ML18348B112: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
#REDIRECT [[NRC-18-0054, 2, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)]]
| number = ML18348B112
| issue date = 12/14/2018
| title = Fermi 2, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109
| author name = Polson K J
| author affiliation = DTE Energy
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000341
| license number = NPF-043
| contact person =
| case reference number = EA-13-109, NRC-18-0054
| document type = Letter, Operating Plan, Report, Miscellaneous
| page count = 94
| project =
| stage = Other
}}
 
=Text=
{{#Wiki_filter:1WheretwoADAMSaccessionnumbersarelisted,thefirstisthereferencedocumentandthesecondistheNRCendorsementofthatdocument.2NEI13 02Revision1AppendixJcontainsHCVSFAQ 01throughHCVS FAQ 09.
 
WetwelllevelWetwellLevelinstrumentrange(T50R804B):12'to+4.66'Spilloverheight1.7'Freeboardheight4.66'Additionalfreeboardheight10.33'DrywellfloorWetwellvolumeversuslevel,~6700gallons/inchEstimateoftherateoflevelchangeinthesuppressionpoolforvariousSAWAflowrates:500gpm:13.4minutes/inch;100gpm:67minutes/inch.Wetwellbottomheight
 
Bus72C FcontainspowerforRHRValvesusedforSAWAalignment
 
SAWAHosepathshowninRedRefuelinglocationsinBlue Flow/flowcontrollocationforSAWA/SAWMshowninGreen FLEXAirinYellow HCVS Panel HCVSPipe CoreSourcetermRHRExternalConnection(SAWA Actions)HCVSVentPipeSourceTermSFPActions(RB) HCVSActions(PrimaryBlue)HCVSActions(SecondaryRed)
CoreSourceTerm HCVSVentPi p e SAWARBAlignmentActions HCVSSecondaryActions Red HCVSPrimaryActionsBlue(DCShedding)
CoreSourceTerm HCVSPipeSourceTermHCVSAlternateControlLocationSAWAElectricalActionsHCVSPrimaryActionsandcontrollocation CoreSourceTerm HCVSPipeSourceTermHCVSPrimaryActionsBlue CoreSourceTermHCVSPipeSourceTerm HCVSPipeInspectionPrimary/SecondaryActionsinfirsthour
 
3SeeUFSAR3.11/7.6.1.12forqualificationcodeofrecordIEEE3231974andIEEE3441975.Wherelatercodeyearsarereferenced,thiswasreconciledinthedesignprocess.
 
4EvaluationtimingisfromNEI13 02tosupportradiologicalevaluations.}}

Revision as of 02:08, 5 April 2019