ML18004A022: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[HNP-18-006, Submittal of 14-Day Special Report for Accident Radiation Monitors]]
| number = ML18004A022
| issue date = 01/04/2018
| title = Shearon Harris, Unit 1 - Submittal of 14-Day Special Report for Accident Radiation Monitors
| author name = Jones B K
| author affiliation = Duke Energy Progress, LLC
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000400
| license number = NPF-063
| contact person =
| case reference number = HNP-18-006
| document type = Letter, Licensee 30-Day Written Event Report
| page count = 3
}}
 
=Text=
{{#Wiki_filter:(-,DUKE ENERGY~ Bentley K. Jones Director, Organizational Effectiveness Harris Nuclear Plant 5413 Shearon Harris Road New Hill, NC 27562-9300 10 CFR 50.4 January 4, 2018 Serial: HNP-18-006 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400/Renewed License No. NPF-63
 
==Subject:==
14-Day Special Report for Accident Radiation Monitors Ladies and Gentlemen: In accordance with the Shearon Harris Nuclear Power Plant, Unit 1 (HNP), Technical Specifications 3.3.3.6 and 6.9.2, Duke Energy Progress, LLC, is submitting the enclosed Special Report. This Special Report concerns the operability of two radiation monitors. This submittal contains no regulatory commitments. Should you have any questions regarding this submittal, please contact Jeff Robertson, Regulatory Affairs Manager, at (919) 362-3137. Sincerely,
 
==Enclosure:==
Accident Radiation Monitor Special Report cc: J. Zeiler, NRC Sr. Resident Inspector, HNP M. Barillas, NRC Project Manager, HNP C. Haney, NRC Regional Administrator, Region II Bentley K. Jones Director, Organizational Effectiveness Harris Nuclear Plant  5413 Shearon Harris Road New Hill, NC  27562-9300  10 CFR 50.4          January 4, 2018 Serial:  HNP-18-006                                  ATTN:  Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400/Renewed License No. NPF-63 
 
==Subject:==
14-Day Special Report for Accident Radiation Monitors Ladies and Gentlemen:
In accordance with the Shearon Harris Nuclear Power Plant, Unit 1 (HNP), Technical Specifications 3.3.3.6 and 6.9.2, Duke Energy Progress, LLC, is submitting the enclosed Special Report. This Special Report concerns the operability of two radiation monitors. This submittal contains no regulatory commitments. Should you have any questions regarding this submittal, please contact Jeff Robertson, Regulatory Affairs Manager, at (919) 362-3137. 
 
Sincerely, Bentley K. Jones 
 
==Enclosure:==
Accident Radiation Monitor Special Report       
 
cc: J. Zeiler, NRC Sr. Resident Inspector, HNP M. Barillas, NRC Project Manager, HNP C. Haney, NRC Regional Administrator, Region II    (_~DUKE ENERGY U.S. Nuclear Regulatory Commission    Serial: HNP-18-006 / Enclosure  Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400  Accident Radiation Monitor Special Report  Description of Event:  On December 15, 2017, at 00:15 Eastern Standard Time (EST), the Radwaste Control Room radiation monitoring console, RM-11-3, was declared nonfunctional due to a loss of indication. An attempted reboot of the system was unsuccessful. The Radiation Control Office radiation monitoring console, RM-11-4, was nonfunctional at this time. The result of both RM-11-3 and RM-11-4 being nonfunctional was that the Waste Processing Building Vent Stack High Range Noble Gas Radiation Monitors RM-*1WV-3546-1 (Vent Stack 5) and RM-*1WV-3547-1 (Vent Stack 5A) were inoperable. These monitors are identified in the Shearon Harris Nuclear Power Plant, Unit 1 (HNP), Technical Specification Table 3.3-10 as Items 24.a and 24.b, respectively. During the period of time these monitors were inoperable, the effluent releases continued to be monitored through the affected pathways periodically per procedure. Since the monitors were out of service for greater than 7 days, a Special Report is required to be submitted per Technical Specifications 3.3.3.6 and 6.9.2.
Cause / Corrective Action:  The Waste Processing Building Vent Stack High Range Noble Gas Radiation Monitors RM-*1WV-3546-1 (Vent Stack 5) and RM-*1WV-3547-1 (Vent Stack 5A) were declared inoperable on December 15, 2017, with the loss of indication to RM-11-3. These effluent monitors are on loops between the RM-11-3 and RM-11-4 monitoring consoles. With this pair of RM-11 monitoring consoles out of service due to failed hard drives, communication was lost with the aforementioned effluent monitors, rendering them inoperable due to the inability to monitor them in the Main Control Room during accident conditions. In order to restore operability of the effluent monitors, functionality was restored to one of the two RM-11 monitoring consoles. While a spare hard drive was available on site, the ability to image it required vendor support. The failed RM-11-3 hard drive and the spare were sent to the vendor to load the spare hard drive with the pertinent programs and database. Upon installation, the spare hard drive booted properly, but would not communicate with the effluent monitors due to a suspected issue with the files copied from the failed hard drive. As a result, arrangements to build a replacement hard drive utilizing disaster recovery disks were made. This method required updating the hard drive's database following reinstallation, which occurred on January 3, 2018. Functionality was restored to RM-11-3 followed by the immediate restoration of operability to RM-*1WV-3546-1 and RM-*1WV-3547-1 on January 3, 2018, at 13:31 EST and 13:42 EST, respectively. In addition, spare hard drives are being procured and will be loaded by the vendor to support restoration of RM-11-4 and stock ready spares.
 
}}

Latest revision as of 22:07, 5 April 2019