IR 05000250/2016501: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000250/2016001]]
| number = ML17030A156
| issue date = 01/24/2017
| title = Turkey Point Nuclear Generating Station - U.S. Nuclear Regulatory Commission Emergency Preparedness Annual Inspection Report 05000250/2016501 and 05000251/2016501
| author name = Bonser B R, Loo W T
| author affiliation = NRC/RGN-II/DRS/PSB1
| addressee name = Nazar M
| addressee affiliation = Florida Power & Light Co
| docket = 05000250, 05000251
| license number = DPR-031, DPR-041
| contact person =
| document report number = IR 2016501
| document type = Letter
| page count = 3
}}
 
{{IR-Nav| site = 05000250 | year = 2016 | report number = 501 }}
 
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 24, 2017 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division
 
Florida Power & Light Company Mail Stop NT3/JW 15430 Endeavor Drive Jupiter, FL 33478
 
SUBJECT: TURKEY POINT NUCLEAR GENERATING STATION - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000250/2016501 AND 05000251/2016501
 
==Dear Mr. Nazar:==
On December 31, 2016, the U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Turkey Point Nuclear Generating Station. This inspection began on January 1, 2016. Issuance of this letter closes Inspection Report Number 2016501. Inspection activities charged to these reports include conducting midcycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, in some cases, performing traditional enforcement activities. Any observations and findings in these areas were provided to you via separate correspondence.
 
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC "Agency Rules of Practice and Procedure," a copy of this letter, and your response if any, will be
 
available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,/RA: Wade T. Loo for/
 
Brian R. Bonser, Chief
 
Plant Support Branch 1
 
Division of Reactor Safety Docket No. 50-250 and 50-251 License No. DPR-31and DPR-41
 
cc: Distribution via Listserv
 
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB1 RII:DRP/BR3 RII:DRS/PSB1 SIGNATURE CAF2 LJB4 WTL FOR BRB1 NAME S. Sanchez L. Suggs B. Bonser DATE 1/23/2017 1/23/2017 1/24/2017 E-MAIL COPY YES NO YES NO YES NO Letter to Mr. Mano Nazar from Mr. Brian R. Bonser dated January 24, 2017
 
SUBJECT: TURKEY POINT NUCLEAR GENERATING STATION - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000250/2016501 AND 05000251/2016501 DISTRIBUTION:
L. Suggs, RII, DRP L. Pressley, RII, SR PE A. Beasten, RII, RIDP R. Reyes, RII, SRI D. Orr, RII, RI
 
S. Price, RII, ORA/RC K. Sloan, RII, EICS RIDSNRRDIRS PUBLIC
}}

Revision as of 06:06, 5 February 2019