NL-15-261, Browns Ferry, Units 1, 2, and 3 - Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[CNL-15-261, Browns Ferry, Units 1, 2, and 3 - Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information]]
| number = ML15355A413
| issue date = 12/18/2015
| title = Browns Ferry, Units 1, 2, and 3 - Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information
| author name = Shea J W
| author affiliation = Tennessee Valley Authority
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000259, 05000260, 05000296
| license number = DPR-033, DPR-052, DPR-068
| contact person =
| case reference number = CNL-15-261
| package number = ML15355A412
| document type = Letter
| page count = 4
}}
 
=Text=
{{#Wiki_filter:ENCLOSURE 1 Interconnection System Impact Study: Browns Ferry Nuclear Plant Extended Power Uprate (Critical Energy Infrastructure Information)
Withhold from Public Disclosure Under 10 CFR 2.390
 
ENCLOSURE 1 Interconnection System Impact Study: Browns Ferry Nuclear Plant Extended Power Uprate (Critical Energy Infrastructure Information)
Withhold from Public Disclosure Under 10 CFR 2.390}}

Latest revision as of 13:41, 21 January 2019