GNRO-2015/00023, Grand Gulf, Unit 1, Response to Request for Additional Information Response on Safety Limit Minimum Critical Power Ratio Technical Specification 2.1.1.2 Revision: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[GNRO-2015/00023, Response to Request for Additional Information Response on Safety Limit Minimum Critical Power Ratio Technical Specification 2.1.1.2 Revision]]
| number = ML15104A784
| issue date = 04/14/2015
| title = Grand Gulf, Unit 1, Response to Request for Additional Information Response on Safety Limit Minimum Critical Power Ratio Technical Specification 2.1.1.2 Revision
| author name = Coutu T
| author affiliation = Entergy Operations, Inc
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000416
| license number = NPF-029
| contact person =
| case reference number = GNRO-2015/00023
| package number = ML15105A164
| document type = Letter type:GNRO
| page count = 3
}}
 
=Text=
{{#Wiki_filter:The Attachment Contains Proprietary Information GNRO-2015/00023April14,2015 u.s.Nuclear Regulatory Commission Attn: DocumentControlDeskWashington,DC20555-0001 Entergy Operations, Inc.P.O.Box756PortGibson,MS39150 Tom CoutuDirector,Regulatory
&Performance ImprovementGrandGulfNuclearStationTel.(601)437-7511
 
==SUBJECT:==
SafetyLimitMinimumCriticalPowerRatioTechnical Specification 2.1.1.2Revision,Requestfor Additional Information Response Grand Gulf NuclearStation,Unit1DocketNo.50-416LicenseNo.NPF-29
 
==REFERENCES:==
1.GrandGulf NuclearStationLicense AmendmentRequest,MaximumExtendedLoadLineLimit Analysis Plus (MELLLA+)License AmendmentRequest,dated September25,2013 2013/00012, NRC ADAMS Accession No.ML3269A 140)2.GE Nuclear Energy,"ApplicabilityofGEMethodstoExpanded Operating Domains," NEDC-33173P,Revision4, November 20123.GE NuclearEnergy,"LicensingTopicalReport-GEBWRMaximumExtendedLoadLineLimit Analysis Plus," NEDC-33006P,Revision3,June2009 4.NEDE-24011-P-A,"GeneralElectricStandard ApplicationforReactor Fuel (GESTAR-II)5.GE NuclearEnergy,"Safety AnalysisReportforGGNSMaximumExtendedLoadLineLimit Analysis Plus," NEDC-33612P,Revision0, September 20136.GrandGulf NuclearStationLicense AmendmentRequesttoRevise Technical Specification2.1.1.2,dated November 21,20142014/00068) 7.KGO-ENO-JB1-15-046, GNF-A SupplementalSafetyLimit InformationforGrand GulfCycle20MELLLA+(GNF002N5693Rev0,March2015)8.GNF2 Advantage Generic Compliance with NEDE-24011-P-A (GESTAR II), NEDC-33270P,Rev.5,May20139.GNF AdditionalInformationRegardingtheRequestedChangestothe Technical Specification SLMCPR, GNF-0000-0155-6546-RO-P, August16,2013 10.General Electric Standard Application for Reactor Fuel, P-A-20, December2013;andtheU.S.Supplement, A-20-US, December 2013 GNRO-2015/00023Page2of3
 
==DearSirorMadam:==
Inthe attachment, Entergy Operations, Inc.(Entergy)provides responsestothe Request for Additional Information(RAI)datedMarch12,2015.TheLicense Amendment Request (LAR)submitted November 21,2014 in letter GNRO-2014/00068 proposesarevisiontotheSafetyLimitMinimumCritical Power Ratio (SLMCPR)values for operation in accordancewiththe requirementssetforthin References1,2and3.Global NuclearFuels-Americas (GNF-A)considers the informationprovidedinthe Attachmenttobe proprietary and therefore exemptfrompublic disclosure pursuantto10CFR2.390.The proprietary information was provided to Entergyina GNF-A transmittal.
Therefore, on behalf of GNF-A, Entergy requests to withhold the Attachmentfrompublic disclosure in accordance with10CFR 2.390(b)(1).TheRAI responsesdonotincludenew commitments.Ifyouhaveany questionsorrequire additional information, please contact JamesNadeauat 601-437-2103.
I declare under penaltyofperjurythatthe foregoingistrueandcorrect.
ExecutedonApril14, 2015.Sincerely, TCtras
 
==Attachment:==
 
RAI ResponsestoSafetyLimit Minimum Critical Power Ratio SLMCPR TSRevisionLARcc:(seenextpage)
GNRO-2015/00023Page3of3cc:Mr.MarcDapas Regional Administrator,RegionIVU.S.Nuclear Regulatory Commission612EastLamarBlvd.,Suite400Arlington,TX 76011-4125U.S.Nuclear Regulatory CommissionATTN:Mr.A.Wang, NRR/DORLMailStop OWFN/8 G1411555RockvillePikeRockville,MD 20852-2378StateHealth Officer Mississippi DepartmentofHealthP.O.Box1700Jackson,MS 39215-1700NRCSeniorResident InspectorGrandGulf Nuclear StationPortGibson,MS39150}}

Latest revision as of 00:04, 29 January 2019