L-16-044, Davis-Besse, Unit 1 - ES-301-5: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
#REDIRECT [[L-16-044, ES-301-5]]
| number = ML16217A375
| issue date = 08/02/2016
| title = Davis-Besse, Unit 1 - ES-301-5
| author name =
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name =
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000346
| license number =
| contact person =
| case reference number = L-16-044
| package number = ML15274A353
| document type = License-Operator, Part 55 Examination Related Material
| page count = 3
}}
 
=Text=
{{#Wiki_filter:Facility Davis-Besse  Date of Exam 6/13/1 6 thru 6/2 0/1 6    Operating Test No DB NRC 201 6 A P P L I C A N T E V E N T  T Y P E Scenarios 1 2 3  4 Back-up  T O T A L    M      I    N      I    M    U    M(*)  CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O  A T C  B O P  S R O  A T C  B O P  S R O  A T C  B O P  S R O  A T C  B O P R I U  M A S T E R RX 1 1  4 4  2 2  5 5  1 1 0 NOR    5  5        1 1 1 I/C 2,3,4,6,7,9 3 ,7,9 2,4,6 1,2,3, 7 1,2 1,3 ,7 1,2,3,4,5,6 1,3,5 1,2,4, 6 1,2,3,4,7 2,4 1,3,7  4 4 2 MAJ 8 8 8 6 6 6 7 7 7 6 6 6  2 2 1 TS 2,5  1,4  1,4  2,5    0 2 2  SROI- 1  RX 1    4        2 1 1 0 NOR            0 1 1 1 I/C 2,3,4,6,7,9    1,2    1,2,4, 6    1 2 4 4 2 MAJ 8    6    7    3 2 2 1 TS 2,5            2 0 2 2  SROI- 2  RX  1    2      2 1 1 0 NOR      5      1 1 1 1 I/C  3,7,9    1,3 ,7 1,2,3,4,5,6      1 2 4 4 2 MAJ  8    6 7      3 2 2 1 TS      1,4      2 0 2 2  SROI -3  RX    4    2    2 1 1 0 NOR    5        1 1 1 1 I/C  2,4,6 1,2,3, 7    1,3,5    10 4 4 2 MAJ  8 6    7    3 2 2 1 TS    1,4        2 0 2 2 Instructions:
: 1. Check the applicant level and enter the operating test number and Form ES
-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at
-the-controls" (ATC) and "balance
-of-plant" (BOP) positions; Instant SROs (SRO
-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO
-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one
-for-one basis.
: 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right
-hand columns.
: 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO
-I applicants in either the ATC or BOP position to best evaluate the SRO
-I in manipulating plant controls.
 
Facility      Date of Exam Operating Test No A P P L I C A N T E V E N T  T Y P
E Scenarios 1 2 3  4 Back-up  T O T A L    M      I    N      I    M    U    M(*)  CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O  A T C  B O P  S R O  A T C  B O P  S R O  A T C  B O P  S R O  A T C  B O P R I U  S RO I -4  RX 1  4    2    3 1 1 0 NOR    5        1 1 1 1 I/C 2,3,4,6,7,9  1,2,3, 7    1,3,5    13 4 4 2 MAJ 8  6    7    3 2 2 1 TS 2,5  1,4        4 0 2 2  SROI-5  RX  1    2      2 1 1 0 NOR      5      1 1 1 1 I/C  3,7,9    1,3,7 1,2,3,4,5,6      12 4 4 2 MAJ  8    6 7      3 2 2 1 TS      1,4      2 0 2 2  SROU -1  RX 1  4        2 1 1 0 NOR    5        1 1 1 1 I/C 2,3,4,6,7,9  1,2,3, 7        10 4 4 2 MAJ 8  6        2 2 2 1 TS 2,5  1,4        4 0 2 2 Instructions:
: 1. Check the applicant level and enter the operating test number and Form ES
-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at
-the-controls (ATC)"  and "balance
-of-plant (BOP)" positions;  Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1
-for-1 basis. 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right hand columns.
: 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO
-I applicants in either the ATC or BOP position to best evaluate the SRO
-I in manipulating plant controls.
 
Facility      Date of Exam Operating Test No A P P L I C A N T E V E N T  T Y P
E Scenarios 1 2 3  4 Back-up  T O T A L    M      I    N      I    M    U    M(*)  CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O  A T C  B O P  S R O  A T C  B O P  S R O  A T C  B O P  S R O  A T C  B O P R I U  RO- 1  RX    4        1 1 1 0 NOR            0 1 1 1 I/C  2,4,6  1,2    1,2,4, 6    9 4 4 2 MAJ  8  6    7    3 2 2 1 TS            0 0 2 2  RO -2  RX  1          1 1 1 0 NO R      5      1 1 1 1 I/C  3,7,9    1,3,7      6 4 4 2 MAJ  8    6      2 2 2 1 TS            0 0 2 2  RO -3  RX    4        1 1 1 0 NOR            0 1 1 1 I/C  2,4,6  1,2        5 4 4 2 MAJ  8  6        2 2 2 1 TS            0 0 2 2  SUR  RX              1 1 0 NOR              1 1 1 I/C              4 4 2 MAJ              2 2 1 TS              0 2 2 Instructions:
: 1. Check the applicant level and enter the operating test number and Form ES
-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at
-the-controls" (ATC) and "balance
-of-plant" (BOP) positions; Instant SROs (SRO
-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO
-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one
-for-one basis. 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right
-hand columns.
: 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO
-I applicants in either the ATC or BOP position to best evaluate the SRO
-I in manipulating plant controls.}}

Revision as of 08:59, 28 January 2019

Redirect to: