| number = ML103190621 | | number = ML103190621 | ||
| issue date = 10/29/2010 | | issue date = 10/29/2010 | ||
| title = | | title = Amendment 101 to Final Safety Analysis Report (Fsar), Figure 2.5-595, Underground Barrier Trench a STA 3 + 78 | ||
| author name = | | author name = | ||
| author affiliation = Tennessee Valley Authority | | author affiliation = Tennessee Valley Authority |
Revision as of 11:02, 30 January 2019
ML103190621 | |
Person / Time | |
---|---|
Site: | Watts Bar |
Issue date: | 10/29/2010 |
From: | Tennessee Valley Authority |
To: | Office of Nuclear Reactor Regulation |
References | |
Download: ML103190621 (1) | |
Similar Documents at Watts Bar | |
---|---|
Category:Final Safety Analysis Report (FSAR)
MONTHYEARWBL-23-053, Updated Final Safety Analysis Report (UFSAR) Amendment 5, Redacted Version2023-11-0808 November 2023
[Table view]Updated Final Safety Analysis Report (UFSAR) Amendment 5, Redacted Version ML23312A1462023-11-0808 November 2023 Updated Final Safety Analysis Report (UFSAR) Amendment 5 - Table of Contents ML20323A3182020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Table of Contents WBL-20-047, Amendment 3 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (Redacted)2020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (Redacted) ML20323A3082020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML20323A3142020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Table of Contents to Sec 3.7 ML20323A3192020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML20323A3172020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Division of Responsibility (Dor), Abbreviations ML20323A3112020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML20323A3222020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML21123A2262020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Sections 3.8 to 3.12 (Redacted) ML20323A3152020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML20323A3032020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary System ML20323A3052020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 10, Main Steam and Power Conversion Systems ML20323A3002020-10-29029 October 2020 Submittal of Amendment 3 to Updated Final Safety Analysis Report ML20323A3202020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System ML21123A2252020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Table of Contents to Sec 2.4 (Redacted) ML20323A3012020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML20323A3092020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML20323A3162020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML20323A3102020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 2, Sec 2.5, Geology, Seismology, and Geotechnical Engineering Summary of Foundation Conditions ML20323A3062020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML20323A3122020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML20142A3892020-05-21021 May 2020 Wbnp PSAR, Chapter 12, Conduct of Operations L-19-022, Amendment 2 to Updated Final Safety Analysis Report, Chapter 8, Electric Power - Redacted2019-03-18018 March 2019 Amendment 2 to Updated Final Safety Analysis Report, Chapter 8, Electric Power - Redacted ML19060A1472019-02-19019 February 2019 Amendment 1 to USAR Chapter 2 Auxiliary System NRC Additional Redactions 2 of 5 ML19060A1762019-02-18018 February 2019 Amendment 1 to USAR Chapter 2 Auxiliary System NRC Additional Redactions 3 of 5 ML19060A1822019-02-18018 February 2019 Amendment 1 to USAR Chapter 2 Auxiliary System NRC Additional Redactions 5 of 5 ML19039A1042019-02-0808 February 2019 Amendment 1 to USAR Chapter 2 Auxiliary System NRC Additional Redactions 1 of 5 ML19060A1492019-02-0808 February 2019 Amendment 1 to USAR Chapter 2 Auxiliary System NRC Additional Redactions 4 of 5 ML17334A1602017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations ML17334A1732017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 8, Electric Power (Redacted) ML17334A1622017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 14, Initial Test Program ML17334A1692017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 4, Reactor ML17334A1562017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (Redacted) ML17334A1722017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls ML17334A1582017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management ML17334A1592017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 12, Radiation Protection (Redacted) ML17334A1652017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 17, Quality Assurance ML17334A1702017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System ML17334A1632017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 15, Accident Analyses ML17334A1572017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 10, Main Steam and Power Conversion Systems ML17334A1642017-11-0202 November 2017 Amendment 1 to Updated Safety Analysis Report, Chapter 16, Technical Specifications ML15279A3042015-09-11011 September 2015 Amendment 114 to Final Safety Analysis Report, Section 2.0 - Site Characteristics, Figure 2.5-554. Sheet 1 of 2 ML15279A3072015-09-11011 September 2015 Amendment 114 to Final Safety Analysis Report, Section 2.0 - Site Characteristics, Figure 2.5-556 ML15279A3182015-09-11011 September 2015 Amendment 114 to Final Safety Analysis Report, Section 2.0 - Site Characteristics, Figure 2.5-579 ML15279A3192015-09-11011 September 2015 Amendment 114 to Final Safety Analysis Report, Section 2.0 - Site Characteristics, Figure 2.5-583 ML15279A3082015-09-11011 September 2015 Amendment 114 to Final Safety Analysis Report, Section 2.0 - Site Characteristics, Figure 2.5-571. Sheet 1 of 4 ML15279A3052015-09-11011 September 2015 Amendment 114 to Final Safety Analysis Report, Section 2.0 - Site Characteristics, Figure 2.5-554. Sheet 2 of 2 ML15279A3252015-09-11011 September 2015 Amendment 114 to Final Safety Analysis Report, Section 2.0 - Site Characteristics, Figure 2.5-597 2023-11-08 Category:Drawing MONTHYEARWBL-22-034, Update to Fire Protection Report Figures Redacted2022-08-0101 August 2022
[Table view]Update to Fire Protection Report Figures Redacted CNL-20-058, Tennessee Valley Authority, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Function 6.e of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation (WBN-TS-19-27)2020-08-27027 August 2020 Tennessee Valley Authority, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Function 6.e of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation (WBN-TS-19-27) ML16293A5682016-10-0505 October 2016 Report No. R-P2473, Wall Thickness Profile Sheet. (Sketch) ML16293A5612016-10-0505 October 2016 Report No. R-P2441, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P3450, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P3450, Wall Thickness Profile Sheet. (Sketch) CNL-16-135, Report No. R-P3450, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P3450, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2479, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2479, Wall Thickness Profile Sheet. (Sketch) ML16293A5742016-10-0505 October 2016 Report No. R-P2479, Wall Thickness Profile Sheet. (Sketch) ML16293A5732016-10-0505 October 2016 Report No. R-P2477, Wall Thickness Profile Sheet. (Sketch) ML16293A5722016-10-0505 October 2016 Report No. R-P2476, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2476, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2476, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2477, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2477, Wall Thickness Profile Sheet. (Sketch) ML16293A5692016-10-0505 October 2016 Report No. R-P2474, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2474, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2474, Wall Thickness Profile Sheet. (Sketch) ML16293A5712016-10-0505 October 2016 Report No. R-P2475, Wall Thickness Profile Sheet. (Sketch) ML16293A5602016-10-0505 October 2016 Report No. R-P2440, Wall Thickness Profile Sheet. (Sketch) ML16293A5672016-10-0505 October 2016 Report No. R-P2472, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2472, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2472, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2473, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2473, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2475, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2475, Wall Thickness Profile Sheet. (Sketch) ML16293A5652016-10-0505 October 2016 Report No. R-P2455, Wall Thickness Profile Sheet. (Sketch) ML16293A5642016-10-0505 October 2016 Report No. R-P2444, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2444, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2444, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2455, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2455, Wall Thickness Profile Sheet. (Sketch) ML16293A5632016-10-0505 October 2016 Report No. R-P2443, Wall Thickness Profile Sheet. (Sketch) ML16293A5622016-10-0505 October 2016 Report No. R-P2442, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2442, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2442, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2443, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2443, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2440, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2440, Wall Thickness Profile Sheet. (Sketch) ML16293A5552016-10-0505 October 2016 Report No. R-P2373, Wall Thickness Profile Sheet. (Sketch) ML16293A5512016-10-0505 October 2016 Report No. R-P2183, Wall Thickness Profile Sheet. (Sketch) ML16293A5542016-10-0505 October 2016 Report No. R-P2265, Wall Thickness Profile Sheet. (Sketch) ML16293A5572016-10-0505 October 2016 Report No. R-P2437, Wall Thickness Profile Sheet. (Sketch) ML16293A5482016-10-0505 October 2016 Report No. R-P2147, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2148, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2148, Wall Thickness Profile Sheet. (Sketch) ML16293A5582016-10-0505 October 2016 Report No. R-P2438, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2184, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2184, Wall Thickness Profile Sheet. (Sketch) ML16293A5532016-10-0505 October 2016 Report No. R-P2185, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2438, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2438, Wall Thickness Profile Sheet. (Sketch) ML16293A5502016-10-0505 October 2016 Report No. R-P2182, Wall Thickness Profile Sheet. (Sketch) ML16293A5472016-10-0505 October 2016 Report No. R-P2146, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2146, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2146, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2182, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2182, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2439, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2439, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2373, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2373, Wall Thickness Profile Sheet. (Sketch) ML16293A5592016-10-0505 October 2016 Report No. R-P2439, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2185, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2185, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2183, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2183, Wall Thickness Profile Sheet. (Sketch) ML16293A5522016-10-0505 October 2016 Report No. R-P2184, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2265, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2265, Wall Thickness Profile Sheet. (Sketch) 2022-08-01 |
Text
A OFMS,~ msr I95, TEST NYMm flO/.S%I XMAXtMUM DRY DENSlW ASrM .5? WSTULATm F4IIUREPIINF AT INmFdCE BEWEEN 7IPE A 6ARWFILL 19SXIVAXIUUM ORY DCM.Vi7YjAND TIPEII FIIII7*NLL 000% MAXIMUM D8IDENPI7Ij L P~S~ULATED FA,LUflF PLANE -
- ASSVMED ,,,7NIFICE ADDED BY AHENDME