &deg;F  < 2200 &deg;F}}

Latest revision as of 12:30, 6 April 2019