NLS2017052, Cooper, Submittal of Revision to the Safeguards Plan: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[NLS2017052, Submittal of Revision to the Safeguards Plan]]
| number = ML17132A182
| issue date = 05/10/2017
| title = Cooper, Submittal of Revision to the Safeguards Plan
| author name = Shaw J
| author affiliation = Nebraska Public Power District (NPPD)
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000298
| license number = DPR-046
| contact person =
| case reference number = NLS2017052
| document type = Letter type:NLS
| page count = 2
}}
 
=Text=
{{#Wiki_filter:L__ __ .. SAFEGUARDS INFORMATION Nebraska Public Power District NLS2017052 May 10, 2017 U. S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C. 20555-0001 Always there when you need us
 
==Subject:==
Revision to the Cooper Nuclear Station Safeguards Plan Cooper Nuclear Station, Docket No. 50-298, DPR-46
 
==Dear Sir or Madam:==
50.54(p) The purpose of this letter is to transmit a revision to the Cooper Nuclear Station Safeguards Plan * (Enclosure).
The Attachment provides a summary of the changes included in this revision.
These changes do not result in a reduction of effectiveness of the Safeguards Plan. The Attachment and Enclosure contain Safeguards Information as defined by 10 CFR 73.22 and disclosure to m1authorized individuals is prohibited.
Therefore, we request the Attachment and Enclosure be withheld from public disclosure.
This letter *contains no regulatory commitments.
If you have any questions regarding this submittal, please contact Jerry Bebb, Security Manager, at (402) 825-5244.
Sincerely, .(7\/.'
//"Jim Shaw V Licensing Manager /lb WARN!NG Vlalation d 10 CfR 73.21. "RettUtr8ments of Ille Protactlo.1 rl Safeiuanls lnfonnatiall" 111111¥ei:t IDcMI llld criminal penalties Attachment
-Description of Changes Report 10 CFR 50.54(p)(2)
Enclosure
-'
Nuclear Station Safeguards Plan -NAME: . .
DATE: .w.,.IWlllll,...._
__ NOTE: The Attachment and Enclosure to this letter contain SAFEGUARDS INFORMATION.
Upon separation of this letter from the Attachment and Enclosure, this letter is DECONTROLLED.
:, . COOPER NUCLEAR STATION P.O. Box 98 /Brownville; NE 68321-0098 Telephone:
(402) 825-3817 /Fax: (402) 825-5211 www.nppd.com NLS2017052 Page 2 of2 SAFEGUARDS INFORMATION cc: Regional Administrator w/ Attachment and Enclosure USNRC -Region IV NPG Distribution w/o Attachment and Enclosure CNS Records w/ Attachment and Enclosure NOTE: The Attachment and Enclosure to this letter contain SAFEGUARDS INFORMATION.
Upon separation of this letter from the Attachment and Enclosure, this letter is DECONTROLLED.}}

Latest revision as of 10:32, 6 April 2019